Outline
GCC Progress Since November 2010•Update of GSICS Operation Plan•GEO-LEO Baseline Algorithm Implementation• Product Quality Assurance Activities
GSICS Procedure for Product Acceptance Implementation•GSICS Instrument Event Log Activities• GSICS Quarterly• GCC Meeting Support: Joint GRWG-VI and GDWG-V
Meeting, and GRWG and GDWG Web Meetings GCC Near-term Goals for 2011
21 April 2023Slide: 3
Post Joint Meeting Update of GSICS Operation Plan
All actions from the Joint GRWG-VI and GDWG-V Meeting posted
Actions now separated by GSICS organizational entity – Exec Panel&WMO, GCC, GRWG, GDWG, and GPRCs (One sheet per entity)
For a given organizational entity, actions are separated by action type
Considering using Google Docs to update the plan
21 April 2023Slide: 4
GEO-LEO Baseline Algorithm Implementation Status
Jan07 Jan08 Jan09 Jan10 Jan11
GOES-11
Jun/07
Aug/08
MTSAT-1R
Nov/09
FY-2D
GOES-12
GOES-13
Meteosat-7/9
FY-2C
AIRS IASI
MTSAT-2
21 April 2023Slide: 5
MTSAT-1R
FY-2C
AIRS IASI
Nov/09
GOES-10
GOES-8
Aug2003 Jun2007
Aug/08Meteosat-7
Jun06
GOES-12Jun/07
Jan07 Jan08 Jan09 Jan10 Jan11GOES-11
Jun06
Meteosat-8 Aug/08
Jan2004
Oct2004
Jun2005
105W
Back Process Plan @ Univ. Wisconsin
GEO-LEO Baseline AlgorithmBack Processing Plan @ Univ. Wisconsin
21 April 2023Slide: 6
GEO-LEO Baseline Algorithm Back Processing
Jan03 Jan04 Jan05 Jan06 Jan07
GOES-10
AIRS
21 April 2023Slide: 7
NOAA has two MTSAT-2 water vapor channel SRFs, the original one from the package NOAA received about 5 years ago (black line)
The newer SRF (blue line) is not the same as the original SRF (in black), but the original looks more realistic, as the one in blue has a straight line at the left shoulder position.
The different SRF causes about 0.5K difference at the homogeneous scenes
GEO-LEO Baseline Algorithm MTSAT-2 H2O Channel SRF?
New MTSAT SRF Applied to AIRS
Old MTSAT SRF Applied to IASI
21 April 2023Slide: 8
Stray light?
GEO-LEO Baseline Algorithm Fengyun-2D: Stray Light and SRF?
Non-linear issue?
21 April 2023Slide: 9
GSICS Procedure for Product Acceptance (GPPA) - Current Product Status
Progress of Potential Products in Demonstration Phase• GL01.1.0 - GSICS Correction for EUMETSAT SEVIRI IR Channels based on IASI• GL02.1.0 - GSICS Correction for MTSAT Imager IR Channels based on AIRS and IASI• GL03.1.0 - GSICS Correction for GOES Imager IR Channels based on AIRS and IASI Achieved flow of near-real time data to GSICS Collaboration Server at EUMETSAT ATBD and Traceability to SI Standards documents were accepted as of March 3, 2011 Documentation of use of associated radiative transfer models and cal/val supporting
measurements under review Testing by two or more potential users of product
GL01.1.0 and GL03.1.0 - Results under review GL02.1.0 – Results Due mid-June
• LL01.1.0 - Patmos-X AVHRR solar reflective channel corrections based on MODIS Achieved flow of near-real time data to GSICS Collaboration Server at EUMETSAT Under testing by three or more potential users of product Submitted ATBD and Traceability to SI Standards documents
21 April 2023Slide: 10
GPPA: Road to Pre-Operational Phase Collect and disseminate user
feedback regarding product's data usability and format
[GL02.1.0 and GL03.1.0 late due to reviewer delays]
Examine and remediate the submitted documents (radiative transfer models and cal/val supporting measurements)
• Who: Product users and GCC Director
• Due: April 2011
• Who: GPAT, product provider, and GCC Director
• Due: June 2011
21 April 2023Slide: 11
GPPA: Road to Pre-Operational Phase Collect and disseminate user
feedback regarding product's data usability and format
Examine and remediate the submitted documents (radiative transfer models and cal/val supporting measurements)
[Under current revision to consolidate into one document for all GEO-LEO IR GSICS Correction products]
• Who: Product users and GCC Director
• Due: April 2011
• Who: GPAT, product provider, and GCC Director
• Due: June 2011
21 April 2023Slide: 12
GPPA: Road to Pre-Operational Phase [Major milestone] Make a consensus
decision whether or not to continue the product acceptance process
Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document
Examine and remediate the submitted product quality document
• Who: GPAT and Executive Panel
• Due: June 2011
• Who: Product provider and
GCC Director • Due: June 2011
• Who: GPAT, product provider, and GCC Director
• Due: August 2011
21 April 2023Slide: 13
GPPA: Road to Pre-Operational Phase [Major milestone] Make a consensus
decision whether or not to continue the product acceptance process
Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document
Examine and remediate the submitted product quality document
• Who: GPAT and Executive Panel
• Due: June 2011
• Who: Product provider and
GCC Director • Due: June 2011
• Who: GPAT, product provider, and GCC Director
• Due: August 2011
21 April 2023Slide: 14
GPPA: Road to Pre-Operational Phase [Major milestone] Make a consensus
decision whether or not to continue the product acceptance process
Complete and submit Section III.3.A (product quality) of the GPAF and submit the product quality document
Examine and remediate the submitted product quality document
• Who: Product provider • Due: June 2011
• Who: Product users and GCC Director
• Due: June 2011
• Who: GPAT, product provider, and GCC Director
• Due: August 2011
21 April 2023Slide: 15
GPPA: Road to Pre-Operational Phase
Enter Pre-Operational Phase – August 2011
21 April 2023Slide: 16
GPPA: Road to Operational Phase Obtain product feedback from the Executive
Panel and remediate product based on this feedback
Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC
Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide)
• Who: Product provider
• Due: November 2011
• Who: Product users and GCC Director
• Due: December 2011
• Who: GPAT, product provider, and GCC Director
• Due: February-March 2012
21 April 2023Slide: 17
GPPA: Road to Operational Phase Obtain product feedback from the Executive
Panel and remediate product based on this feedback
Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC
Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide)
• Who: Product provider
• Due: November 2011
• Who: Product users and GCC Director
• Due: December 2011
• Who: GPAT, product provider, and GCC Director
• Due: February-March 2012
21 April 2023Slide: 18
GPPA: Road to Operational Phase Obtain product feedback from the Executive
Panel and remediate product based on this feedback
Complete documents associated with GPAF Sections III.2.C (analysis software documentation), III.2.D (product version control plan), III.3.B (operations and distribution plan), and III.3.C (data user's guide), and submit the documents to the GCC
Examine and remediate the submitted documents (product version control plan, operations and distribution plan, and data user's guide)
• Who: Product provider
• Due: November 2011
• Who: Product users and GCC Director
• Due: December 2011
• Who: GPAT, product provider, and GCC Director
• Due: February-March 2012
21 April 2023Slide: 19
GPPA: Road to Pre-Operational Phase
Enter Operational Phase - February-March 2012
21 April 2023Slide: 20
GPPA: Future Plans
In the Next Year …All Four Current Potential Products in Pre-Operational Phase
New Potential Product Submissions:GSICS Correction for CMA VISSR IR channels based on IASIGSICS Correction for EUMETSAT SEVIRI, MTSAT Imager and GOES Imager solar reflective channels based on MODISGSICS Correction for MSU/AMSU-A data based on SNO
21 April 2023Slide: 21
GSICS Instrument Event Log Activities: Past Efforts
Feedback About Instrument Monitoring and Anomaly Reporting at Joint GRWG-IV/GDWG-III Workshop
All GSICS partners shall propose contents of the performance monitoring pages which they intend to display on their own web sites.
ACTION GDWG03_06
NOAA has up-and-running monitoring systems for GEO and LEO satellites Attempts have been made during the course of 2009 to solicit
instrument monitoring or anomaly information web sites from members There has been a lack of response The GCC would like a way forward for Action GDWG03_06.
21 April 2023Slide: 22
GSICS Instrument Event Log Activities: 17/02/2011 Web Meeting & 25/03/2011 Joint Meeting
Clarified that this activity is related to an action on the GSICS Exec Panel from CGMS to "define what should be the key factors that need to be displayed in the GSICS Instrument Monitoring web sites".
Resolved the initial requirements for the GSICS instrument event logsThe GSICS instrument event logs for a given satellite instrument shall:Provide sufficient information for the user to
• Gain awareness of anomalies, maneuvers and other events associated with that instrument
• Resolve, adapt to and/or mitigate errors in their data processing streams caused by these events
Not overwhelm the user with information that is not understandable (acronyms etc.). Link to more details such as daily email notifications Be hosted by each GPRC
Action JOINT06_03 - Provision of a draft template for the instrument event log by 31 May 2011
21 April 2023Slide: 23
Each GSICS GPRC will us a web interface to created, archived, and disseminated provide information on instrument event and calibration updates.
Web page structure• The front web page for these logs will allow users to link to the satellite and instrument for
which they require information• The back web pages will allow the users to access information to scheduled and anomalous
instrument events and calibration updates that significantly affect data quality The web pages are to be accessible, at minimum, to GSICS members The dissemination of instrument information that violates the national
export control laws of each participating GSICS member is discouraged
GSICS Instrument Event Log Activities: GCC Proposed Concept of Operations
21 April 2023Slide: 24
Satellite/Instrument Event and Calibration Update Logs
GEO SatellitesGEO Satellite Series #1 (e.g. GOES 10-15)
Satellite Name Instrument #1 Instrument #2 Instrument #N
Satellite #1 (e.g., GOES-10) (e.g., Imager) (e.g., Sounder) …
Satellite #2 (e.g., GOES-11) (e.g., Imager) (e.g., Sounder) …
…Satellite #N (e.g., GOES-15)
…(e.g., Imager)
…(e.g., Sounder)
…
LEO Satellite Series #1 (e.g. NOAA-6-14 )Satellite Name Instrument #1 Instrument #2 Instrument #3 Instrument #N
Satellite #1 (e.g., NOAA-6) (e.g., AVHRR) (e.g., HIRS) (e.g., MSU) (e.g., SSU)
…Satellite #N (e.g., NOAA-14)
…(e.g., AVHRR)
…(e.g., HIRS)
…(e.g., MSU)
…(e.g., SSU)
LEO Satellite Series #2 (e.g. NOAA-15-19 )LEO Sat. Table …
GEO Satellite Series #2 (e.g. GOES-16-17 )GEO Sat. Table …
LEO Satellites CLICK
Front Page
21 April 2023Slide: 25
GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager)Event and Calibration Update Log
Scheduled Satellite/Instrument EventsEvent Description Data Impact Event Outcome Begin Date End Date
Event #1 Data Impact #1 Event Outcome #1 BD #1 ED #1
Event #2 Data Impact #2 Event Outcome #2 BD #2 ED #2
…Event #N
…Data Impact #N
…Event Outcome #N
…BD #N
…ED #N
CLICK to More Comprehensive Description of
Event
Example Events:PTC-Patch Temperature ChangeDC-DecontaminationCSP-Change Satellite PositionOM-Other Manuever
Example Events Outcomes:R-ResolvedA-AdaptM-Mitigate(Could put a date of outcome – e.g., R20110417)
Example Data Impacts:O-OutageDQD-Data Quality Deterioration
Back Page #1
21 April 2023Slide: 26
GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager)Event and Calibration Update Log
Anomalous Satellite/Instrument EventsEvent Description Data Impact Event Outcome Begin Date End Date
Event #1 Data Impact #1 Event Outcome #1 BD #1 ED #1
Event #2 Data Impact #2 Event Outcome #2 BD #2 ED #2
…Event #N
…Data Impact #N
…Event Outcome #N
…BD #N
…ED #N
CLICK to More Comprehensive Description of
Event
Example Events:AS-Anomalous ShutdownPM-High RadiationAIP-Anomalous Instrument Performance
Example Events Outcomes:R-ResolvedA-AdaptM-Mitigate(Could put a date of outcome – e.g., R20110417)
Example Data Impacts:O-OutageDQD-Data Quality DeteriorationNDS-Non-nominal Data Set (e.g., Diagnostic Mode Data Set)
Back Page #2
21 April 2023Slide: 27
GEO Satellite #1 Instrument #1 (e.g. GOES-10 Imager)Event and Calibration Update Log
Calibration Algorithm/Parameter UpdatesUpdate Description Data Impact Event Outcome Begin Date End Date
Update #1 Data Impact #1 Event Outcome #1 BD #1 ED #1
Update #2 Data Impact #2 Event Outcome #2 BD #2 ED #2
…Update #N
…Data Impact #N
…Event Outcome #N
…BD #N
…ED #N
CLICK to More Comprehensive Description of
Update
Example Updates:UCC-Updated Calibration CoefficientsURVS-Updated Response vs. Scan angleUDM-Updated Detector Map
Example Events Outcomes:R-ResolvedA-AdaptM-Mitigate(Could put a date of outcome – e.g., R20110417)
Example Data Impacts:O-OutageDQD-Data Quality DeteriorationNDS-Non-nominal Data Set (e.g., Diagnostic Mode Data Set)
Back Page #3
21 April 2023Slide: 28
Is the list of possible events or updates complete? Is it possible to create an e-mail notification if significant events or
calibration updates occur? How do we acquire the information? Often this information may be
buried in much longer reports that would have to be manually extracted to keep the event/calibration update logs up-to-date
Do we do this for historical instruments, or just moving forward? Will we be competing with our own operational agencies in providing
this service? Is it even possible to make the event logs private to GSICS Members
only, or do we even need this level of privacy?
Instrument Event and Calibration Update Logs: Questions, Concerns, and Comments
21 April 2023Slide: 29
GSICS Quarterly Newsletter
GSICS Quarterly Volume 4 Issue 4 and Volume 5 Issue 1 is complete
Volume 5 Issue 2 is under development. Ideas for upcoming issues include a synopsis of
the GSICS plans for development of reflective solar band channels, or the GSICS Procedure for Product Acceptance
21 April 2023Slide: 30
Meeting Support
GSICS Meetings GSICS Joint GRWG-VI and GDWG-V
Meeting – March, 2011, Daejeon, Republic of Korea
GSICS Executive Panel IX – Nov. 2010, New Delhi, India
Centra web meetings hosted by EUMETSAT: Two meetings of the GSICS Microwave Sub-Group and three GRWG/GDWG meetings
21 April 2023Slide: 31
Near-term 2010-11 Goals Implement Procedure for Product Acceptance
• Shepherd All Four Current Demo Phase Potential Products to Pre-Operational Phase or Beyond
• Potential Product Submissions GSICS Correction for CMA VISSR IR Channels based on IASI GSICS Correction for EUMETSAT SEVIRI, MTSAT Imager and GOES Imager solar reflective channels based on
MODIS GSICS Correction for MSU/AMSU-A data based on simultaneous nadir overpasses
GSICS Baseline Algorithm • Continue to coordinate efforts to establish the GSICS baseline algorithm at NOAA GPRC
GSICS Instrument Event Logs• Hold a web meeting with the GRWG and GDWG regarding this issue to get feedback on
prototype designsGSICS Quarterly
• Continue to create and distribute this important link to the GSICS communityGCC Web Site
• Make changes to GCC web site based on recommendations made at the Joint meeting.Meeting Support
• GSICS 3rd Users Workshop ( 6 September 2011), QA4EO Workshop (18 - 20 October 2011), and GSICS Web Meetings