Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN1
* The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010-264330-CATHI)
CATHIMarie Curie Initial Training Network
Cryogenics, Accelerators and Targets at HIE-ISOLDE
Guillaume KAUTZMANN (BE/ABP/SU)*WP4, ESR6
Mid Term Review Meeting, 26 September 2012
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN2
Outline
Background
Activities at CERNLINAC
Other
Training
Contacts
Publications
Future Work and Trainings
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN3
Background
Previous Education: 2009: Masters of Science in Topography
National Institute of Applied Science, Strasbourg, France
Work Experience: 2010-sep. 2011: Instrumentation Engineer on the
construction of the french nuclear research
facility “Laser MegaJoule”
Soldata, Bordeaux, France
Jan. 2009-Sep. 2009: Master Thesis and working
in GPS and Airborne Surveying Methods
Fugro Geoid, Montpellier, France
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN4
Activities at CERN LINAC – Alignment Specifications
• Alignment and monitoring of the Cavities and Solenoids in the Cryomodules• Alignment w.r.to a common nominal beam line (NBL) along the Linac• Permanent system• Precision demanded along radial and height axis at 1 sigma level :
300 microns for the Cavities 150 microns for the Solenoids
NBL
+/-300 micr
+/-150 micr
~16 m
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN5
Proposed concept:
Hardware:- BCAM based
observation- Metrological tables- Targets- Viewport crossing
Conditions:- Cryogenic- High Vacuum
Activities at CERN LINAC – Alignment Concept
3D Reconstruction Software
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN6
BCAM Studies: Field of view issue
Development of a new BCAM called HBCAM
Technical specification + Technical Visit to Brandeis (USA)
Viewports studies: Tests to check the viewport qualities
Tests to check and validate theoretical models in order to correct the effects on the
optical measurements
Deformation Liberec University (Czech Republic) + CERN TE/MSC-CMI
Target studies: Studies of different target types Two types are going to detailed conception
Cryotest with Mario Herrmann (TE/VSC)
Activities at CERN LINAC – Specific (1/2)
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN7
Software: Participation on the reconstruction software done by S.Waniorek
(BE/ABP/SU)
Test bench: Needed to :
- Validate the theoretical foundation of the software
- Test of the different hardware parts
First results promising on the comparison reference measurement/
Reconstructed position by the software
Integration: Implication in several decisions regarding the integration of the
alignmnent system in the tunnel
Integration of the alignment system to the Cryomodule design
Activities at CERN LINAC – Specific (2/2)
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN8
Cryomodules Assembly:
Participation on the survey and alignment for:
- Assembly chain of the cryomodules
- Clean room design
Transfer lines:
Participation on Transfer lines Working Group
Special focus on the alignment of elements between magnets
Inter Tank:
Participation on DiagBox Working Group
Activities at CERN Other
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN9
Training (1/2)
First months: Familiarization phase with the survey methods and CERN administrative
procedures
Training courses: “Radiological Protection Course”@ CERN;
“Self-Rescue Mask (Biocell)” @ CERN;
“Post-induction training (HRT, EDH, EDMS, INDICO and CDS)” @ CERN;
“Project Engineering” @ CERN;
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN10
Training (2/2)
Technical Visit: ATLAS Experiment visit where a BCAM solution is implemented;
Brandeis University (Waltham, Massachusetts, USA);
Open Source Instrument (Waltham, Massachusetts, USA);
Tevatron (Fermilab, Illinois, USA);
Conference, Seminars, Workshop:
“12th International Workshop on Accelerator”
@ Fermilab, Batavia, U.S.A (September 10-14, 2012);
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN11
Contacts
Contacts
- with other MC Fellows
- with other CERN Departments, principally TE
- outside CERN: Meca-Test (mechanical company, Switzerland) for the target development;
STPS (mechanical company, France) for the test Bench;
EREO (optics) for the development of tools for window adjustment;
OSI for the development of new BCAM;
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN12
Publications
Technical specification: “HIE-ISOLDE Specification for the development
Of HBCAM” EDMS N°: 1231567;
IWAA 2012:
1. “The HIE-ISOLDE Alignment and monitoring system Software and test mock up” (primary author + presentation);
2. “HIE-ISOLDE Alignment and Monitoring System Technical Design and Project Status” (primary author);
Cryomodule design Working Group:
1. “HIE-ISOLDE Cryomodule Technical Review -The Alignment System - April 26th, 2012”, EDMS N°: 1214768, (Participation on the presentation support);
2. “News on BCAM tests – December, 15th, 2012”;
Beam department newsletter: Article in the life section - September 2012
Several presentations for working groups, security, quality…
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN13
Work: Extend the test Bench;
HBCAM development;
Participation on metrological table design;
Survey for Cryomodule assembly, clean room, …
Training: “Cern Accelerator School”@ Granada University (October 29th to November 9th, 2012);
Secondment:
- Brandeis University (Waltham, Massachusetts, USA);
Presentation skills; Programming in C++; Travailler en salle propre…
Future Work and Training
Mid Term Review Meeting, 26 September 2012 G. KAUTZMANN14
Thanks for your attention