Page 1 of 20 GSA/OP/01/17 “General ICT Support to GSA” LOT1 – “General IT Services Support” ANNEX I.D.1 to the Tender Specifications Technical Terms of Reference
Transcript
Page 1: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 1 of 20

GSA/OP/01/17 “General ICT Support to GSA”

LOT1 – “General IT Services Support”

ANNEX I.D.1 to the Tender Specifications Technical Terms of Reference

Page 2: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 2 of 20

Table of Contents

I. Acronyms and abbreviations .......................................................................................................... 4

II. Purpose of Lot 1 .............................................................................................................................. 5

III. Description of GSA IT Infrastructure ........................................................................................... 5

A. Sites ............................................................................................................................................. 5

B. Technology .................................................................................................................................. 6

IV. General requirements ................................................................................................................. 7

A. Specific Contract award process ................................................................................................. 7

B. ICT specialist - general conditions ............................................................................................... 7

C. ICT specialist – procedure to request ......................................................................................... 8

D. ICT Specialist profiles .................................................................................................................. 8

E. ICT Specialist for GSA Sits in FR/UK ........................................................................................... 10

F. Allocated Specialist - continuous skillset development ............................................................ 10

G. Personal data protection management .................................................................................... 10

V. Services description ...................................................................................................................... 11

A. General ICT Services .................................................................................................................. 11

TASK 1. Contract Management .............................................................................................. 11

a) Scope ................................................................................................................................. 11

b) Deliverables ....................................................................................................................... 12

c) Price Conditions ................................................................................................................ 12

TASK 2. Minor HW/SW purchasing service ............................................................................ 12

a) Scope ................................................................................................................................. 12

b) Deliverables ....................................................................................................................... 13

c) Price Conditions ................................................................................................................ 13

TASK 3. Minor HW/SW leasing service .................................................................................. 13

a) Scope ................................................................................................................................. 14

b) Deliverables ....................................................................................................................... 14

c) Price Conditions ................................................................................................................ 14

TASK 4. SW Licenses purchasing service ................................................................................ 15

a) Scope ................................................................................................................................. 15

b) Deliverables ....................................................................................................................... 15

c) Price Conditions ................................................................................................................ 15

Page 3: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 3 of 20

TASK 5. Offsite backup storage .............................................................................................. 15

a) Scope ................................................................................................................................. 15

b) Deliverables ....................................................................................................................... 16

c) Price Conditions ................................................................................................................ 16

B. Specific ICT Services .................................................................................................................. 16

TASK 6. ICT Technical Consultancy ......................................................................................... 16

a) Scope ................................................................................................................................. 16

b) Deliverables ....................................................................................................................... 16

c) Price Conditions ................................................................................................................ 16

TASK 7. Full-scope ICT Project delivery .................................................................................. 16

a) Purpose and Scope ............................................................................................................ 16

b) Deliverables ....................................................................................................................... 17

c) Price Conditions ................................................................................................................ 17

TASK 8. On-call Standby support (remote/on-site) service ................................................... 17

a) Service initiation................................................................................................................ 17

b) Purpose ............................................................................................................................. 17

c) Scope ................................................................................................................................. 18

d) Availability ......................................................................................................................... 18

e) Activation and reaction times ........................................................................................... 18

f) Deliverables ....................................................................................................................... 18

g) Price Conditions ................................................................................................................ 18

TASK 9. GSA Portfolio takeover .............................................................................................. 19

a) Scope ................................................................................................................................. 19

b) Deliverables ....................................................................................................................... 19

c) Price conditions ................................................................................................................. 19

VI. Milestones and deliverables ..................................................................................................... 19

Page 4: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 4 of 20

I. Acronyms and abbreviations

FWC Framework Contract SC Specific Contract EGNOS European Geostationary Navigation Overlay Service EUCI European Union Classified Information GRC Galileo Reference Centre GSC Galileo Service Centre GSMC Galileo Security Monitoring Centre HW Hardware MCP Microsoft Certified Professional MCSA Microsoft Certified System Administrator MCSD Microsoft Certified Desktop Support Technician MCTC Microsoft Certified Training Centre PA Project Administrator PSC Personal Security Clearance SME Subject Matter Expert SSL Secure Socket Layer SW Software TMG Threat Management Gateway VPN Virtual Private Network OTC Over-the-counter

Page 5: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 5 of 20

II. Purpose of Lot 1

The objective of this call for tenders is to establish a contractual framework for the provision of services in the areas of:

IT User support

IT Systems and Software Training

IT Systems maintenance

IT Systems administration and configuration

IT Systems design and planning

IT Systems testing and evaluation

IT Systems analysis

IT Project management

IT Security

IT Systems documentation and content management

Task 6 shall cover information and communication systems operated by the GSA, including those processing EU classified information up to the level RESTREINT UE/EU RESTRICTED. All the other tasks, cover all the information and communication systems operated by the GSA only up to level EU UNCLASSIFIED.

The contractor must be proficient in the core technologies used by the GSA and the expertise must be supported by the relevant certifications issued by the software or hardware vendors. Whenever technically possible and financially favourable, the contractor shall be directly involved in all new developments and changes of the GSA’s information and communication systems.

The specific tasks will be achieved via the execution of specific contracts.

III. Description of GSA IT Infrastructure

A. Sites

The Agency operates in following geographical locations:

• PRAGUE, Czech Republic GSA Headquarters

Main technology centre with core IT infrastructure

• Saint-Germain-en-Laye, France GSA GSMC site

Operational subset of IT infrastructure. Site topology sufficient for independent operations of

core IT services.

• Swanwick, United Kingdom GSA GSMC site

Main backup and disaster recovery site.

• Toulouse, France GSA EGNOS

Operational subset of IT infrastructure

Page 6: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 6 of 20

• Madrid, Spain GSA GSC

Operational subset of IT infrastructure

• Haag, Netherlands GSA GRC

Operational subset of IT infrastructure

In the future other sites located within Europe may become operational.

B. Technology

The core technologies of the GSA are based on Microsoft, Dell EMC and Cisco:

Server Hardware

Dell, HP, IBM x86 servers

Cisco x86 Blade servers

Dell EMC VNX Storage

Dell EMC Data Domains

Network Hardware

Cisco Catalyst switches

Cisco Nexus switches

Cisco Fabric Interconnect

Cisco ASA Firewalls

Netasq VPN Encryptors and related software products

Polycom

Back office

Microsoft Windows Server 2008 R2, 2012 R2, 2016

Microsoft Active Directory

Microsoft SQL Server 2008, 2012, 2014

Microsoft Exchange 2010, 2013, 2016

Microsoft SharePoint 2010, 2013

K2 BlackPearl

Microsoft Lync 2013

System Centre Configuration Manager 2012 R2

System Centre Operations Manager 2012 R2

System Centre Service Manager 2012 R2

System Centre Virtual machine Manager 2012 R2, 2016

System Centre Data Protection Manager 2012 R2

Microsoft Certificate services

Microsoft Threat Management Gateway 2010

Microsoft Azure Cloud

Symantec Antivirus

Page 7: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 7 of 20

McAfee Antivirus

Front Office

Windows 7, 8, 10

Office 2013

Lync 2013

Polycom Video Conference

Windows Phone 8, 10

Apple iPhone / iPad

Other Technology

Netasq

Netgear

Polycom Desk phones

NOTE: The software versions listed are the versions currently utilised by the GSA, the Framework Service Contract covers current versions and all future evolutions of the systems.

IV. General requirements

A. Specific Contract award process

The present Contract shall be implemented through specific contracts, according to the procedure defined in Art. I.3 of the FWC(Annex II to the Invitation to Tender).

When the specific contract is for provision of services at GSA premises, the GSA shall have the right to interview contractor’s experts proposed to be made available as described below in section IV B and C.

B. ICT specialist - general conditions

Each specialist offered by the contractor must be first confirmed by GSA internal interview, which may also include a written test. In specific cases (i.e. User Trainer) level of English or presentation skills may also be tested.

The GSA may decide to accept specialist without the specified credentials, under the condition that the contractor guarantees to upgrade the missing skill or certification within the first quarter of the SC duration. As example, if GSA chooses to accept a “System Administrator – Senior” profile without required certification (i.e. one exam missing) in Specific Contract for one year, the contractor must guarantee the specialist will upgrade his skillset according to the requirement within the first three months of the allocation to GSA.

Page 8: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 8 of 20

C. ICT specialist – procedure to request

The GSA shall send request to Contractor with indication of required specialist

profile, and required starting date. This notice period shall be maximum 30 working

days.

Contractor shall propose a candidate, if the candidate never worked for the GSA, the

proposal must be accompanied with a CV and a slot for an interview (in Prague GSA

HQ or by phone).

Upon agreement form GSA, the candidate shall be ready to start working within 14

working days.

D. ICT Specialist profiles

The Contractor must be able to provide specialist with the following profiles, to any of the sites mentioned in section 2.1 (or other sites within Europe that may be requested in the future) upon request of the GSA:

# PROFILE REQUIREMENTS

1 Helpdesk Operator – Junior Minimum 1 year helpdesk experience with 1st level of support

MCP or equivalent3 certification for any of the following client Operating Systems: Windows 7,8,10.

2 Helpdesk Operator – Senior Minimum 3 years helpdesk experience with 1st or 2nd level of support

MCP for 1 client OS and one server OS, or equivalent1 certification. Proven training for MS Office administration.

3 Helpdesk Operator – Junior FRANCE

Minimum 1 year helpdesk experience

MCP or equivalent1 certification for any of the following client Operating Systems: Windows 7,8,10.

4 Helpdesk Operator – Senior FRANCE

Minimum 3 years helpdesk experience with 1st or 2nd level of support

MCP for 1 client OS and one server OS, or equivalent1 certification. Proven training for MS Office administration.

5 System Administrator - Junior

Minimum 3 years sysadmin experience with 2nd or 3rd level of support

MCSA or equivalent1 certification.

6 System Administrator - Senior

Minimum 5 years sysadmin experience with 2nd or 3rd level of support

MCSE or equivalent1 certification.

MCP for one architect exam (Exchange, SQL,

Page 9: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 9 of 20

SharePoint, etc.)

7 System Administrator – Junior

FRANCE

Minimum 3 years sysadmin experience with 2nd or 3rd level of support

MCSA or equivalent1 certification.

8 Webmaster, Content Editor Minimum 2 years SME experience with strong focus on SharePoint. K2 an asset.

9 System Architect Minimum 5 years SME experience with focus on the specific requested field of expertise

MCP for architecture of the specific system requested

10 Test Engineer Minimum 2 years SME experience

11 Network Specialist Minimum 3 years SME experience

CCNP Certification or equivalent1

12 IT Security Specialist Minimum 4 years SME experience

CompTIA, CEH, or equivalent1 certification

Proven experience with IT Security audits

13 Project Manager Minimum 5 years SME experience

Prince II, SCRUM, or other PA certification path

14 Software Developer Minimum 3 years SME experience

MCSD or equivalent1 certification

Throughout knowledge.Net, HTML, JavaScript, PowerShell, CSS, XML, K2, or other language as required by the SC

Strong orientation on SharePoint development

15 System Specialist Minimum 3 years SME experience

MCP or equivalent1 for the specific system requested

16 User Trainer Minimum 3 years SME experience

Excellent command of English language

17 Technical Writer Minimum 2 years SME experience

Excellent command of written English language

18 IS Lead Implementer Information Security IT Lead Implementer Certified or

Proven track of leading ISO certification process within organization

19 IT Procurement support Proven knowledge of EU procurement regulatory framework

To be acquainted with the SW licenses procurement specifics

1 Equivalent to be evaluated and determined by the GSA IT Department

Page 10: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 10 of 20

E. ICT Specialist for GSA Sits in FR/UK

Following rules apply:

• The minimum specific contract assignment length shall be 12 months

• The specialist hired under this profile will not receive any additional travel or housing

reimbursement. It is foreseen for such specialist to be hired on the local market.

• When specialist allocated to FR/UK is required to travel on official mission, it will be

covered by GSA Rules for Mission Reimbursement

F. Allocated Specialist - continuous skillset development

The contractor must guarantee to the GSA a continuous skillset development of human resources allocated to GSA for medium or long term period. It shall be guaranteed for each specialist to have at minimum 7 days of professional training in a year. This must be certified training (MCTC, CISCO Academy, etc.) led by a certified trainer.

The exact subject of the training shall fall into professional scope of the specialist, and must be to the benefit of job position, allocated to the specialist in the GSA. GSA and the contractor must agree on the training before it is commenced.

The cost incurred for the training, shall be borne by the contractor. The GSA will relieve the specialist off duty, for the duration of the training. This time is considered “not worked” for the GSA, and will not be paid.

G. Personal data protection management

Attention is drawn to the articles I.19 and II.6 of the draft FWC, the applicable declarations on confidentiality, absence of conflict of interest and personal data protection management (templates annexed to the FWC) and section 2.3.9.6 of the Tender Specifications. Regarding the personal data protection management (in the sense of Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data2), the Contractor:

2 Or any legislative act amending, repealing or replacing this Regulation 45/2001.

Page 11: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 11 of 20

(i) is considered the data processor;

(ii) shall guarantee to the GSA a continuous scrupulous personal data management throughout the FWC at minimum in terms of:

Contractor’s staff’s awareness – including regular trainings provided,

Contractor’s staff’s documented commitment (ref: Annex II.IV and Annex II.IV of the draft FWC);

(iii) Contractor’s obligation of ex ante notifying the GSA of any new personal data processing operation that the Contractor envisages to undertake or detects as needed to be undertaken under FWC/ any SC;

(iv) Take at any time specific care of security of personal data processing and processing of personal data on behalf of controller (in sense of the Regulation 45/2001).

V. Services description

A. General ICT Services

TASK 1. CONTRACT MANAGEMENT

a) Scope

The contractor shall provide on a request of the Agency:

A contract manager and a deputy that will ensure continuous and sound contract management, throughout the duration of the life of the framework contract.

These persons shall perform as a minimum the following duties:

• Manage the framework contract, its specific contracts and deliverables

• Assign an ad hoc project teams and provide the GSA with the team

composition and contact details

• Arrange the proper execution of all the project tasks

• Monitor and maintain proper knowledge level and career development

as laid down in article IV.E. Of this document.

• Manage its resources allocated to the project, monitor and document

the use of resources

• Monitor and report on the use of the “Provisional amounts for

unplanned work” allocated to the specific contracts

• Be proactive and prevent any risks related to the correct functionality of

all supported systems by informing the GSA counterparts whenever a

risk is identified

• Guarantee and report on sound financial management of allocated

resources

Page 12: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 12 of 20

• Ensure all communication with GSA, in particular regarding the

organisation of work and any changes and exceptions that may happen

during the project execution; inform GSA in advance (at least 5 working

days) of any actions or resources required to assist the Contractor

• Chair project and contract meetings

• Draft minutes of all the meetings, submit them for GSA comments

and/or approval within 3 working days so that the final meeting minutes

are available 5 working days after the meeting

• Draft project documentation if required

• Monitor mission costs of the specialists working for the GSA and collect

the necessary evidence for the purpose of reimbursement of these costs

where applicable

• Create monthly reports covering the execution of all running specific

contracts and providing lists of all activities and products delivered to

the GSA over the respective time period; any invoicing to the GSA can be

done only on the basis of these reports approved by the GSA

• Adopt to reporting tools and templates where provided by GSA, in order

to align with an existing GSA policies and procedures

b) Deliverables

The delivered services as described under scope. Monthly reports in format and scope agreed upon the signature of first SC.

c) Price Conditions

The contract management service shall be offered as a firm fixed price for a period of one month (see GSA-OP-01-17-Annex-I.D.LOT1).

TASK 2. MINOR HW/SW PURCHASING SERVICE

a) Scope

Text Upon request, the Contractor shall provide an ad-hoc service for the purchase of:

• ICT material

• Supplies

• SSL certificates

• Services either for unexpected use, or in situations that the services are

available only via online payments.

This applies to individual items of value less than 5000 EUR. The typical items to be purchased are spare parts or items available only from Internet online transactions, like SSL certificates, software utilities, hard disks, memory, supplies and accessories (namely toner cartridges), cables etc. or services like

Page 13: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 13 of 20

a repair of a broken device out of warranty, payment to a specialised technician coming to GSA premises etc.

These purchases must be explicitly authorised by the GSA on a case-by-case basis. The process is as follows:

1) The GSA shall initiate the purchase, by sending details on the required

items as appropriate – description, specification, price range, required

delivery date to the contractor, number of offers to be obtained.

2) The contractor shall verify the details, obtain the offer/s from potential

supplier/s and send it to the Agency within 10 days after receipt of the

request, unless otherwise specified in the request.

3) The GSA approves the purchase through an email from Agency’s

representative.

4) The Contractor executes the purchase

5) The GSA confirms the reception of HW/SW, this closes the process

The Contractor shall also handle all activities related to warranty, repair, return and replacements of such materials and supplies purchased for the GSA. No handling fees or price mark-ups shall be charged for these purchases (this activity shall be included in the basic service price).

In order to allow for more flexibility in handling urgent support needs (urgent missions, unforeseen work, purchases and leases) under the Basic service, a provisional amount of money may be allocated for this purpose via a specific contract without a link to a specific task or project.

In average 1 purchase actions per quarter, with no more than 5 items is expected to be handled.

b) Deliverables

Procured items shall be delivered directly to GSA location identified in the initial request. Delivery receipt, or other document including the actual price of the purchase along with the warranty documentation, if such exist, shall also be delivered.

The purchase shall be listed in monthly report.

c) Price Conditions

The HW/SW purchasing services hall be offered as a fixed price for a period of one month (see GSA-OP-01-17-Annex-I.G.LOT1).

The price of the purchased under this task items shall be reimbursed to the contractor based on an invoice, proof of payment effected, and delivery receipt, signed by the Agency.

TASK 3. MINOR HW/SW LEASING SERVICE

Page 14: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 14 of 20

a) Scope

Upon request, the Contractor shall provide a leasing service requested by the GSA. As example if a specific HW is required for limited amount of time (weeks, months) the Contractor shall provide full scope service, and deliver required HW to GSA. This applies to individual assignment of value less than 5000 EUR.

Such lease must be explicitly authorised by GSA on a case-by-case basis. The process is as follows:

1) GSA will initiate the required leasing service request, by sending details

to the contractor

2) Contractor verifies the details and price quote.

3) If the price quote is different from the request, the quote is forwarded

to GSA for approval.

4) GSA approves the leasing service

5) Contractor executes the lease

6) GSA confirms the reception of the service, this closes the process

The Contractor shall handle all activities related to transport, warranty, repair, return and replacements of such materials leased on behalf of the GSA. The full price of the lease, along with the expenses incurred in relation to this procedure shall be reimbursed to the Contractor. Detailed worksheet for such expanses must be provided to the GSA, with all available proofs (receipts, etc.)

In order to allow for more flexibility in handling urgent support needs (urgent missions, unforeseen work, purchases and leases) under the Basic service, a provisional amount of money may be allocated for this purpose via a specific contract without a link to a specific task or project.

This is an exceptional service, and it is expected to be activated only in exceptional circumstances. Only few such actions per the duration of the contract are foreseen.

b) Deliverables

Leased items shall be delivered directly to GSA location identified in the initial request. Delivery receipt, or other document including the actual price of the lease, shall be included.

The lease shall be listed in monthly report.

c) Price Conditions

Text The HW/SW leasing service shall be offered as a fixed price for a period of one month (see GSA-OP-01-17-Annex-I.G.LOT1).

Page 15: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 15 of 20

The price of the purchased under this task items shall be reimbursed to the contractor based on an invoice, proof of payment effected, and delivery receipt, signed by the Agency.

TASK 4. SW LICENSES PURCHASING SERVICE

a) Scope

The Contractor shall provide support in the purchase of software licenses needed for the GSMC operation – identification of potential supplier, drafting the procurement documentation in line with the provision of the Financial Regulation, provision of support in the procurement procedure conduct - launch, sending of invitation to the pre-defined bidder/s, handling of Q/A session, support in the evaluation of the received bids and preparation of the follow-up orders/contracts.

The individual items could be of a value above 5000 EUR. The resulting contracts for the procurement of the SW licenses shall be signed by the GSA.

The typical items to be purchased are various OTC Software licenses.

b) Deliverables

Text Deliverables shall be defined in the ToR to the specific contract, including but not limited to draft requests for quotation, justifications of a single source situation existence, draft orders/contracts, monthly report on the activities performed, substantiated by time-sheets, indicating as a minimum the particular assignment, the expert name and the date/s on with the service was performed .

c) Price Conditions

The SW licenses purchasing services price shall be based on a day rate for the expert to be made available for the assignment (expert ICT procurement) (see GSA-OP-01-17-Annex-I.G.LOT1).

TASK 5. OFFSITE BACKUP STORAGE

a) Scope

The contractor shall provide an off-site backup storage with rotation scheme. Following conditions must be met:

• backup media sets shall be collected from GSA offices (normally in

Prague but it should be possible also in Saint-Germain-en-Laye, France,

and Swanwick, United Kingdom) on regular basis (frequency 1x, 2x, 3x,

4x or 5x a week)

Page 16: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 16 of 20

• the exact location(s), frequency and number of media sets will be

determined in the specific contracts

• backup media sets shall be stored in secure and environmentally

controlled conditions

• there shall be a rigorous chain-of-custody and audit trail, both in transit

and when the media sets are stored

The GSA shall have the right to locate and request the delivery of a specific media set at any time, day or night, and any day of the year following the predefined procedure and authorization.

b) Deliverables

Deliver required service and list this service in the monthly report.

c) Price Conditions

This service will be paid for according to the GSA-OP-01-17-Annex-I.G.LOT1, article IV, “Offsite Backup storage”.

B. Specific ICT Services

TASK 6. ICT TECHNICAL CONSULTANCY

a) Scope

The Contractor shall make available an IT subject matter expert (SME) for provision of consultancy services. The qualification of the SME shall comply with the profile descriptions as described in section V.C hereto. Based on the requirement the contractor will be assigned for full/partial/period of time. The length of the assignment will be defined in the SC.

b) Deliverables

Deliver required service and provide on-time dully filed timesheets for the signature of GSA contract manager.

c) Price Conditions

The ICT consultancy service shall be offered as a man-day rate for the profiles specified in section xx (see GSA-OP-01-17-Annex-I.G.LOT1). Only the services really rendered, as evidenced by time sheets submitted, shall be paid.

TASK 7. FULL-SCOPE ICT PROJECT DELIVERY

a) Purpose and Scope

Page 17: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 17 of 20

The purpose of the service is to deliver, when required by SC task, full scope IT project, from the analysis and design, to implementation, training, documentation, etc. as required by the GSA IT.

It is understood, the full scale project will involve establishment of a team including all necessary profiles composition, in order to successfully deliver the required project. As an example following profiles can be foreseen to participate in single full scale project:

• Project Manager

• System Architect

• System Specialist

• Test Engineer

• Document writer

• User Trainer

Such projects will be delivered in close cooperation with GSA IT Development Team, and shall be executed in accordance with an agreed methodology (Prince2, SCRUM, PM2, etc.)

b) Deliverables

Full scope IT project as defined in requirements, including documentation and other fundamental project elements as further detailed in the Specific Contract.

c) Price Conditions

In its specific contract offer the contractor shall provide justified estimation of the man-days needed for the different profiles for each phase of the project. The Agency shall asses the estimation provided and when it is considered acceptable shall issue a specific contract for the project at a fixed price. Alternatively, the Agency may request further justification / revision of the offer submitted.

TASK 8. ON-CALL STANDBY SUPPORT (REMOTE/ON-SITE3) SERVICE

a) Service initiation

When required, this service shall be initiated by a task in specific contract. Details about areas covered, and detailed scope shall be part of this task description.

b) Purpose

The purpose of the service is remedy of anomalies on GSA systems requiring immediate or rather quick action, and therefore only senior personnel with

3 Only in GSA Prague HQ

Page 18: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 18 of 20

sufficient working experience will be involved in this task. The specialist profile provisions of the Article V. C. shall apply.

c) Scope

The Contractor shall be capable to provide on-call standby support of ICT Specialists for the below mentioned Critical systems, given such task has been anchored in a specific contract. The exact profiles required shall be described within a task description of Specific Contract. Travel to other GSA sites will not be required for the standby service.

• Cisco Network, Firewalls, Switches, Wi-Fi hotspots and other

network infrastructure equipment

• Dell EMC storage systems

• Microsoft Exchange infrastructure

• Microsoft SharePoint infrastructure

• Microsoft Lync infrastructure

• Microsoft TMG

d) Availability

The On-Call Stand-By shall be available between 08:00 and 18:00, Monday to Friday, unless specified otherwise within task description of specific contract.

e) Activation and reaction times

The service shall be activated by GSA authorised personnel contacting any of the following4:

• Contractor dedicated on-Call phone number

• Contract manager

• Deputy contract manager

• Contractor dedicated email address

The desired availability times are:

Availability on remote access: 1 hour Availability on-site in GSA Prague HQ: 3 hours

f) Deliverables

Deliver required service and list this service in the monthly report.

g) Price Conditions

This service will be paid for in the following manner:

4 Precise contact procedure and details shall be detailed in Specific Contract

Page 19: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 19 of 20

• Monthly fixed fee for On-Call Stand-By duty service upkeep

• Ad-hoc payment for an activated specialist.

TASK 9. GSA PORTFOLIO TAKEOVER

a) Scope

The Contractor must be ready to launch a technology takeover phase no later than 2 weeks after signature of the Framework Contract. This phase is designed to adopt running projects and existing in-place procedures from the former Contractor, and must guarantee seamless and takeover with zero or minimal (outside of working hours) impact on core GSA IT Services. This takeover shall not take longer than 30 calendar days.

b) Deliverables

Deliver required service and list this service in the monthly report. Detailed protocol of the system and technology condition is also foreseen as a follow-up of this task.

c) Price conditions

The details and fixed price of this task is to be determined and described in the Specific Contract. The GSA shall issue a specific contract, covering all technology scopes that have to be taken over, shortly after the signature of the FWC. Initiation of this task is on the discretion of the GSA.

VI. Milestones and deliverables

The intermediate and final outputs and deliverables during the execution of the framework contract through specific contracts shall include (to be further detailed in the specific contract):

• Relevant progress reports (monthly, quarterly, ad hoc, close-out) as defined in relevant

specific contract,

• Timesheets for relevant tasks in Specific Contract

• Deliverables acceptance sheets duly dated and signed by the contractor and the Contracting

Authority’s project officer,

• Ad-hoc technical reports,

• Meeting minutes.

Unless otherwise specified by the GSA, the contractor shall deliver 1 (one) electronic copy of each deliverable with all relevant data, including the presentations done during the meetings. The intermediate and final outputs and deliverables for the interim and final payment (e.g. progress report/final report, preparation of articles, leaflets, delivery of on-site support, ad-hoc presentations, etc.) will be required at the level of specific contracts. The corresponding submission timelines, volume, detailed tasks will also be described at the level of each Specific Contract Terms of Reference.

Page 20: GSA/OP/01/17 “General ICT Support to GSA” LOT1 General … ·  · 2017-07-31MCSD Microsoft Certified Desktop Support Technician ... VPN Virtual Private Network OTC Over-the-counter

Page 20 of 20

The language in which the deliverable (including all reports and software) is to be submitted is English, unless otherwise specified by the GSA.

The GSA will have 30 (thirty) calendar days from receipt of the deliverables to approve or reject them in full or in part. The contractor will have 15 (fifteen) calendar days to submit additional information / another report /clarifications upon reception of the comments and/or request for clarification from the GSA.

Results of the activities performed under the framework contract may be published or released by the GSA to third parties. For this purpose, the contractor must ensure that there are no restrictions based on confidentiality and/or intellectual property rights imposed by third parties. Should the contractor intend to use study data that cannot be published, such limitation must be explicitly mentioned in the offer.

The GSA may also ask contractor to submit relevant reporting in form of electronic records in already established reporting tools at disposal in GSA. This may be task specific, and shall be detailed in Specific Contract.


Recommended