7/30/2019 GSC Platform Operation Guide http://slidepdf.com/reader/full/gsc-platform-operation-guide 1/28  ------ GSC Platform Operation Guide
Transcript
Page 1: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 1/28

 

------ GSC Platform OperationGuide

Page 2: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 2/28

GSC---Global Simulation Center

You can use the GSC resources by accessing the Intranet of

our company anytime and anywhere.

ME&NA

EuropeSouth AF

Simulation center

AP South

America

Network

management

platform

North

America

CIS

EP

China

Page 3: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 3/28

In the case of information security, a public shared platform can be used to share

simulation resources and experiences globally. Thus, the resources can be managed

uniformly and the simulation service capability is improved.

The corresponding areas of the IP addresses are:

10.75.47.134 AP

10.75.47.135 ME&NA and Source AF

10.75.47.136 CIS, Source America, North America, Europe and EP10.75.47.137 China

GSC---Global Simulation Center

Page 4: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 4/28

Function and Features

Complete materials Electronic maps library, propagation models library and antenna library Simulation documents Enough U-Net simulation software resources Simulation with the basic input information

Significance and function The current software license is managed in centralized way and allocated

dynamically. Thus, it will improve the use efficiency and decrease thecost.

In business travel, employees can log in to the Intranet of our company tocomplete the simulation task without the simulation tool. It avoids the risk

of losing the license. The performance of the headquarters' GSC server is better. The calculation

speed is faster, thus, the simulation efficiency is improved a lot. The centralized management of the simulation services improves the

simulation capability of Huawei network design.

High speed and large capacity

Page 5: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 5/28

The GSC Helps You!

When there is an urgent simulation task

and you have no dongle, how to deal with it?

The GSC provides many dongle resources. You can use

them with the use application when accessing the

company Intranet.

Page 6: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 6/28

The GSC Helps You!

When the local network is unstable and the

floating dongle is terminated frequently, you

cannot stand for it. 

The server of the GSC locates in the data center. All

the project calculation is performed in the server.Even if the local network has faults, the project data

will not lose if the user re-logs in to the server within

24 hours.

Page 7: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 7/28

The GSC Helps You!

The speed of the laptop PC is slow and thehardware space is small.

The processing speed of the project is decided by the GSC

performance configuration. Without occupying the local

resources, the hardware configuration of the GSC is 2 x 2.4

GB CPU. The GSC has 8 GB memory and the calculation

performance is geometrically improved. The 200 stations

occupation of a user can be realized within 2 minutes.

There are simulation projects of 

thousands stations to be processed.

 How to deal with it?

Page 8: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 8/28

The GSC Helps You!

Multiple projects are bidden at the

same time

The GSC supports multithreaded operation of multiple

users. The users' operations are not interfered with eachother. The number of users is not limited when there is

authority. Multiple users can use the GSC at the same

time and the efficiency is improved.

and the dongle is not enough.

 How to deal with it?

Page 9: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 9/28

Content

Operations

Applying Authority

Login Mode

Data Transmission

Creating Projects

Archiving Projects

FAQs

Seeking for help

Page 10: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 10/28

Applying Authority

The applicant fills in the application form and the Commitment for Using

 Network Tools.

The director or the region network design manager signs and confirms it.

(The mail confirmation is allowed.)

The applicant sends the confirmed application firm to:

[email protected].

After the approval and authorization, the administrator notifies the applicant

through email. The applicant logs in to the server and operates following the Global

Simulation Center Operation Flow and Criteria and Global Simulation

Center Operation and Management Regulations.

Page 11: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 11/28

Content

Operations

Applying Authority

Login Mode

  Data Transmission

Creating Projects

Archiving Projects

FAQs

Seeking for Help

Page 12: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 12/28

Login Mode

Select Start > Programs > Accessory > Communication > Remote desktop

connection, as shown in the following figure.

Domain account (the initial letter of the

name + five digits

employee ID)

Password

IP address of 

the server

Page 13: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 13/28

Content

Operations

Applying Authority

Login Mode

  Data Transmission

Creating Projects

Archiving Projects

FAQs

Seeking for Help

Page 14: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 14/28

Data Transmission (1)-Email Mode

Files cannot be copied and pasted directly between the remote serverand the local host.

There are two transmission modes:

Email mode

It is suggested transmitting small files in this mode.

Note:Engineers are forbidden to send email from their own mailbox totheir own mailbox. 

Page 15: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 15/28

Data Transmission (2)-FTP Mode

FTP mode At local, the user can upload data througnftp://10.75.47.81 

(The user name and password for uploading and downloading are both unet.) At server, choose My Computer > Network Drives.

The FTP on’10.75.47.81’(F:) is displayed.Copy the uploaded data to the directory of the project.

Note :After copying data, you must delete the uploaded data in the FTP. Or else, theGSC use qualification will be cancelled. (The downloading data procedure issimilar.)

Upload data

Project finishes

Save

the uploaded

data

Download data

FTP Server

Page 16: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 16/28

Data Transmission (3)-Map Uploading

Upload maps and

notifies the

administrator.

Upload maps and

notifies the

administrator.

The administrator

backs up and

updates maps

information.

Maps information is

updated and released

regularly.

Page 17: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 17/28

Content

Operations

Applying Authority

Login Mode

Data Transmission

Creating Projects

Archiving Projects

FAQs

Seeking for Help

Page 18: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 18/28

The GSC Navigation Tree

Project files

Simulation data

Project parameters

Electronic map library

Propagation models

library

Simulation knowledge and

experienceReport template

……

Windows 2003 Serveroperating system

° ²́ úÆ· Ï ß

° ×́ ÊÁ Ï À à± ð ° ·́ ¢² ¼· ¶ Î §

Page 19: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 19/28

New project (1)

Naming conventions1. Naming the project folder

The naming convention of the folder is:

country name_project name.

2. Naming the project files

The naming convention of the UNET project

files is country name_project

name_remarks_date.

For example,

Page 20: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 20/28

New project (2)

Save mode of the simulation link loss matrixSelect Data in the browser and right-click Prediction. Then, select

Property.

Default modeDo save-as of the

matrix data in the path.

Page 21: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 21/28

Content

Operations

Applying Authority

Login Mode

Data Transmission

Creating Projects

Archiving Projects

FAQs

Seeking for Help

Page 22: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 22/28

Archiving Projects and Clearing Disk Space

Delete the following project filesafter the simulation:

1. Temporary map data

2. Matrix data in the simulation

calculation matrix

3. Compressed project file

The size of the data

can be several GB

and the data can be

deleted.

Delete the data of the temporary map.

Page 23: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 23/28

Content

Operations

FAQs

Seeking for Help

Page 24: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 24/28

FAQ (1)

The remote connection cannot be performed.

Phenomenon:

The user clicks the link in the Remote desktop connection dialog box and the error is prompt as

follows:

Solutions:The user should first check whether the entered server IP address is correct

and the local host is connected to the company Intranet. Then, ping the

relative IP address of the server. If the IP address cannot be pinged,

contact the local IT engineers or the network maintenance engineers.

Page 25: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 25/28

FAQ (2)

The server cannot be logged in to.Phenomenon: 

The user cannot log in to the server after entering the user name and password.

Solutions:

The user should first check whether the connected server is theapplied server and the user name and password is that of the

applicant. Then, check whether the CHINA domain is selected. If

all the previous are correct, you can send email to

[email protected] .

Page 26: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 26/28

Content

Operations

FAQs

Seeking for Help

Page 27: GSC Platform Operation Guide

7/30/2019 GSC Platform Operation Guide

http://slidepdf.com/reader/full/gsc-platform-operation-guide 27/28

Seeking For Help

GSC use

 [email protected]

  [email protected] +86-755-28567019

Simulation service

The person in charge of simulation in the sale support department of each product

Comments and suggestions

[email protected]

  Please state Comments feedback in the email title.