    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    midas GTS Tutorial

    Construction Stage Analysis of Metro Station

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    2/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    Overview

    In this tutorial the modeling

    sequence for a 2D metro station has

    been given.

    The figure on the right shows the

    cross section of the metro station.

    The ground has 9 different layers of

    soil

    Four different stages of excavation

    have been id entified.

    L1- Ground to Roof Slab

    L2- Roof Slab to Ticket Slab

    L3 Ticket Slab to In termediate Sl ab

    L4 Intermediate Slab to Raft Slab

    The columns, barrets, slabs and D

    wall have been mod eled as

    structural elements (beam elements).

    On the next p age a zoom ed in view

    of the D wall and columns can be

    seen.

    00

    Construction Stage Analysis of Metro Station

    1

    Man Made Fill (1)

    Upper Sand (2)

    Upper Clay (3)

    Middle Sand (4)

    Low er Sand (5)

    Upper Clay (6) Low er Sand (7)

    Low er Clay (8)

    Low er Sand (9)

    L1

    L2

    L3

    L4

    If you want to start this tutorial except definition of attributes and generation of all geometries, I

    recommend that you need to see this tutorial fro m Step 6(page 35).

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    3/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    Overview

    The closer look of the cross section

    is shown here during the

    construction phase.

    00

    Construction Stage Analysis of a Metro Station

    2

    +32.69

    4.92 6.48 6.48 4.92 15.97

    27.37

    11.39 11.40

    +33.29

    +42.89

    +47.54

    +54.34

    +24.19

    +52.34+52.59

    EB +30.0

    0.80

    +26.85

    20 kN/m2 20 kN/m2

    20 kN/m2

    2,5 kN/m2

    2,5 kN/m2

    0.80 0.80

    0

    .90

    0.

    70

    0.

    70

    0.

    80

    S

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    4/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    01

    Material Properties

    Soil Material Properties

    3

    ID 1 2 3 4 5 6 7 8

    NameMan

    Made FillUpperSand

    MiddleSand

    LowerSand

    UpperClay UD

    LowerClay UD

    UpperClay D

    LowerClay D

    Type Ground Ground Ground Ground Ground Ground Ground Ground

    (E) [MPa] 5 40 100 140 60 80 54 72

    Poissons Ratio () 0.3 0.25 0.25 0.25 0.45 0.45 0.35 0.35

    Unit Weight [kN/m3

    ] 16.677 18.639 19.62 20.601 18.639 18.1485 18.639 18.1485

    Unit Weight(Saturated) [kN/m3]

    16.677 18.639 19.62 20.601 18.639 18.1485 18.639 18.1485

    Cohesion (c) [kPa] 0 0 0 0 160 170 2 0

    Friction Angle () 27 35 38 39 0 0 28 30

    K0 0.52 0.43 0.38 0.36 0.56 0.62 0.56 0.62

    Material Model MC MC MC MC MC MC MC MC

    Drainage ParameterUndrain

    edUndrain

    edUndrain

    edUndrain

    edUndrain

    edUndrain

    edDrained Drained

    *MC- Mohr Coulomb

    St

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    5/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    01

    Material Properties

    Structural Element Material Properties

    4

    ID 9 10 11 12 13

    MaterialD Wall

    Concrete

    D Wall

    Concrete(service)

    Structural

    Steel

    Structural

    Concrete

    Structural

    Concrete(Service)

    Type Structural Structural Structural Structural Structural

    (E) [MPa] 19,905 9,953 200,000 23,281 11,641

    Poissons Ratio () 0.2 0.2 0.3 0.2 0.2

    Unit Weight

    (Gamma) [kN/m3]25 25 77 25 25

    Material Model Elastic Elastic Elastic Elastic Elastic

    Note: 1. D Wall conc rete is used in D Wall and B arrets2. Structural Concrete is used in Slabs and Columns

    GTS provides two types of materials, Ground and Structural. Ground is used to define material characteristics for those elements which are used to represent soil/ground (like plane strain in 2D and so lid elements in 3D).Structural material is used to define the material characteristics of struc tural elements like beam/truss/plate etc,

    Step

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    6/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    02

    Properties

    Property

    5

    Columns

    Barrets

    Property is used to d efine the geometrical details o f structural elements. For line elemen

    ts cross section/spacing may be defined. For plane elements thickness may be defined

    Since the column is a composite sectionwe directly enter the propert ies of the sec

    tion as shown.

    Step

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    7/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    02

    Properties

    Property

    6

    Roof Slab

    Ticket/Intermediate Slab

    Step

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    8/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    02

    Properties

    Property

    7

    Raft Slab

    D Wall

    Step

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    9/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Main Menu > File> New

    2. In the Project Setting define the

    details as shown.

    3. Cl ick [OK].

    03

    File > Open

    8

    2

    2

    Step

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    10/72

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Construction Stage Analysis of a Metro Station

    Procedure1. Main Menu > Model >

    Property > Attr ibute

    2. Click on [Add] >Select [Plane].

    3. ID 1, Name Man Made Fill.

    4. Element Type > [Plane Strain].

    5. Material > Click [Add].

    6. ID 1, Name Man Made Fill,

    Model Type [Mohr Coulomb].

    7. Enter the properties as shown.

    8. Click [OK] in Add/Modify

    Ground Material.

    9. Click [Apply] in Add/ Modify

    Plane Attribute.

    10. Similarly create the Att ributes

    for Upper Sand, Middle Sand,

    Lower Sand, Upper Clay UD

    and Lower Clay UD using the

    material properties defined in

    the table before.

    04

    Model > Property > Attribute

    9

    1

    2

    3

    4

    5

    6

    67

    8

    7

    9

    MIDAS IT C L dMIDAS IT C L dStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    11/72

    MIDAS IT Co., LtdMIDAS IT Co., Ltdp

    Construction Stage Analysis of a Metro Station

    Procedure

    1. ID 7, Name Upper Clay D.

    2. Element Type > [Plane Strain].

    3. Material > Click [Add].

    4. ID 7, Name Upper Clay D,

    Model Type [Mohr Coulomb].

    5. Enter the properties as shown

    in the table before.

    6. Make sure that the DrainageParameter is changed to

    Drained

    7. Click [OK] in Add/Modify

    Ground Material.

    8. Click [Apply] in Add/ Modify

    Plane Attribute.

    9. Similarly create the Attributes

    for Low er Clay D using the

    material properties given in

    table before.

    04

    Model > Property > Attribute

    1

    1

    2

    3

    4

    4

    5

    6

    7

    8

    MIDAS IT C LtdMIDAS IT C LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    12/72

    MIDAS IT Co., LtdMIDAS IT Co., Ltdp

    Construction Stage Analysis of a Metro Station

    Procedure

    1. The table on the right shows all

    the Attributes created for

    different soils.

    2. Upper Clay Drained and Lower

    Clay Drained have been defined

    separately because their

    properties are diff erent during

    drained and undrained behavior.

    3. So the Drained behavior of Claywil l be simulated later on as a

    boundary condition during the

    modeling process.

    4. In the next step we create the

    At tr ibutes for the Structural

    Elements.

    04

    Model > Property > Attribute

    11

    1

    MIDAS IT Co LtdMIDAS IT Co LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    13/72

    MIDAS IT Co., LtdMIDAS IT Co., Ltdp

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Main Menu > Model > Property >

    At tr ibute

    2. Click [Add] > Select [Line].

    3. ID 9, Name D Wall

    4. Element Type > [Beam].

    5. Material > Click [Add].

    6. Enter the material properties for

    D Wall Concrete and click [OK].

    7. Property > Click [Add].

    8. ID 1, Name `D Wall.

    9. Type > [Beam/Nonlinear Beam],

    Click [Sectional Library].

    10. Enter the properties as shown.

    11. Click[OK] in Sectional Library ,

    Click [OK] in Add/Modify

    Property Box.

    12. Click [Apply] in Add/Modify Line

    Attr ibute.

    04

    Model > Property > Attribute

    12

    1

    2

    3

    4

    5

    6

    6

    7

    8

    9

    9

    10

    1111

    MIDAS IT Co LtdMIDAS IT Co LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    14/72

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Attribute ID 10, Name D Wall

    Service

    2. Element Type > [Beam].

    3. Material > Click [Add].

    4. Enter the material properties for

    D Wall Conc. Service as shown

    and click [OK] in Add/Modify

    Structural Material box.

    5. Property > Select D Wall.

    6. Click [Apply] in Add/Modify Line

    At tr ibute.

    04

    Model > Property > Attribute

    13

    1

    2

    3

    4

    4

    4

    5

    5

    MIDAS IT Co LtdMIDAS IT Co LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    15/72

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Construction Stage Analysis of a Metro Station

    Procedure

    1. ID 11, Name Barret

    2. Element Type > [Beam].

    3. Material > Select D WallConcrete.

    4. Property > Click [Add].

    5. ID 2, Name Barret.

    6. Type > [Beam]

    7. Click [Sectional Library].

    8. Enter the properties as shown.

    9. Click[OK] in Sectional Library,

    Click [OK] in Property Dialogue

    Box.

    10. Click [Apply] in Add/Modify Line

    At tr ibute.

    04

    Model > Property > Attribute

    14

    1

    2

    3

    4

    5

    6

    7

    8

    9

    9

    10

    MIDAS IT Co LtdMIDAS IT Co LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    16/72

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Construction Stage Analysis of a Metro Station

    Procedure

    1. ID 12, Name Barret Service

    2. Element Type > [Beam].

    3. Material > Select D Wall Conc.Service.

    4. Property > Select Barret.

    5. Click [Apply] in Add/Modify Line

    At tr ibute.

    04

    Model > Property > Attribute

    15

    1

    2

    3

    4

    5

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    17/72

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Construction Stage Analysis of a Metro Station

    Procedure

    04

    Model > Property > Attribute

    16

    Since the column is a composite section asshow n the properties o f the composite s

    ection have been calculated and thenentered

    1. ID 13, Name Column

    2. Element Type > [Beam].

    3. Material > Click [Add].

    4. Enter the material properties for

    Structural Steel as shown and

    click [OK] in Add/Modify

    Structural Material box.

    5. Property > Click [Add].

    6. ID 3, Name Column.

    7. Type > [Beam/Nonlinear Beam]

    8. Enter the properties as shown.

    9. Click [OK] in Add/Modify

    Property Dialogue Box.

    10. Click [Apply] in Add/Modify Line

    At tr ibute.

    1

    2

    3

    4

    4

    5

    6

    7

    8

    9

    10

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    18/72

    S Co., tdS Co., td

    Construction Stage Analysis of a Metro Station

    Procedure

    04

    Model > Property > Attribute

    17

    1. ID 14, Name Roof Slab

    2. Element Type > [Beam].

    3. Material > Click [Add].

    4. Enter the material properties for

    Structural Concrete as shown

    and click [OK] in Add/Modify

    Structural Material box.

    5. Property > Click [Add].

    6. ID 4, Name `Roof Slab.

    7. Type > [Beam]

    8. Click [Sectional Library]

    9. Enter the properties as shown.

    10. Click [OK] in Add/Modify

    Property Dialogue Box.

    11. Click [Apply] in Add/Modify Line

    At tr ibute.

    1

    2

    3

    4

    5

    6

    7

    8

    8

    10

    10

    11

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    19/72

    ,,

    Construction Stage Analysis of a Metro Station

    Procedure

    04

    Model > Property > Attribute

    1. ID 15,

    Name Roof Slab Service

    2. Element Type > [Beam].

    3. Material > Click [Add].

    4. Enter the material properties for

    ID-13, Name Structural Conc.

    Service as show n.

    5. Click [OK] in Add/Modify

    Structural Material box.

    6. Property > Select Roof Slab.

    7. Click [Apply] in Add/Modify Line

    At tr ibute.

    1

    2

    3

    4

    5

    6

    7

    18

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    20/72

    Construction Stage Analysis of a Metro Station

    Procedure

    04

    Model > Property > Attribute

    1. ID 16, Name Ticket/Inmdt Slab

    2. Element Type > [Beam].

    3. Material > Select

    12 : Structural Concrete

    4. Property > Click [Add].

    5. ID 5, Name `Ticket/Inmdt Slab.

    6. Type > [Beam/Nonlinear Beam]

    7. Click [Sectional Library]

    8. Enter the properties as shown.

    9. Click [OK] in Add/Modify

    Property Dialogue Box.

    10. Click [Apply] in Add/Modify Line

    Attr ibute.

    Note : Since the Ticket and

    Intermediate Slab have the same

    thickness and same material so

    the Attribute for them is also

    same.

    1

    2

    3

    4

    5

    6

    7

    8

    9

    9

    10

    19

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    21/72

    Construction Stage Analysis of a Metro Station

    Procedure

    04

    Model > Property > Attribute

    1. ID 17, Name Ticket/Inmdt Slab

    Service

    2. Element Type > [Beam].

    3. Material > Select

    13 : Structural Conc. Service

    4. Property > Select

    5 : Ticket/Inmdt Slab

    5. Click [Apply] in Add/Modify Line

    Attr ibute.

    20

    1

    2

    3

    4

    5

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    22/72

    Construction Stage Analysis of a Metro Station

    Procedure

    04

    Model > Property > Attribute

    1. ID 18, Name Raft Slab

    2. Element Type > [Beam].

    3. Material > Select

    12 : Structural Concrete

    4. Property > Click [Add].

    5. ID 6, Name `Raft Slab.

    6. Type > [Beam]

    7. Click [Sectional Library]

    8. Enter the properties as shown.

    9. Click [OK] in Add/Modify

    Property Dialogue Box.

    10. Click [Apply] in Add/Modify Line

    At tr ibute.

    11. Create the Att ribute for Raft

    Slab Service by selecting

    material 13:Structural Concrete

    and Property 6:Raft .

    21

    10

    1

    2

    3

    4

    5

    6

    7

    8

    9

    9

    11

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    23/72

    Construction Stage Analysis of a Metro Station

    Procedure

    04

    Model > Property > Attribute

    1. All the Attributes that have been

    created are shown here.

    22

    1

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    24/72

    Construction Stage Analysis of a Metro Station

    Procedure

    05

    Geometry > Curve> Create on WP > Rectangle W ire)

    23

    1. Main Menu > Geometry > Curve >

    Create on WP > Rectangle(Wire)

    2. Make sure that the Method is setto ABS x, y

    3. Enter coordinates -100,-100 and

    click [Apply].

    4. The Method now changes to REL

    dx, dy .

    5. Enter the coordinates of the

    diagonally opposite corner as 200,100 .

    6. On the execution of this command

    we get a wi re whose dimensions

    are X=200 m and Y=100 m as

    shown in the f igure.

    7. Click [Cancel] to close the

    Rectangle dialogue box.

    1

    2

    3

    3

    4

    5

    7

    6

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    G C C WP

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    25/72

    Construction Stage Analysis of a Metro Station

    Procedure

    05

    Geometry > Curve> Create on WP > L ine

    24

    1. Main Menu > Geometry >

    Curve > Create on WP > Line

    2. Make sure that the Method is setto ABS x, y . Enter coordinates

    -11.4, 0 and click [Apply].

    3. The Method now changes to

    REL dx, dy. Enter the

    coordinates of t he end point as

    0,-27.49 .

    4. Similarly repeat the above

    procedure with the initial

    coordinates as 11.4 ,0 and the

    (next) relative coordinates as

    0, -27.49 .

    5. Create two more lines whose

    respective ABS & REL

    coordinates are given below

    6. 1st line (-6.48,-1.75) (0,-28.4)

    7. 2ndline (6.48,-1.75) (0,-28.4)

    1

    2 3

    4

    6

    7

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    G t C C t WP

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    26/72

    Construction Stage Analysis of a Metro Station

    Procedure

    05

    Geometry > Curve> Create on WP > L ine

    25

    1. In the previous steps the

    geometry of D Wall and Columns

    was created. In this s tep the

    geometry of the Slabs wi ll be

    created.

    2. 1stline (-11.4,-1.75) (22.8,0)

    3. 2ndline (-11.4,-6.8) (22.8,0)

    4. 3rdline (-11.4,-11.45) (22.8,0)

    5. 4thline (-11.4,-21.05) (22.8,0)

    Note : The first set of

    coordinates are ABS (x, y) and

    the next are REL (dx, dy) as can

    be seen in the figure.

    2

    3

    4

    5

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > Curve>

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    27/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Main Menu > Geometry >

    Curve > Intersect

    2. Select all the curves that have

    been created till this step by

    using (Ctrl+A) or drag the

    mouse around the created

    edges to select all.

    3. The selected edges will be

    displayed by pink color

    4. Click [Apply].

    5. To ensure proper nodal

    connectivity it is necessary to

    intersect those edges which are

    in contact (like Wall and slab

    are in contact so the edges

    representing them need to be

    intersected)

    06

    26

    Geometry > Curve> Intersect

    1

    2

    4

    3

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > New Geometry Set >

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    28/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. The edges now intersected will

    be split up into smaller edges.

    2. So in order to organize theedges, Geometry Set will be

    used.

    3. Geometry > Geometry Set >

    Context Menu > New Geometry

    Set

    4. Rename the new Geometry set

    to Slabs by using F2 . Right

    click on this Geometry set and

    select Incl./Excl. Items.

    5. Select the 12 edges as

    highlighted and click [OK].

    6. Now when the Geometry Set

    Slabs is selected, the

    highlighted edges w ill be

    selected.

    7. Hide Slabs Geometry Set by

    checking it off as shown.

    07

    27

    Geometry > New Geometry Set > Incl ./Excl. I tems

    Check-off to hide Slabs

    3

    4

    5

    7

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > Curve> Create on WP >

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    29/72

    Construction Stage Analysis of a Metro Station

    Procedure

    08

    Geometry > Curve> Create on WP > L ine

    28

    1. Geometry > Curve > Create on

    WP > Line

    2. To create the edges representingthe different soil profiles, lines

    will be created with co-ordinates

    mentioned.

    3. 1stline (-100,-3) (200,0)

    4. 2ndline (-100,-9.05) (200,0)

    5. 3rdline (-100,-11.55) (200,0)

    6. 4thline (-100,-16.55) (200,0)

    7. 5thline (-100,-20.55) (200,0)

    8. 6thline (-100,-22.05) (200,0)

    9. 7thline (-100,-30.55) (200,0)

    10. 8thline (-100,-36.0) (200,0)

    11. When all the edges are created

    they are shown in the figure.

    12. The distance at any time can be

    checked by pressing F3 and

    invoking the Measure

    command.

    11

    12

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > Curve>

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    30/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Main Menu > Geometry >

    Curve > Intersect

    2. Select all the curves by using

    (Ctrl+A) and click [Apply].

    09

    29

    Geometry > Curve> Intersect

    1

    2

    2

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > New Geometry Set > Incl/Excl I tems

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    31/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Geometry > Geometry Set >

    Context Menu > New Geometry

    Set

    2. Rename the new Geometry set

    to Soils by using F2 . Right

    click on this Geometry set and

    select Incl./Excl. Items.

    3. Select the 32 edges as

    highlighted and click [OK].

    4. Hide Soils Geometry Set by

    checking it off as shown.

    10

    3

    y y

    Check-off to hide Soil s1

    2

    2

    3

    4

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > New Geometry Set > Incl/Excl I tems

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    32/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Similarly create two new

    Geometry Sets and rename

    them to D Wall and

    Columns.

    2. Include the edges as shown in

    the D Wall Geometry Set.

    3. Include the edges as shown in

    the Columns Geometry Set.

    4. Hide the Columns Geometry

    Set and show only D Wall

    Geometry Set.

    10

    31

    y y

    2

    3

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > Transform> Translate

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    33/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Show only the D Wall

    Geometry Set and hide the rest

    as shown.

    2. Main Menu > Geometry >

    Transform > Translate.

    3. Select the highlighted edge.

    4. Direction > Select Global-X

    5. Enter the details as shown and

    click [Apply].

    6. Similarly repeat the procedure

    for the other edge as shown in

    the figure below

    11

    32

    y

    2

    3

    6

    4

    5

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > Curve> Intersect

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    34/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Hide the D Wall Geometry Set.

    2. Main Menu > Geometry >

    Curve > Intersect

    3. Select all the curves by using

    (Ctrl+A) and click [Apply].

    4. Select the two edges as shown

    5. Invoke the context menu and

    select Delete to delete these

    edges.

    6. When the Delete dialogue box

    appears, click [OK].

    12

    33

    2

    3

    3

    44

    5

    6

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Geometry > Curve> Create on WP > L ine

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    35/72

    Construction Stage Analysis of a Metro Station

    Procedure

    13

    y

    34

    1. Two more lines will be created

    which would define the location

    of building loads

    2. Main Menu > Geometry >

    Curve > Create on WP > Line

    3. 1st line (-27.37,-2) (-10,0)

    4. 2nd line (27.37,-2) (10,0).

    5. The geometry now is complete

    and the next step is creating the

    mesh sets.

    2

    3

    4

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Mesh > Size Control> Along Edge

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    36/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Show all the Geometry Sets.

    2. Main Menu > Mesh > Size

    Control > Along Edge

    3. Select the edges as shown.

    4. Seeding Method > Select

    Interval Length , Interval

    Length > Enter 1 .

    5. Click [Preview ] ] to see the

    seeding. Click [Apply].

    6. Change the Seeding Method to

    Linear Grading (Length) .

    7. Select the edge and reversed

    edge as shown.

    8. Enter Slen as 5 and Elen

    as 1.

    9. Click [Preview ] to see the

    seeding. Click [Apply].

    14

    35

    2

    3

    3

    4

    5 5

    6

    7

    8

    9 9

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Mesh > Size Control> Along Edge

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    37/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Select the 6 edges on the left of

    D Wall and 6 reversed edge to

    the right of D Wall as shown.

    2. Enter Slen as 5 and Elen

    as 1.

    3. Click [Preview ] to see the

    seeding. Click [Apply].

    4. Select the 2 edges as shown.

    5. Let the Seeding Method and

    other parameters be same.

    6. Check on Symmetric Seeding

    7. Click [Preview ] to see the

    seeding. Click [OK].

    14

    36

    1

    2

    3 3

    4

    5

    6

    7

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    Mesh > Display > Mesh Seed

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    38/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. To see the seeds that have

    been assigned to all the edges,

    select all the edges, right c lick

    to invoke the Context Menu and

    select Display Mesh Seed

    2. When the Display Mesh Seed

    dialogue box appears select

    Show Mesh Seed and click

    [OK].

    3. To hide the seeds, select all the

    edges, right click to invoke the

    Context Menu and select

    Display Mesh Seed

    4. Select Hide Mesh Seed in the

    Display Mesh Seed dialogue

    box and click [OK].

    14

    37

    1

    2

    2

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    15

    Mesh > Auto-Mesh > Planar Area

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    39/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Main Menu > Auto-Mesh >

    Planar Area...

    2. Select the 23 edges as shownwhich define the first layer of

    soil.

    3. Enter Element Size 5 .

    4. Select Attribute 1 : Man Made

    Fill.

    5. Click on Advanced Option .

    6. Select Element type as

    Triangle

    7. Check-off Register Each Area

    Independently and click [OK] .

    8. Click [Apply] in Auto-Mesh

    Planar Area dialogue box.

    Note : If anytime the meshing step

    is undone the features in

    Advanced Option are again

    set to default values.

    38

    1

    2

    3

    4

    5

    6

    7

    7

    8

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    15

    Mesh > Auto-Mesh > Planar Area

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    40/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Check-off the Man Made Fill

    Mesh set previously created so

    that the selected edges can be

    seen clearly.

    2. Select the edges as shown for

    the second layer.

    3. Select Attribute 2 : Upper Sand

    and enter Name Upper Sand 2

    4. Click [Advanced Option] to check

    if the opt ions selected are still

    updated.

    5. Click [Preview] to see the seeds.

    Click [Apply] to create the mesh

    set.

    Note : The edges which have Green

    seeds imply those edges have

    been previously used for

    meshing and when the seeds are

    Red the edges have not been

    used for meshing.

    39

    2

    1

    3

    4

    5 5

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    15

    Mesh > Auto-Mesh > Planar Area

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    41/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Check-off the Upper Sand 2

    Mesh set previously created.

    2. Select the 23 edges as shown forthe third layer.

    3. Select Attribute 5 : Upper Clay

    UD and enter Name Upper Clay

    3

    4. Click [Preview] to see the seeds.

    Click [Apply] to create the mesh

    set.

    5. Check-off the Upper Clay 3

    Mesh set.

    6. Select the edges for the 4thlayer

    as shown.

    7. Select Attribute 3 : Middle Sand

    and enter Name Middle Sand 4

    8. Click [Preview] to see the seeds.

    Click [Apply] to create the mesh

    set.

    4

    2

    3

    4 4

    6

    7

    8

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    15

    Mesh > Auto-Mesh > Planar Area

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    42/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Check-off the Middle Sand 4

    Mesh set previously created.

    2. Select the edges as shown forthe 5thlayer.

    3. Select Attribute 4 : Lower Sand

    and enter Name Lower Sand 5

    4. Click [Preview] to see the seeds.

    Click [Apply] to create the mesh

    set.

    5. Check-off the Lower Sand 5

    Mesh set.

    6. Select the edges for the 6thlayer

    as shown.

    7. Select Attribute 5 : Upper Clay

    UD and enter Name Upper Clay

    6

    8. Click [Preview] to see the seeds.

    Click [Apply] to create the mesh

    set.

    41

    2

    3

    4 4

    6

    7

    8

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    15

    Mesh > Auto-Mesh > Planar Area

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    43/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Check-off the Upper Clay 6

    Mesh set previously created.

    2. Select the edges as shown forthe 7thlayer.

    3. Select Attribute 4 : Lower Sand

    and enter Name Lower Sand 7

    4. Click [Preview] to see the seeds.

    Click [Apply] to create the mesh

    set.

    5. Check-off the Lower Sand 7

    Mesh set.

    6. Select the edges for the 8thlayer

    as shown.

    7. Select Attribute 6 : Lower Clay

    UD and enter Name Lower Clay

    8

    8. Click [Preview] to see the seeds.

    Click [Apply] to create the mesh

    set.

    42

    2

    3

    4 4

    6

    7

    8

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    15

    Mesh > Auto-Mesh > Planar Area

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    44/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Check-off the Lower Clay 8

    Mesh set previously created.

    2. Select the edges as shown forthe 9thlayer.

    3. Select Attribute 4 : Lower Sand

    and enter Name Lower Sand 9

    4. Click [Preview] to see the seeds.

    Click [OK] to create the mesh set

    and close the dialogue box.

    5. Check-on all the Mesh sets.

    6. The mesh sets are shown in the

    figure below.

    43

    2

    3

    4 4

    5

    6

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    16

    Model> Display Material/Property

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    45/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. To check that the mesh sets have

    been assigned the Attributes

    correctly, show all the mesh sets

    2. Main Menu > Model > Display

    Material/Property .

    3. The Attributes that have been

    assigned to the mesh set can

    now be cross-checked by the

    color code and conf irmed.

    4. In the next step, the mesh sets

    would be divided into mesh sets

    based on stages of

    construction/excavation.

    44

    2

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    17

    Mesh> Mesh Set > New M esh Set

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    46/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. In the Works-Tree go to Mesh >

    Mesh Set > Context Menu > New

    Mesh Set.

    2. Rename this New Mesh Set to

    L1 by clicking F2 on it.

    3. Right click on L1 mesh set >

    Context Menu > Mesh Set >

    Incl./Excl. Items.

    4. Select the 94 elements to be

    included in the L1 mesh set.

    5. Cl ick [OK].

    6. Hide the L1 mesh set.

    45

    1 2

    3

    4

    5

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    17

    Mesh> Mesh Set > New M esh Set

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    47/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Similarly create a New Mesh Set

    and rename it to L2 by clicking

    F2 on it.

    2. Right click on L2 mesh set >

    Context Menu > Mesh Set >

    Incl./Excl. Items.

    3. Select the highlighted elements

    to be included in the L2 mesh

    set.

    4. Cl ick [OK].

    5. Hide the mesh set L2

    6. Create two more New Mesh Set .

    7. Rename them to L3 and L4

    respectively.

    1

    1

    2

    3

    4

    46

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    17

    Mesh> Mesh Set > New M esh Set

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    48/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Right click on L3 mesh set >

    Context Menu > Mesh Set >

    Incl./Excl. Items.

    2. Select the highlighted elements

    to be included in the L3 mesh

    set.

    3. Click [OK] and hide this mesh set.

    4. Right click on L4 mesh set >

    Context Menu > Mesh Set >

    Incl./Excl. Items.

    5. Select the highlighted elements

    to be included in the L4 mesh

    set.

    6. Cl ick [OK].

    47

    2

    1

    3

    4

    5

    6

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    18

    Model> Element > Ex tract Element

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    49/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Model Works Tree > Mesh > Mesh

    Set > Context Menu > Hide All.

    2. Geometry > Curve > Context

    Menu > Show All.

    3. Check-on/Show all the

    Geometry Sets except the Soil

    Geometry Set.

    4. Main Menu > Model >Element >

    Extract Element

    5. From Shape > Edge.

    6. Select Edge(s) > Select the D

    Wall Geometry Set.

    7. Attribute 9 : D Wall .

    8. Name D Wall .

    9. Click [Apply].

    10. Hide the D Wall Geometry Set.

    48

    4

    1

    2

    3

    5

    6

    7

    8

    9

    MIDAS IT Co., LtdMIDAS IT Co., LtdStep

    18

    Model> Element > Ex tract Element

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    50/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Select Edge(s) > Select the edges

    as shown for the Roof Slab .

    2. Attribute 14 : Roof Slab .

    3. Name Roof Slab . Click [Apply].

    4. Select Edge(s) > Select the edges

    as shown for the Ticket Slab .

    5. Attribute 16 : Ticket/Inmdt Slab .

    6. Name Ticket Slab . Click [Apply].

    7. Select the edges as shown for the

    Intermediate Slab .

    8. Attribute 16 : Ticket/Inmdt Slab .

    9. Name Intermediate Slab . Click

    [Apply].

    10. Select Edge(s) > Select the edges

    as shown for the Raft Slab .

    11. Attribute 18 : Raft Slab .

    12. Name Raft Slab . Click [Apply].

    49

    1

    2 3

    3

    4

    5 6

    6

    7

    8 9

    9

    10

    11 12

    12

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    18

    Model> Element > Ex tract Element

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    51/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Select Edge(s) > Select the edges

    as shown for the L2 Columns .

    2. Attribute 13 : Column.

    3. Name L2 Columns .Click [Apply].

    4. Select Edge(s) > Select the edges

    as shown for the L3 Columns .

    5. Attribute 13 : Column.

    6. Name L3 Columns .Click [Apply].

    7. Select Edge(s) > Select the edges

    as shown for the L4 Columns .

    8. Attribute 13 : Column.

    9. Name L4 Columns. Click

    [Apply].

    10. Select Edge(s) > Select the edges

    as shown for the Barrets .

    11. Attribute 11 : Barret .

    12. Name Barret .

    13. Click [OK].

    5

    1

    2 3

    3

    4

    5 6

    6

    7

    8 9

    9

    10

    11 12

    13

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    19

    Model> Element > Align Csys

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    52/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Show D Wall, L2 Columns, L3

    Columns, L4 Columns and

    Barret mesh sets only.

    2. Select the above mentioned mesh

    sets. Context Menu > Display >

    Click Element Csys .

    3. The coordinate system of the 1D

    elements are not aligned in the

    same direction.

    4. To align the elements go to

    Model > Element > Change

    Parameter

    5. Select base element as the element

    whose Z-axis (blue) is aligned in

    same direction as Global X-axis

    (red).

    6. Select all the displayed elements as

    elements to be aligned & [Apply].

    7. Hide Element Csys by following

    Step 2.

    51

    1

    2

    3

    4

    5

    5

    5

    6

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    19

    Model> Element > Align Csys

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    53/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Show Roof Slab , Ticket Slab ,

    Intermediate Slab and Raft

    Slab mesh sets only.

    2. Select the above mentioned mesh

    sets. Context Menu > Display >

    Click Element Csys .

    3. Select base element as the

    element whose X-axis (red) is

    aligned in same direction as

    Global X-axis (red).

    4. Select all the displayed elements

    of the slab mesh sets as elements

    to be aligned & click [OK].

    5. Hide Element Csys by following

    Step 2.

    52

    4

    1

    2

    3

    4

    4

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    20

    Model > Load > Self Weight and Line Beam Load 1

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    54/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Main Menu >Model > Load >

    Self Weight

    2. Load Set >Self Weight.

    3. Self Weight Factor> Y : -1.

    4. Cl ick [OK].

    5. Model > Load > Line Beam

    Load

    6. Load Set Roof Slab Load .

    7. Select the nodes at the two end

    of the Roof Slab .

    8. Direction> Global Y

    9. Projection> No.

    10. Enter the values of x1, x2, w1

    and w2 as show n.

    11. Click [Apply].

    53

    2

    3

    4

    5

    6

    7

    7 7

    8

    10

    9

    11

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    21

    Model > Load > Line Beam Load

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    55/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Load Set Ticket Slab .

    2. Select the nodes at the two end

    of the Ticket Slab .

    3. Direction> Global Y

    4. Projection> No.

    5. Enter the values of x1, x2, w1

    and w2 as show n.

    6. Click [Apply].

    7. Load Set Ticket Slab Service .

    8. Select the nodes at the two end

    of the Ticket Slab .

    9. Direction> Global Y

    10. Projection> No.

    11. Enter the values of x1, x2, w1and w2 as show n.

    12. Click [Apply].

    54

    1

    2

    2

    3 4 5

    6

    7

    8

    8

    9 10 11

    12

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    21

    Model > Load > Line Beam Load

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    56/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Load Set Intermediate Slab .

    2. Select the nodes at the two end

    of the Intermediate Slab .

    3. Direction> Global Y

    4. Projection> No.

    5. Enter the values of x1, x2, w1

    and w2 as show n.

    6. Click [Apply].

    7. Load Set Intermediate Slab

    Service .

    8. Select the nodes at the two end

    of the Intermediate Slab .

    9. Direction> Global Y

    10. Projection> No.

    11. Enter the values of x1, x2, w1

    and w2 as show n.

    12. Click [OK].

    55

    1

    2

    2

    3 4 5

    6

    7

    8

    8

    9 10 11

    12

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    22

    Model > Load > Pressure Load

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    57/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Model Works Tree > Geometry >

    Curve > Context Menu > Show All.

    2. Main Menu > Model > Load >

    Pressure Load

    3. Load Set CS Traffic Load.

    4. Object Type > [Curve] . Select the

    2 edges as show n.

    5. Enter the values as shown in the

    dialogue box

    6. Click [Preview] to see the loads

    and click [Apply].

    7. Load Set Service Traffic Load.

    8. Object Type > [Curve] . Select the

    3 edges as show n.

    9. Enter the values as shown in thedialogue box

    10. Click [Preview] to see the loads

    and click [Apply].

    56

    2

    3

    4

    4 4

    5

    6

    7

    8

    8

    9

    10

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    22

    Model > Load > Pressure Load

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    58/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Load Set Building Load 1.

    2. Object Type > [Curve] . Select the

    edges as show n.

    3. Enter the values as shown in the

    dialogue box

    4. Click [Preview] to see the load

    and click [Apply].

    5. Load Set Building Load 2.

    6. Object Type > [Curve] . Select the

    edge as shown.

    7. Enter the values as shown in the

    dialogue box

    8. Click [Preview] to see the load

    and click [Apply].

    57

    1

    2

    2

    3

    4

    5

    6

    6

    7

    8

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    23

    Model > Boundary > Ground Support

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    59/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Analysis Works Tree > Load >

    Context Menu > Hide All.

    2. Model Works Tree > Mesh > Mesh

    Set Context Menu > Show All.

    3. Main Menu > Model > Boundary >

    Ground Support

    4. BC Set > Ground Support

    5. Cl ick [OK].

    58

    3

    12

    4

    4

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    24

    Model > Boundary > Change Element Attribute

    3 8

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    60/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. Main Menu > Model > Boundary >

    Change Element A ttr ibute

    2. BC Set > Upper Clay Drained .

    3. Change the selection filter to Mesh

    (M)

    4. Select the Upper Clay 3 and Upper

    Clay 6 mesh sets. From the Model

    Works Tree.

    5. Select Attribute 7:Upper Clay D

    6. Click [Apply].

    7. BC Set > Lower Clay Drained .

    8. Change the selection filter to Mesh

    (M)

    9. Select the Lower Clay 8 mesh set.

    From the Model Works Tree.

    10. Select Attr ibute 8:Lower Clay D

    11. Click [Apply].

    59

    2

    4

    1

    5

    6

    7

    9

    10

    11

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    24

    Model > Boundary > Change Element Attribute

    2 7

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    61/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. BC Set > D Wall Service .

    2. Change the selection filter to Mesh

    (M)

    3. Select the D Wall mesh set from the

    Model Works Tree.

    4. Select Attribute 10:D Wall Service

    5. Click [Apply].

    6. BC Set > Barret Service .

    7. Change the selection filter to Mesh

    (M)

    8. Select the Barret mesh set from the

    Model Works Tree.

    9. Select Attribute 12:Barret Service

    10. Click [Apply].

    6

    1

    3

    4

    5

    6

    10

    8

    9

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    24

    Model > Boundary > Change Element Attribute

    2 7

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    62/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. BC Set > Roof Slab Service .

    2. Change the selection filter to Mesh

    (M)

    3. Select the Roof Slab mesh set from

    the Model Works Tree.

    4. Select Attribute 15:Roof Slab

    Service

    5. Click [Apply].

    6. BC Set > Ticket Slab Service .

    7. Change the selection filter to Mesh

    (M)

    8. Select the Ticket Slab mesh set

    from the Model Works Tree.

    9. Select A ttribute 17:Ticket/Inmdt

    Slab Service

    10. Click [Apply].

    61

    1

    3

    4

    5

    6

    9

    10

    8

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    24

    Model > Boundary > Change Element Attribute

    2 7

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    63/72

    Construction Stage Analysis of a Metro Station

    Procedure

    1. BC Set > Inmdt Slab Service .

    2. Change the selection filter to Mesh

    (M)

    3. Select the Intermediate Slab mesh

    set from the Model Works Tree.

    4. Select A ttribute 17:Ticket/Inmdt

    Slab Service

    5. Click [Apply].

    6. BC Set > Raft Slab Service .

    7. Change the selection filter to Mesh

    (M)

    8. Select the Raft Slab mesh set from

    the Model Works Tree.

    9. Select Attribute 19:Raft Slab

    Service

    10. Click [OK].

    62

    1

    3

    4

    5

    6

    9

    10

    8

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    25

    Model > Construction Stage >Define Construction Stage

    11

    2

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    64/72

    Construction Stage Analysis of a Metro Station 63

    1. Main Menu > Model >

    Construction Stage > Define

    Construction Stage

    2. Click [New], Stage Name Initial.

    3. Drag & Drop from Set Data to

    Act ivated Data the mesh sets,

    load and boundary condition as

    shown.

    4. Define Water level as -24.34 .

    5. Check-on [Clear Displacement].

    6. Click [Save].

    7. Click [New], Stage Name

    Loading.

    8. Activate the loads as shown.

    9. Click [Save].

    2

    2

    3

    4

    5

    7

    7

    8

    9

    6

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    25

    Model > Construction Stage>Define Construction Stage

    31

    1

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    65/72

    Construction Stage Analysis of a Metro Station 64

    1. Click [New], Stage Name D Wall

    +Columns.

    2. Drag & Drop from Set Data to

    Act ivated Data the mesh sets,

    shown.

    3. Check on Undrained .

    4. Click [Save].

    5. Click [New], Stage Name

    Excavation to Roof (L1).

    6. Drag & Drop from Set Data to

    Deactivated Data the L1

    mesh set.

    7. Check on Undrained .

    8. Click [Save].

    1

    2

    4

    3

    45

    5

    6

    8

    7

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    25

    Model > Construction Stage>Define Construction Stage

    51

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    66/72

    Construction Stage Analysis of a Metro Station 65

    1. Click [New], Stage Name Roof

    Slab + L2 Excv.

    2. Drag & Drop from Set Data to

    Activated Data the Roof Slab

    mesh set, Roof Slab Load load

    and into Deactivated Data the

    L2 mesh set.

    3. Check on Undrained .

    4. Click [Save].

    5. Click [New], Stage Name Ticket

    Slab + L3 Excv.

    6. Drag & Drop from Set Data to

    Activated Data the Ticket Slab

    mesh set, Ticket Slab load and

    into Deactivated Data the L3

    mesh set.

    7. Check on Undrained .

    8. Click [Save].

    1

    2

    4

    3

    65

    5

    6

    8

    7

    2

    6

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    25

    Model > Construction Stage>Define Construction Stage

    51

    1

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    67/72

    Construction Stage Analysis of a Metro Station 66

    1. Click [New], Stage Name Inmdt

    Slab + L4 Excv.

    2. Drag & Drop from Set Data to

    Act ivated Data the

    Intermediate Slab mesh set,

    Intermediate Slab load and

    into Deactivated Data the L4

    mesh set.

    3. Check on Undrained .

    4. Click [Save].

    5. Click [New], Stage Name Raft

    Slab.

    6. Drag & Drop from Set Data to

    Activated Data the Raft Slab

    mesh set.

    7. Check on Undrained .

    8. Click [Save].

    1

    2

    4

    3

    65

    5

    6

    8

    7

    2

    6

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    25

    Model > Construction Stage>Define Construction Stage

    91

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    68/72

    Construction Stage Analysis of a Metro Station 67

    1. Click [New], Stage Name EWL

    Service.

    2. Activate/Deactivate the mesh

    sets/Boundary Condition and

    loads as shown in the figure .

    3. Check-on Define Water Level

    for Global and enter a value of -

    18.34 m.

    4. Click [Save].

    1

    2

    3

    4

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    1 M i M A l i

    26

    Analysis > Analysis Case

    1

    2

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    69/72

    Construction Stage Analysis of a Metro Station

    1. Main Menu > Analysis >

    Analysis Case

    2. Cl ick [Add]

    3. Name >

    CSA of Metro.

    4. Analysis Type > Select

    [Construction Stage].

    5. Click on [Analysis Control] .

    6. Analysis Control > Select

    Construction Stage tab.

    Check-on Initial Stage For

    Stress Analysis and select

    [Initial].

    7. Check on [K0 Condition].

    8. Non-linear tab. Load Steps >

    Check-on A rc Length Method .

    9. Click [OK] in Analysis Control.

    10. Click [OK] in Analysis Case.

    2

    3

    4

    5

    6

    7

    8

    99

    68

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    27

    Analysis > Solve1

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    70/72

    Construction Stage Analysis of a Metro Station

    1. Main Menu > Analysis > Solve

    2. Check on CSA of Metro.

    3. Cl ick [OK].

    Al l the messages during the

    analysis wil l be shown in the

    Output Window. Especially, one

    needs to be very cautious

    about warn ing messages,

    because these messages

    indicate that the analysis

    results may not be correct. The

    model is automatically saved

    before the analysis. The result

    is saved as binary fi le(*.TA*) in

    the same folder as the model.

    The detail analysis information

    is also saved in a text

    file(*.OUT).

    69

    The Warning shown is not an error but a re

    minder that the cross section has not been defined. This comes as Columns have been c

    onsidered as composite sections.

    2

    3

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    28

    Post Works Tree> Raft Slab -Step 001(1) > DY V ), Soil SYY

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    71/72

    Construction Stage Analysis of a Metro Station

    1. Post Works Tree > Raft Slab -

    Step 001(1)> Displacement >

    DY(V). Shows the disp lacement

    contour in Y direction (vertical

    for t his problem).

    2. Post Works Tree > Raft Slab -

    Step 001(1)> 2D Element

    Stresses > Soil SYY. Check the

    effective vertical stresses in

    soil as shown during the Raft

    Slab stage.

    7

    1

    2

    MIDAS IT Co., LtdMIDAS IT Co., Ltd

    Step

    Procedure

    29

    Post Works Tree> Excavation 3-Step 001(1) > 1D Element Forces >Beam My

  • 7/25/2019 GTS 2D Tutorial on Metro Station

    72/72

    Construction Stage Analysis of a Metro Station 71

    1. Post Works Tree > Raft Slab -

    Step 001(1)> 1D Element

    Forces > Beam My. Shows the

    moment in element Y dir ection.

    2. Tabbed Toolbar > Post Data

    Tab > Click the arrow next to

    the Output Set as shown.

    3. As the user scrolls through this

    with Sensitive checked-on

    the results are updatedsimultaneously for each stage

    and the results for each stage

    can be checked by directly

    scrolling to the stage.

    Tabbed Toolbar

    1

    2

    3


Recommended