Group 2 - Project Update April 1, 2004 Tyler Helble
Transcript
Page 1: Group 2 - Project Update April 1, 2004 Tyler Helble.

Group 2 - Project UpdateApril 1, 2004

Tyler Helble

Page 2: Group 2 - Project Update April 1, 2004 Tyler Helble.

Progress Report

Finalized TX/RX Board Design Ordered TX/RX Boards from Express PCB Ordered Passives, VCSEL, and PD Soldered components Tested TX/RX Aggressive and Non-

Aggressive Revised Gantt Chart Published Midterm Report

Page 3: Group 2 - Project Update April 1, 2004 Tyler Helble.

TX/RX Board Design

Page 4: Group 2 - Project Update April 1, 2004 Tyler Helble.

Aggressive DesignStandard Design

Page 5: Group 2 - Project Update April 1, 2004 Tyler Helble.

PCB Board – Solder Side

Page 6: Group 2 - Project Update April 1, 2004 Tyler Helble.

PCB Board – Ground Plane

Page 7: Group 2 - Project Update April 1, 2004 Tyler Helble.

PCB Board – VCSEL, PD, Passives

PD Hamamatsu S5973VCSEL Lasermate

Hamamatsu S5973

Page 8: Group 2 - Project Update April 1, 2004 Tyler Helble.

PCB Board – Soldered Components

PD

VCSEL

Page 9: Group 2 - Project Update April 1, 2004 Tyler Helble.

TX/RX Test Results

Initial Tests Revealed no power to TX chips. Board was getting hot.

Found solder link between power and ground, etched it out.

Retested and obtained decent eye results using the probe. (VCSEL not attached yet)

Page 10: Group 2 - Project Update April 1, 2004 Tyler Helble.

TX/RX Test Results – using probe

Page 11: Group 2 - Project Update April 1, 2004 Tyler Helble.

TX/RX Test Results

Received visible eye on Agilent osciliscope.

Page 12: Group 2 - Project Update April 1, 2004 Tyler Helble.

TX/RX Test Results

RX board powered up, chips receiving power Aligned fiber using XYZ stage in lab No signal from the SMA connector Tried to detect signal with probe, no luck

Page 13: Group 2 - Project Update April 1, 2004 Tyler Helble.

TX/RX Test Results

Using the XYZStage to align The fiber and PD

Page 14: Group 2 - Project Update April 1, 2004 Tyler Helble.

Future Plans

Solder VCSEL and test today Test PD separately to double check pins/light

detection Pray

Page 15: Group 2 - Project Update April 1, 2004 Tyler Helble.

Jan F e b M arch Ap ril

Pro je ct Ste p s: 1 -10 11 -2 0 21 -3 1 1 -10 11 -2 0 21 -2 9 1 -10 11 -2 0 21 -3 1 1 -10 11 -2 0 21 -3 0

ba ckg roun d resea rch (Jan 8 - Ap r 13 )

test eva l boa rd (F eb 5 - F eb 11 )

O p tica l lin k b udge t (F eb 10 - F e b 19 )

C hoo se pa rts (F eb 1 1 - F e b 19 )

O rde r VC SEL /PD 's (F e b 19 -F eb 2 5 )

Bu ild test boa rd (F eb 1 3 - F e b 20 )

D esign Sche ma tic (F eb 1 5 - F eb 22 )

Boa rd des ig n (F eb 19 - Ma rch 2 )

D esign rev iew (F eb 26 - Ma rch 4 )

O rde r PC B's (Ma rch 5 - Ma rch 14 )

Sp r ing Bre ak (Ma rch 5 - Ma rch 1 4 )

C onstruct Boa rd (Ma rch 14 - Ma rch 21 )

Tes t ing/Troubles hoot ing (M arc h 21 - M arc h 28)

D esign Mo d ifica tions (Ap r il 1 - Ap r il 7 )

Bu ild second boa rd (Ap r il 7 - Ap r il 1 3 )

F in a l re po rt (Ap r il1 3 - Ap r il 21 )

T est (F eb 5 )

Mid te rm R ep o rt (Ma rch 19 )

F in a l R e po rt (Ap r il 2 1 )

Group 2 Gantt Chart - 1 Gbps Optical Ethernet

Pro jected T imeC omp le tedO ve rd ue

Even t


Recommended