DESIGN REVIEW BOARD Staff Report
Agenda Item H.1 Meeting Date: April 12, 2016
TO: Goleta Design Review Board FROM: Brian Hiefield, Associate Planner; (805) 961-7559 SUBJECT: 6025 Calle Real (aka 55 N. Fairview Ave.) (APN 077-170-025)
Cajun Kitchen Façade Improvements Case No. 16-037-DRB
PROJECT DESCRIPTION: This is a request for Conceptual review. The applicant proposes site improvements including new landscaping and site lighting, and the construction of a new patio, entry structure, and façade improvements. No new habitable square footage is proposed. The project was filed by agent Paul Poirier of Paul Poirier & Associates on behalf of Michael Prochelo, property owner. Related cases: 16-037-LUP.
ATTACHMENTS:
Reduced 11" x 17" copies of site plans and elevations.
APPROVALS: DATE:
NO: DATE: COMMENTS:
REVISIONS:
PRINT DATE:
PROJECT CODE:
CHECKED BY:
DRAWN BY:
FILENAME:
ISSUE DATE:
1550 A01 Cover Sheet.dwg
1550
SITE
AD
DRE
SS:
6025
Ca
lle R
ea
lG
ole
ta, C
A 93
117
Tayl
or M
eg
da
lEl
liot M
eg
da
l and
Ass
oc
iate
s25
2-C
S. B
eve
rly D
r.Beverly Hills, CA 90212
PRO
JEC
T O
WN
ER:
CAJ
UN K
ITCH
EN -
CAL
LE R
EAL
Co
mm
erc
ial R
em
od
el
Mar 14, 2016, 2:42pm
156
Wes
t Ala
mar
Ave
.Sa
nta
Bar
bara
, CA
931
05Su
ite C
Paul
Po
irie
r
Asso
cia
tes
-
Project Information
A0.1
KKC
SCOPE OF WORK
PROJECT DIRECTORY
TENANT
MECHANICAL & PLUMBING ENGINEER
ARCHITECT
ELECTRICAL ENGINEER
ABREVIATIONS
PROJECT STATISTICS VICINITY MAP
SHEET INDEX
CAJUN KITCHENCALLE REALCOMMERCIAL REMODEL
AT6025 CALLE REALGOLETA, CA 93117
STRUCTURAL ENGINEER
OWNER
Rusty's Pizza
Shell Gas Station
CALLE REAL
AREA OF WORK
NOT A PART
NOT A PART
SITE PLAN
A1.1
(E) LANDSCAPING
NUMBER OF PARKING SPACES
ADA PATH OF TRAVEL, MAX 4.9% SLOPE IN DIRECTION OF TRAVELWITH MAX 1.9% CROSS SLOPE
AREA OF REMODEL
SITE PLAN1/16" = 1'-0"
APPROVALS: DATE:
NO: DATE: COMMENTS:
REVISIONS:
PRINT DATE:
PROJECT CODE:
CHECKED BY:
DRAWN BY:
FILENAME:
ISSUE DATE:
1550 A11 Site Plan.dwg
1550
SITE
AD
DRE
SS:
6025
Ca
lle R
ea
lG
ole
ta, C
A 93
117
Tayl
or M
eg
da
lEl
liot M
eg
da
l and
Ass
oc
iate
s25
2-C
S. B
eve
rly D
r.Beverly Hills, CA 90212
PRO
JEC
T O
WN
ER:
CAJ
UN K
ITCH
EN -
CAL
LE R
EAL
Co
mm
erc
ial R
em
od
el
Mar 14, 2016, 2:39pm
156
Wes
t Ala
mar
Ave
.Sa
nta
Bar
bara
, CA
931
05Su
ite C
Paul
Po
irie
r
Asso
cia
tes
-
KITCHEN
STORAGE
DINING
MEN'S
WOMEN'S
OFFICE
COOLER
W.H.
NEW PR. OF6' DOORS
LINE OFOVERHANG
NEW DOOR
FLOOR PLAN
A2.1
CWR
31FLOOR PLAN1/8"= 1'-0""
APPROVALS: DATE:
NO: DATE: COMMENTS:
REVISIONS:
PRINT DATE:
PROJECT CODE:
CHECKED BY:
DRAWN BY:
FILENAME:
ISSUE DATE:
1550 A21 Floor Plan.dwg
1550
SITE
AD
DRE
SS:
6025
Ca
lle R
ea
lG
ole
ta, C
A 93
117
Tayl
or M
eg
da
lEl
liot M
eg
da
l and
Ass
oc
iate
s25
2-C
S. B
eve
rly D
r.Beverly Hills, CA 90212
PRO
JEC
T O
WN
ER:
CAJ
UN K
ITCH
EN -
CAL
LE R
EAL
Co
mm
erc
ial R
em
od
el
Mar 14, 2016, 2:40pm
156
Wes
t Ala
mar
Ave
.Sa
nta
Bar
bara
, CA
931
05Su
ite C
Paul
Po
irie
r
Asso
cia
tes
-
1EW
1W
(E) STUD WALL TO REMAIN
(N) WALL w/ 3-5/8" MTL STUDS @ 16" O.C. PERDETAILS 12/A9.1 SIM, 43/A9.1 & 43/A9.2
2W (N) 6" METAL STUD FULL HT w/ 12" CEM. BOARD FULLYMUDDED FULL HT, S.S. AT COOKLINE SIDE OF WALLON 6" CURB (43/A9.2)
NOTE:FOR DOOR AND WINDOW SCHEDULE SEE SHEET A2.3
2EW (E) CMU WALL TO REMAIN
APPROVALS: DATE:
NO: DATE: COMMENTS:
REVISIONS:
PRINT DATE:
PROJECT CODE:
CHECKED BY:
DRAWN BY:
FILENAME:
ISSUE DATE:
1550 Color Elevations.dwg
1550
SITE
AD
DRE
SS:
6025
Ca
lle R
ea
lG
ole
ta, C
A 93
117
Tayl
or M
eg
da
lEl
liot M
eg
da
l and
Ass
oc
iate
s25
2-C
S. B
eve
rly D
r.Beverly Hills, CA 90212
PRO
JEC
T O
WN
ER:
CAJ
UN K
ITCH
EN -
CAL
LE R
EAL
Co
mm
erc
ial R
em
od
el
Mar 14, 2016, 2:41pm
156
Wes
t Ala
mar
Ave
.Sa
nta
Bar
bara
, CA
931
05Su
ite C
Paul
Po
irie
r
Asso
cia
tes
-
COLOR ELEVATIONS
A3.1c
P+A
--
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
WEST ELEVATION1/8" = 1'-0"
1/8" = 1'-0"
1/8" = 1'-0"
1/8" = 1'-0"11
21
31
41
APPROVALS: DATE:
NO: DATE: COMMENTS:
REVISIONS:
PRINT DATE:
PROJECT CODE:
CHECKED BY:
DRAWN BY:
FILENAME:
ISSUE DATE:
1550 Color Elevations.dwg
1550
SITE
AD
DRE
SS:
6025
Ca
lle R
ea
lG
ole
ta, C
A 93
117
Tayl
or M
eg
da
lEl
liot M
eg
da
l and
Ass
oc
iate
s25
2-C
S. B
eve
rly D
r.Beverly Hills, CA 90212
PRO
JEC
T O
WN
ER:
CAJ
UN K
ITCH
EN -
CAL
LE R
EAL
Co
mm
erc
ial R
em
od
el
Mar 14, 2016, 2:41pm
156
Wes
t Ala
mar
Ave
.Sa
nta
Bar
bara
, CA
931
05Su
ite C
Paul
Po
irie
r
Asso
cia
tes
-
CONCEPT IMAGES
A3.2c
P+A
--
VIEW OF ENTRYWAY
VIEW OF BUILDING FROM STREET
VIEW OF SIDE PATIO PATIO PERSPECTIVE
AERIAL VIEW