    MITSUBISHI HEAVY INDUSTRIES, LTD.NAGASAKI SHIPYARD & MACHINARY WORKS

    25 October 2009

    SAUDI ARABIASHUQAIQ-2 IWPP PROJECT

    COURSE- H-3

    ITEM Boiler & auxiliaries

    CONTENTS

    Heater

  • 7/28/2019 H-3 Power Point (Air Heater)

    2/63

    PAGE 2

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Part.1

    General

    for

    LjungstromAir Heater

  • 7/28/2019 H-3 Power Point (Air Heater)

    3/63

    PAGE 3

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1st topic Company Introduction Page 5

    2nd topic General Explanation of Ljungstrom Regenerative

    Air HeaterPage 8

    3rd topic Heating element Page 13

    4th topic Sealing System Page 18

    5th topic Auxiliary Equipment for SHUQAIQ Page 21

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    4/63

    PAGE 4

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1st topic Company Introduction Page 5

    2nd topic General Explanation of Ljungstrom Regenerative

    Air HeaterPage 8

    3rd topic Heating element Page 13

    4th topic Sealing System Page 18

    5th topic Auxiliary Equipment for SHUQAIQ Page 21

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    5/63

    PAGE 5

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Company Introduction

    Company History of ALSTOM K.K.

    1907 Founded as Gadelius Trading Co.1979 Merged into Flakt AB Sweden

    1988 Merged into ABB Group

    1999 Jointed with ALSTOM- formed

    ABB ALSTOM Power2000 Transferred to ALSTOM Group

    2007 100thAnniversary

    Long Presence in JapanLong Presence in Japan

  • 7/28/2019 H-3 Power Point (Air Heater)

    6/63

    PAGE 6

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Company Introduction

    ALSTOM Ljungstrom Group

    Air Preheater Company

    North America

    Air Preheater Company

    North America

    Alstom KK EER

    Asia

    Alstom KK EER

    Asia

    APER GmbH Div. Air

    Preheater Europe

    APER GmbH Div. Air

    Preheater Europe

    Bammental,

    Germany

    Kobe, Japan

    Wellsville, NY

    (Headquarters)Osaka, Japan (NK)

    Vinhedo,

    Brazil

    Concordia, KS

    Engineering

    Facilities

    Manufacturing

    Facilities

    Shanghai, China

    (CNEER)

    Shanghai, China

    (CNASAEER)

  • 7/28/2019 H-3 Power Point (Air Heater)

    7/63

    PAGE 7

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1st topic Company Introduction Page 5

    2nd topic General Explanation of Ljungstrom Regenerative

    Air HeaterPage 8

    3rd topic Heating element Page 13

    4th topic Sealing System Page 18

    5th topic Auxiliary Equipment for SHUQAIQ Page 21

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    8/63

    PAGE 8

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    AH

    Boiler

    FDF

    EP

    STACK

    Function of LjungstromAir Heater

    General Explanation of Ljungstrom

    AirHeater

    DeDe--SOxSOx

    SystemSystem

    SAH

  • 7/28/2019 H-3 Power Point (Air Heater)

    9/63

    PAGE 9

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    HotSide

    Cold

    Side

    General Explanation of Ljungstrom

    Air HeaterAir and Gas Flows

    HotSide

    Cold

    Side

    Air

    AirGas

    Gas

  • 7/28/2019 H-3 Power Point (Air Heater)

    10/63

    PAGE 10

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    General Explanation of LjungstromAir

    Heater Construction of LjungstromAir Heater

    Heating Element

    Rotor Drive Unit

    Guide Bearing

    Housing Panel

    Corner Duct

    Pin Rack

    Center Section

    Soot Blower

    Radial Seal

    Bypass Seal

    Axial Seal

    RotorDiaphragm

    Stay Plate

  • 7/28/2019 H-3 Power Point (Air Heater)

    11/63

    PAGE 11

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Ex.

    26 -VI- 1325

    Element Total Height (mm)

    Flow Type: V, VI=Vertical shaft, H=Horizontal shaft

    AH Nominal Size: Related to Rotor Diameter

    General Explanation of LjungstromAir

    HeaterExplanation of LjungstromAir Heater type

  • 7/28/2019 H-3 Power Point (Air Heater)

    12/63

    PAGE 12

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1st topic Company Introduction Page 5

    2nd topic General Explanation of Ljungstrom Regenerative

    Air HeaterPage 8

    3rd topic Heating element Page 13

    4th topic Sealing System Page 18

    5th topic Auxiliary Equipment for SHUQAIQ Page 21

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    13/63

    PAGE 13

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Heating Element

    Explanation of where the HE are installed

    Heating

    ElementDiaphragm

    Stay Plate

    DUNDUNTMTMNFNF

  • 7/28/2019 H-3 Power Point (Air Heater)

    14/63

    PAGE 14

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    CRLS*1.2NF300Cold

    Mild steel0.6DUN1025Hot

    MaterialThickness

    (mm)

    TypeDepth

    (mm)

    Layer

    * CRLS : Corrosion Resistant Low-alloy

    Steel

    Heating ElementHeating Element Spec. of AH for Shuqaiq-2

  • 7/28/2019 H-3 Power Point (Air Heater)

    15/63

    PAGE 15

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Pressure

    Pressured

    rop

    d

    rop

    Thermal efficiencyThermal efficiency

    NFNF

    DUNDUNTMTM

    DUDU

    Heating Element

    Element performance characteristic tendency

  • 7/28/2019 H-3 Power Point (Air Heater)

    16/63

    PAGE 16

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    28-VIX-2400Crude Oil300MWEVN O MONVietnam

    27-VIX-2150Oil---Lin-YuangChinese Petrochemical co. (Taiwan)

    26-VIX-1950Oil250MWx3Seraya P.S. Unit1~3Power Seraya Ltd. (Singapore)

    27.5-VI-1700(RT)Coal210MWMindanaoState Power Development Corp.(Philippines)

    27.5-VIX-1800Oil300MWTula Power Plant Unit5Comision Federal De Electricida

    (Mexico)

    32.5-VI-1900 (RT)Coal700MWx2JimahSKS Power RDN.BHD. (Malaysia)

    32.5-VI-1900 (RT)Coal700MWx3Tanjung Bin, JohorSKS Power RDN.BHD. (Malaysia)

    33.5-VI-2450(RT)Coal1000MWHitachi-naka Unit1Tokyo Electric Power Co., Ltd. (Japan)

    23-HRX-1250Oil & Gas250t/hChiba Plant CBL B15Sumitomo Chemiccal Co. (Japan)

    23.5-VIR-1350Oil450T/HMizushima Unit3Mitsubishi Chemical Co. (Japan)

    28-VIX-1025VR---Aichi Unit3Idemitsu Kosan (Japan)

    26.5-VI-1800VR&Gas185MWMizue Unit1 IPPGenex Co., Ltd. (Japan)

    30.5-VI-2525(RT)Coal500MWShin Onoda Unit1&2Chugoku Electric Power Co., Ltd.

    (Japan)

    28.5-VIX-2225N.Gas&Oil350MWCairo West Unit 7&8Cairo Electricity Production Corp.(Egypt)

    24-VIRX-2200Oil158 MWCarlos Manuel De Cespedes

    Unit No. 4Cuba

    30.5-VI-1625 (RT)Coal226MWBlue Waters Unit 1&2Griffin Energy Pty Ltd. (Australia)

    AH typeFuelCapacityPlant nameCompany name

    Reference List - DUNTM Heating element (excerpted)

  • 7/28/2019 H-3 Power Point (Air Heater)

    17/63

    PAGE 17

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1st topic Company Introduction Page 5

    2nd topic General Explanation of Ljungstrom RegenerativeAir Heater

    Page 8

    3rd topic Heating element Page 13

    4th topic Sealing System Page 18

    5th topic Auxiliary Equipment for SHUQAIQ Page 21

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    18/63

    PAGE 18

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    W= VRPHV : Volume of rotor plenum (m3)

    RPH: Rotor revolutions per hour

    GAS

    AXIALSEAL

    BY-PASSSEAL

    AIR

    Radial Leakage

    Axial Leakage

    HOTSIDE

    SIDECOLD

    SECTORPLATE

    RADIAL SEAL

    SECTORPLATE

    - Direct leakage

    - Entrained leakage

    Axial

    seal

    plat

    e

    ENTRAINED LEAKAGE

    Sealing System

    W=CA(2gP)C : Flow coefficient

    A : Total areas of seal gap (m2)

    g : Gravitational acceleration (m/s2

    ) : Specific weight of gas (kg/m3)P: Pressure difference between two

    flows

    Explanation of Leakage

  • 7/28/2019 H-3 Power Point (Air Heater)

    19/63

    PAGE 19

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    BY-PASS SEAL

    ANGLE

    BY-PASS SEAL

    (HOT)

    T BAR

    AXIAL SEAL

    BY-PASS SEAL

    (COLD)

    HOLDING

    STRIPPOST SEAL

    (COLD)

    ROTOR POST

    RADIAL SEAL

    (HOT)

    HOLDINGSTRIP

    ROTOR DIAPHRAGM

    POST SEAL

    (HOT)

    SECTORPLATE (HOT)

    HOUSING

    Sealing System

    Rotor Seals (Typical)

    T BAR

    RADIAL

    SEAL

    (COLD)

  • 7/28/2019 H-3 Power Point (Air Heater)

    20/63

    PAGE 20

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1st topic Company Introduction Page 5

    2nd topic General Explanation of Ljungstrom RegenerativeAir Heater

    Page 8

    3rd topic Heating element Page 13

    4th topic Sealing System Page 18

    5th topic Auxiliary Equipment for SHUQAIQ Page 21

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    21/63

    PAGE 21

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Rotor Drive Unit

    Bearing

    Lubricant Oil Circulation Unit

    Sootblower

    Fire Detecting Device

    Water Washing Device

    Fire Extinguishing Device (for Hotside)

    Auxiliary Equipment of AH for SHUQAIQ

    Rotor Drive Unit

    Guide Bearing

    Soot Blower

    Lubricant Oil Circulation Unit

    Fire Detecting Device

    Water Washing Device

  • 7/28/2019 H-3 Power Point (Air Heater)

    22/63

    PAGE 22

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Auxiliary Equipment for SHUQAIQ

    Rotor Drive UnitRotor Drive Unit (RDU) consists of speed reducer, main electric motor and

    auxiliary air motor. A pinion gear is mounted to the output shaft which engages a

    pin rack. The rotor assembly, containing the heating elements, is rotated by this

    RDU through the air and gas streams at approximately 1.8 RPM. The air motor,

    coupled to the main electric motor, is used as auxiliary motor for emergency and

    maintenance operation.

    Electricmotor

    Speed

    reducer

    Air motor

    (Utility)

    Electric power : 7.5kw

    Compressed air : 4.1barg

    4.0m3/min.Pinion gearcover

  • 7/28/2019 H-3 Power Point (Air Heater)

    23/63

    PAGE 23

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Auxiliary Equipment for SHUQAIQRotor Bearing

    Guide Bearing : #23052

    The guide bearing is responsible

    for supporting the redial loads at

    the top of the air heater

    Bearing

    (Self-aligning

    roller

    bearing)

    Bearing

    (Thrust self-aligning

    roller bearing)

    Support Bearing : #29456

    The air heater rotor is supported

    by the support bearing at the

    bottom of the air heater

  • 7/28/2019 H-3 Power Point (Air Heater)

    24/63

    PAGE 24

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Auxiliary Equipment for

    SHUQAIQLubricant Oil Circulation Unit (for Guide Bearing)

    (Utility)

    Electric power : 0.75kwCooling water : 2.9barg, 3.6ton/hr

    The purpose of this unit is to circulate the

    lubricant oil for cooling when the

    temperature of the oil in the guide bearinghousing reaches 50 degree Celsius.

  • 7/28/2019 H-3 Power Point (Air Heater)

    25/63

    PAGE 25

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Type : Half Retractable Type

    Steam condition (Cold side)

    Blowing Press.

    11.8barg

    Consumption

    1.7ton/hr

    Electric power : 0.1kw

    Cleaning Heating element surface by superheated

    steam

    Heating element

    Steam

    Auxiliary Equipment for

    SHUQAIQSootblower (for Cold side)

  • 7/28/2019 H-3 Power Point (Air Heater)

    26/63

    PAGE 26

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Auxiliary Equipment for

    SHUQAIQ Fire Detecting System (FDS)

    Detecting sensor : Thermocouple

    Installation position of

    Thermocouple :

    Gas outlet duct : 4 pcs.

    The purpose of the system is to monitorthe gas temperature leaving the air heater

    and detect the fire at early stage. If hot

    spot become present in the rotor, the gas

    temperature will increase unexpectedly.

  • 7/28/2019 H-3 Power Point (Air Heater)

    27/63

    PAGE 27

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Auxiliary Equipment for

    SHUQAIQ

    Type : Stationary Multi Nozzle Type

    (at gas inlet & gas outlet duct)

    Water Condition

    Blowing Press. : 4.9barg

    Consumption : 96ton/hr/each side

    WaterWashing Device

  • 7/28/2019 H-3 Power Point (Air Heater)

    28/63

    PAGE 28

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Auxiliary Equipment for

    SHUQAIQ

    Type : Stationary Multi NozzleType

    (at gas inlet)

    Water ConditionBlowing Press. : 4.9barg

    Consumption : 192ton/hr

    Fire Extinguishing Device (for Hot side)

    The fire extinguishing device consist of 1

    stationary multi nozzle pipe located in thegas inlet duct. The device is used in

    conjunction with the water washing

    device. The device is design to emit large

    amount of water onto a concentrated

    area of the heating element surface.

    Fire extinguishingdevice

    Socket

    Nozzle

    Washing

    Tube

  • 7/28/2019 H-3 Power Point (Air Heater)

    29/63

    PAGE 29

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    Operation and Maintenancefor

    Ljungstrom Air Heater

    Part.2

  • 7/28/2019 H-3 Power Point (Air Heater)

    30/63

    PAGE 30

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-1. Pre start-up checks

    1-2. Cold-run inspection

    1-3. Hot-run adjustment

    1-4. Start-up instructions

    1-5. Shutting down instructions

    1-6. Rotor stoppage due to motor failure

    1-7. Operation procedure of soot blower

    1st Operation

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    31/63

    PAGE 31

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    2-1. Daily inspections

    2-2. Periodical Inspections

    2nd Maintenance

    3rd Safety precautions

    2-3. Water washing

    Agenda

  • 7/28/2019 H-3 Power Point (Air Heater)

    32/63

    PAGE 32

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-1. Pre start-up checks

    1-2. Cold-run inspection

    1-3. Hot-run adjustment

    1-4. Start-up instructions

    1-5. Shutting down instructions

    1-6. Rotor stoppage due to motor failure

    1-7. Operation procedure of soot blower

    1st Operation

    Agenda

    PAGE 33

  • 7/28/2019 H-3 Power Point (Air Heater)

    33/63

    PAGE 33

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-1.Pre start-up checks

    To determine whether or not the Air Hater is ready for service,a complete inspection of the Air Heater and its auxiliary equipment

    is required. The operator should be concerned with all components

    being installed correctly, clean, and correctly lubricated.

    Prior to start-up, the operator must pay particular attention to the

    following areas to ensure safe and efficient operation of the AirHeater.

    Instructions

    PAGE 34

  • 7/28/2019 H-3 Power Point (Air Heater)

    34/63

    PAGE 34

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-1.Pre start-up checks

    FINAL CHECK-OUT

    LUBRICATION

    ROTOR INSPECTION

    ROTOR SEALS

    GUARDS AND COVERS

    PLANT UTILITIES

    ELECTRICAL CONNECTIONS AND CONTROL SYSTEM

    ROTOR ROTATION

    SOOT BLOWER STEAM PIPING

    Instructions

    PAGE 35

  • 7/28/2019 H-3 Power Point (Air Heater)

    35/63

    PAGE 35

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-1. Pre Start-up checks

    1-2. Cold-run inspection

    1-3. Hot-run adjustment

    1-4. Start-up instructions

    1-5. Shutting down instructions

    1-6. Rotor stoppage due to motor failure

    1-7. Operation procedure of soot blower

    1st Operation

    Agenda

    PAGE 36B i f B ilB i f B il

  • 7/28/2019 H-3 Power Point (Air Heater)

    36/63

    PAGE 36

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-2.Cold running test

    Hot-run adjustment

    Confirm unobstructed operation by air motor drive

    Continuous running test

    Back-up test

    - Start the auxiliary air motor by opening the hand valve.

    - Observe the rotor for unobstructed operation.Finish

    Fin ish

    - Energize the main drive motor and run the rotor

    - Check the motor temp.,

    abnormal sound,vibration...etc.

    - Test the automatic operation of the air motor solenoid valve

    upon power loss to the main drive motor.Finish

    Instructions

  • 7/28/2019 H-3 Power Point (Air Heater)

    37/63

    PAGE 38Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    38/63

    PAGE 38

    MHI BUSINESSCONFIDENTIALMHI BUSINESSCONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-3.Hot-run adjustment

    NOTE: This adjustment should be done at 100%-load during hot-run test

    b. Soot blower blowing pressure adjustment

    (1) Blowing pressure: 11.8 barg (Cold Side)

    Instructions

    PAGE 39Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    39/63

    PAGE 39

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-1. Pre Start-up checks

    1-2. Cold-run inspection

    1-3. Hot-run adjustment

    1-4. Start-up instructions

    1-5. Shutting down instructions

    1-6. Rotor stoppage due to motor failure

    1-7. Operation procedure of soot blower

    1st Operation

    Agenda

    PAGE 40Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    40/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-4.Start-up

    The following operation sequence should be used to place the air heater

    into service.

    A. Start the air heater's main drive motorbefore the forced and

    induced daft fans are started. The rotor must be rotating before emitting

    hot flue gas through the air heater.

    B. When firing the boiler on oil, start cold end soot blowing to the air heater

    continuously during start-up using an auxiliary blowing medium until stableboiler conditions are achieved and the normal soot blowing medium is available.

    C. Energize the guide bearings oil circulation units.

    The pump motors will start upon oil temperature rise.

    D. Start the air heater's auxiliary equipment control system.

    E. After normal soot blowing medium is available, activate the air heater sootblower

    Instructions

    PAGE 41Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    41/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Basic of BoilerBasic of Boiler

    1-1. Pre Start-up checks

    1-2. Cold-run inspection

    1-3. Hot-run adjustment

    1-4. Start-up instructions

    1-5. Shutting down instructions

    1-6. Rotor stoppage due to motor failure

    1-7. Operation procedure of soot blower

    1st Operation

    Agenda

    PAGE 42Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    42/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    1-5.Shutting down

    The following sequence should be used to remove the air heater from service.

    A. Activate the soot blower to remove any deposits which may have

    accumulated on the heating element surface.

    B. Keep the FD & ID fans running during the cleaning operation so that the

    air heater temperature will decrease more rapidly.

    C. Deactivate the air heater soot blowers.

    D. De-energize the air heater's auxiliary equipment control system.

    E. Keep the rotor turning and the fans operating until the gas inlet temperatureat the heater inlet drops below 150C.This will evenly distribute the effects of thermal distortion, over the entire

    rotor structure.

    F. Shut down the FD & ID fans.

    G. De-energize the rotor drive unit of the air heater.H. Close the manual valve to stop compressed air to the auxiliary air drive motor.

    I. Deactivate the guide bearing oil circulation units.

    Instructions

    PAGE 43Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    43/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    1-1. Pre Start-up checks

    1-2. Cold-run inspection

    1-3. Hot-run adjustment

    1-4. Start-up instructions

    1-5. Shutting down instructions

    1-6. Rotor stoppage due to motor failure

    1-7. Operation procedure of soot blower

    1st Operation

    Agenda

    PAGE 44Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    44/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    1-6.Rotor stoppage due to motor failure

    ! CAUTION

    Trip!!

    Instructions

    Back-up startAir Motor

    (Aux. Drive)

    Elec. Motor

    (Main Drive)

    If operation mode is selected to manual mode, aux. air motor does not

    start automatically.

    Operation mode of aux. electric motor should select to AUTO at normal condition.

    Over

    running

    clutch(ORC)

    PAGE 45Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    45/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    NOTE: The air heater structure will not experience permanent damage

    as long as the temperature of the gas entering the air heater does not

    exceed 480. However, if the rotor cannot be restarted immediately(within approx.15 min), damage to some of the seals and/or sealing plates

    is likely to occur due to non-uniform thermal expansion of the rotor.

    Non-uniform

    thermal expansion

    of the rotor

    Air side

    Gas side

    PAGE 46Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    46/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    1-1. Pre Start-up checks

    1-2. Cold-run inspection

    1-3. Hot-run adjustment

    1-4. Start-up instructions

    1-5. Shutting down instructions

    1-6. Rotor stoppage due to motor failure

    1-7. Operation procedure of soot blower

    1st Operation

    Agenda

    PAGE 47Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    47/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    1-7.Operation procedure of Soot Blower

    Frequency and occasion for soot blowing

    (Standard operation frequency)

    : once every 8 hours

    for the cold side, in principle

  • 7/28/2019 H-3 Power Point (Air Heater)

    48/63

  • 7/28/2019 H-3 Power Point (Air Heater)

    49/63

    PAGE 50Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    50/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    2-1. Daily inspections

    2-2. Periodical Inspections

    2nd Maintenance

    3rd Safety precautions

    2-3. Water washing

    Agenda

    PAGE 51Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    51/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    2-1.Daily Inspections

    Rotor guide&support bearing

    Check the rotating sound,oil level, gas leak.

    Draft loss and temperatureCheck and record the draft loss

    both side and temperature

    Rotor drive unit

    Check the temp., vibration,current, oil level.

    Soot blower

    Check the blowingpressure and leak.

    Rotor

    Visual Check the elementsand seals condition from

    observation port.

    Lubricant oil circulation unit

    Check the oil pressure andcooling water.

    PAGE 52Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    52/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    2-1. Daily inspections

    2-2. Periodical Inspections

    2nd Maintenance

    3rd Safety precautions

    2-3. Water washing

    Agenda

    PAGE 53Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    53/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    - Repair.

    - Replacement

    1.Visual check

    2.Measuring the Weight, thicknessHeating element

    - Repair

    - Replacement

    1.Thickness measurement

    2.Visual check

    AH proper

    - Cold side partition plate,

    Cold side housing panel,

    ...etc

    - Repair.

    - Replacement

    1.Overhaul2.Visual check

    3.Leak test

    4.Functional test

    Lubrication oil circulationunit

    - Oil pump,filter,cooler,

    Safety valve

    - Repair.

    - Replacement.1.Hammering

    2.Visual check

    Rotor trunnion

    - Trunnion bolts,Locking bar

    - Repair.

    - Replacement.

    1.Visual check

    2.Measuring the thickness

    3.Liquid penetrate testing

    Rotor proper

    - Rotor post,Rotor,Pin rack

    T-bar

    - Repair.- Replacement

    1.Visual check

    2.Hand check

    3.Oil sampling

    Bearings

    - Support,Guide,

    Air seal cover

    Contents of inspection Measures at abnormalComponents parts

    2-2.Periodical inspections (Summary)

    PAGE 54Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    54/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    - Repair.

    - Replacement

    1.Overhaul

    2.Visual check

    3.Measuring

    Rotor drive unit

    - Speed reducer,Elec. motor

    Aux motor,Pinion gear

    - Repair.

    - Replacement

    1.Visual check

    2.Measuring the thickness

    Stationary water washing

    Fire extinguishing device

    - Nozzle,Tube

    - Repair.- Replacement

    - Readjustment

    1.Hammering

    2.Measuring the thickness3.Measuring the seal clearance

    4.Measuring the degree

    of parallelism

    Rotor seal

    - Post seal, Radial seal,

    Bypass seal, Axial seal,

    Static seal,Sector plate

    - Repair.

    - Replacement

    1.Visual check

    2.Overhaul

    3.Measuring

    Soot blower

    - Speed reducer, Carriage,

    Feed tube, Lance tube,Wall box, Flanges

    1.Visual check

    Contents of inspection

    - Repair.

    - Replacement

    Others

    - Manholes, doors

    Observation port

    Measures at abnormalComponents parts

    PAGE 55Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    55/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    2-1. Daily inspections

    2-2. Periodical Inspections

    2nd Maintenance

    3rd Safety precautions

    2-3. Water washing

    Agenda

    PAGE 56Basic of BoilerBasic of Boiler

    2 3 W t hi

  • 7/28/2019 H-3 Power Point (Air Heater)

    56/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    2-3.Water washing

    P Water

    washing

    OperationOut of service

    Initial value

    Water

    washing

    Operation

    When pressure drop across the Air heater keeps increasing despite continued

    use of the soot blower properly, it is a sign that the deposits have coagulated and

    stick fast to the heating element surface.In general, we recommend that when the pressure drop exceeds the initial value x

    1.5times, water washing shall be carried with the Air heater during out of service.

    Instructions

    Out of service

    PAGE 57Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    57/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Operation procedure of water washing

    Preparation

    1) Make sure that the temperature of gas inlet is below 150.

    It may cause damages on AH if it is higher than 150.

    2) Line up the water line.3) Check the drain lines to be able to drain adequately.

    4) Shut off steam valves for soot blower

    5) Observe the condition of deposit on heating element.

    Finish

    Start water washing

    8-12hr

    - Measuring the pH value of drain water.

    - Check the supply water pressure.- Check the piping for drain out.

    - Check the conditions of washing.

    The auxiliary air motor drive should be used to reduce

    the speed to approximately to RPM.

    Instructions

    PAGE 58Basic of BoilerBasic of Boiler

    Instructions

  • 7/28/2019 H-3 Power Point (Air Heater)

    58/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    Determine the completion

    Complete

    a) Completion may be determined from the difference of pH value

    between washing water and drain water.

    When the difference is less than 1, it may be completed in principle.

    pHv

    alue

    b) Observe the heating elements over entire area to check deposit

    being removed. If deposits still remain, continue washing.

    1) Close water valves

    2) Open dampers in the inlet and outlet ducts

    3) Remove the illumination light

    4) Close drain lines

    5) Dry up heating elements(It is desirable to dry by operating the fans)

    6) Stop rotor rotation

    Finish

    pH Washing water

    Drain water

    -> pH value decreases due to sulfuric acid

    Instructions

    PAGE 59Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    59/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    DANGER: WASHING OF THE AIR HEATER HEATING

    ELEMENT SHOULD ONLY BE CARRIED OUT WHEN THE AIR

    HEATER IS OUT OF SERVICE AND THE GAS SIDE

    TEMPERATURE IS COOL ENOUGH TO ALLOW MAINTENANCE

    PERSONNEL ENTRY TO THE AIR HEATER AND ADJACENT

    DUCTS. HOWEVER, IN NO CASE SHOULD WATER BE EMITTED

    ONTO THE ROTOR UNTIL THE METAL TEMPERATURE OF THE

    GAS INLET HEATING ELEMENT IS BELOW 150C.

    CAUTION: BEFORE AND DURING WATER-WASHING,

    INSPECT HOPPER DRAINS TO INSURE THAT THE DRAINS ARE

    NOT PLUGGED. TREMENDOUS QUANTITIES OF WATER

    MUST EXIT THE DRAINS OR THE CONNECTING DUCTS CANBECOME FLOODED

    CAUTION: INSUFFICIENT WATER WASHING HAS ADVERSE

    EFFECTS TO THE HEATING ELEMENT AND INCOMPLETE

    DRYING WILL CAUSE RAPID PROGRESSION OF CORROSIONAND ACCUMULATION OF DEPOSITS ON THE HEATIMNG

    ELEMENTS WHEN RETURNING TO SERVICE.

    PAGE 60Basic of BoilerBasic of Boiler

    A d

  • 7/28/2019 H-3 Power Point (Air Heater)

    60/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    2-1. Daily inspections

    2-2. Periodical Inspections

    2nd Maintenance

    3rd Safety precautions

    2-3. Water washing

    Agenda

    PAGE 61Basic of BoilerBasic of Boiler

    ! IMPORTANT

  • 7/28/2019 H-3 Power Point (Air Heater)

    61/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    DANGER: NEVER ATTEMPT TO ENTER THE AIR HEATER UNTILTHE FOLLOWING CONDITIONS ARE MET.

    ALL ELECTRIC POWER TO THE ROTOR DRIVE UNIT AND THE

    SOOTBLOWER UNIT HAS BEEN ISOLATED.

    THE LOCAL COMPRESSED AIR HAND VALVE AT THE AIR

    MOTOR SHOULD BE SECURED IN THE OFF POSITION.

    THE SURFACE TEMPERATURE OF THE AIR HEATER IS

    BELOW 100F (38C).

    O2 AND CO2 CONCENTRATION ARE SATISFIED TO ENTER.

    For detail operation and maintenance instructions, please refer to:

    Operation & Maintenance Manual

    ! IMPORTANT

    PAGE 62Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    62/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL

    CAUTION: WHENEVER WELDING IS DONE ON THE ROTOR POST ORROTOR ASSEMBLY, THE ROTOR POST (MAIN SHAFT) MUST BE

    CONNECTED TO AN EARTH GROUND.FAILURE TO PROVIDE A

    PROPER GROUND MAY RESULT IN DAMAGE TO THE AIR HEATER

    BEARINGS.

    DANGER: NEVER APPROACH OR TOUCH ANY ROTATING PARTS

    (SHAFTS, COUPLINGS, ETC.) DURING OPERATION.

    LOOSE CLOTHING CAUGHT IN THESE ROTATING PARTS MAY

    RESULT IN SEVERE INJURY AND/OR DEATH.

    CAUTION: OPERATING THE AIR HEATER WITH GAS INLET

    TEMPERATURES IN EXCESS TO THE MAXIMUM DESIGN

    TEMPERATURES CAUSE THE ROTOR SEALS TO CONTACT THE AIR

    HEATER STRUCTURE AND RESULT IN PREMATURE WEAR ORPOSSIBLE PERMANENT DAMAGE TO THE SEALING SYSTEM.

    PAGE 63Basic of BoilerBasic of Boiler

  • 7/28/2019 H-3 Power Point (Air Heater)

    63/63

    MHI BUSINESS

    CONFIDENTIAL

    MHI BUSINESS

    CONFIDENTIAL