+ All Categories
Home > Documents > GUCS (Groupe Utilisateur CATIA/ Smarteam )

GUCS (Groupe Utilisateur CATIA/ Smarteam )

Date post: 15-Feb-2016
Category:
Upload: jethro
View: 70 times
Download: 0 times
Share this document with a friend
Description:
GUCS (Groupe Utilisateur CATIA/ Smarteam ). CATIA FORUM 08 DECEMBER 2011. Overview. GUCS PLMWG GrACQ in 2012 External contact Follow -up enhancement request Data Reminder. Y. Muttoni 9 e Catia forum 08/12/2011 . - PowerPoint PPT Presentation
Popular Tags:
17
GUCS (Groupe Utilisateur CATIA/Smarteam) CATIA FORUM 08 DECEMBER 2011
Transcript
Page 1: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

GUCS (Groupe Utilisateur CATIA/Smarteam)

CATIA FORUM 08 DECEMBER 2011

Page 2: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Overview

GUCS PLMWG GrACQ in 2012 External contact Follow-up enhancement request Data Reminder

Y. Muttoni 9e Catia forum 08/12/2011

Page 3: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Y. Muttoni 9e Catia forum 08/12/2011

GUCSMembers: Y.Muttoni, T.Klioutchinikova, M.Timmins1 invited: C.Delamare

PLM-WGA.Bertarelli, S. Chemli, S.Bally, S.Petit, D.Widegren

Mandate:Put the interest of the users in the foreground and make sure the tools match the needs.

Mandate:The PLM WG is to define processes needed for efficient life-cycle management of CAE data at CERN and is to coordinate the adoption, use and evolution of these processes throughout the organization.

Meetings:-Weekly meetings: Discuss priorities, particular enhancement and problems.-Monthly meetings with your local correspondents: communication upstream and downstream, consultations.

Meetings:- Twice a week for 2010- Weekly meetings in 2011

Monthly communal meetings between GUCS and PLMWG to discuss issues such as document life cycles

Page 4: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Y. Muttoni 9e Catia forum 08/12/2011

GUCSMembers: Y.Muttoni, T.Klioutchinikova, M.Timmins1 invited: C.Delamare

PLM-WG (2012 proposal)S.Bally, S. Chemli, S.Petit, P-o. FrimanM.Timmins (GUCS), P. Trilhe (GrACQ), G. Villiger

Mandate:Put the interest of the users in the foreground and make sure the tools match the needs.

Mandate:The PLM WG is to define processes needed for efficient life-cycle management of CAE data at CERN and is to coordinate the adoption, use and evolution of these processes throughout the organization.

Meetings:-Weekly meetings: Discuss priorities, particular enhancement and problems.-Monthly meetings with your local correspondents: communication upstream and downstream, consultations.

Meetings:-Twice a week for 2010- Weekly meetings in 2011- The specification “Product Data Lifecycle at CERN” should be presented at users in 2012

Monthly communal meetings between GUCS and PLMWG to discuss issues such as document life cycles

Page 5: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Y. Muttoni 9e Catia forum 08/12/2011

GrACQP. Trilhe, D. Perini, M.Timmins(GUCS), D. Steyaert, G. Villiger, L. Faisandel, P. Moyret, D. Pugnat, S. Maridor, B. Nicquevert, S. Bally (PLMWG), F. Borralho, M. Garcia Carnero

Mandate:Define rules and practices to designer and project engineer to produce drawings in the better quality.

Meetings:-Weekly meetings

Regular communal meetings between GUCS and GrACQ to discuss issues such as cartouche modification.

Page 6: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

External contact 150 Catia users

Catia V5 – Smarteam since 2004

Y. Muttoni 9e Catia forum 08/12/2011

Page 7: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Next step : Video conference on specific topic◦ Methodology◦ Reverse engineering ◦ Life data management◦ Next release CATIAV5/Smarteam◦ Training

Y. Muttoni 9e Catia forum 08/12/2011

External contact

Page 8: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Y. Muttoni 9e Catia forum 08/12/2011

External contact

Regular meetings at Lyon 4-5 times per year on CATIA/Smarteam. Necessary to have with IN2P3 a common version of CATIA.Thanks for their presentation in this forum.

Page 9: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Y. Muttoni 9e Catia forum 08/12/2011

External contactCern participants

•3 Mechanical designer•2 Integration designer•2 Support CAD

•Caec chairman•GS-ASE group leader•GUCS Chairman

Contact with external firms

Pedretti Airlight Energy ManufacturingJulius Blum Smarteam/Enovia V6ALSTOM Engineering processTechviz Visualization solutions for 3D applicationsFraunhofer Process and Methodology

Present for users: CATIA V5 - Smarteam

Future for users: CATIA V6 – Enovia V6

and Dassault Time to be defined

4-5 years???Necessary to keep an eye on it

Page 10: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

REQUESTS FOLLOW-UP (1/2)Enhancement Request Who Delivere

dStill expected in 2011

2012

R20 deployment (almost completed) GUCS x xExternalisation tool for sub contracting GUCS xLifecycles on objects PLM xCDD number removed upon save-as GUCS xMass in SMT GUCS x2D pdf for archived and non archived drawings.

GUCS x

Multi-printing for non archived drawings PLM x3d viewers (external and internal) PLM xCAD Data Navigator (replacement of CWN) PLM x

Y. Muttoni 9e Catia forum 08/12/2011

Page 11: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

REQUESTS FOLLOW-UP (1/2)Enhancement Request Who Delivere

dStill expected in 2011

2012

Hot fix and new test users Ok GUCS x xMissing installation module by IT GUCS xLifecycles on objects – Mechanism tested PLM xIn dev to be tested GUCS xMass in SMT OK for the part GUCS x2D pdf for archived and non archived drawings. 1271generated files after 1 month

GUCS x

Not yet started PLM xTest on 3D Via composer player Ok PLM xReady in development PLM x

Y. Muttoni 9e Catia forum 08/12/2011

Page 12: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

REQUESTS FOLLOW-UP (2/2)Enhancement Request Who Delivere

dStill expected in 2011

2012

Document Types Classification : 3DBE, 2DBE, 3DBM, 2DBM, 3DFEA, etc.

PLM x

Access Rights through e-groups and CAD-Teams

PLM x

Project Structure on LHC Equipment Codes PLM xSynchronisation of Statuses between CDD and SmT

PLM x

Y. Muttoni 9e Catia forum 08/12/2011

https://espace.cern.ch/cad-service/default.aspx

Page 13: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

REQUESTS FOLLOW-UP (2/2)Enhancement Request Who Delivere

dStill expected in 2011

2012

The process should be defined PLM x

Access Rights through e-groups and CAD-Teams

PLM x

Project Structure on LHC Equipment Codes PLM xWho is the master? the drawing or the 3D model?

PLM x

Euclid-Migrated Models Geometry Correction Tool

GUCS x Beta

Software GPURE in production (Simplified 3D model)

GUCS x

Y. Muttoni 9e Catia forum 08/12/2011

https://espace.cern.ch/cad-service/default.aspx

On request of the EN department leader a list of the top enhancement requests will be provided for year 2012

Page 14: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

DATA

Y. Muttoni 9e Catia forum 08/12/2011

150 Users produce the data

The past has shown the need to clean up data regularly remind the vms to unix transition and the CAD migration from Euclid to Catia.

When you start a new design (part or product) check if the model does not exist in smarteam.

A cleaning of the vacuum equipment 3D model has started in smarteam.

Clean your 3D model not used and not useful.Using the 3D models catalogue.

Page 15: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Reminder

Y. Muttoni 9e Catia forum 08/12/2011

Do not forget to discuss with your local correspondent. We meet them once a month. Map link local correspondentThe methodology task is on the way R. Betemps will make a presentation at the next forum.Smarteam refresh course is always available for all the users having followed the standard course.In case of problems use the CAD Support mail. The GUCS members read them regulary.The CATIA forum is for you but to continue we need you (topics, ideas, news…).

Page 16: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Y. Muttoni 9e Catia forum 08/12/2011

Page 17: GUCS  (Groupe Utilisateur  CATIA/ Smarteam )

Thank you for your attention

Special thanks to Jean-Pierre for the forum CATIA organization

Questions?

Y. Muttoni 9e Catia forum 08/12/2011


Recommended