GSI Darmstadt Site report • FAIR project • Overview IT at GSI Helmut Kreiser
Transcript
Page 1: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

GSI Darmstadt

Site report

• FAIR project

• Overview IT at GSI

Helmut Kreiser

Page 2: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

Das FAIR Projekt

Facility for Antiproton and Ion Research

Jürgen Eschke

Vortrag Wissenschaft für Alle, GSI, 12.5.2004

Page 3: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

UNILAC

ESR

GSIAcceleratorFacilities

SIS100/SIS300

Plasma Physics

CBMHESR

NESR

Super- FRS

CR

Atomic Physics

PANDA

FLAIR

Verbesserung gegenüber heute: Primärstrahlintensität 100 – 1000 x

Sekundärstrahlintensitäten für radioaktive Kerne: bis 10 000x

Ionenenergie: 20 x

Neu: schnell gepulste supraleitende

Magnete

„gekühlte“ Antiprotonenstrahlen bis 15 GeV

Speziell: intensive „gekühlte“ Strahlen radioaktiver ‚exotischer‘ Kerne

effizienter Parallelbetrieb für mehrerer Experimente

FAIR

Page 4: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.
Page 5: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.
Page 6: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.
Page 7: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

1.1.

1.2.

1.4.

1.5.

1.3.

SIS100

3.

SIS2006T4.

CR System

6.

3.1.

Simulat.5.1.

4.1. 9.1.

HESR

7.

PANDA

9.

NESR

8.

Working packages

SIS18Upgrade

1.

6.1. 7.1.

Super-FRS

11.

14.1.

CBM

10.

Plasma Phys. Exp.

12.

AtomicPhys. Exp.

13.

10.1.

11.1.

12.1.

Buildings +Infrastructure

14.

Installations2-4,6-13,

15.1.

Structure of the

FAIR project

Acc. SystemPhysics

5.

Integration

15.

P-Linac

2.

13.1.8.1.2.1.

Safety

Project OfficeAdvisory Committees PACs, TAC, EMAC,..

Beamlines5..2.

cryogenics

15.2.

alignement/surveillance

15.3.

IT media con.

15.4.

controls

15.5.

14.2.

14.3.

14.4.

Controlling

Accelerator Coordinator (Technical Boards) Research Coordinator (Technical Boards ) Civil Construction Coordinator (TB)

Integration Coordinator(TB)

Quality

Project Management

Project Director, Deputy Research Coordinator, Accelerator Coordinator,

Civil Construction Coordinator, Integration Coordinator,

Administrative Coordinator

FAIR Council (Representatives of Countries and/or Institutions)

 Finance Committee, Project Oversight Committee

Scientific Advisory Com.

Page 8: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

IT

• Linux (Debian) ~ 350– (SUSE) ~ few

• Windows ~ 800• AIX (reducing) ~ 10

– plus bio physics ~ 20• VMS ~ 15

– plus Accelerator controls (~30)

• Notebooks– Windows (XP)– Linux (SUSE)

• Mass storage (3 libraries, TSM, TSM-API access)– 2 SAN based (Storage Tek with LTO-2 tapes drives)

Page 9: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

What is new

• Firewall (Cisco PIXS)• Linux MTA (2-3) (migrate from AIX)

– Spam filtering (tagging) (Spamassassin)– Virus checking (Sophos, ClamAV)– Problems: Siesta (~20 min)– enforce GSI e-mail naming convention

([email protected])

• DNS Service migration to Linux (from AIX)– connection timeouts on AIX

Page 10: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

What is new

• new Fileservers with Serial ATA disc raids– 3 U boxes with up to 15 discs– Data– Scratch– Problems with old IDE disc raids

• new batchsystems (1 U boxes, Dual Xeon, 3.2 GHz)

• Windows migrate to XP, Server 2000/2003• phase out WinNT (this year)

Page 11: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

Systems

Page 12: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

What is new

• Debian 3.0 r2• non interactive daily security updates with

„out of the box“ debian tools• monitoring system (mon)

– processes

– disc status

– log host (syslog-ng)

– perhaps box status

• GRID, LCG -> need systems and support

Page 13: GSI Darmstadt Site report FAIR project Overview IT at GSI Helmut Kreiser.

What is to be done

• Migration of services from AIX to Linux– radius– listserv– NIS (sign on, LDAP based)– …..

• Groupware (mailserver) discussion– Microsoft Exchange 2003– OCS (Oracle collaboration suite)

• separate discussion forum (FUD forum, open source)• Discussion: new Batch queueing system

– LSF production (money)– SGE– OpenPBS

• if money is available– replace old batchfarm boxes– new and much more storage systems (user, data, scratch) SAN/FC ?– ~ 10 TByte is too small– good Linux desktop support -> manpower ??