FEATURE ARTICLE DEEP FOUNDATIONS • JAN/FEB 2019 • 63 AUTHORS Ed O’Malley, P.E., GeoStructures, Inc., and Mike Pockoski, P.E., Geopier Foundation Company Grouted Rigid Inclusions Support Sports Complex This 161,000 sq ft (14,955 sq m), sports complex and youth training center is located at 401 Garasches Lane on what was once an industrialized area in South Wilmington, Del. The facility, called the “76ers Fieldhouse,” is the first of its kind in the tri-state area. It includes a main basketball arena, which will seat 2,500 spectators and will be the home of the Delaware Blue Coats, an NBA G-league team. The complex also features two full- sized artificial turf soccer fields — one indoor and one outdoor — and two additional full-sized basketball courts. In addition to the sports-specific amenities, the complex also includes the Nemours sports medicine clinic, Titus Sports Academy performance training center, retail space and office space. Rossetti Architects designed this arena with long roof spans, providing clearance for the Working with the design team, Desai/Nasr Structural Engineers (DNSE) and GTA Geotechnical Engineers (GTA), GeoStructures (GSI) was able to provide a fast-track design-build foundation solution for a site with very soft organic soils and large aerial loads due to grade raised fill. The ® use of Geopier rigid inclusions provided settlement control for the new sports com- plex. The displacement installation method allowed the in-place environmentally impacted soils to remain undisturbed while allowing for the design and construction of conventional shallow foundations with a slab- on-grade in lieu of piles and a structural slab. Structural and Loading Details Column loads in the one- and two- story retail, concession, locker rooms and office areas were less than 200 kips (890 kN). While floor slab loads are generally between 150 and 200 psf (7.2 and 9.6 kPa), the levelness of the floor slabs, which would support basketball courts and artificial-turf soccer fields, was very important. Therefore, delivering uniform settlement control was a critical element in making sure the slabs would perform well. indoor soccer field and unobstructed viewing in the basketball arena. To achieve the required spans, the construction consists of steel girders with insulated roof panels. Column loads for the long span roof structure were on the order of 200 to 300 kips (890 to 1,335 kN).
Transcript
Page 1: Grouted Rigid Inclusions Support Sports Complexsentezinsaat.com.tr/pdf/DFI Magazine -Page_63-66.pdfFEATURE ARTICLE DEEP FOUNDATIONS • JAN/FEB 2019 • 63 AUTHORS Ed O’Malley, P.E.,

FEATURE ARTICLE

DEEP FOUNDATIONS • JAN/FEB 2019 • 63

AUTHORS Ed O’Malley, P.E., GeoStructures, Inc., and Mike Pockoski, P.E., Geopier Foundation Company

Grouted Rigid Inclusions Support Sports Complex

This 161,000 sq ft (14,955 sq m), sports

complex and youth training center is

located at 401 Garasches Lane on what was

once an industrialized area in South

Wilmington, Del. The facility, called the

“76ers Fieldhouse,” is the first of its kind in

the tri-state area. It includes a main

basketball arena, which will seat 2,500

spectators and will be the home of the

Delaware Blue Coats, an NBA G-league

team. The complex also features two full-

sized artificial turf soccer fields — one

indoor and one outdoor — and two

additional full-sized basketball courts. In

addition to the sports-specific amenities,

the complex also includes the Nemours

sports medicine clinic, Titus Sports

Academy performance training center,

retail space and office space.

Rossetti Architects designed this arena with

long roof spans, providing clearance for the

Working with the design team,

Desai/Nasr Structural Engineers (DNSE)

and GTA Geotechnical Engineers (GTA),

GeoStructures (GSI) was able to provide a

fast-track design-build foundation solution

for a site with very soft organic soils and

large aerial loads due to grade raised fill. The ®use of Geopier rigid inclusions provided

settlement control for the new sports com-

plex. The displacement installation method

allowed the in-place environmentally

impacted soils to remain undisturbed while

allowing for the design and construction of

conventional shallow foundations with a slab-

on-grade in lieu of piles and a structural slab.

Structural and Loading Details

Column loads in the one- and two-

story retail, concession, locker rooms and

office areas were less than 200 kips (890 kN).

While floor slab loads are generally

between 150 and 200 psf (7.2 and 9.6 kPa),

the levelness of the floor slabs, which

would support basketball courts and

artificial-turf soccer fields, was very

important. Therefore, delivering uniform

settlement control was a critical element in

making sure the slabs would perform well.

indoor soccer field and unobstructed

viewing in the basketball arena. To achieve

the required spans, the construction

consists of steel girders with insulated roof

panels. Column loads for the long span

roof structure were on the order of 200 to

300 kips (890 to 1,335 kN).

Page 2: Grouted Rigid Inclusions Support Sports Complexsentezinsaat.com.tr/pdf/DFI Magazine -Page_63-66.pdfFEATURE ARTICLE DEEP FOUNDATIONS • JAN/FEB 2019 • 63 AUTHORS Ed O’Malley, P.E.,

support mechanism provided by the

ground improvement system, which

facilitated optimizing the pier layout and

thickness of the slab.

During final design, uplift loading was

identified. Moderate uplift loads can be

controlled on rigid inclusion projects by

either increasing the footing dimensions to

counteract the uplift loading or by adding

uplift rods within the rigid inclusions that

are then cast into the footings. Working

with the structural engineer, both tech-

niques were used to simplify the design

and decrease the construction costs.

ConstructionA total of 1,500 rigid inclusion elements

with a nominal diameter of 20 in (508 mm)

were installed to depths of about 35 ft

(10.7 m) to support the grade-raise fill and

new structure and to resist the uplift

loading. The rigid inclusions consist of

cement grout and AASHTO #57 stone,

which is a clean, open-graded blend with a

maximum aggregate size of 1.5 in (38 mm).

A Geopier rigid inclusion is constructed

from the bottom up by inserting into the

ground to the required depth a hollow

mandrel charged with a cement grout

/stone mix. Depending on the soil

conditions, the mandrel is raised upward a

maximum of about 4 ft (1.2 m) to allow the

stone/grout mixture to fill the void space

left by the mandrel. Then, the mandrel is

pushed back downward about 2 ft (0.6 m)

to compact the 4 ft (1.2 m) height of stone

into a 2 ft (0.6 m) height of compacted lift.

The pile driving machine that installs the

64 • DEEP FOUNDATIONS • JAN/FEB 2019 DEEP FOUNDATIONS • JAN/FEB 2019 • 65

During the geotechnical exploration, GTA

identified several unique soil conditions

that would affect the project delivery. The

geotechnical investigation revealed that

soil conditions consisted of 4 to 19 ft (1.2 to

5.8 m) of loose, poorly graded, silty sand,

sandy silt and lean clay fill, which

contained varying amounts of concrete

rubble, bricks, glass, wood and slag.

Underlying the fill was a 5 to 15 ft (1.5 to

4.6 m) layer of very soft-to-soft organic silt

and elastic silt with SPT N-values ranging

from weight of hammer (WHO) to

4 blows/ft (blows/0.3 m). Below this soft

layer was an 8 to 15 ft (2.4 to 4.6 m) thick

Geology and Subsurface Conditions

Artist rendering of the 76ers Fieldhouse

The results of laboratory testing indi-

cated that the organic silts (OH) had liquid

limit moisture contents (w ) ranging from LL

104% to 130%, natural moisture contents

(w ) ) c about 96% and dry unit weights (ᵞ of dry

The presence of the very soft-to-soft

organic layer increased the complexity of

the project dramatically, primarily due to

the project’s grading requirements, which

required 2 to 8 ft (0.6 to 2.4 m) of grade-

raise fill placement across the building pad.

layer of medium dense-to-dense sand

with SPT N-values ranging from 13 to

64 blows/ft. Below the alluvial sands were

relatively stiff clays of the Potomac

Formation. Groundwater was encountered

at depths ranging from 2 to 10 ft (0.6 to

3 m) below the existing ground surface.

Generalized subsurface profile

Considering the complexity of the

project, the rigid inclusion system was

recommended to the building’s owner,

Harris Blitzer Sports & Entertainment in

partnership with The Buccini/Pollin

Because of the complex stratigraphy at the

project site, environmentally impacted fill

soils and groundwater contamination, any

foundation method selected would need to

consider the impact of the installation

methodology on the generation of

contaminated spoils as well as protection of

the groundwater.

Innovative Solution to Geotechnical Challenges

The fast-track construction schedule

did not allow for the time required for

traditional surcharge preloading methods

to be utilized. In addition, the variable

uncontrolled fill and soft, compressible soil

would not support the high column loads

required by the long-span construction of

the facility. The designers provided specific

recommendations for different foundation

alternatives: pipe piles, precast concrete

piles, timber piles, auger cast-in-place

piles, rammed aggregate piers and

controlled modulus columns.

about 47 lb/cu ft (7.4 kN/cu m). Based on

the presence of this highly-compressible

layer, it was determined that about 18 to

24 in (46 to 61 cm) of settlement would

occur due to the compression of the soft

soils when subjected to the applied loading

imposed by the grade-raise fill. GTA

estimated that the total settlement would

occur between 4 and 10 years without the

use of vertical drains.

The thick, highly-compressible organic

layer posed significant settlement risks to

the structure. Grade-raise fill would yield

an unacceptable magnitude of site

compression (settlement) and delay

periods, while the structural loads would

result in unacceptable compression of the

organic layer. Additionally, the proximity of

the substantial roof loads directly adjacent

to the relatively light facility and locker

room loads created differential settlement

hurdles that required careful consideration.

Traditional rammed aggregate pier

(RAP) solutions were considered and

quickly excluded as the high loads and

thick, soft organic soils required a stiffer

pier element to span the soft organic soil

strata. The pile solutions would support

the loads but would require the inclusion

of structurally reinforced grade beams and

slabs to mitigate the long-term impacts of

the organic layer. This rigid inclusion

Group, and its contractor, BPGS Con-

struction (BPGS). The rigid inclusions are

installed using a displacement process that

does not generate spoils and could provide

a structural capacity to handle the project’s

geotechnical challenges, including:

penetration of difficult fill, immediate and

future compression of the soft organic soils,

contamination in the groundwater and

cross-contamination of the subsurface

strata, and caving potential of the soft soils

during construction.

The composition of the existing fill was

undocumented and variable but could be

improved through ground improvement to

provide adequate support for the high

bearing pressure spread footings. However,

the very soft organic layer required a high

stiffness element to mitigate the potential

for long-term creep due to organic decay.

system provides the same long-term

settlement performance as the RAP system

but allows the use of conventional shallow

foundations and slabs-on-grade. The thick

structural slab and heavily reinforced grade

beams and pile caps required by the other

piling options added cost in addition to

design and construction complexity.

Rigid Inclusion Design Strategy

GSI worked with DNSE, the project

structural engineer, to provide a system

that would support the column and wall

footings as well as the slab-on-grade. The

slab design was especially challenging, as

the grade-raise fill induces substantial

compression and creep within the organic

layer that could eventually lead to minimal

support of the floor slab between rigid

inclusion elements. A soil-structure

interaction (SSI) analysis was required of

the support provided by the rigid

inclusions and the load transfer layer above

the rigid inclusions as well as the slab being

supported. A finite element analysis was

performed to evaluate the nonuniform

Installation of the grouted impact piers

Typical grouted impact pier element for footings supported on engineered fill

Page 3: Grouted Rigid Inclusions Support Sports Complexsentezinsaat.com.tr/pdf/DFI Magazine -Page_63-66.pdfFEATURE ARTICLE DEEP FOUNDATIONS • JAN/FEB 2019 • 63 AUTHORS Ed O’Malley, P.E.,

support mechanism provided by the

ground improvement system, which

facilitated optimizing the pier layout and

thickness of the slab.

During final design, uplift loading was

identified. Moderate uplift loads can be

controlled on rigid inclusion projects by

either increasing the footing dimensions to

counteract the uplift loading or by adding

uplift rods within the rigid inclusions that

are then cast into the footings. Working

with the structural engineer, both tech-

niques were used to simplify the design

and decrease the construction costs.

ConstructionA total of 1,500 rigid inclusion elements

with a nominal diameter of 20 in (508 mm)

were installed to depths of about 35 ft

(10.7 m) to support the grade-raise fill and

new structure and to resist the uplift

loading. The rigid inclusions consist of

cement grout and AASHTO #57 stone,

which is a clean, open-graded blend with a

maximum aggregate size of 1.5 in (38 mm).

A Geopier rigid inclusion is constructed

from the bottom up by inserting into the

ground to the required depth a hollow

mandrel charged with a cement grout

/stone mix. Depending on the soil

conditions, the mandrel is raised upward a

maximum of about 4 ft (1.2 m) to allow the

stone/grout mixture to fill the void space

left by the mandrel. Then, the mandrel is

pushed back downward about 2 ft (0.6 m)

to compact the 4 ft (1.2 m) height of stone

into a 2 ft (0.6 m) height of compacted lift.

The pile driving machine that installs the

64 • DEEP FOUNDATIONS • JAN/FEB 2019 DEEP FOUNDATIONS • JAN/FEB 2019 • 65

During the geotechnical exploration, GTA

identified several unique soil conditions

that would affect the project delivery. The

geotechnical investigation revealed that

soil conditions consisted of 4 to 19 ft (1.2 to

5.8 m) of loose, poorly graded, silty sand,

sandy silt and lean clay fill, which

contained varying amounts of concrete

rubble, bricks, glass, wood and slag.

Underlying the fill was a 5 to 15 ft (1.5 to

4.6 m) layer of very soft-to-soft organic silt

and elastic silt with SPT N-values ranging

from weight of hammer (WHO) to

4 blows/ft (blows/0.3 m). Below this soft

layer was an 8 to 15 ft (2.4 to 4.6 m) thick

Geology and Subsurface Conditions

Artist rendering of the 76ers Fieldhouse

The results of laboratory testing indi-

cated that the organic silts (OH) had liquid

limit moisture contents (w ) ranging from LL

104% to 130%, natural moisture contents

(w ) ) c about 96% and dry unit weights (ᵞ of dry

The presence of the very soft-to-soft

organic layer increased the complexity of

the project dramatically, primarily due to

the project’s grading requirements, which

required 2 to 8 ft (0.6 to 2.4 m) of grade-

raise fill placement across the building pad.

layer of medium dense-to-dense sand

with SPT N-values ranging from 13 to

64 blows/ft. Below the alluvial sands were

relatively stiff clays of the Potomac

Formation. Groundwater was encountered

at depths ranging from 2 to 10 ft (0.6 to

3 m) below the existing ground surface.

Generalized subsurface profile

Considering the complexity of the

project, the rigid inclusion system was

recommended to the building’s owner,

Harris Blitzer Sports & Entertainment in

partnership with The Buccini/Pollin

Because of the complex stratigraphy at the

project site, environmentally impacted fill

soils and groundwater contamination, any

foundation method selected would need to

consider the impact of the installation

methodology on the generation of

contaminated spoils as well as protection of

the groundwater.

Innovative Solution to Geotechnical Challenges

The fast-track construction schedule

did not allow for the time required for

traditional surcharge preloading methods

to be utilized. In addition, the variable

uncontrolled fill and soft, compressible soil

would not support the high column loads

required by the long-span construction of

the facility. The designers provided specific

recommendations for different foundation

alternatives: pipe piles, precast concrete

piles, timber piles, auger cast-in-place

piles, rammed aggregate piers and

controlled modulus columns.

about 47 lb/cu ft (7.4 kN/cu m). Based on

the presence of this highly-compressible

layer, it was determined that about 18 to

24 in (46 to 61 cm) of settlement would

occur due to the compression of the soft

soils when subjected to the applied loading

imposed by the grade-raise fill. GTA

estimated that the total settlement would

occur between 4 and 10 years without the

use of vertical drains.

The thick, highly-compressible organic

layer posed significant settlement risks to

the structure. Grade-raise fill would yield

an unacceptable magnitude of site

compression (settlement) and delay

periods, while the structural loads would

result in unacceptable compression of the

organic layer. Additionally, the proximity of

the substantial roof loads directly adjacent

to the relatively light facility and locker

room loads created differential settlement

hurdles that required careful consideration.

Traditional rammed aggregate pier

(RAP) solutions were considered and

quickly excluded as the high loads and

thick, soft organic soils required a stiffer

pier element to span the soft organic soil

strata. The pile solutions would support

the loads but would require the inclusion

of structurally reinforced grade beams and

slabs to mitigate the long-term impacts of

the organic layer. This rigid inclusion

Group, and its contractor, BPGS Con-

struction (BPGS). The rigid inclusions are

installed using a displacement process that

does not generate spoils and could provide

a structural capacity to handle the project’s

geotechnical challenges, including:

penetration of difficult fill, immediate and

future compression of the soft organic soils,

contamination in the groundwater and

cross-contamination of the subsurface

strata, and caving potential of the soft soils

during construction.

The composition of the existing fill was

undocumented and variable but could be

improved through ground improvement to

provide adequate support for the high

bearing pressure spread footings. However,

the very soft organic layer required a high

stiffness element to mitigate the potential

for long-term creep due to organic decay.

system provides the same long-term

settlement performance as the RAP system

but allows the use of conventional shallow

foundations and slabs-on-grade. The thick

structural slab and heavily reinforced grade

beams and pile caps required by the other

piling options added cost in addition to

design and construction complexity.

Rigid Inclusion Design Strategy

GSI worked with DNSE, the project

structural engineer, to provide a system

that would support the column and wall

footings as well as the slab-on-grade. The

slab design was especially challenging, as

the grade-raise fill induces substantial

compression and creep within the organic

layer that could eventually lead to minimal

support of the floor slab between rigid

inclusion elements. A soil-structure

interaction (SSI) analysis was required of

the support provided by the rigid

inclusions and the load transfer layer above

the rigid inclusions as well as the slab being

supported. A finite element analysis was

performed to evaluate the nonuniform

Installation of the grouted impact piers

Typical grouted impact pier element for footings supported on engineered fill

Page 4: Grouted Rigid Inclusions Support Sports Complexsentezinsaat.com.tr/pdf/DFI Magazine -Page_63-66.pdfFEATURE ARTICLE DEEP FOUNDATIONS • JAN/FEB 2019 • 63 AUTHORS Ed O’Malley, P.E.,

66 • DEEP FOUNDATIONS • JAN/FEB 2019

piers has approximately 30,000 lb

(134 kN) of crowd force to compact the

stone downward and out radially.

By applying lateral pressure to the soil

deposit, the pier develops additional skin

friction and bond with the surrounding soil

matrix, which helps to increase its capacity

when compared to a conventional rigid

inclusion system. The ultimate result is a

rigid element that can support the load

imposed by the grade-raise fill as well as the

new building’s applied loading and can

provide long-term settlement control. The

rigid inclusions were designed using a

composite aggregate/grout unconfined

compressive strength of 2,000 psi

(13.8 MPa) to provide a working axial

capacity of 120 kips (535 kN), which was

verified in the field by the load testing of a

nonproduction element.

ConclusionThe use of the composite aggregate/grout

rigid inclusions saved time on the construc-

tion schedule and resulted in a cost savings

compared to an alternative system con-

sisting of a deep foundation and structural

slab. Ultimately, a cost savings of $600,000

was realized on the project. This rigid inclusion

system provided multiple benefits to the project:

• The risk of bulging in the soft organic

soils was mitigated and the system

provided long-term settlement control.

• A low permeability material (grouted

stone) was used to mitigate the risk of

groundwater cross-contamination.

• The displacement and tremie method

reduced the risk of caving in the soft

soils during construction, allowed for

the construction of elements beneath

the groundwater table and eliminated

spoils on this contaminated site.

• Uplift elements provided uplift control

and saved money versus constructing

oversized spread footings.

• A conventional slab-on-grade was

constructed eliminating the need for a

thick structural slab.

Ed O’Malley, P.E., is vice president of engineering for

GeoStructures. He specializes in assisting customers

solve various engineering challenges by utilizing

many different shallow and deep foundation systems.

Mike Pockoski, P.E., is the area manager of the

eastern division for Geopier Foundation Company.

He works with a strong network of specialty ®geotechnical contractors to deliver the Geopier

systems throughout the mid-Atlantic, New England,

Chicago, and central and eastern Canada.


Recommended