ADDENDUM NO. 3 02 JUNE 2017
RE: GS# 101-297
TECHNOLOGY CLASSROOM BUILDING Alcorn State University Lorman, MS
FROM: Allred Architectural Group, PA
628 Washington Avenue, Suite C Ocean Springs, MS 39564 (228) 762-1975
TO: Plan Holders
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated April 28, 2017. Acknowledge receipt of this Addendum in the space provided on the Proposal Form. Failure to do so may subject Bidder to disqualification. This Addendum consists of 5 pages plus 9 pages of attachments for a total of 14 pages. CLARIFICATIONS
1. None in this Addendum.
CHANGES TO PROJECT MANUAL
1. SECTION 04810 UNIT MASONRY a. 2.01, b. – add sub-items: “3. Burlington Brick by Columbus Brick Company” and “4. Red Wire-Cut
222 Modular, Columbia 4, Carolina Collection by Forterra.” 2. SECTION 06100 ROUGH CARPENTRY
a. 1.01.A.2. – add sub-item: “a. Additional blocking is required to be centered behind all Video Display Plug Boxes as located throughout the building. Reference E-AV Sheets for locations. Blocking is to be 4 feet square.”
3. SECTION 06550 QUARTZ SOLID SURFACE: a. 2.01 MANUFACTURERS, A: Change “Diresco” to read “Vadara”. b. 2.02 MATERIALS: Delete this paragraph in its entirety and replace with the following:
“ A. Material: Homogeneous quartz surfaces material B. Window sills - 2 cm (3/4") 1. Color: Absolute Blanc C. Restroom Vanities - 2 cm (3/4") 1. Color: Nero Galassia D. Vertical Surfaces – 2 cm (3/4") 1. Color: Absolute Blanc E. Countertops/Millwork Cladding – 2 cm (3/4") 1. Color: Absolute Blanc”.
2 of 5
4. SECTION 10400 IDENTIFYING DEVICES: a. 2.07 ALUMINUM LETTERS, add the following: “B. Interior Cast Aluminum Letters. Furnish and
install individual cast metal letters. Letters shall be flat faced, aluminum, with finish as selected by the Architect from manufacturers full line of finishes. Font shall be selected by the Architect from manufacturers full line of fonts. Letters shall be Gemini Signs or equal manufacturer. Text and letter sizes shall be as shown on drawings. Backs of letters to be tapped for threaded stud mounting with spacer sleeves. Provide mounting templates for each set/grouping of letters/text.”
5. SECTION 15110 PIPE AND FITTINGS a. 110.2.A.5 – Replace with the following: “Utility and relief drains, including AHU condensate drain,
shall be Type “L” copper with solder fittings”. 6. SECTION 15160 MECHANICAL SYSTEMS INSULATION
a. 160.2.A – Replace with the following: “Domestic hot and cold water and all storm water piping shall be insulated with 1” thick Johns-Manville “Micro-Lok HP” fiberglass pipe insulation with 25/50 flame smoke rating or approved equal. Longitudinal laps and butt strips shall be smoothly secured with Benjamin-Foster 85-20 adhesive. Fittings and valves on pipe sizes smaller than 3” shall be insulated with J-H #301 insulating and finishing cement to a thickness equal to the adjacent pipe insulation. Fittings and valves 3” and larger shall be insulated with molded Fiber Glass covers secured with Fab-Cloth and finished with a generous coat of Foster 31-99 Mastic. The underside of all roof drains shall be insulated with 2” fiberglass duct wrap insulation with all joints and seams glued and sealed.
7. SECTION 15300 PLUMBING FIXTURES, TRIM AND SPECIALTIES a. 300.2.B – Add the following:
1. FD-3 (Floor Drain): Zurn (ZN662) with 16” square nickel bronze strainer, sediment bucket, and 4” outlet.
2. RD-3 (Roof Drain): Zurn (ZC-100-C) 15” cast iron body with cast iron grate dome, underdeck clamp, 4” outlet.
CHANGES TO DRAWINGS
1. DRAWING AD2.03 – FINISH KEY: a. Change all references of Quartz Manufacturer that read “DIRESCO” to read “VADARA”. b. Change all references of Quartz color that read “PREMIUM PURE WHITE A250” to read
“ABSOLUTE BLANC”. c. Change all references of Quartz color that read “BLACK DIVINITY A035” to read “NERO
GALASSIA”. d. Change the NOTES section of the CURTAINS & VALENCES: “54” WIDE PANELS; PROVIDE
BLACK-OUT LINERS SEWN INTO EACH PANEL”. 2. Add AD3.1 (attached) to revise trench drain to cast-in-place concrete in lieu of polymer concrete sections. 3. Add AD3.2 (attached) to identify invert elevation of cleanouts at locations of mechanical roof downspouts
tie-in to site drawings. 4. Add AD3.3 (attached) to correct invert elevations on paver trench drain system at rear of building adjacent
to amphitheater. 5. Add AD3.S1 (attached) to modify drawing AD2.1 from addendum 2 to clarify walkway dimensions.
3 of 5
6. DRAWING S1.01 – Clarification: Special Inspection tasks listed on Sheet S1.01 under “Special Inspections” shall be the responsibility of the Owner. All other testing listed in the technical specifications of each material shall be the responsibility of the Contractor, unless otherwise indicated by special inspections note on S1.01.
7. DRAWING 4/S2.12 – Add a note pointing to the top of the interior stringer at the top of the third floor stair landing that reads “TOP OF STEEL STRINGER TO BE FLUSH WITH CONCRETE LANDING SLAB”.
8. DRAWING S6.01 – DETAILS a. Detail 3/S6.01 Detail – Add the following note: “CLARIFICATION - PROVIDE CONTINUOUS
SHELF ANGLE ATTACHED TO THE FACE OF CONCRETE FLOOR SLABS. PROVIDE 10”x10”x3/8” CONNECTION PLATE AT 4’-0” O.C. POSITION AS DETAILED AT EACH FINISHED FLOOR LEVEL AT THE NEAREST COURSING OF BRICK. SHELF ANGLES ARE TO REMAIN AT CONSISTENT HEIGHT AT EACH LEVEL AROUND COMPLETE BUILDING PERIMETER WHERE FACE BRICK IS LOCATED. PROVIDE THRU WALL FLASHING WITH CONTINUOUS SEALED TERM BAR ATOP (TURN UP WALL 8” MIN.). PROVIDE CONT. MORTAR NET AND MASONRY WEEPS @ 24” O.C.”
9. DRAWING S6.10, DETAIL 7. - Provide 2 inch pvc sleeves through each double tee stem at the neutral axis of the section spaced 4’ – 0” longitudinally for support of hoist, lighting and other ancillary heavy loads. Additionally, provide galvanized steel “tee” hangers to fit between double tee joints for support of ceiling and other lightly loaded elements.
10. DRAWING A1.11 – THIRD FLOOR & PENTHOUSE OPENINGS PLAN a. Conference Room 331 – Add Window Tag to un-labeled (bottom-right corner) section of window to
read: “331c”. Add window to “Aluminum Frame Schedule – Third Floor” on Sheet A7.03R (Added this addendum).
11. DRAWING A1.15 – FIRST FLOOR FINISH PLAN: Add a note pointing to the bottom of the inner railing of MONUMENTAL STAIR 121 that reads “RETURN FULL HEIGHT OF TERRAZZO BASE AT END OF STAIR AROUND END OF STRINGER AND BACK TO INSIDE CORNER”.
12. DRAWING A1.22 – ROOF DETAILS a. Details 1 and 6 – Omit all references to 5/8” plywood.
13. DRAWING A4.01 – BUILDING SECTION a. Change note, “4” CLOSED CELL FOAM INSULATION UNDER PENTHOUSE” to read, “APPLY 3”
CONTINUOUS CLOSED CELL FOAM INSULATION TO UNDERSIDE OF CONCRETE SLAB AT ALL AREAS DIRECTLY ABOVE FACULTY LOUNGE OUTDOOR TERRACE 304a AND UNDERNEATH PENTHOUSE 401.”
14. DRAWING A4.07 – WALL SECTIONS a. Detail 1 Wall Section A.1
i. Omit reference “5/8” GYPSUM SHEATHING TO BACK STUCCO SYSTEM”. 15. DRAWING A4.10 – WALL SECTIONS
a. Change note, “4” CLOSED CELL FOAM INSULATION AT UNDERSIDE OF CONCRETE STRUCTURE AT CONFERENCE 331” to read, “APPLY 3” CONTINUOUS CLOSED CELL FOAM INSULATION TO UNDERSIDE OF CONCRETE OF CONCRETE SLAB AT ALL AREAS DIRECTLY ABOVE STUDENT LOUNGE OUTDOOR TERRACE 216c AND UNDERNEATH DEAN’S OFFICE 329, DEAN’S RR 335 AND CONFERENCE ROOM 331”.
16. DRAWING A5.01 – ENLARGED DETAILS a. Detail 1 – Omit reference to 5/8” plywood.
17. DRAWING A5.02 – ENLARGED DETAILS a. Detail 1 – Omit reference to 5/8” plywood.
4 of 5
18. DRAWINGS 1/A6.06 & 2/A6.06 – Add a note pointing to the top of the interior stringer at the top of the third-floor stair landing that reads “TOP OF STEEL STRINGER TO BE FLUSH WITH CONCRETE LANDING SLAB TO ALLOW RAILING SHOE TO CONTINUE AT SAME ELEVATION FLUSH W/ LANDING”.
19. DRAWING A7.03 – Delete this drawing and replace with attached drawing A7.03R. Update the index of drawings accordingly. See clouded revisions as follows:
a. Added ‘Shade Type’ column to the Aluminum Frame Schedule. b. Corrected various head and jamb detail references.
20. DRAWING A7.05 - ALUMINUM FRAME TYPES a. Change Mark 329a to ‘Va’. b. Change Mark 329b to ‘Vb’.
21. DRAWINGS A7.01-A7.09 ALUMINUM FRAME DETAILS – a. Clarification: All aluminum storefront details should reference the center-glazed screw spline
construction with high performance sill as specified in lieu of the shear block system as shown in some details.
b. Clarification: At all window head locations to receive shades (see sheet A7.03R), whether motorized or manually operated, shall be integrated into the window head framing in a manner similar that shown in detail B1.1/A5.02.
22. DRAWING EAV1.0 a. AV Backbox & Power Coordination Schedule
ii. See box types AC, AVK, T6. The box sizes include typographical errors. The correct box sizes are as follows (Width x Height x Depth):
1. Type AC: Hoffman ASE, 6” x 6” x 4” 2. Type AVK: Hoffman ASE, 6” x 6” x 4” 3. Type T6: Hoffman ASE, 6” x 6” x 6”
iii. See box type FB. Note that the model number for this box reflects a custom box assembly. Contact the manufacturer and reference the Quote Number (QT) as shown on the schedule.
b. Raceway & Power Distribution Notes iv. Backboxes
1. Replace Note 10 with the following, “10. For all AV Box locations, provide a separate power receptacle as noted. Locate the power box directly adjacent to AV backboxes U.O.N. Allow for standard clearance per NEC.”
2. Replace Note 12 with the following, “12. Boxes noted as ‘4S’ are standard EO style, 4” Square Box, Welded, Metallic, 3.5” deep, UON.”
3. Add Note 14 to read as follows, “14. Gang boxes are EO style, Size as noted. Provide welded, metallic type, 3.5” deep, UON.”
23. DRAWINGS E2.2 & E4.2; (First and Third Floor Power Plans): Add the following note to each drawing: “NOTE: COORDINATE POWER FLOOR BOX/CONDUIT LOCATIONS FOR FIXED FURNITURE WITH FIXED FURNITURE VENDOR/SHOP DRAWINGS PRIOR TO INSTALLATION”.
24. DRAWINGS E2.4, E2.5, E3.4, E3.5 & E4.4; (All Electrical A/V Systems Connection Plans): Delete all references to “SC”, including associated circuits, switches and junction boxes. No powered screen controls will be installed in this project.
25. DRAWINGS E3.2, E3.5, E4.2; (All Second and Third Floor Power Plans): Delete all references to “MS”, including associated circuits, switches and junction boxes. No powered motorized shades will be installed on the second or third floors of this project.
26. DRAWING P3.02 – Add waste and sewer connections to sink in Faculty Lounge 303 and shown on attachment drawing P3.02R1.
AD3.1
CHECKED BY
DRAWN BY
DATE
JOB NUMBER
OF SHEETS
SHEET
REVISION DATE
VA
RIE
S
3
G:\D
raw
ings\2014\1405 Alcorn State Tech Building\CIVIL\1405 ALCO
RN
TECH
ED
SITE 2 - grade fill.dw
g, 6/2/2017 11:47:42 AM
AD3.2
CHECKED BY
DRAWN BY
DATE
JOB NUMBER
OF SHEETS
SHEET
REVISION DATE
3
3
G:\D
raw
ings\2014\1405 Alcorn State Tech Building\CIVIL\1405 ALCO
RN
TECH
ED
SITE 2 - grade fill.dw
g, 6/2/2017 11:47:29 AM
2
5
6
2
5
7
2
5
8
2
5
9
2
4
5
255.50
245.50
249.00
255.50
252.50
252.00
2
5
5
2
5
3
2
5
4
SIDEWALK
DRAIN
244.50
252.00
~
YD-2
TOP-251.50
INV.=245.50
251.50
1
2
"
C
9
0
0
P
V
C
248.50
PIPE
BEDDING
(TYP.)
252
259.50
259.50
259.98
260.00
259.50
260.00
260.98
259.75
2
5
2
259.50
TRENCH
TOP=259.50
INV.HIGH=255.00
INV.LOW=254.00
JB-3
TOP=259.25
INV.=255.00
JB-4
TOP=259.25
INV.=254.00
12"
C900 P
VC
252.00
2
5
0
2
5
1
2
5
2
2
4
6
2
4
7
2
4
8
2
4
9
NOTE 7
STEP FOOTING
(SEE NOTE 7
AND SHEET 301A)
18" PVC SLEEVE REQUIRED
THROUGH WALL. "LINK
SEAL" OR EQUAL TO SEAL
ANNULAR SPACE.
8" C900 PVC
260
2
6
0
CLEANOUT (LOCATE OUTSIDE
OF PAVER AREA) SEE 4/C601
INV.=256.00
AD3.3
CHECKED BY
DRAWN BY
DATE
JOB NUMBER
OF SHEETS
SHEET
REVISION DATE
3
3
3
3
3
3
G:\D
raw
ings\2014\1405 Alcorn State Tech Building\CIVIL\1405 ALCO
RN
TECH
ED
SITE 2 - grade fill.dw
g, 6/2/2017 11:46:27 AM
2017-05-25
REFER
ENCE W
ALL S
ECTIO
N G
.1 S
HEET A
4.15
Techn
olo
gy
Cla
ssro
om
Bui
ldin
g
RSS
2014-04
MRCCHECKED BY
DRAWN BY
DATE
JOB NUMBER
OF SHEETS
SHEET
REVISION DATE
3
1'-2" 8" 1'-2"
3'-0"
8"
1
2
"
1'-0"
2"
VA
RIE
S
WIT
H S
LO
PE
1'-0
" T
O 3
'-0
"1
'-0
"
VA
RIE
S
WIT
H S
LO
PE
0" T
O 2
'-0
"
3'-0
"
4"
4"
5'-1
3
4
" (VERIFY WITH ARCH. DRAWINGS)
3'-0
"
1'-0
"
3'-0"
3- #4 x CONT.
#5 @ 12" O.C. T & B
3- #5 x CONT. T & B
1'-0"
2'-0
"
1'-0"1'-0"
06/02/2017
1
A
1' -
0"
2"
2' - 11"
2"
2' - 11"
2"
2"
1' -
10
1/2
"
2"
1' -
8"
2"
8' -
0"
12
' - 0
"
6' - 0"
B
8' -
0"
3' -
0"
2"
1' -
9"
2"
5' -
9"
2"
5' - 10"
2"
2' - 8"
2"
2' - 8"
2"
C
21
' - 0
"3
' - 0
"
2 1
/2"
1' -
8 1
/2"
2 1
/2"
5' -
8 1
/2"
2 1
/2"
5' -
0"
2 1
/2"
1' -
8 1
/2"
2 1
/2"
5' -
8 1
/2"
2 1
/2"
8' - 6"
2 1/2"
1' - 8 1/2"
2 1/2"
4' - 3 1/2"
2 1/2"
1' - 8 1/2"
2 1/2"
SP SP SP
HIGH
LOW
8' -
0"
5' -
10
1/2
"8
' - 0
"3
' - 0
"
2"
1' -
5"
2"
4' -
6"
2"
1' -
5"
2"
8' - 0"
2"
1' - 5"
2"
4' - 6"
2"
1' - 5"
2"
2"
1' -
5"
2"
4' -
6"
2"
1' -
5"
2"
8' - 0"
2"
1' - 5"
2"
4' - 6"
2"
1' - 5"
2"
NOTE: SET SILL ON FINISHEDFLOOR AT SECOND AND
THIRD FLOORS
D
6' - 4"
2"
8' -
0"
2"
6' - 0"
2"
6' - 4"
7' -
0"
2"
1' -
9"
2"
4' -
9"
2"
8' - 5 1/2"
2"
4' - 0"
2"
3' - 11 1/2"
2"SP SP SP
12
' - 0
"
2"
1' -
10
1/2
"
2"
1' -
8"
2"
7' -
10
"
2"
9' - 6"
2"
1' - 4 1/2"
2"
6' - 0"
2"
1' - 5 1/2"
2"
FE G
H
SP SP
10
' - 0
"
2"
1' -
9"
2"
7' -
9"
2"
8' - 5 1/2"
2"
4' - 0"
2"
4' - 0"
2"
I
10
' - 0
"
2"
1' -
8"
2"
7' -
10
"
2"
10' - 2 1/2"
2"
1' - 9 1/2"
2"
6' - 0"
2"
1' - 9 1/2"
2"
K
12
' - 0
"
2"
2' -
4"
2"
9' -
2"
2"
9' - 6"
2"
2' - 1"
2"
4' - 8"
2"
2' - 1"
2"
APPR
OVED
BY
CHECKED
BY
DR
AW
N B
Y
REVIS
ED
DATE
JO
B N
UM
BER
SHEET
628
ASH
ING
TON
AV
EN
UE
,O
CEA
NM
S 39
56
4
PH
ON
E: (2
28)
76
2-1
97
5 F
AX: (2
28)
76
9-9
545
EM
AIL
:CO
NTA
CT@
ALL
RED
AR
CH
ITEC
TUR
AL
GR
OU
P.C
OM
AR
CH
ITEC
TUR
AL
GR
OU
PS
PR
ING
S,
W
APPR
OVED
BY
APPR
OVED
BY
SU
ITE
C
A7.03R
2014
-04
05/19
/2017
6/2/20
17
RCC
HA
Alu
min
um
Fra
me S
chedule
/ A
lum
inum
Fra
me T
ypes
Technolo
gy C
lassro
om
Build
ing
Alc
orn S
tate
Univ
ersity
Lorm
an, M
issis
sip
pi
Aluminum Frame Schedule - First Floor
MarkTypeMark Location Width Height Thickness
Height AboveNearest
Finished Floor MaterialHeadDetail Jamb Detail Sill Detail
MullDetail Shade Type Comments
100a A Airlock 100 6' - 4" 12' - 0" 0' - 4 1/2" 0" Aluminum 21/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
100b K Airlock 100 9' - 6" 12' - 0" 0' - 4 1/2" 0" Aluminum 1/A7.08 10/A7.08 11/A7.08 5,6/A7.07 N/A
101a M Stairwell 101a (Low) 4' - 4" 9' - 0" 0' - 4 1/2" 11'-0" Aluminum 18/A7.07 19/A7.07 20/A7.07 6/A7.07 N/A
101b M Stairwell 101a (High) 4' - 4" 9' - 0" 0' - 4 1/2" 27'-0" Aluminum 18/A7.07 19/A7.07 20/A7.07 6/A7.07 N/A
104a B Classroom 104 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
104b B Classroom 104 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
105a B Classroom 105 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
105b B Classroom 105 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
106a B Classroom 106 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
106b B Classroom 106 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
107a B Classroom 107 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
107b B Classroom 107 5' - 10" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 16/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
110 J Interactive Learning Center 110 121' - 11" 30' - 11" 0' - 10 1/2" 0" Aluminum 1/A1.23 7,8,9/A7.07 7/A5.09; 4/A7.08 5,6/A7.07 N/A
111a I Entry Airlock 111 10' - 2 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
111b I Entry Airlock 111 10' - 2 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
112 C Lobby 112 8' - 6" 21' - 0" 0' - 10 1/2" 3'-0" Aluminum 12/A7.08 13/A7.08 14/A7.08 5,6/A7.07 N/A
115a G Airlock 115 9' - 6" 12' - 0" 0' - 4 1/2" 0" Aluminum 1/A7.08 2/A7.07 3/A7.08 5,6/A7.07 N/A
115b H Airlock 115 8' - 5 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
117a M Stairwell 117 (Low) 4' - 4" 9' - 0" 0' - 4 1/2" 11'-0" Aluminum 18/A7.07 19/A7.07 20/A7.07 6/A7.07 N/A
117b M Stairwell 117 (High) 4' - 4" 9' - 0" 0' - 4 1/2" 27'-0" Aluminum 18/A7.07 19/A7.07 20/A7.07 6/A7.07 N/A
118a F Classroom 118 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
118b F Classroom 118 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
118c F Classroom 118 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
118d F Classroom 118 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
119a F Classroom 119 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
119b F Classroom 119 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
119c F Classroom 119 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
119d F Classroom 119 8' - 5 1/2" 7' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Motorized
120a H East Corridor 120 8' - 5 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
120b H East Corridor 120 8' - 5 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
120c H East Corridor 120 8' - 5 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
120d H East Corridor 120 8' - 5 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
120e H East Corridor 120 8' - 5 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
120f H East Corridor 120 8' - 5 1/2" 10' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07;2/A7.08 3/A7.08 5,6/A7.07 N/A
121a E Monumental (Egress) Stair 121 6' - 4" 8' - 2" 0' - 4 1/2" 0" Aluminum 11/A7.07 8/A7.07 3/A7.07 - N/A
121b N Monumental (Egress) Stair 121 9' - 7" 26' - 0" 0' - 10 1/2" 15'-0" Aluminum 12/A7.08 13/A7.08 15/A7.08 5,6/A7.07 N/A
121c N Monumental (Egress) Stair 121 9' - 7" 26' - 0" 0' - 10 1/2" 15'-0" Aluminum 12/A7.08 13/A7.08 15/A7.08 5,6/A7.07 N/A
129a D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Full Height Curtains As Specified
129b D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Full Height Curtains As Specified
129c D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Full Height Curtains As Specified
129d D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.06 5,6/A7.07 Full Height Curtains As Specified
129e D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.06 5,6/A7.07 Full Height Curtains As Specified
129f D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 3'-0" Aluminum 21/A7.07 8/A7.07 17/A7.06 5,6/A7.07 Full Height Curtains As Specified
Aluminum Frame Schedule - Second Floor
203a B Computer Center 203 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
203b B Computer Center 203 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
204a B Computer Center 204 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
204b B Computer Center 204 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
205a B Library/Academic Res. Ctr. 205 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
205b B Library/Academic Res. Ctr. 205 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
205c B Library/Academic Res. Ctr. 205 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
205d B Library/Academic Res. Ctr. 205 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
208a L Corridor / Seating Area 2nd Floor 208 6' - 4" 12' - 0" 0' - 4 1/2" 0" Aluminum 21/A7.07 8/A7.07 7/A7.09 5,6/A7.07 N/A
208b T Corridor / Seating Area 2nd Floor 208 9' - 6" 12' - 0" 0' - 4 1/2" 0" Aluminum 1/A7.09 10/A7.08 11/A7.08 5,6/A7.07 N/A
209 S Group Study Room 209 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
210 S Group Study Room 210 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
211 S Group Study Room 211 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
212 S Group Study Room 212 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
213a S Community Center / SBA 213 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
213b S Community Center / SBA 213 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
214a S Entrepreneurship Center 214 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
214b S Entrepreneurship Center 214 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
214c S Entrepreneurship Center 214 5' - 10" 11' - 4" 0' - 4 1/2" 10" Aluminum 6/A7.09 2/A7.08 5/A5.04 5,6/A7.07 Manual
215 P East Corridor 2nd Floor 215 9' - 6" 12' - 0" 0' - 4 1/2" 0" Aluminum 1/A7.08 10/A7.08 11/A7.08 5,6/A7.07 N/A
216a O Student Lounge 216 8' - 6" 8' - 8" 0' - 4 1/2" 10" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Manual
216b O Student Lounge 216 8' - 6" 8' - 8" 0' - 4 1/2" 10" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Manual
216c O Student Lounge 216 8' - 6" 8' - 8" 0' - 4 1/2" 10" Aluminum 21/A7.07 8/A7.07 17/A7.07 5,6/A7.07 Manual
216d O Student Lounge 216 8' - 6" 8' - 8" 0' - 4 1/2" 10" Aluminum 21/A7.07 8/A7.06 17/A7.07 5,6/A7.07 Manual
216f Q Student Lounge 216 20' - 3 1/2" 8' - 2" 0' - 4 1/2" 0" Aluminum 2/A7.09 3/A7.09 4,5/A7.07 5/A7.07 N/A
216g R Student Lounge 216 20' - 3 1/2" 8' - 2" 0' - 4 1/2" 0" Aluminum 2/A7.09 3/A7.09 4,5/A7.07 5/A7.07 N/A
219a D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 16'-10 1/2" Aluminum 1/A7.09 8/A7.07 17/A7.08 5,6/A7.07 Full Height Curtains As Specified
219b D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 16'-10 1/2" Aluminum 1/A7.09 8/A7.07 17/A7.08 5,6/A7.07 Full Height Curtains As Specified
219c D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 16'-10 1/2" Aluminum 1/A7.09 8/A7.07 17/A7.08 5,6/A7.07 Full Height Curtains As Specified
219d D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 16'-10 1/2" Aluminum 1/A7.09 8/A7.07 17/A7.08 5,6/A7.07 Full Height Curtains As Specified
219e D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 16'-10 1/2" Aluminum 1/A7.09 8/A7.07 17/A7.08 5,6/A7.07 Full Height Curtains As Specified
219f D Auditorium 129 8' - 0" 8' - 0" 0' - 4 1/2" 16'-10 1/2" Aluminum 1/A7.09 8/A7.07 17/A7.08 5,6/A7.07 Full Height Curtains As Specified
Aluminum Frame Schedule - Third Floor
304a Ub Faculty Lounge 304 5' - 1 1/2" 8' - 0" 0' - 4 1/2" 0" Aluminum 2/A7.09 8/A7.07 4,5/A7.09 6/A7.07 N/A
304b Ua Faculty Lounge 304 9' - 5 1/2" 8' - 0" 0' - 4 1/2" 0" Aluminum 2/A7.09 8/A7.07 4/A7.09 5,6/A7.07 N/A
304c B Faculty Lounge 304 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 N/A
304d B Faculty Lounge 304 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 N/A
306a B Electronic Training Center 306 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
306b B Electronic Training Center 306 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
306c B Electronic Training Center 306 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
306d B Electronic Training Center 306 5' - 10" 8' - 0" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 Manual
310 O Third Floor Lobby 310 8' - 6" 8' - 8" 0' - 4 1/2" 0" Aluminum 7/A7.07 8/A7.07 16/A7.08 5,6/A7.07 N/A
321a CC Chair 321 10' - 6 1/2" 9' - 7" 0' - 4 1/2" 3'-2" Aluminum 4/A1.22 8/A7.07 SIM 8/A7.09 5,6/A7.07 Manual
321b BB Spans Office 313 To Chair 321 109' - 8" 9' - 7" 0' - 4 1/2" 3'-2" Aluminum 4/A1.22 8/A7.07 SIM 8/A7.09 5,6/A7.07 Manual Shade @ Each Office
322 W Corridor 322 9' - 6" 12' - 0" 0' - 4 1/2" 0" Aluminum 1/A7.08 10/A7.08 11/A7.08 5,6/A7.07 N/A
329a Va Spans Office 325 To Dean's Office 329 67' - 10 1/2" 10' - 9 1/2" 0' - 4 1/2" 2'-0" Aluminum 6/A1.23 8/A7.07 SIM 8/A7.09 5,6/A7.07 Manual Shade @ Each Office
329b Vb Office 325 7' - 9" 10' - 9" 0' - 4 1/2" 2'-0" Aluminum 6/A1.23 8/A7.07 SIM 8/A7.09 5,6/A7.07 Manual Shade @ Each Office
331a Zc Conference Room 331 8' - 4" 10' - 9" 0' - 4 1/2" 2'-0" Aluminum 6/A1.23 8/A7.07 SIM 8/A7.09 5,6/A7.07 Manual
331b Za Conference Room 331 26' - 0 1/2" 10' - 9" 0' - 4 1/2" 2'-0" Aluminum 6/A1.23 8/A7.07 SIM 8/A7.09 5,6/A7.07 Manual
331c Zb Conference Room 331 8' - 11" 10' - 9" 0' - 4 1/2" 2'-0" Aluminum 9/A7.08 8/A7.06 SIM; 10/A7.08 8/A7.08 5,6/A7.06 Manual
340a AA Third Floor South Corridor 340 119' - 5 1/2" 9' - 7" 0' - 4 1/2" 3'-2" Aluminum 4/A1.22 8/A7.07 8/A7.09 5,6/A7.07 N/A
340b X Third Floor South Corridor 340 9' - 6" 12' - 0" 0' - 4 1/2" 0" Aluminum 1/A7.08 10/A7.08 11/A7.08 5,6/A7.07 N/A
340c Y Third Floor South Corridor 340 6' - 4" 12' - 0" 0' - 4 1/2" 0" Aluminum 21/A7.07 8/A7.07 7/A7.09 5,6/A7.07 N/A
2" x 4 1/2" Aluminum StorefrontWith 1" Insulated Glass
First FloorSP-Spandrel Glass
2" x 4 1/2" Aluminum StorefrontWith 1" Insulated Glass
First Floor
2 1/2" x 10 1/2" Aluminum CurtainWall With 1" Insulated Glass
Manufacturer To Provide Engineered SteelReinforcement In Mullions To Meet Loading
Requirements For InstallationSpans First and Second Floors
2" x 4 1/2" Aluminum StorefrontWith 1" Insulated Glass
First Floor
FIRST FLOOR
1/4" = 1'-0" 1/4" = 1'-0" 1/4" = 1'-0"
2" x 4 1/2" Aluminum StorefrontWith 1" Insulated Glass
First FloorSP-Spandrel Glass
2" x 4 1/2" Aluminum StorefrontWith 1" Insulated Glass
First Floor
2" x 4 1/2" Aluminum StorefrontWith 1" Insulated Glass
First Floor
FIRST FLOOR
1/4" = 1'-0" 1/4" = 1'-0"
1/4" = 1'-0"
2" x 4 1/2" Aluminum CurtainWall With 1" Insulated Glass
First Floor
2" x 4 1/2" Aluminum StorefrontWith 1" Insulated Glass
First Floor
2" x 4 1/2" Aluminum CurtainWall With 1" Insulated Glass
First Floor
1/4" = 1'-0"1/4" = 1'-0"1/4" = 1'-0"
NOTE: ALL HEAD, JAMB, AND SILL CONNECTIONS SHALL BE AS REQUIRED BY MANUFACTURER TO MEET ALL LOADING AND CODE REQUIREMENTS.
5 of 5
27. DRAWING M4.01 – Add VFD locations for AHU-2, AHU-3, and AHU-4 as shown on attachment drawing M4.01R1.
28. DRAWING E-0.1, LEGEND.
e. Symbol “ ” change to read, “3/4”c. standpipe, stubbed concealed into fixed furniture with final
connections to furniture pigtail circuits in handhole. Coordinate rough-in location with architect and
furniture shop drawings.
29. DRAWING E-2.5, FIRST FLOOR PLAN – PART “B”, LIGHTING.
f. Add two (2) symbol “B4” fixtures and connect to lighting circuit A-9. See attached sheet E-2.5RB.
30. DRAWING E-3.2, SECOND FLOOR PLAN – PART “A”, POWER.
g. Computer Center 203, delete connection to motorized shades and raise/lower switch. Circuit serving to
become 20A1P spare.
h. Computer Center 204, delete connection to motorized shades and raise/lower switch. Circuit serving to
become 20A1P spare.
i. Library/Academic Res. Center 205, delete connection to motorized shades and raise/lower switch.
Circuit serving to become 20A1P spare.
j. Student Lounge 216, delete connection to motorized shades and raise/lower switch. Circuit serving to
become 20A1P breaker.
31. DRAWING E-4.1, THIRD FLOOR PLAN – PART “A”, LIGHTING.
k. Third Floor Lobby 310, emergency lighting homerun designated F-1-2, change to E-5-6.
l. Conference Room 331, add fourteen (14) symbol “F1” fixtures to lighting cove and connect to lighting
circuit C6. Provide new single pole switch for control. See attached sheet E-4.1R.
32. DRAWING E-4.2, THIRD FLOOR PLAN – PART “A”, POWER.
m. Electrical Room 307, delete Panel “EHB”.
n. Faculty Lounge 304, delete connection to motorized shades and raise/lower switch. Circuit serving to
become 20A1P spare.
o. Electronic Training Center 306, delete connection to motorized shades and raise/lower switch. Circuit
serving to become 20A1P spare.
END OF ADDENDUM #3