WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

122 DECEMBER 2014

Groundwater Modelling Application for Waterworks

Tapesh Ajmera (TKAJ),Hydrogeologist Specialist

COWI India Pvt Ltd/COWI Denmarkhttp://www.cowiportal.com/Pages/home.aspx

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

2

Outline

22 DECEMBER 2014

› COWI Services

› Overview of project

› Case study: Farup

3

COWI Services-Hydrogeology

22 DECEMBER 2014WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

Groundwater modelling

Groundwater control system design

Site Investigation and characterization

Pumping / Slug Test

Multi-phase and multi-component numerical modelling in porous and fracture-

porous media

Surface and subsurface flow and solute transport modelling

Soil and groundwater remediation of contaminated sites

Rainfall-runoff modelling, and stage-discharge modelling

Statistical for hydrology and environmental data analysis

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

4

Groundwater Modelling for Waterworks

Kortlægning uden for OSD – Midtjylland, Denmark

22 DECEMBER 2014

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

5 22 DECEMBER 2014

Study Area: Waterworks area

Farup

Helgenaes

OvergaardGods

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

622 DECEMBER 2014

Primary objective of project

› Develop a site-specific groundwater model based hydrogeological and hydrological inputs.

› Calibrate of groundwater model using PEST.

› Determine capture zone for each waterworks.

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

722 DECEMBER 2014

Step for Model development

Collection of hydrological and hydrogeological

input

Prepared input file for model

Develop conceptual model

Model calibration based head observed, recharge, and

abstraction wells

Model for prediction (optimal hydraulic

conductivity) Import Qpermit as guidelines

Results: head distribution and capture zone of

waterworks

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

822 DECEMBER 2014

Case Study: Farup

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

922 DECEMBER 2014

Study Area: Farup

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1022 DECEMBER 2014

Model Features› Model domain area: 122.17 km²

› Grid size: 100*100 m2

› Three-dimensional groundwater flow model developed in MODFLOW (GMS version 9.2).

› Model geology has been construct based regional Denmark groundwater model.

› Model consist of five hydro-stratigraphic layers and eight computational layers with specified hydraulic conductivity and porosity.

› Top and bottom elevation of each layer has been implemented based on field observed data.

› Total five pumping wells has implemented with specified well information. However, capture zone analysis has executed for one waterworks, which include only two abstraction wells such as well no. 58.367 and 58.399.

› The fixed head along the entire boundary in the limestone based on the filed observed data and no-flow boundaries in the other layers have implemented.

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1122 DECEMBER 2014

Hydraulic Parameters for Groundwater Model

Layer Name Layer description Hydraulic conductivity (m/s)

Porosity (%)

Sand1(S1) Quaternary Sand 2 1e-5 30

Clay1(C1) Quaternary Clay separating QS2 and QS3

1e-7 25

Sand2(S2) Local Sand on top of QS4 1e-5 30

Clay(C2) Pre-quaternary clay 1e-8 25

Limestone (LS) Water-bearing part of the limestone

2e-4 20

Note: Vertical anisotropy ratio equal to 10 for all geological layer

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1222 DECEMBER 2014

No. Well I.D X Y Z DVR90 Flow rate

(m³/d)

Top of ScreenDVR90

Bottom of

ScreenDVR90

1 58.367 552628 6266998 39.25 -284.93 -26.75 -31.75

2 58.399 552738 6267234 45.97 -284.93 -21.04 -38.04

3 58.279 553861 6266721 14.9 -460.27 14.7 -54.11

4 58.387 557555 6267519 51.61 -832.88 15.0 -26.43

5 58.403 561435 6270884 49.96 -191.78 -1.5 -30.0

Pumping Wells Information

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1322 DECEMBER 2014

Recharge and Ground Topography variable recharge rate over the top surface

recharge rate varies from 221 mm/y to 430 mm/y

ground topography as DEM

Note: unit: m/d

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1422 DECEMBER 2014

Geology

A A'

B'

B

Section A-A'

Section B-B'

Z magnification = 50

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1522 DECEMBER 2014

PEST: Calibration

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1622 DECEMBER 2014

Simulated Head

Layer-1 Layer-2

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1722 DECEMBER 2014

Simulated Head

Layer-3 Layer-4

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

1822 DECEMBER 2014

Simulated Head

Layer-5 Layer-6

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

19 22 DECEMBER 2014

Simulated Head

Layer-7 Layer-8

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

20 22 DECEMBER 2014

Capture Zone

› Model: MODPATH

› One waterworks (2 wells)

› backwards tracking of particles

› no. of particle:10*10*10

› Within cell

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

21

Team

22 DECEMBER 2014

Hydrogeologist/Groundwater modeller SpecialistGroundwater and Geoscience Department,COWI India/COWI DenmarkEmail:[email protected] Ph.:+91-8826074442

Hydrogeologist/Groundwater modeller SpecialistGroundwater and Geoscience Department,COWI DenmarkEmail:[email protected]

Project Director & HOSGroundwater and Geoscience Department,COWI DenmarkEmail:[email protected]

Project Director,Groundwater and Geoscience Department,COWI DenmarkEmail:[email protected]

WATER RESOURCES MANAGEMENT AND CLIMATE CHANGE IMPACTS ASSESSMENT

22

Thank you for your attention!

22 DECEMBER 2014


Recommended