Page 1: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

HERITAGE MANAGEMENT PROTOCOL QUT CREATIVE INDUSTRIES PRECINCT

KELVIN GROVE URBAN VILLAGE

Page 2: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT A Heritage Management Protocol

© COPYRIGHT Allom Lovell Pty Ltd, October 2004 G:\Projects\04015 CreativeInd QUT\Reports\r01.doc

Page 3: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE

CONTENTS

■ i

1 INTRODUCTION 1

1.1 BACKGROUND 1

1.2 THIS STUDY 2

1.3 WHO SHOULD USE THIS DOCUMENT 3

1.4 THE STRUCTURE OF THE PROTOCOL & HOW TO USE IT 4

2 LEGISLATIVE FRAMEWORK 6

2.1 BRISBANE CITYPLAN 2000 6

2.2 QUEENSLAND HERITAGE ACT 6

DEFINITIONS 7 PENALTIES 8 PERIODIC INSPECTIONS 9

2.3 EMERGENCIES 9

2.4 WORK METHOD STATEMENTS 10

3 AN APPROACH TO CONSERVATION 11

3.1 PHILOSOPHY 11

CULTURAL SIGNIFICANCE GUIDING DECISIONS 11 CONTINUING THE THEME 11

3.2 PROCESS 12

FOLLOWING A LOGICAL PROCESS 12 KEEPING RECORDS 12 REVERSIBILITY 12

Page 4: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE

CONTENTS

■ ii

4 BUILDING Z1 (FORMERLY BUILDINGS A & B) 13

4.1 APPROVALS 13

EMERGENCIES 13 WORK TO SERVICES AND EQUIPMENT 14 TABLE OF APPROVALS 14

5 BUILDING Z2 (FORMERLY BUILDING C) 15

5.1 APPROVALS 15

EMERGENCIES 15 WORK TO SERVICES AND EQUIPMENT 16 TABLE OF APPROVALS 16

6 BUILDING Z3 (FORMERLY D/C39) 17

6.1 SIGNIFICANCE 18

6.2 THE EXTERIOR 18

SIGNIFICANT FABRIC 18 NON-SIGNIFICANT FABRIC 19

6.3 THE INTERIOR 19

SIGNIFICANT FABRIC 19 NON-SIGNIFICANT FABRIC 20

6.4 APPROVALS 20

EMERGENCIES 20 WORK TO SERVICES & EQUIPMENT 20 TABLE OF APPROVALS 20

7 BUILDING Z4 (FORMERLY BUILDING E1/C39) 25

7.1 SIGNIFICANCE 26

7.2 THE EXTERIOR 26

Page 5: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE

CONTENTS

■ iii

SIGNIFICANT FABRIC 26 NON-SIGNIFICANT FABRIC 27

7.3 THE INTERIOR 27

SIGNIFICANT FABRIC 27 NON-SIGNIFICANT FABRIC 28

7.4 APPROVALS 28

EMERGENCIES 28 WORK TO SERVICES & EQUIPMENT 28 TABLE OF APPROVALS 28

8 BUILDING Z5 (FORMERLY E2/C33) 33

8.1 SIGNIFICANCE 34

8.2 THE EXTERIOR 34

SIGNIFICANT FABRIC 34 NON-SIGNIFICANT FABRIC 34 NON-SIGNIFICANT FABRIC 35

8.3 THE INTERIOR 35

SIGNIFICANT FABRIC 35

8.4 NON-SIGNIFICANT FABRIC 36

8.5 APPROVALS 36

EMERGENCIES 36 WORK TO SERVICES & EQUIPMENT 36 TABLE OF APPROVALS 36

9 BUILDING Z6 (FORMERLY BUILDING F) 41

9.1 APPROVALS 41

EMERGENCIES 41 WORK TO SERVICES AND EQUIPMENT 42 TABLE OF APPROVALS 42

Page 6: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE

CONTENTS

■ iv

10 BUILDING Z7 (FORMERLY BUILDING C34) 43

10.1 SIGNIFICANCE 43

SIGNIFICANT FABRIC 44 NON-SIGNIFICANT FABRIC 44

10.2 APPROVALS 44

EMERGENCIES 44 WORK TO SERVICES & EQUIPMENT 44 TABLE OF APPROVALS 44

11 BUILDING Z9 (PREVIOUSLY C56) 46

11.1 SIGNIFICANCE 46

11.2 APPROVALS 46

EMERGENCIES 46 WORK TO SERVICES AND EQUIPMENT 47 TABLE OF APPROVALS 47

12 PARER PLACE (LOT 903) 48

12.1 SIGNIFICANCE 49

12.2 APPROVALS 49

EMERGENCIES 49 WORK TO SERVICES AND EQUIPMENT 49 TABLE OF APPROVALS 49

13 GONA PARADE 51

13.1 SIGNIFICANCE 52

13.2 APPROVALS 52

EMERGENCIES 52

Page 7: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE

CONTENTS

■ v

WORK TO SERVICES AND EQUIPMENT 52 TABLE OF APPROVALS 52

14 SPACES BETWEEN THE BUILDINGS (LOT 1) 54

14.1 SIGNIFICANCE 57

14.2 APPROVALS 57

EMERGENCIES 57 WORK TO SERVICES AND EQUIPMENT 57 TABLE OF APPROVALS 58

Page 8: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 1

INTRODUCTION

■ 1

1 INTRODUCTION

This Heritage Management Protocol has been prepared to assist the Queensland University of Technology and the Queensland Heritage

Council to manage changes to part of the heritage listed Gona Barracks. It concerns that part of the listed site known as the Creative Industries Precinct - Lot 1 of the Kelvin Grove Urban Village, part of Gona Parade, and Parer Place (Lot 903). This document acknowledges and identifies the cultural significance of the place and its parts, and aims to protect that significance. It should be read in conjunction with the updated Conservation Plan for the whole listed site prepared in 2004 which recognises the changes made to the site as part of the Kelvin Grove Urban Village infrastructure development and the recent adaptation and new construction by QUT to form the Creative industries Precinct. Philosophy for further adaptation and changes is discussed and categories or levels of approvals for various works are established for each building and the open spaces.

Plan of the Subject Site, part of the KelGrove Urban Village. The heavy broken l

denotes the Heritage Register boundary Gona Barracks, the shaded area denotes

part of the site which is the subject of Protocol – The Creative Industries Preci

[Allom Lov

1 . 1 B A C K G R O U N D

In June 2000, the Queensland Government purchased the former Gona Barracks site from the Department of Defence. The Queensland Department of Housing, in association with the Queensland University of Technology, have developed the barracks and other land to form the Kelvin Grove Urban Village. It will house public and private housing,

1vin ine for the the nct ell]

Page 9: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 1

INTRODUCTION

■ 2

commercial, retail and mixed use development as well as various QUT facilities such as a physical activity and health centre and an Institute for Health and Biomedical Innovation. The first part of the village to be developed and occupied was the Creative Industries Precinct, the subject of this document. Specifically, this protocol relates to Lot 1 on SP151277 – the area occupied by the Creative Industries buildings – as well as Lot 903, now named Parer Place, and a section of Gona Parade. Other parts of the listed site may be the subject of separate future heritage management protocols. Development of the Creative Industries Precinct, which entailed the adaptation of the two early buildings, the removal of one building and the construction of three new buildings, was approved by the Queensland Heritage Council in May 2002. Infrastructure works, including the removal of several buildings within the precinct area and the construction of landscaping and roads, were approved and constructed earlier. Approval was received for revisions to the approved development in September 2003. These revisions were for changes to landscaping and the provision of shade structures and projection facilities to the former parade ground area. The work was completed in time for the commencement of the academic year early in 2004. Separate approval was received for the adaptation of building A26 on Lot 2 for use by Creative Industries in June 2003. That building is not included within the scope of this protocol.

1 . 2 T H I S S T U D Y

The aim of this study is to enable QUT, including its lessees and tenants, to use and manage the Creative Industries Precinct on a daily basis without the need to constantly seek heritage approvals for minor changes. These most often relate to matters of fit-out and maintenance. On a broader scale, the study considers further development of the site and structures, and seeks to provide certainty as to heritage management requirements. The Protocol aims to reduce the administration burden to QUT, its subsidiaries, its lessees and its tenants, and the Queensland Heritage Council by streamlining the heritage assessment process. The procedures for protecting significant fabric generally follow the findings of the Conservation Plan prepared in 2004. That study updated earlier reports and took into account the changes to the Heritage Register boundary and the resultant reduction in site area, the provision of infrastructure as part of the Kelvin Grove Urban Village which included the removal of several buildings from the site, and the construction of the Creative Industries Precinct for QUT.

Page 10: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 1

INTRODUCTION

■ 3

This Protocol takes these findings into account, identifies significant fabric and non-significant fabric in detail, and sets parameters for changes which will require heritage approval or formal exemption.

1 . 3 W H O S H O U L D U S E T H I S D O C U M E N T

Due to the complex nature of tenure over the site and its parts, there are several groups involved in the management and maintenance of the Creative Industries Precinct. It is critical that the matter of cultural significance be considered at the earliest stages of any project or proposal to determine if in fact the proposed changes are appropriate to the buildings and the site. QUT Facilities Management: Trade & Supervisory Staff

This document has been designed to be used on a daily basis by QUT staff, including maintenance staff who carry out routine changes to buildings in the precinct. Garden maintenance contractors should also be familiar with relevant protocol requirements.

QUT Facilities Management: Capital Works and Operations Staff

The document should also be used by the Facilities Management Staff who are involved in the planning and implementation of building projects within the subject site. It should be made available where appropriate to consultant teams engaged for specific projects.

Brisbane City Council

As the body with responsibility for the section of Gona Parade within the subject site, Brisbane City Council need to use the relevant section of the Protocol when planning or carrying out any work in that area.

QUT Creative Industries Faculty, QUT Precincts (part of the

Division of International & Development), Creative Industries Precinct Pty Ltd, tenants including La Boite theatre, Education Television, caterers

These groups need at least to be aware of the constraints involved in the heritage listing of the site even though they may not originate work to the buildings and surrounds. The Protocol should be used to guide any work relating to sub-tenants’ and exhibitors’ requirements which may be co-ordinated by the tenants.

Page 11: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 1

INTRODUCTION

■ 4

Plan of the Creative Industries site with early buildings shaded. [Allom Love

1 . 4 T H E S T R U C T U R E O F T H E P R O T O C O L & H O W T O U S E I T

Following this introductory chapter is a section which deals with the relevant legislative framework, then there is a section on the general philosophy for adapting and changing places of cultural significance. The subsequent chapters then deal with each building and the open spaces. These chapters include a brief outline of the building or space, then addresses in detail those parts of the physical fabric which have cultural heritage significance. Three categories of work or changes are then listed – those which require a formal application and assessment by the Queensland Heritage Council, those which should be subject to an application for an exemption certificate, and those changes which require no approval or exemption application.

2the ll]

Page 12: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 1

INTRODUCTION

■ 5

Changes which do not require approval or further exemption are those which are considered to have no or minimal effect on cultural significance – generally relating to changes to the recent buildings and recent work to the early buildings - and are subject to the endorsement of this document by the Queensland Heritage Council. The following steps should be taken in dealing with the proposed changes:

1. Establish the project; 2. Refer to relevant building or space chapter and determine what

(if any) type of approval is required for the particular changes proposed or planned;

3. Apply for an Exemption Certificate, if applicable, directly to the

Environmental Protection Agency using the appropriate form, or lodge an application under the Integrated Development Assessment System (IDAS) through the Brisbane City Council for assessment using the appropriate forms.

Such applications would normally be accompanied by the following:

Plans, elevations, sections and other drawings necessary to explain the proposed works and to show existing conditions.

A statement setting out the impact of the work on the cultural

significance of the place.

Photographs of the effected area. Similar information is required for Exemption Certificate applications, and Work Method Statements should also be provided where possible. Where insufficient information is provided with an Exemption Certificate Application or where the proposed works are considered to be of a complex nature, the Environmental Protection Agency may require a formal Development Application.

Page 13: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 2

LEGISLATIVE FRAMEWORK

■ 6

2 LEGISLATIVE FRAMEWORK

This chapter outlines the applicable legislation and processes involved in obtain approval for development on the site.

2 . 1 B R I S B A N E C I T Y P L A N 2 0 0 0

The former Gona Barracks site is entered in the Heritage Register of places of cultural heritage significance in the Brisbane City Council CityPlan 2000. Development, or building work, on registered places is assessed under the Heritage Place Code which is part of the CityPlan 2000. As the place is included in the Queensland Heritage Register, proposed works would be assessed under the provisions of the Queensland Heritage Act.

2 . 2 Q U E E N S L A N D H E R I T A G E A C T

Under the Queensland Heritage Act 1992, all development within a place entered on the Queensland Heritage Register (QHR) must be first assessed and approved by the Queensland Heritage Council (QHC) through the Integrated Development Assessments System (IDAS). The Environmental Protection Agency (EPA) is the Queensland government body which assists the QHC and its committees in administering the Queensland Heritage Act (QHA). The Queensland Heritage Act requirements for development in a registered place are set out in Part 5 of the Act which was amended in 2003. That part also provides for the exemption of certain types of development from formal application and assessment through the issue of Exemption Certificates Upon application by the owner of a registered place the Queensland Heritage Council may issue a certificate which allows certain development that: (a) is excluded work; or (b) is genuinely required for a place of worship for liturgical

purposes; or (c) is permitted under a heritage agreement; or (d) would have no impact on the cultural heritage significance of the

place. The QHA also provides for Heritage agreements made between the owner of a registered place and the Minister, in this case the Minister for Environment and Heritage. The purpose of such an agreement, to which a local government may be a party, may be to apply controls and parameters to development within the broad guidelines of the Act. This

Page 14: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 2

LEGISLATIVE FRAMEWORK

■ 7

protocol forms part of that agreement, together with the Conservation Management Plan for the former Gona Barracks. This protocol defines categories or levels of works which will:

1. be exempted from further application or assessment; 2. be subject to further future application(s) for exemption(s) (under

Sections 35 or 37 of the Act as needs arise). 3. be subject to formal application and assessment through IDAS

(under Section 33 of the Act as needs arise). Work requiring formal assessment by the Heritage Council would normally be part of an overall application using Integrated Development Assessment System (IDAS) under the Integrated Planning Act 1997 (IPA) and lodged through the local authority which acts as assessment manager. In this case, the Heritage Council acts as a referral agency. When no other agencies are involved or when the place is owned by a local authority the Heritage Council may act as the assessment manager. In cases where the development would have a substantial effect on cultural heritage significance, the proposed development is required to be publicly advertised by the Heritage Council. Work defined as Emergency Work may also be carried out without approval. (refer to Section 2.3)

D E F I N I T I O N S

The following definitions are for terms used within this protocol document and relate to those definitions within the Queensland Heritage Act 1992 and to the Queensland Heritage & Other Legislation Amendment Act 2003, and to the Integrated Planning Act 1997. Development Becomes building work under the Integrated

Planning Act 1997.

Building work Building work as defined under the Building Act 1975; painting or plastering that substantially alters the appearance of the place; renovations, alterations or additions; excavations, disturbances or changes to landscape or natural features of land that substantially alters the appearance; work on furniture, fittings and other objects associated with the place and that contributes to the place’s cultural heritage significance.

Cont./

Page 15: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 2

LEGISLATIVE FRAMEWORK

■ 8

Place A defined or readily identifiable area of land and includes all buildings and their immediate surrounds. In this case, place includes all buildings and structures within the site boundary together with the open spaces between and around the structures.

Cultural heritage significance of a place

Its aesthetic, architectural, historical, scientific, social or technological significance to the present community and future generations.

Building Includes furniture, fittings and other objects associated with the building and which contribute to the building’s cultural heritage significance.

Emergency work Reversible work necessary to give temporary support, shelter or security to a place because it has been, or is likely to be, damaged by fire or natural disaster or because of accidental or intentional damage, excludes demolition.

Excluded work Maintenance work, minor repair work, or other minor work that will not cause detriment to the cultural heritage significance of the place, is not of a significant scale and is reversible, excludes emergency work.

Maintenance work

Work performed for the protective care of a place including for example the protective care of the materials, features, contents and setting comprising fences, gardens and grounds, roads and paths, roof and drainage system, services and utilities, and including painting work in a colour conforming with an existing colour scheme.

Minor repair work

Work of a minor nature involving repairs to materials, features, contents and setting and using the same types of materials and the same construction methods as were originally used in the place.

P E N A L T I E S

Unauthorised development in relation to a registered place may incur a maximum penalty of

17,000 units (currently $1,275,000) under Section 4.3.1 of the Integrated Planning Act.

Page 16: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 2

LEGISLATIVE FRAMEWORK

■ 9

A Stop Order may be issued under the Heritage Act by the Minister to prevent work or activity that may destroy or reduce the cultural heritage significance of a place. The Stop Order can continue in force for up to 40 days and the maximum penalty for contravention of stop order is 17,000 penalty units. Restoration orders may also be issued which require making good of damage and non-development orders which prohibit development of a place for up to ten years may be served.

P E R I O D I C I N S P E C T I O N S

Officers of the Environmental Protection Agency may periodically inspect the site to monitor cumulative impacts on the cultural significance of the place. These inspections may include, at the discretion of the officers, any part of the site or buildings and may be made at times agreed between QUT and the Environmental Protection Agency (EPA). If the EPA is convinced that any work has been carried out contrary to this protocol it will advise QUT. If the impact of such work warrants, the Minister may issue a Stop Order under the Act.

2 . 3 E M E R G E N C I E S

Emergency work, as defined in the Queensland Heritage Act may be carried out without approval or an exemption certificate. In the event that fabric of a building or structure is damaged in a way that causes a hazard to people or the risk of further damage to the fabric, one of the following special emergency procedures should be followed: Where temporary protection can be provided:

(i) In circumstances where risks may be investigated by safely erecting barricades or props to stabilise the structure, these shall be erected immediately.

(ii) Inform the Manager, Cultural Heritage Branch, Environmental Protection Agency of the circumstances.

Where immediate repair is essential:

(i) Immediately carry out repairs in accordance with the advice of conservation architects.

(ii) Inform the Manager, Cultural Heritage, Environmental Protection Agency of the circumstances. (In these cases, repair using materials and workmanship which would normally require assessment under this document may be carried out without approval.)

Page 17: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 2

LEGISLATIVE FRAMEWORK

■ 10

2 . 4 W O R K M E T H O D S T A T E M E N T S

As part of future applications of exemption certificates, work method statements should be submitted outlining the proposed practice for conduct of the work. The method statements should be prepared by the project managers and project officers, maintenance staff and appropriately skilled tradesmen such as stonemasons in consultation with a conservation architect. The method statements should accord with the policies set out in the Conservation Plan. The following is a guide for the contents of the method statements. METHOD THE NAME OF THE METHOD (EG STONEWORK)

Skills Any special trade skills or competencies required

Description An outline description of the method of work and the materials to be used.

Record keeping Requirements for recording instances of the use of the method.

Page 18: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 3

AN APPROACH TO CONSERATION

■ 11

3 AN APPROACH TO CONSERVATION

This chapter includes some basic principles that may assist those who may be involved in the design of new work to the Creative Industries

Precinct.

3 . 1 P H I L O S O P H Y

Conservation recommendations begin at the broadest level providing the philosophical basis that underpins heritage conservation and the approach taken in this document to the conservation of cultural significance of the former Gona Barracks site.

C U L T U R A L S I G N I F I C A N C E G U I D I N G D E C I S I O N S

Decisions about changes to the Creative Industries Precinct need to be based on a thorough understanding of the cultural significance of those parts affected by the decisions. The physical fabric contains and expresses the evidence of its history and holds much of its cultural significance. The open spaces and remaining early buildings – particularly those which remain relatively intact – express the ethos of the former Gona Barracks and will require particular protection, the aim being to conserve significant fabric for the future. In a broader sense, the Gona Barracks character as a group of buildings set around an open parade ground, although lessened to some extent by the recent work, should guide decisions about additional structures on and around the site.

C O N T I N U I N G T H E T H E M E

The adaptive work which turned part of the former Gona Barracks into the QUT Creative Industries Precinct followed the broad principles of a Master Plan prepared for the Kelvin Grove Urban Village and approved by the Queensland Heritage Council in 2001. Any new work should continue to follow the master plan and the approach taken with the formation of the Creative Industries Precinct. Uses were allocated to the historic buildings which limited the need for adaptation and change. Early volumes, spaces and fenestration treatments were largely retained as were smaller detailed elements which contribute to the sense of the place being a former army barracks. The parade ground has been preserved not only in a visual sense but in terms of pedestrian activity and flow.

Junctions between new and existare clearly expressed. (l

It is important to retain evidence of the militause of the buildings, in this case marks on do

from wagons and gun carriages. (rig [Allom Lov

New work to the early buildings is clearly distinguishable from the early fabric and has been “inserted” in a clear yet respectful manner.

3ing eft)

ry ors ht)ell]

Page 19: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 3

AN APPROACH TO CONSERATION

■ 12

Similarly, the new buildings make no attempt to mimic or blend with the old structures. While of larger floor plan areas and volumes than the early buildings, they have been designed in a manner which suggests a smaller scale.

3 . 2 P R O C E S S

F O L L O W I N G A L O G I C A L P R O C E S S

Good conservation is assisted by following a logical process of gathering information, assessing cultural significance, designing changes to limit adverse impacts, carrying out work carefully, and keeping records.

K E E P I N G R E C O R D S

Careful records should be made of the state of the relevant building parts before any change is made, of all the work that is undertaken, and of the reasons for decisions. In repairing fabric, evidence may be destroyed and a record of its state beforehand will be needed to ensure that any new material or work is appropriate. New evidence may also be revealed by conservation work, and it is also important to record this. A register of all applications made, and approvals and exemptions received, should be maintained together with relevant design documentation, reports and the like. The register should be updated annually. Conditions of approval should be included so that they can be reviewed and checked-off as they are complied with.

R E V E R S I B I L I T Y

Accepted conservation practice favours making changes so they are readily reversible, and in a way that makes them recognisable as changes. In order to make changes and new fabric clearly recognisable, it is appropriate to continue the architectural language of the recent adaptive work. Imitation of historic details will only act to distort the evidence and is not appropriate. The aim is to encourage the highest quality in design and conservation. The control of the buildings and elements included in the heritage register boundary should not be seen to inhibit the use of the buildings or the manner in which they are further adapted. Instead the cultural significance of the place and the qualities that make it special should be seen to provide enormous opportunities for their continued use.

Page 20: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 4

BUILDING Z1

■ 13

4 BUILDING Z1 (FORMERLY BUILDINGS A & B)

Building Z1 was constructed in 2003 on land which formed part of the parade ground. It incorporates the La Boite theatre in a section called “the Roundhouse” with the remainder of the building called “the Works”. The “theatre in the round” form of La Boite is expressed externally and other theatre facilities – rehearsal space, foyer and offices - are housed in the building together with office accommodation for Creative Industries.

4 . 1 A P P R O V A L S

As a recent structure, Building Z1 is not considered to be culturally significant and therefore can be more readily changed and altered than the remaining early buildings. However, changes which may affect its relationship to those buildings and the views to them and within the precinct, are subject to heritage approval under this document.

Key plan and photographZ1. The building above the parade ground

shaded dark, lower levels li[Allom Lov

This chapter includes all of the building above the parade ground as well as the lower levels facing Musk Avenue. The surrounding open spaces are dealt with in Chapter 14.

E M E R G E N C I E S

Emergencies involving the fabric of the building may be dealt with without approval or reference to the Environmental Protection Agency.

4 of is

ght ell]

Page 21: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 4

BUILDING Z1

■ 14

W O R K T O S E R V I C E S A N D E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system. Typical projects may involve a number of task of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Additions or extensions to the building 3 Addition of hoods, vents, grilles, services to the building exterior

1

Changes to the external colours and fenestration 2 Internal work generally 1 External repairs and maintenance 1 Addition of signage, awnings, sails, light-weight structures attached to the building

2

Attachment of temporary banners, signs, artworks. 1

Page 22: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 5

BUILDING Z2

■ 15

5 BUILDING Z2 (FORMERLY BUILDING C)

Building Z2 was constructed in 2003 in the place of a former engineer’s depot which was demolished as part of the Kelvin Grove Urban Village infrastructure work. It is known as “the Terrace” with the projecting level 5 known as “the Loft”. It houses a basement carpark, computer rooms, studios, seminar rooms, exhibition space, a black box performance space known as “the Loft”, and associated dressing rooms.

5 . 1 A P P R O V A L S

As a recent structure, Building Z2 is not considered to be culturally significant and therefore can be more readily changed and altered than the remaining early buildings. However, changes which may effect its relationship to those buildings and the views to them and within the precinct, are subject to Heritage approval under this document. This chapter includes all of the building above the parade ground as well as the lower levels facing Musk Avenue. The surrounding open spaces are dealt with in Chapter 14.

Key plan and photograph of Z2. The buildabove parade ground is shaded dark, low

levels are shaded lig[Allom Lov

E M E R G E N C I E S

Emergencies involving the fabric of the building may be dealt with without approval or reference to the Environmental Protection Agency.

5ing er ht.

ell]

Page 23: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 5

BUILDING Z2

■ 16

W O R K T O S E R V I C E S A N D E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system. Typical projects may involve a number of tasks of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Additions or extensions to the building. 3 Addition of hoods, vents, grilles, services to the building exterior.

1

Changes to the external colours and fenestration except to the Musk Avenue façade.

2

Internal work generally. 1 External repairs and maintenance. 1 Addition of signage, awnings, sails, light-weight structures attached to the building except to the Musk Avenue façade.

2

Attachment of temporary banners, signs, artwork 1 Changes to external colours and fenestration to the Musk Avenue façade.

1

Addition of signage, awnings, sails, light-weight structures attached to the building to the Musk Avenue façade.

1

Page 24: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 17

6 BUILDING Z3 (FORMERLY D/C39)

This building was known as building C39 during the site’s use by the army and was joined to the adjacent building Z4 prior to the Creative Industries development. It was constructed as an Artillery Drill Hall in 1915 as part of the original development of the site.

Its plan form and detailing however is not unlike the nearby Gun Parks, one of which survives as Z5. The building was joined to building Z4, an Artillery Brigade Office, in 1935 by a connecting mess room which was removed as part of the recent work. The combined structure was previously known as Building 39.

6Key plan and photograph

[Allom Lovell]

The building consisted of a large central open space flanked by offices at each end. Pairs of large timber doors from the central section opened onto the parade ground. Prior to the recent redevelopment, the building had undergone various modifications, mostly related to enclosure of part of centre section and the addition of suspended ceilings and partitions. As part of the adaptive work for Creative Industries, a large exhibition space was inserted into the north-east corner of the building. Known as “The Block”, the new structure reads clearly as a separate entity and has no direct internal connection with the existing building which is now known as “The Shed”. Access is via a separate covered entry to the south-east.

Page 25: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 18

The remaining part of the early building has been adapted to accommodate a computer studio, testing rooms and store rooms related to fashion design studies. The single-storey building retains its early exposed steel roof trusses. Some early internal walls remain, others have been altered or removed and some new walls have been added. Floors to the central section have been topped with concrete to make them level with the flanking rooms. New services including air-conditioning have been installed. Externally, the remaining section of the building has been conserved and retains most of its early fabric.

6 . 1 S I G N I F I C A N C E

Building Z3 is significant as part of the original development of the Gona Barracks site. It formed a part of the complex of buildings built around a central parade ground in the upper barracks area. As a building type, it is relatively uncommon and regardless of the recent adaptive works and additions, it remains culturally significant for its rarity value.

7The extent of the former mess room additions

has been expressed with contrasting sheet cladding.

[Allom Lovell]

6 . 2 T H E E X T E R I O R

The external fabric of the building survives relatively intact as part of the recent Creative Industries works.

S I G N I F I C A N T F A B R I C

The significant external fabric is building Z3 includes the remaining early elements.

The roof structure and form, timber fascias barges and battened eaves.

The weatherboard clad walls. Note that much of the weatherboard cladding was removed to allow installation of insulation. The boards were refitted and salvaged from demolished areas and reused. Some later openings in early walls were also infilled. Although re-worked and repaired as part of the recent work, these walls remain significant.

Early doors, windows, hardware.

The early timber louvred vent to the west wall.

The concrete door stops.

Page 26: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 19

N O N - S I G N I F I C A N T F A B R I C

Changes and additions made to the building as part of the Creative Industries adaptation are not considered to be of cultural heritage significance.

The new exhibition space insertion in its entirety.

New roof cladding, barge capping, gutters and downpipes.

The entry from the parade ground.

The western entry including ramp, steps, awning.

Glazed infills and walls

The FC clad section of the west wall (although the cladding is not significant, this wall treatment serves to interpret size and location of the former link to the adjacent building Z4)

Building services.

Recent paint finishes.

Signage.

Recent door hardware.

Recent glazing to windows.

6 . 3 T H E I N T E R I O R

The early room forms and planning are significant, including the exposed roof trusses, purlins and roofing to central area.

S I G N I F I C A N T F A B R I C

The steel roof trusses, hardwood purlins, and exposed roof sheeting including the spatial quality of the central section. (Note that as part of the recent work, the existing roof sheeting was left in place and an extra layer of corrugated galvanised roofing laid over the top with insulation between).

The T&G timber ceilings to the flanking rooms.

The early timber framed partitions with T&G linings and timber trims, the inner faces of the outside walls. Some of these are concealed by new inner walls but in one section glass has been used to allow viewing of the early single-skin exposed frame construction and window.

Timber floors and floor structure to the flanking rooms.

Slab on ground to central section. (This is only exposed at the parade ground edge.)

Early doors, frames, hardware trims.

Page 27: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 20

N O N - S I G N I F I C A N T F A B R I C

The exhibition space insertion generally.

Recent walls, partitions and infills.

Recent floor topping, floor finishes generally.

Ceiling to ‘Wash & Dye’ room.

Recent doors, hardware.

Joinery, benches, fixture, equipment.

Building services generally.

Signage.

Recent paint finishes.

6 . 4 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of the building should be dealt with in accordance with Section 2.3.

W O R K T O S E R V I C E S & E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency. Extension modification or replacement of services is included in the following table.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system.

Page 28: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 21

Typical projects may involve a number of tasks of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Construction of external additions to the building including links and awnings.

3

Demolition of, or cutting openings in significant walls greater than 1m2.

3

Demolition of, or cutting openings in significant walls less than or equal to 1m2.

2

Modification of the roof form and structure. 3 Work to the roof of the early building including re-sheeting, cutting penetrations, installation of hoods, vents and the like.

3

Work as above to the Exhibition space. 1 Alterations to fascias, eaves, soffits of the early building other than repairs which match existing.

3

Changes to rainwater goods to the early building 2 Like-for-like replacement and repair of rainwater goods in their current locations.

1

External repairs and maintenance to the Exhibition Space (“The Block”).

1

Removal, replacement, over-sheeting of weatherboarding cladding.

3

Construction of masonry walls. 3 Removal of, or modification to, the timber door posts and associated framing.

3

Addition of hoods, vents, grilles, services to the exhibition space.

1

Addition of hoods, vents, grilles, services to the early building.

2

Removal of, or modification to the early gable vent. 3 Changes to non-significant external walls, glazing. 2 Removal of and modification to non-significant internal walls, partitions, joinery, ceilings.

1

Construction of (reversible) framed and sheeted, glazed or similar partitions where significant fabric is not removed, cut or otherwise damaged.

1

Page 29: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 22

Cont./

T Y P E O F W O R K A P P R O V A L

Over-sheeting or changing finishes to significant walls. 3 Addition of new doors and openings in non-significant walls.

1

Construction of additional wet areas such as kitchens, bathrooms and toilets.

3

Any work within the Exhibition space. 1 Concealment of exposed roof structure and timber ceilings with suspended ceilings.

3

Removal of, or modification to steel trusses, timber purlins, CGI linings, T&G ceilings.

3

Removal of, or modification to, the early timber floors. 3 Construction of mezzanine or raised floors within the early section of the building.

3

Installation of floor finishes. 1 Addition of signage, banners, art installation not within agreed parameters.

2

Installation of signs, banners, art installations within agreed parameters.

1

Alterations to the existing signage system. 1 Removal of or modification to significant doors, windows and frames other than changes to recent hardware, includes infilling of doors and windows.

3

Modifications to non-significant windows and doors. 1 Changes to recent door and window hardware. 1 Removal of, or modification to the recent glass internal lining which allows views to the early wall and window.

2

Changes to external colours and fenestration of the Exhibition Space.

2

Repainting significant elements using: - existing colours - different colours

1

2 Repainting non-significant elements. 1 Installation of joinery, furniture, fittings and equipment. 1 Installation of additional plumbing fixtures and associated services.

2

Page 30: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 23

Cont./

T Y P E O F W O R K A P P R O V A L

Reticulation of additional building services, alterations to services generally, replacement of plumbing fixtures (note previous penetration requirements).

1

Alternation to the air-conditioning system involving the provision of additional plant and ducting.

2

Changes to entry ramps, awnings, steps. 2 Replacement of broken glass. 1 Removal of, or modification to, the concrete door stops. 3 Attachment of hooks, nails, fixings to significant walls. 2 Attachment of hooks, nails, fixings to non-significant walls and infill panels.

1

Cleaning of interiors. 1 Removal of, or changes to any other elements identified as being significant.

3

Removal of or changes to any other element identified as not being significant.

1

Page 31: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 6

BUILDING Z3

■ 24

Page 32: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 25

7 BUILDING Z4 (FORMERLY BUILDING E1/C39)

Building Z4, now also referred to the “The Hut”, was built as a brigade headquarters in 1915, incorporating a lecture room in the centre upper level above accommodation for brigade vehicles and a store. In 1935 it was linked to the adjacent building Z3 by a mess room which was removed as part of the Creative Industries Precinct development. The combined structure was known as building C39.

The building consisted of offices each side of the vehicle shed on the ground floor with the lecture room above. Pairs of large timber doors, in the style of those to the adjacent buildings, opened on to the parade ground.

8Key plan and photograph.

[Allom Lovell]

In the years leading up to the recent redevelopment, various changes had been made. Some of the double timber doors were replaced, one of the rear flights of stairs was removed, the eastern section was modified as part of the 1935 mess infill, and offices were included in the centre section. As part of the Creative Industries work the building reverted to its early form with the mess additions to the east demolished. The centre section on the ground floor became an open office area and the flanking wings offices and a plant room. The lecture room upstairs has been subdivided into offices. A new masonry screen wall was built to the rear (north) side and encloses circulation space and a stair connecting to the two levels.

Page 33: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 26

New services including air conditioning have been installed. A raised timber floor was built over the existing concrete slab to the centre section, level with the flanking wings. A new entry was created off the parade ground with a covered ramp. Externally, the building remains generally intact and has been conserved.

7 . 1 S I G N I F I C A N C E

Building Z4 is significant as part of the original development of Gona Barracks. It formed a part of the complex of buildings built around a central parade ground in the upper barracks area. As a building type, it is relatively uncommon. Indeed with its central two-storey section, it is different to the other barracks buildings both extant and demolished. Little of its cultural heritage significance was lost with the recent work and it remains significant for its rarity value.

7 . 2 T H E E X T E R I O R

The external fabric of the building survives relatively intact as part of the recent Creative Industries works.

S I G N I F I C A N T F A B R I C

The significant external fabric of building Z4 includes the remaining early elements.

The roof structure and form, the timber fascias, barges and battened eaves

The weatherboard-clad walls. Note that some of the weatherboard cladding was removed to allow installation of insulation. The boards were refitted. Some later openings in early walls were also infilled using salvaged boards (eg. where former Mess Hall additions were removed, part of east wall). Although reworked and repaired as part of the recent work, these walls remain significant.

9Views of the new enclosed stair and the

conserved external wall. [Allom Lovell]

The remaining door posts and high level timber louvres to the centre section.

Early doors and windows and hardware. Some doors, and windows generally are fixed closed.

The early window hoods to the north-west.

Early timber louvre vents to the gable ends.

The concrete door stops.

Page 34: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 27

N O N - S I G N I F I C A N T F A B R I C

Changes and additions made to the building as part of the Creative Industries adaptation are not considered to be of cultural heritage significance.

New roof cladding, barge cappings, gutters and downpipes.

The rear additions which enclose the stair.

The FC clad infill to the eastern wall. (This wall was reconstructed after removal of the link and therefore services to mark the extent of the early building form.)

The new entry, doors, ramp and awning.

The glass wall the south elevation.

The new sunhood to the north-east windows.

Building services.

Recent paint finishes.

Signage.

Recent door hardware.

Recent glazing to windows.

7 . 3 T H E I N T E R I O R

The early planning arrangement of the ground floor is significant and is expressed in the current layout. Although the former lecture room above has been sub-divided, this has been done in a manner which allows some interpretation of the area as a single space.

S I G N I F I C A N T F A B R I C

The exposed timber roof trusses on the upper level.

T&G timber ceilings.

Early timber framed partitions with T&G linings and timber trims.

Timber floors and floor structure to the flanking wings on the ground floor and to the upper level.

Slab on ground to central section (under new timber floor).

Early doors, frames, hardware and trims.

Page 35: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 28

N O N - S I G N I F I C A N T F A B R I C

Recent walls, partitions, infills.

The rear additions including the stair.

Recent ceilings, bulkheads.

Raised timber floor to centre section.

Floor finishes generally.

Recent doors, hardware.

Joinery, benches, fixture, equipment.

Building services generally.

Signage.

Recent paint finishes.

7 . 4 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of the building should be dealt with in accordance with Section 2.3.

W O R K T O S E R V I C E S & E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency. Extension modification or replacement of services is included in the following table.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system.

Page 36: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 29

Typical projects may involve a number of tasks of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Construction of external additions to the building including links and awnings.

3

Demolition of, or cutting openings in significant walls greater than 1m2.

3

Demolition of, or cutting openings in significant walls less than or equal to 1m2.

2

Modification of the roof form and structure. 3 Work to the roof including re-sheeting, cutting penetrations, installation of hoods, vents and the like.

3

Alterations to fascias, eaves, soffits other than repairs which match existing.

3

Changes to rainwater goods. 2 Like-for-like replacement and repair of rainwater goods in their current locations.

1

Removal, replacement, over-sheeting of weatherboarding cladding.

3

Construction of masonry walls. 3 Removal of, or modification to, the timber door posts and associated framing.

3

Addition of hoods, vents, grilles, services. 2 Changes to non-significant external walls, glazing. 2 Removal of, or modification to, the early gable vents. 3 Removal of and modification to non-significant internal walls, partitions, joinery, ceilings.

1

Construction of (reversible) framed and sheeted, glazed or similar partitions where significant fabric is not removed, cut or otherwise damaged.

1

Over-sheeting or changing finishes to significant walls. 3 Addition of new doors and openings in non-significant walls.

1

Page 37: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 30

Cont./

T Y P E O F W O R K A P P R O V A L

Construction of additional wet areas such as kitchens, bathrooms and toilets.

3

Concealment of exposed roof framing and timber ceilings with suspended ceilings.

3

Removal of, or modification to timber trusses, T&G ceilings. 3 Removal of, or modification to, the early timber floors. 3 Construction of mezzanine or raised floors. 3 Installation of floor finishes. 1 Addition of signage, banners, art installation not within agreed parameters.

2

Installation of signs, banners, art installations within agreed parameters.

1

Alterations to the existing signage system. 1 Removal of or modification to significant doors, windows, louvres and frames other than changes to recent hardware, includes infilling of doors and windows.

3

Modifications to non-significant windows and doors. 1 Changes to recent door and window hardware. 1 Removal of, or modification to early window hoods. 3 Removal of, or modification to recent window hoods. 2 Repainting significant elements using:

- existing colours - different colours

1 2

Repainting non-significant elements. 1 Installation of joinery, furniture, fittings and equipment 1 Installation of additional plumbing fixtures and associated services.

2

Reticulation of additional building services, alterations to services generally, replacement of plumbing fixtures (note previous penetration requirements).

1

Alternation to the air-conditioning system involving the provision of additional plant and ducting.

2

Changes to entry ramp, awnings, internal stair. 2 Replacement of broken glass. 1 Removal of, or modification to, the concrete door stops. 3

Page 38: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 31

Cont./

T Y P E O F W O R K A P P R O V A L

Attachment of hooks, nails, fixings to significant walls. 2 Attachment of hooks, nails, fixings to non-significant walls. 1 Cleaning of interiors. 1 Removal of, or changes to any other elements identified as being significant.

3

Removal of or changes to any other element identified as not being significant.

1

Page 39: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 7

BUILDING Z4

■ 32

Page 40: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 33

8 BUILDING Z5 (FORMERLY E2/C33)

Building Z5 is now referred to by Creative Industries as “Shed 2”. It was built in 1915 as a gun park, part of the original development of the site for specialist militia training units. The building was virtually identical to the adjacent building C32, demolished as part of the recent development. The plan form is also similar to that of building C39 (now Z3) with a large central open space used for the storage of artillery guns flanked on each side by rooms used as offices, harness rooms and store rooms.

The centre section had pairs of large timber doors which opened on to the parade ground. These were removed in more recent times and replaced with steel doors. Other changes made included the removal of harness room fittings as well as partitions added to the southern harness room and a section of the central gun park section. Otherwise the building survived largely intact.

10Key plan and photograph.

[Allom Lovell]

As part of the Creative Industries development the building was adapted to provide accommodation for fashion design students. The later partitions were removed but many of the early walls – including those separating the three sections of the building – were also taken out or opened-up to form essentially a large studio space. Remnants of the front (parade ground) offices were retained as stores and fitting rooms and smaller rooms at the rear for stores. A machine studio was inserted in the centre and projects slightly beyond the former building envelope. The later steel doors were removed and a new glazed screen wall set in behind the line of the early doors. The end spaces have new timber framed mezzanine floors which provide plant

Page 41: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 34

space. The early timber floor to the southern end and the concrete to the central area was replaced with new concrete. New services, including air conditioning have been installed. Externally, as with Building Z3, new roofing was laid over the existing which remains expressed internally. New louvres have been installed in the gable ends for the plant rooms. Otherwise, the exterior remains largely intact and has been conserved.

8 . 1 S I G N I F I C A N C E

Building Z5 is significant as part of the original development of Gona Barracks site. It formed a part of the complex of buildings built around a central parade ground in the upper barracks area. As a building type, it is relatively uncommon and less so since the removal of the former building C32. Little of its cultural heritage significance was lost with the recent work and it remains significant for its rarity value.

11The rear of the building facing Kelvin Grove

Road with the row of timber posts and hitching rails.

[Allom Lovell]

8 . 2 T H E E X T E R I O R

The external fabric of the building survives relatively intact as part of the recent Creative Industries works.

S I G N I F I C A N T F A B R I C

The significant external fabric of building Z5 includes the remaining early elements.

The roof structure and form, the timber fascias, barges and battened eaves.

The weatherboard-clad walls.

Early doors and windows and hardware, including the later steel armoury doors to the north-east. Some doors, and windows generally, are fixed closed.

Roof vents.

Early concrete doors stops, the hitching rails to the rear and the early drinking fountain.

The remaining doors posts separating the bays to the centre section and the surviving panel of high level timber louvres.

12The early drinking fountain.

[Allom Lovell]

Page 42: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 35

N O N - S I G N I F I C A N T F A B R I C

Changes and additions made to the building as part of the Creative Industries adaptation are not considered to be of cultural heritage significance.

New roof cladding, barge capping, gutters and downpipes.

The projecting walls of the Machine Studio.

The glazed wall facing the parade ground.

The ventilation louvres in the gable ends.

Building services.

Recent paint finishes.

Signage.

8 . 3 T H E I N T E R I O R

Although lost to some extent with the recent work, the original plan form of the building is significant together with remaining early building fabric.

S I G N I F I C A N T F A B R I C

The steel roof trusses, hardwood purlins and the exposed roof sheeting including the spatial quality of the open central section. (Note that as part of the recent work, the existing roof sheeting was left in place and an extra layer of corrugated galvanised roofing laid over the top with insulation between).

The T&G timber ceilings in the flanking rooms (now concealed within the mezzanine plant rooms).

Remnants of early timber framed partitions with T&G linings and timber trims, the inner faces of the outside walls. Some of these are concealed by new inner walls but several areas of glass allow views of the early single-skin exposed frame construction and windows.

Early doors, frames, hardware, trims.

Timber floor and floor structure to the northern end.

Page 43: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 36

8 . 4 N O N - S I G N I F I C A N T F A B R I C

Recent walls, partitions, infills.

The mezzanine plant room floors including soffits and access stairs.

Recent concrete floor slabs, floor finishes generally.

Recent doors, hardware.

Joinery, benches, fixtures, equipment.

Building services generally.

Signage.

Recent paint finishes.

8 . 5 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of the building should be dealt with in accordance with Section 2.3.

W O R K T O S E R V I C E S & E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency. Extension modification or replacement of services is included in the following table.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system.

Page 44: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 37

Typical projects may involve a number of tasks of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Construction of external additions to the building including links and awnings.

3

Demolition of, or cutting openings in significant walls greater than 1m2.

3

Demolition of, or cutting openings in significant walls less than or equal to 1m2.

2

Modification of the roof form and structure. 3 Work to the roof including re-sheeting, cutting penetrations, installation of hoods, vents and the like, removal or modification to roof vents.

3

Work as above to the Exhibition space. 1 Alterations to fascias, eaves, soffits other than repairs which match existing.

3

Changes to rainwater goods. 2 Like-for-like replacement and repair of rainwater goods in their current locations.

1

Removal, replacement, over-sheeting of weatherboarding cladding.

3

Construction of masonry walls. 3 Removal of, or modification to, the timber door posts and associated framing.

3

Addition of hoods, vents, grilles, services. 2 Changes to non-significant external walls, glazing. 2 Removal of and modification to non-significant internal walls, partitions, joinery, ceilings, mezzanine flooring.

1

Construction of (reversible) framed and sheeted, glazed or similar partitions where significant fabric is not removed, cut or otherwise damaged.

1

Over-sheeting or changing finishes to significant walls. 3 Addition of new doors and openings in non-significant walls.

1

Page 45: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 38

Cont./

T Y P E O F W O R K A P P R O V A L

Construction of additional wet areas such as kitchens, bathrooms and toilets.

3

Concealment of exposed roof structure and timber ceilings with suspended ceilings.

3

Removal of, or modification to steel trusses, timber purlins, CGI linings, T&G ceilings.

3

Removal of, or modification to, the early timber floors. 3 Construction of additional mezzanine or raised floors. 3 Installation of floor finishes. 1 Addition of signage, banners, art installation not within agreed parameters.

2

Installation of signs, banners, art installations within agreed parameters.

1

Alterations to the existing signage system. 1 Removal of or modification to significant doors, windows, louvres and frames other than changes to recent hardware, includes infilling of doors and windows.

3

Modifications to non-significant windows and doors. 1 Changes to recent door and window hardware. 1 Removal of, or modification to, the recent glass internal linings which allow views of the early walls and windows.

2

Repainting significant elements using: - existing colours - different colours

1

2 Repainting non-significant elements. 1 Installation of joinery, furniture, fittings and equipment 1 Installation of additional plumbing fixtures and associated services.

2

Reticulation of additional building services, alterations to services generally, replacement of plumbing fixtures (note previous penetration requirements).

1

Alternation to the air-conditioning system involving the provision of additional plant and ducting.

2

Replacement of broken glass. 1 Removal of, or modification to, the concrete door stops, the drinking fountain and the hitching rails.

3

Page 46: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 39

Cont./

T Y P E O F W O R K A P P R O V A L

Attachment of hooks, nails, fixings to significant walls. 2 Attachment of hooks, nails, fixings to non-significant walls. 1 Cleaning of interiors. 1 Removal of, or changes to any other elements identified as being significant.

3

Removal of or changes to any other element identified as not being significant.

1

Page 47: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 8

BUILDING Z5

■ 40

Page 48: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 9

BUILDING Z6

■ 41

9 BUILDING Z6 (FORMERLY BUILDING F)

Building Z6 was constructed in 2003 on land which was occupied by the former building C32, a gunpark similar to C33, now Z5. It also occupies part of the former parade ground area and is adjacent to the entry off Kelvin Grove Road. Now known as “the Hub” the building accommodates

9 . 1 A P P R O V A L S

As a recent structure, Building Z6 is not considered to be culturally significant and therefore can be more readily changed and altered than the remaining early buildings.

13Key plan and photograph.

[Allom Lovell]

However, changes which may effect its relationship to those buildings, and the views to them and within the precinct, are subject to heritage approval under this document.

E M E R G E N C I E S

Emergencies involving the fabric of the building may be dealt with without approval or reference to the Environmental Protection Agency.

Page 49: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 9

BUILDING Z6

■ 42

W O R K T O S E R V I C E S A N D E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system. Typical projects may involve a number of task of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Additions or extensions to the building. 3 Addition of hoods, vents, grilles, services to the building exterior.

1

Changes to the external colours and fenestration. 2 Internal work generally. 1 External repairs and maintenance. 1 Addition of signage, awnings, sails, light-weight structures attached to the building.

2

Attachment of temporary banners, signs, artwork. 1

Page 50: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 10

BUILDING Z7

■ 43

10 BUILDING Z7 (FORMERLY BUILDING C34)

Building Z7 was constructed in 1914 as an Artificer’s workshop. It was used by army mechanics for repairing wagon wheels and axles and artillery guns, and is a small single storey structure on a concrete base. The timber framed is clad in modern ribbed steel sheet and the gabled roof lined in the same material.

Internally the building has two main rooms, one with a concrete floor, set at a lightly lower level than the other which has timber floor, suggesting that construction may have been in two stages. The building is currently used as a garden shed for site maintenance staff. The eastern section has been painted internally and a new sink has been installed to the western end as part of the recent work. The building exterior was also repaired and repainted.

14Key plan and photograph.

[Allom Lovell]

1 0 . 1 S I G N I F I C A N C E

Although one of the first buildings to be constructed on the site, building Z7 has been extensively re-worked over the years and any significance it may have had as an early building has been compromised.

Page 51: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 10

BUILDING Z7

■ 44

S I G N I F I C A N T F A B R I C

The gabled form of the building. Early windows and door. Timber framing generally. Barges, fascias. Timber floors. The CGI partition separating the two sections.

N O N - S I G N I F I C A N T F A B R I C

Concrete slabs. External cladding. Later wall and ceiling sheet linings. Roofing, rainwater goods. Sink.

15An interior view of building Z7 showing the wall

dividing the two areas.[Allom Lovell]

Services. Paint finishes.

1 0 . 2 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of the building should be dealt with in accordance with Section 2.3.

W O R K T O S E R V I C E S & E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency. Extension modification or replacement of services is included in the following table.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document.

Page 52: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 10

BUILDING Z7

■ 45

Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system. Typical projects may involve a number of task of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Demolition or removal. 3 Construction of additions or extensions. 3 Any work to the interior 1 Changes to external colours and fenestration 2 External repairs and maintenance 1 Addition of awnings attached to the building 2 Addition of signage, hoods, vents, grilles, services to the exterior.

1

Page 53: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 11

BUILDING Z9

■ 46

11 BUILDING Z9 (PREVIOUSLY C56)

Building Z9 was probably built in the 1950’s and appear to have been used as a store room. It is a small single-store structure with a timber frame, clad part-height with CGI sheeting and with wire mesh to the upper walls. A lean-to addition to the north is enclosed with wire mesh. The main section has an early concrete floor and in the lean-to a recent slab has been laid. The low pitched roof is timber-framed and lined with new CGI sheet. The exterior was repainted as part of the recent work and the building is now used as a bin store.

1 1 . 1 S I G N I F I C A N C E

Little is known about the age or function of this building and it is not considered to be significant.

16Key plan and photograph.

[Allom Lovell]

1 1 . 2 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of the building may be dealt with without approval or reference to the Environmental Protection Agency.

Page 54: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 11

BUILDING Z9

■ 47

W O R K T O S E R V I C E S A N D E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system. Typical projects may involve a number of task of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Demolition or removal. 2 Construction of additions or extensions. 3 Any work to the interior 1 External repairs and maintenance 1 Changes to external colours and fenestration 2 Addition of signage, hoods, vents, grilles, services to the exterior.

1

Addition of awnings attached to the building 2

Page 55: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 12

PARER PLACE (LOT 903)

■ 48

12 PARER PLACE (LOT 903)

This section of open space formed part of the Gona barracks parade ground and is described as Lot 903 on SP151277. As part of the 2000 Master Plan for the Kelvin Grove Urban Village site, a large portion of the parade ground was retained with an open 25 metre wide corridor extending the length of the parade ground from north to south and linking open spaces at each end, with Parer Place being the northern space.

17

Key plan and photograph. [Allom Lovell]

The parade ground had been an integral part of the early site and of the operations of Gona Barracks since 1913. The site was not originally level and was reputedly filled during World War II. It had a bitumen surface prior to the recent work undertaken as part of the Creative Industries development. The area was paved, grassed and planted and street furniture, including lighting and seating was provided. Shade structures, incorporating projection facilities, have been built at the eastern end of the space, allowing images to be projected onto building Z2. A coffee shop in building Z1 opens out onto the space, which is used for performances and displays as well as student recreation. Small interpretive plaques relating to the former use of the site by the army are set in the paving.

Page 56: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 12

PARER PLACE (LOT 903)

■ 49

1 2 . 1 S I G N I F I C A N C E

The significance of the former parade ground resides in its scale as one of the largest known parade grounds of its type and period, in the contribution it makes to an understanding of the military use of the site, and in its contribution to the setting of the early buildings which surround it. It also has importance as a place for assembly and parade. As part of the former parade ground, Parer Place provides a setting for the remaining early barracks’ buildings on that part of the site. These buildings and the adjacent open space, together provide a “sense” of the early barracks.

18Views across the parade ground are important.

[Allom Lovell]

This sense of an open parade ground, although reduced to some extent by the recent work remains. Views across the parade ground and between the buildings are significant and should be protected. These are illustrated in the diagram at the end of Chapter 14. The physical fabric in the space, the ground surface treatments, street furniture, planting, and the shade structure, are not significant.

1 2 . 2 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of Parer Place may be dealt with without approval or reference to the Environmental Protection Agency.

W O R K T O S E R V I C E S A N D E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system.

Page 57: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 12

PARER PLACE (LOT 903)

■ 50

Typical projects may involve a number of task of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Construction of ‘permanent’ structures including kiosks or other buildings, shade structures (larger than table umbrellas), awnings, stages, platforms, fences, walls, screens, balustrades.

3

Extensions or modification to existing shade structure and projection facility.

3

Repairs and replacement of paving. 1 Provision of “permanent” car parking spaces. 3 Changing of levels. 3 Removal of planting and replacement with paving matching the existing.

2

Provision of additional planting or changes in types of planting.

3

Provision of additional street furniture and lighting. 2 Maintenance work generally. 1 Repairs and replacement of street furniture. 1 Repairs or replacement of services (refer “Emergencies” and “work to Services & Equipment”).

1

Provision of additional above-ground services. 2 Installation of “temporary” exhibits, displays, artworks, stalls.

1

Repairs and replacement of existing signs. 1 Provision of additional signage. 2 Any work which reduces views between and around the parade ground and buildings and reduces the sense of openness.

3

“Permanent” installed for more than one month. “Temporary” installed for less than one month.

Page 58: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 13

GONA PARADE

■ 51

13 GONA PARADE

This chapter relates to that section of Gona Parade within the Creative Industries Precinct as defined in Chapter One. It formed part of the Gona Barracks parade ground and abuts Parer Place (Lot 903) to the north and Musk Avenue to the south). As part of the 2000 Master Plan for the Kelvin Grove Urban Village site, a large portion of the parade ground was retained, with an open 25 metre wide corridor, Gona Parade, extending the length of the parade ground from north and south and linking open spaces at each end.

The parade ground had been an integral part of the early site and of the operations of Gona Barracks since 1913. The site was not originally level and was reputedly filled during World War II. It has a bitumen surface prior to the recent work undertaken as part of the Creative Industries development. As part of that work, the area was re-levelled, lowering the southern end to meet the new road cut through the site, Musk Avenue. Gona Parade was paved, grassed and planted.

19Views across the parade ground are important.

[Allom Lovell]

Tall palm trees are laid out in a regimented manner and the space remains relatively open. This part of the site is now owned by the Brisbane City Council and is a gazetted road. It remains accessible to services vehicles and some parking is provided.

Page 59: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 13

GONA PARADE

■ 52

1 3 . 1 S I G N I F I C A N C E

The significance of the former parade ground resides in its scale as one of the largest known parade grounds of its type and period, in the contribution it makes to an understanding of the military use of the site, and in its contribution to the setting of the early buildings which surround it. It also has importance as a place for assembly and parade. As part of the former parade ground, Gona Place connects to the open spaces to the north and south and gives an indication as to the former scale of the parade ground. Views down the length of Gona Parade, particularly where they allow views of the early barracks buildings are significant and should be protected. These are illustrated in the diagram at the end of Chapter 14.

20A view of Gona Parade looking towards the

north.[Allom Lovell]

The physical fabric in the space, the ground surface treatments, street furniture and planting is not significant.

1 3 . 2 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of Gona Parade may be dealt with without approval or reference to the Environmental Protection Agency.

W O R K T O S E R V I C E S A N D E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency.

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system. Typical projects may involve a number of task of varying levels, in which case the highest level or category will determine the type of application required for the project.

Page 60: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 13

GONA PARADE

■ 53

1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Construction of ‘permanent’ structures including kiosks or other buildings, shade structures (larger than umbrellas), awnings, stages, platforms, fences, walls, screens, balustrades.

3

Provision of additional “permanent” car parking spaces. 2 Repairs and replacement of paving. 1 Changing of levels. 3 Removal of planting and replacement with paving matching the existing.

2

Provision of additional planting or changes in types of planting.

3

Provision of additional street furniture and lighting. 2 Maintenance work generally. 1 Repair and replacement of street furniture. 1 Repair or replacement of services (refer “Emergencies” and “Work to Services & Equipment”).

1

Provision of additional above-ground services. 2 Installation of “temporary” exhibits, displays, artworks, stalls.

1

Repair and replacement of existing signs. 1 Provision of additional signage. 2 Any work which restricts views between and around the parade ground and buildings and reduces the sense of openness and connectivity.

3

“Permanent” installed for more than one month. “Temporary” installed for less than one month.

Page 61: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 16

THE SITE

■ 54

14 SPACES BETWEEN THE BUILDINGS (LOT 1)

This chapter deals with the open spaces surrounding the buildings which are part of Lot 1 and not addressed in the other chapters. Some of these open spaces, at parade ground level, are parts of buildings Z1, Z2 and Z3 - the tops of podium floors below which face on to Musk Avenue. The sense of separate free-standing buildings surrounding an open parade ground has largely been retained in the recent development, at least when viewed from with the parade ground. When viewed from Musk Avenue and beyond however, this aspect although originally limited by site topography, has been lost. The spaces between the buildings, particularly the early structures, allow them to be read and interpreted as separate entities and provide views into the parade ground. Surface treatments are simple and plain are mostly consist of concrete paving or grass. Several smaller structures existed on the site prior to the recent work. These included flag poles and latrine buildings.

21Key plan – The Lot 1 open spaces are shaded.

Building Z5 can be readily seen from Kelvin Grove Road.

[Allom Lovell]

Page 62: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 16

THE SITE

■ 55

The Parade Ground and surrounding buildcannot be readily seen from Musk Ave

[Allom Lo

Building surrounds remain open and plalandsca

[Allom Lo

22ings nue.vell]

23inly ped.vell]

Page 63: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 16

THE SITE

■ 56

24Views onto the parade ground, from the parade

ground, and the spaces between the buildings are important.

[Allom Lovell]

Page 64: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 16

THE SITE

■ 57

1 4 . 1 S I G N I F I C A N C E

While no early fabric between the buildings remains - surfaces were excavated, filled and resurfaced - it is these open spaces and the views they provide which remain significant. Some archaeological investigation was carried out on the site as part of the Kelvin Grove Urban Village infrastructure works. Further investigation, as part of any future excavation, has not been deemed necessary. An early drinking fountain and hitching rails outside building Z5 have been included in Chapter 8. They were removed during the recent construction and re-established in the new paving. The spaces between the early buildings, the parade ground and the site edges are significant as they allow interpretation of the place as a former army barracks. The spaces between the recent structures are also important as they allow views into and out of the parade ground. Important views and vistas include:

views into the site from Kelvin Grove Road, including views of Z5, Z7 and Z9 and views into the parade ground between them;

views from the northern boundary from the rear of Z3, Z4 and Z9 and between these buildings into the parade ground;

views into the site from Gona Parade;

views into the site from between Z1 and Z2, Z2 and Z3 from the parade ground level;

views between the buildings generally.

1 4 . 2 A P P R O V A L S

E M E R G E N C I E S

Emergencies involving the fabric of the Lot 1 site open space may be dealt with without approval or reference to the Environmental Protection Agency.

W O R K T O S E R V I C E S A N D E Q U I P M E N T

Regular maintenance, repair and testing of services and equipment may take place without approval or reference to the Environmental Protection Agency.

Page 65: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 16

THE SITE

■ 58

T A B L E O F A P P R O V A L S

The following table sets out the categories or levels of approval required for various works. The requirements for applications are set-out in Section 1.4 and in chapter 2 of this document. Level 1 work types are exempted as part of the endorsement of this document by the Queensland Heritage Council, level 2 items will require the submission of an Exemption Certificate application, and level 3 items will require the submission of a development application through the IDAS system. Typical projects may involve a number of task of varying levels, in which case the highest level or category will determine the type of application required for the project. 1 No approval or application for exemption certificate required. 2 Exemption Certificate application required. 3 Formal assessment required.

T Y P E O F W O R K A P P R O V A L

Construction of “permanent” structures including kiosks or other buildings, shade structures (larger than umbrellas), awnings, stages, platforms, fences, walls, screens, balustrades.

3

Repairs and replacement of paving. 1 Changing of levels. 3 Removal of planting and replacement with paving matching the existing.

2

Provision of additional planting or changes in types of planting.

3

Provision of additional street furniture and lighting. 2 Maintenance work generally. 1 Repair and replacement of street furniture. 1 Repair or replacement of services (refer “Emergencies” and “Work to Services & Equipment”).

1

Provision of additional above-ground services. 2 Installation of “temporary” exhibits, displays, artworks, stalls.

1

Repair and replacement of existing signs. 1

Page 66: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 16

THE SITE

■ 59

Provision of additional signage. 2 Any work which restricts views into the site between and around the buildings, beyond the site – generally as listed in the previous section - and reduces the sense of openness and connectivity.

3

“Permanent” installed for more than one month. “Temporary” installed for less than one month.

Page 67: H MANAGEMENT PROTOCOL QUT CREATIVE ...QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE CONTENTS i 1 INTRODUCTION 1 1.1 BACKGROUND 1 1.2 THIS STUDY 2 1.3 WHO SHOULD USE

QUT CREATIVE INDUSTRIES PRECINCT, KELVIN GROVE URBAN VILLAGE 16

THE SITE

■ 60


Recommended