works/contracts
- Manoj Kumar
V , KoPT
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
2/25
CVCs circulars
Common irregularities/lapses observed instores/purchase contracts and guidelines forim rovement in rocurement s stem - CVC
Problem areas of corruption in construction- CVC
Common irregularities/lapses observed in award and,
and guidelines for improvement thereof- CVC
Shortcomings of general nature observed during
- Manual on policies & procedure for procurement of
works - MOF
GFR Chapter 5 to 8
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
3/25
Competitive price - Value for money
Process to be fair and transparent
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
4/25
- ,
appointment of consultant, Estimates of rates,Technical sanction, Administrative approval,Expenditure sanction
Tender stage - NIT, Invitation & opening oftender, pre-qualification, evaluation & award
Execution stage - Implementation of tender
con t ons, qua ty mon tor ng, post contractmonitoring
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
5/25
Assessment of Need & viabilit No new work
without analysis of existing facilities/ availablealternatives
Modern techniques like pay back period,
discounted cash flow, NPV, IRR, technical &
Av. Life of equipment/spares to be considered.
higher authorities.
One time urchase of e ui ments to be decidedbased on actual intended use, rate of return etc.
Latest specifications & Technology
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
6/25
Guidelines to be formulated
Only when absolutely essential, for specialized jobsonly Com etitive tenderin s stem Scope of work & Role to be well defined
Decision making not to be delegated to them GFR 168-175 - Work
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
7/25
To be worked out in realistic and ob ective manner
Estimates on SOR, for non-scheduled items- properanalysis of rates, prefer products with standard
Basis- Prevailing market price, last purchase price,
economic indices for raw material / labour/equipment,, , ,obtained in similar tender etc.
Items - Should include basic price, fabrication
c arges, nspec on ee, u es, pac ng, an ng,transportation charges, VAT, Octroi, installation,erection, commissioning charges, licence fee,cont ngenc es.
Purpose of tech sanction - proposal is structurallysound, estimate is economical
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
8/25
,
repairs), concurrence of competent authorityof Administrative Department needed.
Purpose - justification of work, realistic
estimate, adherence to yardstick of variousprovisions
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
9/25
Open GFR/MOF- compulsory above 5 lakhs
Limited - small value, urgent & repetitive panel ofvenders in a transparent manner, to be periodicallyrevised
Single Tender Enquiry
Tender on nomination basis - SC held it to bevetting, audit committee to check 10% cases (officeorder 23/7/07 dt 05.07.07)
-declared by govt., single source, tender called onseveral occasions, but no bid or reasonable bid
-can be prescribed
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
10/25
Advertised/ O en tender - ublication in ITJ &
national newspapers, Copies to registered/ past/likely suppliers.
o a en er - mpor o goo s nvo ve , cop es oIndian missions/Embassies of major trading
countries.
For construction - copy to building association.
Time - 4 to 6 weeks for advertised tender, 3-4 weeks
or m e en er To be put on website
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
11/25
Standard tender form with conditions, BOQ, set of
drawings, specification of works All important clauses relating to earnest money,
, ,Warranty BG, Pre-dispatch inspection,
Comprehensive insurance cover, Contractors, , ,Arbitration, Liquidation Damages, risk-purchase,evaluation/exclusion criteria, quality standards etc
o e ncorpora e . Earnest money in two-bid system fixed
reasonable amount on the basis of estimated cost
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
12/25
- ,
50 lakhs +1% for work above 25 cr Performance Guarantee - 5% of contract
value (GFR- 5-10%)
Securit De osit - 5% of contract value GFR-2-5%)
Bonus - 1% of contract value pm subject to
max 5% of contract value
LD - for repairs upto 10 lakhs- 1% per week
LD- Others- 0.5% per week subject to max10% of contract value
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
13/25
Govt. olic on reservation of items to be incor orated.
No purchase preference to public Sector Enterprisesafter 31.3.08
performance parameters and technical evaluation
criteria. Particular brand to be avoided, BIS markedcan e men one . s o pre erre ma es o ma orequipments can be given.
No conditional discounts to be considered.
Price variation - MOF - no variation upto 18 months,above 18 months formulae for POL/Labour/Material
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
14/25
PQ criteria neither too strin ent nor too lax
PQ criteria specific to requirement Evaluation criteria to be mentioned in PQ
document
Verification of PQ credentials to be done Experience certificate from pvt. organisations
to be verified with TDS certificate etc.
-necessary.
- - - - - . .
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
15/25
Sin le bid s stem when s ecifications are ade uatel
defined, item being procured are standardequipments designed as per general industry norms.
- ,negotiations may be conducted to clarify deviations.
After bringing acceptable offers on a common,specifications should be frozen. In case, changes aremade in terms/ conditions/specifications, bidders may
.
Revised bids - Bidding firms meeting qualifyingcriteria may be finalised before or during technical
.taken from bidders not meeting qualifying criteria.Rejection to be intimated with unopened price bid.
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
16/25
-
Clarification of ros ective bidders submitted rior to
submission deadline to be responded promptly Any time prior to deadline, tender documents can be
mo e y a en um
Pre-bid meeting to clarify provisions of tender., .
of agreement
Minutes of meeting to be issued promptly
Deadline for submission of tender to be extended ifnecessary to afford contractors time to take
.
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
17/25
Tender sale and o ening registers to be
maintained. Any change in tender terms & conditions,
, .to all bidders well in advance of revised
opening date in addition to paper and website. Opening in presence of representative of
bidders
orrec on, om ss ons, over-wr ng e c o eattested and numbered On the s ot summar Price bid to be signed by govt. official & 2 reps,
put in a bigger box/envelope & signed
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
18/25
After technical evaluation, no grading
Indian Agent - genuineness of quoted price, nature ofservice by agent, tax compliance, foreign exchangeleakage to be considered
Conditions of tenders are not to be altered after price bids.
Reasonableness of price to be established before awardof contract- based on estimate market rice market ratejustification statement), last purchase price, input / labourcosts, intrinsic value, rate quoted for similar/identicalworks etc Justification statement
AHR and ALR items to be identified and control exercised. Single tender - detailed justification, approval of
com etent authorit and Finance.
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
19/25
Negotiation with L-1(Circular 4/3/07 dt 03.03.07)
No Ne otiation with L-1
Exception - proprietary items, items of limitedsources of supply, suspicion of formation ofcarte
Reasons for negotiations to be recorded me rame - mon , ays a eac g er
level, within tender period
- -,after negotiation
S lit- ratio to be indicated in tender
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
20/25
- Bidding document to be self contained &
comprehensive Provision for bidder to question bidding condition,
bidding process & rejection Provision for settlement of dispute
Specifications to be unambiguous Criteria for responsiveness to be clearly indicated Evaluation only as per laid down conditions
Bidders not to be allowed to modify bids afterdeadline of receipt of bids
Successful bidders name on notice board andwebsite
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
21/25
Advance & BG(Circular 10/4/07 dt 01.4.07)
To be decided b Board with a roval of Finance
Interest free advance- Not encouraged by CVC If advance considered necessary, to be mentioned in
Recovery time based & not linked to progress of work
BG as per recovery installments Interest on delayed recovery, U.C. to be taken
BG to be verified with bank
ecure a vance - up o o ma er a s a us wintermediate bills for items to be used in work
Mobilisation advance - upto 10% of est. @interest
Plant, Machinery Adv - 50% of dep cost @interest
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
22/25
Agreement
Implementation of contract provisions insurance,deployment of technical persons, licences etc
ualit of work/ Ins ection - Check measurement-including hidden & high rate items to be checked by seniorofficers Inspection note by senior officers.
SITE RECORDS Test record, site instructions &compliance, MAS A/c register for issue of items,hindrance register etc.
TIME AND COST OVERRUN - Completion Schedule of
act v t es to e ta en n a vance an progress to emonitored with schedule.
REPORT - Authority granting administrative approval,s ou e ep n orme o e progress o e wor .
TIMELY PAYMENTS - first come first serve basis
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
23/25
System of monitoring to be prepared beforestart. uarterl /monthl monitorin
Large project - Monthly progress report by
contractor indicatin construction schedule,progress chart, plant & Machinery statement,man-power statement, Financial statement,
tatement o extra an su st tute tems,progress photographs, quality control tests,
.
Commissioning & documentation
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]
24/25
Performance BG u to warrant eriod
Guarantee/warranty/DL from date of installation/commissioning
implications should be severely discouraged.
Clauses of insurance, workmen compensation,a our cence, e c o e proper y mp emen e
Liquidation damage for delayed completion unlessbonafide extension, L/C extension charges on
suppliers account Completion of contract should imply completion of all
8/3/2019 Guidelines of Works Contracts [Compatibility Mode]