Guarantees of Origin Scheme 30 th November 2011. Guarantees of Origin – a brief history. EU Directive 2001/77/EC - first mentioned GOs Replaced by the Renewable Energy Directive 2009/28/EC Legislation transposed on the 28 th of March 2011 S.I. (Statutory Instrument) 147 of 2011 - PowerPoint PPT Presentation
Popular Tags:
44
Guarantees of Origin Scheme 30 th November 2011
Transcript
Page 1: Guarantees of Origin Scheme 30 th  November 2011

Guarantees of Origin Scheme

30th November 2011

Page 2: Guarantees of Origin Scheme 30 th  November 2011

2

Guarantees of Origin – a brief history

• EU Directive 2001/77/EC - first mentioned GOs• Replaced by the Renewable Energy Directive

2009/28/EC• Legislation transposed on the 28th of March 2011• S.I. (Statutory Instrument) 147 of 2011• SEMO named as the Issuing Body for Ireland• CER tasked with developing the Supervisory

Framework

Page 3: Guarantees of Origin Scheme 30 th  November 2011

3

What is a Guarantee of Origin?

“Guarantees of origin issued for the purpose of this Directive have the sole function of proving to a final customer that a given share or quantity of energy was produced from renewable sources.”

- Section (52), DIRECTIVE 2009/28/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCILof 23 April 2009

Page 4: Guarantees of Origin Scheme 30 th  November 2011

4

Renewables Directive

• The sole purpose of GOs is Fuel Mix Disclosure• There is no connection between national targets

and FMD• GOs do not follow the physical flow of energy

Page 5: Guarantees of Origin Scheme 30 th  November 2011

5

What is a Guarantee of Origin?

• Standard size of one megawatt hour (1MWh)• Issued on request of the Generator• Guarantee that electricity has been produced from

a renewable source

Page 6: Guarantees of Origin Scheme 30 th  November 2011

6

Guarantee of Origin – Renewable Sources

Examples of renewable sources:

• Wind• Solar• Ocean Energy• Biomass• Hydropower• Landfill Gas• Aerothermal• Geothermal• Hydrothermal

Page 7: Guarantees of Origin Scheme 30 th  November 2011

7

Fuel Mix Disclosure – Interim Solution

• SEMO completes the calc on an annual basis• All Island Fuel Mix• Suppliers submit declarations and ‘claim’

generation (Both in-market and out-of-market)• Interim solution for 2008, 2009, 2010• For these years FMD was based on physical flows

Page 8: Guarantees of Origin Scheme 30 th  November 2011

8

FMD 2010 Breakdown

15.98%1.59%

64.06%

5.78%

12.11%

0.48%

Final Overall Mix 2010

Coal

Oil

Gas

Peat

Renewables

Other

Page 9: Guarantees of Origin Scheme 30 th  November 2011

9

Fuel Mix Disclosure – Output

• SEMO provides an individual Fuel mix breakdown to Suppliers

• And All Island Mix breakdown• Display on their customers’ bills• Consumers may use this comparison when

deciding which supplier to choose

Page 10: Guarantees of Origin Scheme 30 th  November 2011

10

Fuel Mix Disclosure – Enduring Solution

• Enduring solution to be in place next year for 2011 calculation

• Next year Suppliers will be able to declare Irish GOs

• GOs do not follow physical flow• Deadline for Supplier Submissions for Disclosure

Period 2011 is the 31st March 2012

Page 11: Guarantees of Origin Scheme 30 th  November 2011

11

Guarantee of Origin - Status

• Used• Deemed to be used in a disclosure period in which the

GO is counted for FMD purposes• A GO can only be used once

• Active• 12 months from the date of production• Can be used in any disclosure period in which it is active

e.g. a GO issued on 1st of June 2012 can be used in FMD 2012 or FMD 2013

Page 12: Guarantees of Origin Scheme 30 th  November 2011

12

Guarantee of Origin - Status

• Expired• Expires after 12 months• Can still be used or transferred after expiration

• Cancelled• When used in FMD• If not used in final FMD Disclosure Period, into Residual

Mix• Cancelled GOs cannot be used or transferred again

Page 13: Guarantees of Origin Scheme 30 th  November 2011

13

GO Scheme – Business Processes

SEMO will administer the following processes:

• Registration • Request• Issuing• Transfer• Import • Revocation

Page 14: Guarantees of Origin Scheme 30 th  November 2011

14

GO Scheme – Business Processes

Page 15: Guarantees of Origin Scheme 30 th  November 2011

15

GO Calendar

• Some processes are ad hoc

• Others are quarterly

Quarter End Date

Quarter 1 31st March

Quarter 2 30th June

Quarter 3 30th September

Quarter 4 31st December

Page 16: Guarantees of Origin Scheme 30 th  November 2011

16

GO Registration

• Download from the SEM-O website

• Pack for Generators, Pack for Suppliers

• ‘Enable Macro’ document available on the website

• Pack must be fully completed

Microsoft Office Word Document

Microsoft Office Excel Macro-Enabled Wor

Page 17: Guarantees of Origin Scheme 30 th  November 2011

17

SEMO Website - GOs

Page 18: Guarantees of Origin Scheme 30 th  November 2011

18

GO Registration – Authorised Users

• Nomination of Authorised User (Internal)• Nomination of External Agent (External)

• Can only have either an internal or external authorised user to Request, Issue, Transfer

• Supplier can act as an External Agent• Password provided must be 8 characters• Authorised Users and Passwords will be logged

Page 19: Guarantees of Origin Scheme 30 th  November 2011

19

GO Registration

• Once completed email to [email protected]

• Acknowledgement email with Ref Number will be sent

Page 20: Guarantees of Origin Scheme 30 th  November 2011

20

GO Registration

• Within SEM Generators – details checked internally• Out of SEM Generators – details checked with DSO• Suppliers – details checked internally

Page 21: Guarantees of Origin Scheme 30 th  November 2011

21

GO Registration

• ID will be issued, this is separate to any market IDs • This ID will be used for all correspondence relating

to GOs and FMD• Central registry will contain these IDs• SEMO asks if participants can confirm receipt of

this ID

Page 22: Guarantees of Origin Scheme 30 th  November 2011

22

Page 23: Guarantees of Origin Scheme 30 th  November 2011

23

GO Registration

• Enduring Registration Process will take 21 Working Days to complete

• Need to have Initial Registrations complete by the end of 2011

• 19 Working Days until Xmas!!!

Page 24: Guarantees of Origin Scheme 30 th  November 2011

24

GO Requests

• Ad Hoc process • Generator sends request, receives Ref Number• Two validation checks

• 1) Is the Generator registered for the scheme?• 2) Are template details correct?

• 2 WDs for this validation • Except for 10 WDs before end of quarter, extended

to 5 WDs

Page 25: Guarantees of Origin Scheme 30 th  November 2011

25

GO Requests

• Requests can be for more than 1MWh, varying Start/End dates

• Verified Requests added to the request log• Invalid Requests rejected• SEMO will be backdating GOs for 2011• Start sending in requests once registered for the

scheme

Microsoft Office Excel Macro-Enabled Wor

Page 26: Guarantees of Origin Scheme 30 th  November 2011

26

Page 27: Guarantees of Origin Scheme 30 th  November 2011

27

GO Issuing

• Quarterly process

• Metered Generation (MG) pulled from SEM Market Systems (within market) and requested from MRSO (out of market)

• 10 Working Days after end of quarter

Page 28: Guarantees of Origin Scheme 30 th  November 2011

28

GO Issuing

• Cross check Requests against MG• a) If Requested MWh <= MG – GOs Issued• b) If Requested MWh > MG – GOs Rejected

e.g. Request MWh = 10 MG MWh = 9

Authorised User will be informed that 9 are available

• Request can be resubmitted with revised values• Resent within 2 WDs

Page 29: Guarantees of Origin Scheme 30 th  November 2011

29

GO Issuing

• Electronic document as per the S.I.• Each certificate has its own unique ID• Certificates emailed to the Authorised User (20

WDs after the end of the quarter)• Authorised User calls SEMO with their password• The file password is then given• Password is randomly generated• Certificates can then be accessed

Page 30: Guarantees of Origin Scheme 30 th  November 2011

30

GO Issuing – Format of a GO

• Will be in XML format

Page 31: Guarantees of Origin Scheme 30 th  November 2011

31

Page 32: Guarantees of Origin Scheme 30 th  November 2011

32

GO Transfer

• Ad hoc process (need to be completed by 31st of March 2012 for 2011 FMD)

• Current holder’s Authorised User sends in a Transfer Request

• Details of the New Holder (GO Participant)• SEMO verifies the details and updates the Central

Registry• New updated certificates sent to New Holder

Microsoft Office Excel Worksheet

Page 33: Guarantees of Origin Scheme 30 th  November 2011

33

GO Transfer

Page 34: Guarantees of Origin Scheme 30 th  November 2011

34

GO Transfer - Exports

• Export transfers are included here – need MS • New certificates not sent on – registry updated as

‘Exported’

Page 35: Guarantees of Origin Scheme 30 th  November 2011

35

Page 36: Guarantees of Origin Scheme 30 th  November 2011

36

Renewables Attributes Transfer

• Quarterly process• Supplier advises which Generators they have PSO

PPA agreements with • SEMO will be checking PSO lists • However, need as much info as possible

• Attributes will be assigned automatically every quarter

• If details change, must advise SEMO

Microsoft Office Excel Macro-Enabled Wor

Page 37: Guarantees of Origin Scheme 30 th  November 2011

37

GO Revocation

• Ad hoc – Only where SEMO have grounds to suspect fraud; rules set out in S.I.

• SEMO will advise the CER of concerns, however final decision will be taken by SEMO

• Post notice to current holder – must be written notice as per S.I.

• Previous holders will be advised, if contact details are available

• Update Central Registry with ‘Revoked’

Page 38: Guarantees of Origin Scheme 30 th  November 2011

38

Page 39: Guarantees of Origin Scheme 30 th  November 2011

39

GO Imports

• Ad hoc process• Advise SEMO ASAP – will need to contact Member

States to verify validity• If no response from MS after 10 WDs - rejected

• Minimum details required – Static Data• SEMO will work on building contacts within Member

States

Microsoft Office Excel Worksheet

Page 40: Guarantees of Origin Scheme 30 th  November 2011

40

Page 41: Guarantees of Origin Scheme 30 th  November 2011

41

Conclusions

• Registration process to be completed • Requests accepted ad hoc• Issuing once per quarter• Transfers accepted ad hoc• Imports accepted ad hoc• Revocation – as required

Page 42: Guarantees of Origin Scheme 30 th  November 2011

42

Next Steps

• Registrations to commence asap• Once registered send through requests• Backdating to commence for 2011 in January• FMD MOST to be held in January – All Island

Page 43: Guarantees of Origin Scheme 30 th  November 2011

43

Next Steps

Page 44: Guarantees of Origin Scheme 30 th  November 2011