Final Status Survey Final Report Phase VII Appendix A3 Survey Unit Release Record 9312-0001, Containment (Former Radiologically Controlled Area) May 2007 41
Transcript
Page 1: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Final Status SurveyFinal Report Phase VII

Appendix A3Survey Unit Release Record9312-0001, Containment (FormerRadiologically Controlled Area)

May 2007 41

Page 2: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

C*YAPCOFINAL STATUS SURVEY RELEASE RECORD

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 931.2-0001

Prepared By. _ 0M "l4tA

F.s Engineer

Reviewed By:FSS Engineer

Approved By: ____ ___-1

Tecimical Support Mianager

Date: -4 1g 10-7

Date: / ?(7

Revision 0

Page 3: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

TABLE OF CONTENTS

1. SURVEY UNIT DESCRIPTION........................................... 32. CLASSIFICATION BASIS ................................................. 33. DATA QUALITY OBJECTIVES (DQO) ................................. 64. SURVEY DESIGN ......................................................... 105. SURVEY IMPLEMENTATION .......................................... 136. SURVEY RESULTS ....................................................... 147. QUALITY CONTROL ..................................................... 188. INVESTIGATIONS AND RESULTS .................................... 199. REMEDIATION AND RESULTS........................................ 2010. CHANGES FROM THE FINAL STATUS SURVEY PLAN.......... 2011. DATA QUALITY ASSESSMENT (DQA)............................... 2012. ANOMALIES ............................................................... 2113. CONCLUSION.............................................................. 2114. ATTACHMENTS........................................................... 22

14.1 Attachment 1 - Figures (7 pages including cover)14.2 Attachment 2 - Scan Results (5 pages including cover)14.3 Attachment 3 - Laboratory Data (I111 pages including cover)14.4 Attachment 4 - DQA Results (17 pages including covers)

TOTAL 162

Revision 0

Page 4: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

SURVEY UNIT DESCRIPTION

Survey Unit 9312-0001 (Containment) is designated as Final Status Survey (ESS)Class 1 and consists of approximately one thousand nine hundred-seventy five(1,975) square meters of open land and is located approximately one thousand fourhundred eighty feet (1,480 ft) to the southeast of the site benchmark (Northing:237370.20, Easting: 667394.57) site reference coordinate system benchmark used atHaddam Neck Plant (HNP) (see Attachment 1). The survey unit is bounded asfollows: land Survey Unit 93 12-0005 and land Survey Unit 93 12-0006 to the north(called north as oriented with the north to south flow of the Connecticut River), landSurvey Unit 9312-0003 to the west and south and land Survey Unit 9312-0002 to theeast and south. As a result of demolition and remediation activities, the areatopography is mostly flat and de-vegetated. The survey unit has a moderate sloperunning from east to west.

The reference coordinates associated with this survey unit are E009 through E0 12 byS067 through S069 (refer to "HNP License Termination Plan" (LTP) Section 5.4.4).The reference coordinates provide the maximum dimensions of a rectangle containingthis survey unit. Some areas contained in this rectangle may not be part of this surveyunit. The boundary of the survey unit was defined using a Global Positioning System(GPS) based on the Connecticut State Plane System North American Datum (NAD)1927.

2. CLASSIFICATION BASIS

The survey unit was classified in accordance with Procedure RPM 5. 1- 10, "SurveyUnit Classification. "

The "Classification Basis Summary" conducted for Survey Unit 93 12-0001 consistedof:

a) A review of the lOCFR5O.75 (g) (1) database,

b) A review of the "Initial Characterization Report" and the "Historic SiteAssessment Supplement, "

c) Historic and current survey records review,

d) Visual inspections and a "walkdown."

A review of the "Initial and Supplemental Characterization Reports" as well as theprevious "Classification Basis Summaries" was performed. The source documents,the "Connecticut Yankee Haddam Neck Characterization Report" and "InitialClassification for Survey Areas at Connecticut Yankee", were incorporated byreference in LTP, Revision 0.

Revision 03 3

Page 5: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

During plant operation, Survey Unit 9312-0001 was the location of significant,radiologically contaminated structures and systems, namely the reactor, the reactorsystems and the Containment structure.

The Containment Building housed the reactor, reactor primary systems andcomponents as well as numerous other support systems. With the exception ofvarious service water, gas and air systems, the majority of the systems within theContainment were radiologically contaminated. Radioactive material concentrationsin many of these components and systems were high enough to create high radiationareas in their vicinity. The entire Containment Building interior was posted as a"Contaminated Area". Hi storical surveys of the building show that significant levelsof fixed and loose contamination were present in this structure. Some components,equipment, structural steel and concrete became radioactive due to neutron activation.

A review of the Historical Site Assessment and Supplement, as well as, otherhistorical documents (e.g., the I OCFR5O.75(g)(l) files) indicated a significant numberof operational events have impacted Survey Unit 9312-0001. These events includedsignificant spills and leakage from contaminated systems. These events would havehad the most impact on the radiological condition of subsurface structures and footers;and the underlying soil and bedrock prior to system and structural decontaminationand demolition.

Major demolition and remediation activities began in 2002. All contaminatedsystems and components located inside the Containment Building, including thereactor vessel, were removed and appropriately packaged and shipped to an approvedoff-site disposal facility. Interior structural surfaces inside the Containment Buildingwere decontaminated to ensure contamination levels were acceptable for controlleddemolition, Interior walls and floors were then demolished and removed. TheContainment liner was removed with the exception of the Incore Sump, which wasfilled with grout to the basement floor elevation. The remaining interior surfacesinside the Containment shell were decontaminated.

Following decontamination, the Containment basement was filled with soil to thegrade of the exterior open land. The above grade portion of the Containmentstructure was then demolished and removed. Fill was then placed over the surveyunit, raising the grade of the area by approximately four (4) feet. No above gradestructures currently remain within Survey Unit 93 12-000 1.

Outside of the structures, considerable remediation was performed on the soilssurrounding the Containment structure, particularly around the northeast, northwestand southeast quadrants of the survey unit. A large excavation was created to thenorth of the Containment that was designated as Excavation #1. This excavationincluded the area in the vicinity of the Refueling Waster Storage Tank and thePrimary Auxiliary Building (PAB) corridor. A second large excavation, designatedas Excavation #2 was located over the Primary Auxiliary Building (PAB) footprint.A third excavation, designated as Excavation #3 was located in the area between theContainment Building and Spent Fuel Building (SFB).

Revision 04 4

Page 6: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

As adjacent structures were demolished, soil was excavated and removed. Thisprocess continued until bedrock was exposed. Subsurface structures and footings thatremained following demolition and excavation include the Containment Mat, theCable Vault wall, the Service Building east wall, a remnant of the PAB northwestwall, Waste Disposal Building (WDB) footing and miscellaneous fragments offootings and slabs on the bedrock. As with the Containment basement shell, allexcavations were backfilled following the performance of radiological assessments.

In Survey Area 9312, post-remediation soil samples were taken from the as-leftsurface soils under two (2) Survey and Sampling Work Plans, SSWVP-06-08-000 andSSWPT-06-12-001. Thirty-five (35) post remediation surface soil samples werecollected from the various locations within Survey Area 9312. All samples werecollected and analyzed by gamma spectroscopy by an approved off-site laboratory.Ten (10) of the thirty-five (35) post remediation samples collected were analyzed forthe full suite of "Hard-to-Detect" (HTD) radionuclides specified in the LTP,Table 2-12, "Radionuclides Potentially Present at Haddam Neck Plant" and asprovided in Table 3. Statistical quantities (mean, median and standard deviation)from the 2006 post-remediation survey conducted under SSWP-06-08-000 andSSWP-06-12-001 are provided in Table 1.

Minimum Value: 1 .32E-02 -5 .OOE-02

Maximum Value: 1 .70E+00 1 .43E±00

Mean: 2.3 8E-0lI 1.08E-01

Median: 1.65E-01 1.46E-02

Standard Deviation: T3. 1OE-0 I 2.76E-0lI

A review of this sample data shows Cs-137 and Co-60 to be the primaryradionuclides of concern, with both isotopes reported at fairly low concentrations.The sample population as a whole was evaluated to assess the distribution of thedetected radionuclides. The radionuclide distribution percentage for each sample inthe population was calculated by dividing the concentration of each detectedradionuclide by the total activity concentration in the sample, expressing theabundance of the specific nuclide in the sample compared against the total activity.The mean radionuclide distribution was then calculated by taking the average of theindividual sample distribution fractions. The results are provided in Table 2.

Revision 05 5

Page 7: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

Cs-137 0.689

Co-60 0.3 11

No HTD radionuclides were positively identified in concentrations meeting theaccepted criteria for detection (i.e., a result greater than two (2) standard deviationsuncertainty). Radionuclide screening or de-selection is a process where an individualradionuclide or aggregates may be considered insignificant and eliminated from theFSS. The criteria for de-selection are concentrations less than 5% for individualradionuclides and less than 10% for aggregates.

While Sr-90 was not identified in the soil characterization results, it was decided toinclude Sr-90 is a radionuclide of concern for this survey unit as Sr-90 was prevalentin the soils prior to remediation. Therefore, all volumetric soil samples taken as partof the survey design for this survey unit were subjected to direct analysis for Sr-90.

The FSS Engineer performed a visual inspection and walk-down during March 2007to assess the physical condition of the survey unit, evaluate access points, travel pathsand identify potentially hazardous conditions.

This survey area is affected by existing and future groundwater (reference CY memoISC 06-024) which will be a source of dose from residual radioactivity, as discussedin Section 3 under the Data Quality Objectives.

Based upon the identification of radioactive material above the DerivedConcentration Guideline Levels (DCGLs), and the need for radiological remediation,it was concluded that there was some probability for residual radioactivity inconcentrations greater than the DCGLs, justifying a final survey unit classification ofClass 1 (refer to Section 3).

3. DATA QUALITY OBJECTIVES (DQO)

FSS design and planning used the Data Quality Objective (DQO) process asdescribed by the LTP, Procedure RPM 5. 1-11, "Preparation of Final Status SurveyPlan," and the "Multi-Agency Radiation Survey and Site Investigation Manual"(MARSSIM). A summary of the main features of the DQO process are providedherein.

The DQO process incorporated hypothesis testing and probabilistic samplingdistributions to control decision errors during data analysis. Hypothesis testing is aprocess based on the scientific method that compares a baseline condition to analternate condition. The baseline condition is technically known as the nullhypothesis.

Revision 06 6

Page 8: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

Hypothesis testing rests on the premise that the null hypothesis is true and thatsufficient evidence must be provided for rejection. In designing the survey plan, theunderlying assumption, or null hypothesis was that residual activity in the survey unitexceeded the release criteria. Rejection of the null hypothesis would indicate thatresidual activity within the survey unit does not exceed the release criteria.

The primary objective of the FSS plan was to demonstrate that the level of residualradioactivity in Survey Unit 9312-0001 did not exceed the release criteria specified inthe LTP and that the potential dose from residual radioactivity is As Low AsReasonably Achievable (ALARA).

A fundamental precursor to survey design is to establish a relationship between therelease criteria and some measurable quantity. This is done through the developmentof DCGLs. The DCGLs represent average levels of radioactivity above backgroundlevels and are presented in terms of surface or mass activity concentrations.

Chapter 6 of the LTP describes in detail the modeling used to develop the DCGLs forsoil (called Base Case Soil DCGL), existing groundwater radioactivity and futuregroundwater radioactivity that will be contributed by building basements andfootings.

The DCGLs presented in Chapter 6 of the LTP were developed for exposures fromthree (3) components, that is, residual radioactivity in soil, existing groundwaterradioactivity, and future groundwater radioactivity from the burial of concretefoundations or footings from site buildings containing residual radioactivity.Equation 1 shows the mathematical relationship between the three (3) componentsand the total dose.

Equation 1

Hiotai -H Soil ±H ExistingGW ±H FutureG W

The total dose under the LTP criteria is twenty-five (25) mrem/yr Total EffectiveDose Equivalent (TEDE) from all three (3) components. The allowable total doseunder the Connecticut Department of Environmental Protection (CTDEP)radiological remediation standard for CY is nineteen (19) mrem/yr TEDE. To satisfyboth the LTP and CY CTDEP criteria, the dose from soil must be reduced whenusing the existing and future groundwater dose values discussed above.

This survey area is affected by existing groundwater (reference CY memoISC 06-024). Therefore, the dose contribution from existing groundwater is boundedby two (2) mrem/yr TEDE.

This survey unit is considered impacted by future groundwater radioactivecontamination, as there are underground foundations containing residual radioactivematerial within the groundwater saturated zone in the area (reference CY memoISC 06-024). The dose contribution from future groundwater, the third dosecomponent, is bounded by two (2) mremlyr TEDE.

Revision 07 7

Page 9: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

Equation 2

19 mremlyrTotal, = 15 mremf/yrs,)j1 + 2 mrem/yrExisting ow+ 2 mrem/yrFutureGW

The allowable dose for soil in this survey unit is fifteen (15) mrem/yr TEDE asshown by Equation 2 above. The concentration of residual radioactivity resulting infifteen (15) mremlyr TEDE is designated as the Operational DCGL (DCGLop), andhas been established for the radionuclides of concern as provided in Table 3.

Revision 08 8

Page 10: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

H-3 4.12E+02 2 .47E+02 1.65E+01

C-14 5.66E+00 3.40E+00 2.26E-01

Mn-54 1.74E+01I 1.04E+01 6.96E-01

Fe-55 2.74E+04 1 .64E+04 1. 1 OE+03

Co-60 3.8 1 E+00 2.29E+00 1 .52E-0 1

Ni-63 7.23E+02 4.34E+02 2.89E+0 1

Sr-90 1 .55E+00 9.30E-0 1 6.20E-02

Nb-94 7.1 2E+00 4.27E+00 2.85E-0 1

Tc-99 1 .26E±01 7.56E+00 5.04E-0OI

Ag-i 08m 7.1 4E+00 4.28E+00 2.86E-0 1

Cs- 134 4.67E+00 2.80E+00 1 .87E-01

Cs-137 7.9 1E+00 4.75E+00 3.16E-01

Eu-152 l.O1E+01 6.06E+00 4.04E-0OI

Eu-154 9.29E+00 5.57E+00 3.72E-01

Eu-155 3.92E+02 2.35E+02 1.57E+01

Pu-238 2.96E+0l Il.78E+01 1. 18E+00

Pu-239/240 2.67E+O1 Il.60E+01 1.07E+00

Am-241 (5) 2.5 8E+O1 Il.55E+01 1.03E±00

Pu-241 8.70E+02 5.22E+02 3.48E+O I

Cm-2431244 2.90E+O 1 1 .74E+0 1 1. 16E+00

(1) Bold indicates those radionucidies considered Hard to Detect (HTD)

(2) The Base Case Soil DCGL(s) are specified by the LTP in Chapter 6 and are equivalentto twenty-five (25) mrem/yr TEDE

(3) The Operational DCGL is equivalent to achieving fifteen (15) mremlyr TEDE

(4) The required MDC is equivalent to achieving one (1) mremlyr TEDE

(5) Americium-241 can be analyzed by gamma and alpha spectroscopy and is considered tobe Easy to Detect (ETD). The preferred result is the alpha spectroscopy's when bothanalyses are performed

Revision 09 9

Page 11: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

Another important facet of the DQO process is to identify the radionuclides ofconcern and determine the concentration variability. Soil samples were collected in2006 to establish the radiological condition of Survey Unit 9312-0001 for FSS.Cs-137 and Co-60 were the two (2) gamma emitting radionuclides reported inconcentrations with the potential for exceeding the release criteria. Sr-90 wasincluded as a radionuclide of concern due to its prevalence in the soil prior toremediation. The characterization data were used for the survey design and areprovided in Table 1.

Instrument DQOs included a verification of the ability of the survey instrument todetect the radiation(s) of interest relative to the DCGL. Survey instrument responsechecks were required prior to issue and after the instrument had been used. Controland accountability of survey instruments was required to assure the quality andprevent the loss of data.

As, part of the DQOs applied to laboratory processes, analysis results were reported asactual calculated results. Results reported as less than Minimum DetectableConcentration (MDC) were not accepted for FSS. Sample report summaries includedunique sample identification, analytical method, radionuclide, result, and uncertaintyto two (2) standard deviations, laboratory data qualifiers, units, and the required andobserved MDC.

4. SURVEY DESIGN

The level of effort associated with planning a survey is based on the complexity ofthe survey and nature of the hazards. Guidance for preparing FSS plans is providedin Procedure RPM 5.1-11, "Preparation of Final Status Survey Plans". The FSS planuses an integrated sample design that combines scanning surveys and sampling whichcan be either random or biased.

The DQO process determnined that Cs-137, Co-60 and Sr-90 would be theradionuclides of concern in Survey Unit 93 12-0001 (refer to Section 3). Thecharacterization survey did not include any other additional HTD radionuclides ofconcern for this survey unit. As Sr-90 concentrations were determined by directanalysis, surrogate DCGLs were not required as part of the survey design for thissurvey unit via screening under LTP Section 5.4.7.2, "Gross Activity DCGLs". Otherradionuclides that were positively identified in concentrations greater than thescreening criteria during the performnance of this FSS would be evaluated to ensureadequate survey design.

As the survey unit is classified as a Class 1 surface soils area, and discrete, elevatedareas of contamination was possible, the application of the Elevated MeasurementComparison (EMC) remained an option.

The Sign Test was selected as the non-parametric statistical test. The use of the SignTest did not require the selection or use of a background reference area, whichsimplified survey design and implementation. This approach was conservative sinceit included background Cs- 137 as part of the sample set.

Revision 0 to

Page 12: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

The number of soil samples for FSS was determined in accordance with ProcedureRPM 5.1-12, "Determination of the Number of Surface Samples for Final StatusSurvey." The Lower Bound of the Gray Region (LBGR) was set in accordance withProcedure RPM 5. 1-11 ito 0.73 to achieve a relative shift (A/cy) in the range of 1 and 3.The resulting adjusted relative shift was 2.0. A Prospective Power Curve wasgenerated using COMPASS, a software package developed under the sponsorship ofthe United States Nuclear Regulatory Commission (USNRC) for implementation ofthe MARS SIM in support of the decommissioning license termination rule(I OCFR2O, Subpart E). The result of the COMPASS computer run showed adequatepower for the survey design. The survey design specified. fifteen (15) surface soilsamples for non-parametric statistical testing. Based upon a review of the historicalinformation and Characterization Survey data, four (4) judgmental samples weretaken in this survey area. One (1) judgmental sample was taken at the northeastcorner of the survey unit in the vicinity of the "Tank Farm" excavation; two (2)judgmental samples were taken in the southeast corner of the survey unit in thevicinity of the Fuel Transfer Tube excavation and the Spent Fuel Building foundationand one (1) judgmental sample was taken in the northwest quadrant in the vicinity ofthe Primary Auxiliary Building excavation.

The grid pattern and locations of the soil samples were determnined using VisualSample Plan (VSP) in accordance with Procedure RPM 5.1-14, "Identifying, andMarking Surface Sample Locations for Final Status Survey." Visual Sample Planwas created by Pacific Northwest National Laboratory (PNNL) for the United StatesDepartment of Energy. A systematic triangular grid pattern with a random startingpoint was selected for sample design, which is appropriate for a Class 1 area.

Sample locations were identified using AutoCAD-LT, a commercially availableplotting software package with coordinates consistent with the Connecticut StatePlane System. These coordinates were integrated with a GPS to locate samplelocations in the field. Sample Measurement Locations for the design are listed withthe GPS coordinates in Table 4.

9312-0001-OOIF 236653.27 668703.89

93 12-0001-002F 236653.27 668744.35

9312-0001-003F 236618.24 668683.67

9312-0001-004F 236618.24 668724.12

9312-0001-005F 236618.24 668764.58

9312-0001-006F 236618.24 668805.03

Revision 0 1I I

Page 13: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

93 12-0001-007F 236583.20 668663.44

93 12-0001-008F 236583.20 668703.89

9312-0001-009F 236583.20 668744.35

9312-0001-OlOF 236583.20 668784.80

93 12-0001-01 lF 236583.20 668825.26

9312-0001-012F 236548.17 668683.67

9312-0001-013F 236548.17 668724.12

9312-0001-014F 236548.17 668764.58

9312-0001-015F 236513.14 668744.35

93 12-0001-016B(') 236676.51 668734.75

9312-0001-017B~') 236622.41 668815.99

9312-0001-018B(') 236599.54 668836.44

9312-0001-019B~') 236594.08 668662.08

(1) B = biased - indicates judgmental sample location

Procedure RPM 5.1-11 specifies that 5% of the samples are required to be selectedfor HTD analysis. Two (2) soil samples, or 13% of the number of samples that wouldbe used for non-parametric statistical testing were randomly selected for HTDradionuclide analysis using the Microsoft Excel "RANDBETWEEN" function. Eachsample was sent off-site for a full suite analysis of the HTD radionuclides specified inthe LTP, Table 2-12, "Radionuclides Potentially Present at Haddam Neck Plant" andas provided in Table 3.

The LTP requires a minimum of 5% of the samples taken for non-parametricstatistical testing be selected for QC evaluation. The implementation of qualitycontrol measures as referenced by Procedure RPM 5.1-24, "Split Sample Assessmentfor Final Status Survey," included the collection of one (1) soil sample for "splitsample" analysis by the off-site laboratory. This location was selected randomlyusing the Microsoft Excel "RANDBETWEEN" fuinction.

The LTP specifies a required scanning coverage of 100% for outdoor Class 1 areas.

For this Class 1 survey unit, the "Investigation Level" for area scanning and soilsample measurement results are those levels specified in LTP, Table 5-8. Table 5provides a synopsis of the survey design.

Revision 0 112

Page 14: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UINIT 93 12-0001

RELEASE RECORD

Survey Unit Land Area 1,975 M2 Based on AutoCAD-LT

Type 1 and Type 2 errors were19 0.05, sigma was 0. 14 pCilg, the

Number of Measurements (15 systematic grid) LBGR was set at 0.73 to achieve a

(4 judgmental) Relative Shift in the range of I and3

Grid Spacing 12.29 mn Based on triangular grid

4.75 pCi/g Cs-137 Administratively set to achieveOperational DCGL 2.29 pCi/g Co-60 fifteen (15) mremlyr TEDE ~

0.93 pCi/g Sr-90

4.75 pCi/g Cs-137 The Operational DCGL meets theSoil Investigation Level 2.29 pCi/g Co-60 LTP criteria for a Class I survey

0.93 pCi/g Sr-90 unit

Scan Survey Area Approximately The LTP requires 100% areaCoverage 100% of the area coverage for Class 1 survey units

An instrumentresponse greaterthan the Scan

Scan Investigation Level MDC(DCGLEMC) Per BCY-HP-0239 Revision #0of 2,000 cpm plusambientbackground

(1) The allowable dose for soil in this survey unit is fifteen (15) mrem/yr TEDE as thebounding dose from existing and future groundwater has been established based on fielddata (reference CY memo ISC 06-024)

5. SURVEY IMPLEMENTATION

Final status survey field activities were conducted under a Final Status Survey Plan(FSSP). The FSSP package included a detailed survey plan, job safety analysis, jobplanning checklist and related procedures for reference. Daily briefings wereconducted to discuss the expectations for job performance and the safety aspects ofthe survey. The "Daily Survey Journal" was used to document field activities andother inform-ation pertaining to the FSS.

A single scan area was established that constituted approximately 100% of the surfacearea of Survey Unit 9312-0001. Grid lines, one (1) meter wide, were painted on theground of the scan area. A background survey was performed around the survey unitand it was determined that, using an Eberline E-600 with a SPA-3 sodium iodidedetector, background ranged from 7,170 counts per minute (cpm) up to 13,200 cpm.

Revision 0 113

Page 15: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 9312-0001

RELEASE RECORD

The scan area was established and scanned for elevated readings (see Attachment 2for all scan results). Scanning was performed with an Eberline E-600 using a SPA-3sodium iodide detector. The E-600 was operated in the rate-meter mode and usedwith audio response. The probe was positioned as close to the ground as possible andwas moved at a scan speed of about 0.5 meters per second. Approximately 100% ofthe survey unit was scanned.

Meastfr ement locations were identified* in North American Datum (NAD) 1927coordinates using GPS coordinates; sample locations were identified and marked witha surveyor's flag or paint for identification. At each sample location, a one (1) meterradius circle was established around the sample flag or paint mark was scanned forelevated radiation levels.

Nineteen (19) surface soil samples were collected and packaged in accordance withHaddam Neck Plant (HNP) Procedure RPM 5.1-3, "Collection of Sample Media forFinal Status Survey" and FSS design. Samples were controlled, transported, stored,and transferred to the off-site laboratory using Chain-of-Custody (COC) protocol inaccordance with Procedure RPM 5.1-5, "Chain of Custody for Final Status SurveySamples."

Two (2) samples (93 12-0001-005F and 9312-0001-015F) were randomly selected forHTD radionuclide analysis.

The implementation of survey specific quality control measures included thecollection of one (1) sample (9312-0001-003F) for "split sample" analysis.

6. SURVEY RESULTS

All field survey activities were conducted between March 24, 2007 and March 26,2007.

The sample locations identified in the FSS plan were scanned over approximately aone (1) meter radius for elevated radiation levels. Table 6 provides an overview ofthe scan results for sample measurement locations. Scan results are provided inAttachment 2.

I 7.64 10.52 NO

2 9.73 10.94 NO

3 10.20 { 11.19 NO

4 10.30 10.89 NO

Revision 0 114

Page 16: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

5 9.45 11.33 NO

6 8.64 10.66 NO

7 9.52 10.70 NO

8 9.92 12.00 NO

9 12.40 14.40 NO

10 12.10 14.20 NO

1 1 11.00 12.20 NO

12 10.80 11.44 NO

13 9.42 10.83 NO

14 10.50 12.10 NO

15 10.30 11.46 NO

16 (2) 7.79 9.62 NO

17 (2) 10.30 11.63 NO

18(2) 9.96 11.96 NO

19(2) 8.72 9.95 NO(1) The action level is based on a measurement in accordance with the FSS plan

(MDC(DCGLEMC) of 2,000 cpm plus ambient background)

(2) Indicates judgmental sample locations (biased)

The scan area, that comprised approximately 100% of the total surface area for thesurvey unit, was scanned for elevated radiation levels. The area was scanned inaccordance with the FSS plan on March 24, 2007 and March 26, 2007.

Fifty-one (51) scan strips were initially established in this survey unit. Seven (7)elevated measurement locations were identified during scanning. Table 7 provides anoverview of the scan area survey. Scan results are provided in Attachment 2.

Revision 0 115

Page 17: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

1 thru 10 11.20 13.10 INone None

IlIthru 20 10.20 12.20 None None

21lthru 30 13.40 15.20 None None

9312-01 -ER-00-32- 1 9312-0001-020-19312-01 -ER-00-34- 1 9312-0001-021-1

31lthru 40 15.40 14.30 9312-01-ER-00-35-1 9312-0001-022-193 12-01-ER-00-36-1 9312-0001-023-19312-01 -ER-00-37- 1 9312-0001-024-1

41lthru 51 15.00 12.00 9312-01 -ER-00-4 1-1 9312-0001-025-19312-01 -ER-00-42- I 9312-0001-026-1

(1) The action level is based on a measurement in accordance with the FSS plan (MDC(DCGLEMC) Of2,000 cpm plus ambient background)

The off-site laboratory employed for the radiological analyses of samples wasGeneral Engineering Laboratories, LLC. The laboratory analyzed the fifteen (15)samples collected for non-parametric statistical testing, the associated field splits andthe four (4) judgmental samples using gamma spectroscopy. Gamma spectroscopyanalysis was performed to the required MDCs. Gamma spectroscopy resultsidentified some radionuclides meeting the accepted criteria for detection (i.e., a resultgreater than two (2) standard deviations uncertainty). However, Cs-137 was the onlygamma-emitting radionuclide reported in any appreciable concentration.

Cs-137 was positively identified in six (6) of the fifteen (15) samples collected fornon-parametric statistical testing. Co-60 was positively identified in one (1) samplefrom the statistical sample population. The mean of the gamma spectroscopicanalysis results for the sample population indicated that Cs-137 was present at levelsat or below expected environmental levels for Cs-137 within the vicinity of the HNPas presented in the Health Physics TSD BCY-HP-0063.

The "sum-of-fractions" or "unity rule" is the mathematical test used to evaluatecompliance with radiological criteria for license termnination when more than oneradionuclide has been determined to be potentially present. The combination of thefractions of each detected radionuclide against their respective Operational DCGLmust be less than or equal to one (1).

Revision 0 116

Page 18: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

The unity rule is:

Equation 3

C, C2 C,, •DCGL, DCGL 2 DCGL,,

Where: C,, concentration of radionuclide n and.DCGL,, = DCGL of radionuclide n.

A summary of the fifteen (15) samples collected for non-parametric statistical testingresults as well as the results of the unity rule calculation for the identifiedradionuclides are provided in Table 8.

93 12-000 1-OOIF 1 .28E-02 1 .39E-02

9312-0001-002F 7.15E-02 -7.8 1E-04 0.015

9312-0001-003F 0.OOE±00 2.42E-02

9312-0001-004F 6.82E-02 4.22E-04 0.014

9312-0001 -005F 5.55E-02 2. 14E-03 0.0 12

9312-0001 -006F 4.1 2E-02 2.0 1E-03 0.009

93 12-0001-007F -6.43E-03 -4.50E-03

9312-0001 -008F -2.1 7E-03 2.3 7E-03

9312-0001-009F 4.70E-03 -4.23E-03

9312-0001 -01 OF 7.99E-02 3.97E-03 0.017

9312-0001-011 IF -2.03E-02 2.57E-02 0.007

9312-0001-012F 1.20E-02 3.94E-03 0.003

9312-0001-013F 1.38E-02 2.02E-03

9312-0001-01 4F -6.46E-03 -1 .85E-03

9312-0001-015SF -2.30OE-03 1 .22E-02

(1) "-" indicate that the radionuclide was not positively detected in the sample(2) The Operational DCGL from Table 2 is 4.75 pCi/g for Cs-137 and 2.29 pCi/g for Co-60 to

achieve fifteen (15) mrem/yr TEDE respectively.

Revision 0 117

Page 19: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

In addition to the non-parametric statistical sample population, four (4) judgmentalsurface soil samples were taken at biased locations. These locations were selected bythe FSS Engineer based upon a review of the historical site assessment for this areaand previous survey results. These judgmental soil samples were analyzed forCs- 137, Co-60 and Sr-90 in accordance with the DQOs used during the survey design.A summary of the four (4) judgmental samples collected as well as the results of theunity rule calculation for the identified radionuclides are provided in Table 9.

9312-0001-016B 1.7 1E-02 -4.65 E-04

9312-0001-017Bj 5.01 E-04 6.58E-03-

9312-0001-018B -4.40E-03 7. 1 OE-03 0.0

93200109l.71E-02 5.30E-03 0.0

(1) -- " indicate that the radionuclide was not positively detected in the sample

(2) The Operational DCGL from Table 2 is 4.75 pCi/g for Cs-137 and 2.29 pCi/g for Co-60 toachieve fifteen (15) mrem/yr TEDE respectively.

(3) B = biased - indicates judgmental sample location

In addition to Cs-137 and Co-60, Sr-90 was also identified during the DQO processas a radionuclide of concern. Subsequently, all samples were subjected to analysis bygas proportional counting for Sr-90. All analyses met the required minimum MDC.

Sr-90 was not positively identified (i.e., a result greater than two (2) standarddeviations uncertainty) in any of the fifteen (15) samples collected for non-parametricstatistical testing nor in any of the judgmental soil samples. In addition to Sr-90, theoff-site laboratory also processed, as required by the sample plan, two (2) samples forthe full suite of HTD radionuclides as specified in LTP, Table 2-12, "RadionuclidesPotentially Present at Haddam Neck Plant" and as provided in Table 3. Therequested analyses included alpha spectroscopy, gas proportional counting, and liquidscintillation depending on the radionuclide and the measurement method. Allanalyses performed met the required minimum MDC. No other HTD radionuclideswere positively identified.

7. QUALITY CONTROL

The off-site laboratory processed the split samples and performed gammaspectroscopy analysis. One sample location was selected for analysis, which exceedsthe 5% minimum required by the LTP. The data were evaluated using USNRCacceptance criteria specified in Inspection Procedure 84750 as detailed in HNPProcedure RPM 5.1-24, "Split Sample Assessment for Final Status Survey ".

Revision 0 18

Page 20: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

Cs-137 was not detected in sufficient quantity in the field split results at location93 12-0001-003FS to evaluate in accordance with procedure. Evaluation using thereported results for naturally occurring K-40 resulted in acceptable agreementbetween the field-split results at this location.

The sample analysis vendor, General Engineering Laboratories, LLC, maintainsquality control and quality assurance plans as part of normal operation. Refer toAttach ments 3 and 4 for data and data quality analysis results

8. IN~VESTIGATIONS AND RESULTS

Seven (7) investigative surface soil samples were collected from several scan areasexhibiting elevated scan readings. These soil samples were analyzed for Cs-137,Co-60 and Sr-90 in accordance with the DQOs used during the survey design. TheInvestigative Sample designations are listed with the GPS coordinates in Table 10.

9312-0001-020-1 236596.22 668760.32

9312-0001-021-1 236591.06 668722.54

9312-0001-022-1 236588.64 668780.33

9312-0001-023-1 236591.73 668782.14

9312-0001-024-1 236593.28 668785.43

9312-0001-025-1 236598.60 668800.13

9312-0001-026-I 236600.66 668803.01

A summary of the seven (7) investigative samples collected as well as the results ofthe unity rule calculation for the identified radionuclides are provided in Table 11.

9312-0001-020-1 2.15E-03 2.76E-02

9312-0001-021-I -4.99E-03 -2.38E-02

9312-0001-022-1 1 .07E-02 -1I.59E-02

9312-0001-023-I -2.3 1E-02 7.70E-03

Revision 0 119

Page 21: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

0111 AtAA1AY)AA I KIr ~T OA I KM; Al)

9312-0001-025-1 5 .90E-03 1 .47E-02

9312-0001-026-I -1 .45E-02 8.34E-03

(4) "-" indicate that the radionuclide was not positively detected in the sample

(5) The Operational DCGL from Table 2 is 4.75 pCi/g for Cs-137 and 2.29 pCi/g for Co-60 toachieve fifteen (15) inrer/yr TEDE respectively.

(6) 1 = Investigation - indicates investigative sample location

Cs-137, Co-60 and Sr-90 were not positively identified in any of the seven (7)samples collected for investigation. Gamma spectroscopy results identified someradionuclides meeting the accepted criteria for detection (i.e., a result greater than two(2) standard deviations uncertainty). However, no gamma emitting radionuclide wasreported in any concentration greater than its respective MDC.

9. REMEDIATION AND RESULTS

Radiological remedial action as described by MARSSIM Section 5.4 was performedin this survey unit prior to FSS. All excavations were characterized and backfilledprior to performing FSS. In the area where remediation occurred, the ground area iscomprised of barren dirt with no vegetation, and the soils have been graded relativelyflat to the corresponding elevation of the adjacent survey units. The results forCs-137 following remediation were well below the Operational DCGL provided inTable 3. Health Physics TSD BCY-HP-0078, "ALARA Evaluation of SoilRemediation in Support of Final Status Survey, " determined that remediation beyondthat required to meet the release criteria is unnecessary and that the remainingresidual radioactivity in soil was ALARA.

10. CHANGES FROM THE FINAL STATUS SURVEY PLAN

No changes were made to the FSS plan.

11. DATA QUALITY ASSESSMENT (DQA)

The DQO sample design and data were reviewed in accordance with Procedure RPM5.1-23, "Data Quality Assessment, " for completeness and consistency. The samplingdesign had adequate power as indicated by the Retrospective Power Curve. The SignTest was performed on the data and compared to the original assumptions of theDQOs. The evaluation of the Sign Test results demonstrates that the survey unitpasses the unrestricted release criteria, thus, the null hypothesis is rejected.

Revision 0 220

Page 22: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 9312-0001

RELEASE RECORD

Documentation was complete and legible. Surveys and sample collection wereconsistent with the DQOs and were sufficient to ensure that the survey unit wasproperly designated as Class 1.

The preliminary data review consisted of calculating basic statistical quantities (e.g.,mean, median, standard deviation). The mean and median values are well below theOperational DCGL. Also, the retrospective power curve shows that a sufficientnumber of samples were cOllected to achieve the desired power. Therefore, thesurvey unit meets the unrestricted release criteria with adequate power as required bythe DQOs. The basic statistical quantities for the statistical sample population areprovided below in Table 9.

DCGLoP: 4.75E±00 2.29E±00 9.30E-01

Minimum Value: -2.03E-02 -4.50E-03 -3.49E-02

Maximum Value: 7.99E-02 2.57E-02 2.82E-02

Mean: 2.15E-02 5.43E-03 -3.5 1E-03

Median: 1.20E-02 2.14E-03 -7.40E-04

Standard Deviation: 3.28E-02 9.40E-03 1.44E-02

Cs-137 was positively detected in six (6) of the samples collected for non-parametricstatistical testing. The range of the data is less than one (1) standard deviation andthe data set exhibits a calculated positive skew of 0.74. The Cs-137 results arerepresented graphically through posting plots, a frequency plot, and a quantile plot.

Co-60 and Sr-90, although included in the FSS plan for compliance purposes, waspositively identified in only one (1) of the fifteen (15) samples collected for non-parametric statistical testing. Assessment of the basic statistical quantities andgraphical representation of Co-60 and Sr-90 was not considered useful given the non-existent number of actual data points to represent the distribution.

All data, assessments, and graphical representations are provided in Attachment 4.

12. ANOMALIES

No anomalies were noted.

13. CONCLUSION

Survey Unit 9312-0001 has met the final DQOs of the FSS plan. The ALARAcriteria for soils as specified in Chapter 4 of the LTP were achieved. ElevatedMeasurement Comparison was not required.

Revision 0 21

Page 23: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

All positively identified radionuclides of concern were used for statistical testing todetermine the adequacy of the survey unit for FSS.

The sample data passed the Sign Test. The null hypothesis was rejected. TheRetrospective Power Curve generated using COMPASS shows adequate power wasachieved. The survey unit is properly designated as Class 1.

The dose contribution from soil is 0.10 mremlyr TEDE based on the averageconcentration of the samples used for non-parametric statistical sampling.

This survey area is affected by existing groundwater (reference CY memo ISC 06-024); therefore the dose contribution from existing groundwater is bounded at two (2)mrem/yr TEDE.

This survey unit is considered impacted by future groundwater radioactivecontamination, as there are underground foundations containing residual radioactivematerial within the groundwater saturated zone in the area (reference CY memo ISC06-024). The dose contribution from future groundwater, the third dose component,is bounded by two (2) mremlyr TEDE.

The average total dose from residual radioactivity in this survey unit, includingexposures from the three (3) components as described in Section 3, that is, residualradioactivity in soil, existing groundwater radioactivity, and future groundwaterradioactivity from the burial of concrete foundations or footings from site buildingscontaining residual radioactivity will not exceed 4.10 mremlyr TEDE. Therefore,Survey Unit 9312-0001 is acceptable for unrestricted release.

14. ATTACHMENTS

14.1 Attachment 1 - Figures

14.2 Attachment 2 - Scan Results

14.3 Attachment 3 - Laboratory Results

14.4 Attachment 4 - DQA Results

Revision 0 222

Page 24: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 1 (FIGURES)

Revision 0

Page 25: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

= Wet Land

Notes

Notes

Coordinates =etinNAD27ConnwatscntState PAme System,

Connecticut Yankee A tomic Power Company

Survey Unit 9312-0001

Page 26: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

016 F8

p002

)005 = &umpk La..fton forNwnparamct Tooqg

0010004

9312-0002 O Svmpk LOc.Irn frM0Jaudgm=(.Io)Ssmpko

fl09q 9312-9003)003

)014)008

o013

ff 5Nofto

0 15 30I FW

No-o

Coot&UMagcM ainNAD27 Co,,at~cotstate PI,,,, Syotwo

Connecticut Yankee Atomic Power CompanyDesigned Sample Location Map for Survey Unit 9312-0001

Page 27: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

0017O. 0 72

".41-11. 004

-A0. 020

9312-;00059312-0006

.013

_V. 000

c&. 7

0.056 0 = Spj mletionbt forNo--pemmtn T-Win

,,0.080-V068

9312-90027jO. 005 9312-0)003

-0. 006)-0.002

Oswnk DLonhon fiW0Jougmcdi S=Vk

N-to

o Is 30

Nofty

NAD27Comineticustate PJ.,C System

)0.014

Op. 0.1~i2 _

3-'Connecticut Yankee Atomic Power CompanySurvey Unit 9312-0001 Final Status Survey DesignCs-13 7Posting Plot

IDate: April2007Figure 3

i Revision: 0

Page 28: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

0.000> 007)-4.001

026)0.002 - Sample Locaboo for

No.-parametWc Tahtig

014)0.004

30.000W32-0002 O Sample LM".~ f-,

0 Ja4~7Teval S&Vepes

Ž.,0.004 1312-0003)0.024

)-0.002)0.002

.50-0 05)0.002

ý 40. *-012,N-te

0 II 30

Not-s

Coordauotes are inNAD27 Coonocbtcostate Pboo Systemt

Connecticut Yankee Atomic Power CompanySurvey Unit 9312-0001 Final Status Survey DesignCo-60 Posting Plot

Page 29: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

025(9kJ

023 ý-024020 0 jj 022

O =Sample Loc.-Don for0S&Z klrtvmbga

/

9312-60005

9312-0002I I

9312-0003

Nomes

0 15 30ýý Fn

Notes

Coomstinotmres,NAD27COMMOC~tctstate Plante SystemLL

Connecticut Yankee Atomic Power CompanyInvestigative Sample Location Map for Survey Unit9312-0001

FigureS5Date: April2007

Revision: 0

Page 30: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

0.006 0 Sampk Loctom for&M~ &-'to

9312-00059312-0006

-0023,ý,,O 0i"'0.0110.002 -. 0

9312-00029312-0003

N-ft

o 15 30E

Noto

Cmrdioato =o inNAD27C-oor cktSwae Pl~e SystmsII.

Figure 6

Connecticut Yankee Atomic Power Company9312-0001 Investigative Soil SamplesPosting Plot for Cs-137

IDate:- Apri2007

IRevision: 0

Page 31: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 2 (SCAN RESULTS)

Revision 0

Page 32: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Survey Unit 9312-0001 Scan Survey ResultsSample Location Scans

Survey Location Log Date Log Time Reading Alarm >Alarm E-600 SIN Probe SINLevel Level

9312-01-BL-00-01-0 3/24/2007 10:04:00 8.52E+03 1117 10089312-01 -SL-00-01 -0 3/24/2007 10:04:00 7.64E+03 1 .05E+04 1117 10089312-01 -BL-00-02-0 3/24/2007 10:07:00 8.94E+03 1117 10089312-01-SL-00-02-0 3/24/2007 10:07:00 9.73E+03 1.09E+04 1117 10089312-01 -BL-00-03-0 3/24/2007 10:08:00 9.1 9E+03 1117 10089312-01-SL-00-03-0 3/24/2007 10:09:00 1.02E+04 1.12E+04 1117 10089312-01 -BL-00-04-0 3/24/2007 10:10:00 8.89E+03 1117 10089312-01 -SL-00-04-0 3/24/2007 10:11:00 1.03E+04 1.09E+04 1117 10089312-01 -BL-00-05-0 3/24/2007 10:12:00 9.33E+03 1117 10089312-01-SL-00-05-0 3/24/2007 10:12:00 9.45E+03 1.13E+04 1117 10089312-01 -BL-00-06-0 3/24/2007 10:13:00 8.66E+03 1117 10089312-01-SL-00-06-0 3/24/2007 10:14:00 8.64E+03 1.07E+04 1117 10089312-01 -BL-00-07-0 3/24/2007 10:21:00 8.70E+03 1117 10089312-01 -SL-00-07-0 3/24/2007 10:22:00 9.52E+03 1 .07E+04 1117 10089312-01 -BL-00-08-0 3/24/2007 10:20:00 1 .OOE+04 1117 10089312-01 -SL-00-08-0 3/24/2007 10:20:00 9.92E+03 1.20E+04 1117 10089312-01 -BL-00-09-0 3/24/2007 10:19:00 1 .24E+04 1117 10089312-01 -SL-00-09-0 3/24/2007 10:19:00 1 .24E+04 1 .44E+04 1117 10089312-01 -BL-00-1 0-0 3/24/2007 10:17:00 1 .22E+04 1117 10089312-01 -SL-00-1 0-0 3/24/2007 10:18:00 1.21 E+04 1.42E+04 1117 10089312-01 -BL-00-1 1-0 3/24/2007 10:16:00 1 .02E+04 1117 10089312-01 -SL-00-1 1-0 3/24/2007 10:17:00 1.10E+04 1.22E+04 1117 10089312-01 -BL-00-1 2-0 3/24/2007 10:24:00 9.44E+03 1117 10089312-01-SL-00-12-0 3/24/2007 10:24:00 1.08E+04 1.14E+04 1117 10089312-01 -BL-00-1 3-0 3/24/2007 10:25:00 8.83E+03 1117 10089312-01 -SL-00-1 3-0 3/24/2007 10:25:00 9.42E+03 1.08E+04 1117 10089312-01 -BL-00-14-0 3/24/2007 10:27:00 1.01 E+04 1117 10089312-01-SL-00-14-0 3/24/2007 10:27:00 1.05E+04 1.21 E+04 1117 10089312-01 -BL-00-1 5-0 3/24/2007 10:26:00 9.46E+03 1117 10089312-01-SL-00-15-0 3/24/2007 10:26:00 1.03E+04 1.15E+04 1117 10089312-01 -BL-00-1 6-0 3/24/2007 10:30:00 7.62E+03 1117 10089312-01-SL-00-16-0 3/24/2007 10:31:00 7.79E+03 9.62E+03 1117 10089312-01 -BL-00-1 7-0 3/24/2007 10:14:00 9.63E+03 1117 10089312-01 -SL-00-1 7-0 3/24/2007 10:15:00 1.03E+04 1.16E+04 1117 10089312-01 -BL-00-1 8-0 3/24/2007 10:28:00 9.96E+03 1117 10089312-01-SL-00-18-0 3/24/2007 10:29:00 9.96E+03 1.20E+04 1117 10089312-01-BL-00-19-0 3/24/2007 10.22.00 7.95E+03 1117 10089312-01-SL-00-19-0 3/24/2007 10:23:00 8.72E+03 9.95E+03 1117 1008

5/2/2007 1o1 of 1

Page 33: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Survey Unit 9312-0001 Scan Survey ResultsScan Strip Scans

Survey Location Log Date Log Time Reading Alarm >Alarm E-600 S/N Probe S/NLevel Level9312-01-BC-00-01-0 3/24/2007 13:41:00 9.85E+03 1107 10079312-01-SC-00-01-0 3/24/2007 13:47:00 8.44E+03 1.19E+04 1107 10079312-01 -BC-00-02-0 3/24/2007 13:48:00 8.89E+03 1107 10079312-01 -SC-00-02-0 3/24/2007 13:51:00 1.02E+04 1.09E+04 1107 10079312-01 -BC-00-03-0 3/24/2007 13:53:00 1. 11 E+04 1107 10079312-01 -SC-00-03-0 3/24/2007 13:58:00 1 .03E+04 1.31 E+04 1107 10079312-01 -BC-00-04-0 3/24/2007 14:00:00 9.79E+03 1107 1007.9312-01 -SC-00-04-0 3/24/2007 14:06:00 1. 12E+04 1. 18E+04 1107 10079312-01 -BC-00-05-0 3/24/2007 14:06:00 9.92E+03 1107 10079312-01-SC-00-05-0 3/24/2007 14:12:00 8.1 OE+03 1. 19E+04 1107 10079312-01 -BC-00-06-0 3/24/2007 14:14:00 8.32E+03 1107 10079312-01 -SC-00-06-0 3/24/2007 14:20:00 1.01E+04 1.03E+04 1107 10079312-01 -BC-00-07-0 3/24/2007 14:22:00 1.OOE+04 1107 10079312-01 -SC-00-07-0 3/24/2007 14:28:00 9.1 5E+03 1 .20E+04 1107 10079312-01 -BC-00-08-0 3/24/2007 14:30:00 8.53E+03 1107 10079312-01 -SC-00-08-0 3/24/2007 14:33:00 1 .02E+04 1 .05E+04 1107 1007931 2-01 -BC-00-09-0 3/24/2007 14:34:00 9.82E+03 1107 10079312-01 -SC-00-09-0 3/24/2007 14:37:00 8.33E+03 1.18E+04 1107 10079312-01-BC-00-10-0 3/24/2007 14:38:00 9.03E+03 1107 10079312-01-SC-00-10-0 3/24/2007 14:41:00 9.89E+03 1.10E+04 1107 10079312-01 -BC-00-1 1 -0 3/24/2007 14:42:00 9.68E+03 1107 10079312-01 -SC-00- 11 -0 3/24/2007 14:45:00 9.42E+03 1. 17E+04 1107 10079312-01-BC-00-12-0 3/24/2007 14:46:00 9.19E+03 1107 10079312-01 -SC-00-1 2-0 3/24/2007 14:48:00 1.02E+04 1.12E+04 1107 10079312-01 -BC-00-1 3-0 3/24/2007 14:49:00 1 .02E+04 1107 10079312-01-SC-00-13-0 3/24/2007 14:51:00 8.89E+03 1.22E+04 1107 10079312-01 -BC-00-1 4-0 3/24/2007 14:52:00 9.30E+03 1107 10079312-01 -SC-00-1 4-0 3/24/2007 14:54:00 1 .OOE-'04 1.1 3E+04 1107 10079312-01 -BC-00-1 5-0 3/24/2007 14:56:00 9.54E+03 1107 10079312-01-SC-00-15-0 3/24/2007 14:58:00 8.50E+03 1. 15E+04 1107 10079312-01 -BC-00-1 6-0 3/24/2007 14:58:00 8.61 E+03 1107 10079312-01-SC-00-16-0 3/24/2007 15:01:00 8.35E+03 1.06E+04 1107 10079312-01-BC-00-17-0 3/24/2007 15:02:00 8.74E+03 1107 10079312-01-SC-00-17-0 3/24/2007 15:04:00 8.86E+03 1.07E+04 1107 10079312-01-BC-00-18-0 3/24/2007 15:05:00 8.92E+03 1107 10079312-01 -SC-00-1 8-0 3/24/2007 15:08:00 8.96E+03 1.09E+04 1107 10079312-01-BC-00-19-0 3/24/2007 15:09:00 9.31 E+03 1107 10079312-01-SC-00-19-0 3/24/2007 15:11:00 9.72E+03 1.13E+04 1107 10079312-01 -BC-00-20-0 3/24/2007 15:12:00 9.42E+03 1107 10079312-01-SC-00-20-0 3/24/2007 15:14:00 9.43E+03 1.14E+04 1107 10079312-01-BC-00-21-0 3/24/2007 15:15:00 9.59E+03 1107 10079312-01 -SC-00-21 -0 3/24/2007 15:17:00 1.08E+04 1.16E+04 1107 10079312-01 -BC-00-22-0 3/26/2007 8:01:00 8.88E+03 1107 10079312-01 -SC-00-22-0 3/26/2007 8:09:00 1.04E+04 1.09E+04 1107 1007

5/2/2007 1o1 of 3

Page 34: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Survey Unit 931 2-0001

Survey Location

9312-01 -BC-OO-23-O9312-01 -SC-00-23-09312-01 -BC-00-24-09312-01 -SC-00-24-09312-01 -BC-00-25-09312-01 -SC-00-25-09312-01 -BC-00-26-09312-01 -SC-00-26-09312-01 -BC-00-27-09312-0 1-SC-00-27-09312-01 -BC-00-28-09312-01 -SC-00-28-09312-01 -BC-00-29-09312-01 -SC-00-29-09312-01 -BC-00-30-09312-01 -SC-00-30-09312-01 -BC-00-31-0931 2-01-SC-00-31-0931 2-01-BC-00-32-0931 2-01-SC-00-32-09312-01 -ER-00-32-1

9312-01 -BC-00-33-09312-01 -SC-00-33-09312-01 -BC-00-34-09312-01 -SC-00-34-09312-01 -ER-00-34-19312-01 -BC-00-35-09312-01 -SC-00-35-09312-01 -ER-00-35-19312-01 -BC-00-36-09312-01 -SC-00-36-09312-01 -ER-00-36-19312-01 -BC-00-37-09312-01 -SC-00-37-09312-01 -ER-00-37-19312-01 -BC-00-38-09312-01 -SC-00-38-09312-01 -BC-00-39-09312-01 -SC-00-39-09312-01 -BC-00-40-09312-01 -SC-00-40-0

93 12-01 -BC-00-41-09312-01 -SC-00-4 1-09312-01-ER-00-41-1

Scan Survey ResultsScan Strip Scans

Log Date

3/26/20073/26/2007

Log Time

8:10:008:13:00

Reading

1 .25E+041.13E+04

Alarm >AlarmLevel Level

1 .45E+043/26/2007 8:18:00 1.20E+043/26/2007 8:22:00 1 .26E+043/26/2007 8:23:00 7.17E+033/26/2007 8:25:00 8.41 E+033/26/2007 8:27:00 9.58E+033/26/2007 8:30:00 1.11E+043/26/2007 8:31:00 1 .32E+043/26/2007 8:35:00 1 .34E+043/26/2007 8:35:00 1 .27E+043/26/2007 8:40:00 1. 19E+043/26/2007 8:42:00 8.98E+033/26/2007 8:42:00 9.74E+033/26/2007 9:51:00 1.08E+043/26/2007 9:53:00 1.16E+043/26/2007 9:54:00 1.29E+043/26/2007 9:57:00 1 .30E+043/26/20073/26/20073/26/2007

9:58:0010:05:0013:49:00

1. 11E+041.17E+041 .52E+04

3/26/2007 10:05:00 9.95E+033/26/2007 10:06:00 9.97E+03

1 .40E+04

9.17E+03

1.16E+04

1.52E+04

1 .47E+04

1.10E+04

1.28E+04

1 .49E+04

1.31 E+041.31 E+04

1 .20E+04

1 .37E+041 .37E+04

1 .32E+041 .32E+04

1 .43E+041 .43E+04

1.25E+041.25E+04

1 .44E+04

1 .23E+04

1 .26E+04

1. 15E+041. 15E+04

+

E-600 SIN

11071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107110711071107

Probe SIN

10071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007100710071007

3/26/20073/26/20073/26/20073/26/20073/26/20073/26/20073/26/20073/26/20073/26/20073/26/20073/26/20073/26/2007

10:07:0010:15:0013:51 :0010:17:0010:22:0013:51 :0010:23:0010:28:0013:52:0010:29:0010:36:0013:53:00

1.17E+041.22E+041.42E+041.12E+041.16E+041 .49E+041.23E+041.10E+041 .54E+041.05E+041.23E+041.54E+04

+

+

+

+

3/26/2007 10:38:00 1.24E+043/26/2007 10:42:00 1.18E+043/26/2007 10:43:00 1.03E+043/26/2007 10:47:00 1.13E+043/26/2007 10:49:00 1.06E+043/26/2007 10:54:00 1.02E+043/26/20073/26/20073/26/2007

10:55:0011:00:0013:54:00

9.45E+031 .02E+041.41 E+04 +

5/2/2007 2o2 of 3

Page 35: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Survey Unit 9312-0001 Scan Survey ResultsScan Strip Scans

Survey Location Log Date Log Time Reading Alarm >Alarm E-600 SIN Probe SINLevel Level9312-01 -BC-0O-42-0 3/26/2007 11:22:00 1 .OOE+04 1107 10079312-01 -SC-00-42-0 3/26/2007 11:26:00 9.38E+03 1 .20E+04 1107 10079312-01-ER-00-42-1 3/26/2007 13:55:00 1.50E+04 1.20E+04 + 1107 10079312-01 -BC-00-43-0 3/26/2007 11:26:00 9.02E+03 1107 10079312-01 -SC-00-43-0 3/26/2007 11:30:00 9.80E+03 1.10E+04 1107 10079312-01 -BC-00-44-0 3/26/2007 11:32:00 1. 11 E+04 1107 10079312-01 -SC-00-44-0 3/26/2007 11:35:00 9.47E+03 1.31E+04 1107 10079312-01-BC-00-45-0 3/26/2007 11:36:00 9.52E+03 1107 10079312-01-SC-00-45-0 3/26/2007 11:38:00 1.03E+04 1.15E+04 1107 10079312-01 -BC-00-46-0 3/26/2007 11:39:00 9.OOE+03 1107 10079312-01 -SC-00-46-0 3/26/2007 11:42:00 8.45E+03 1.10OE+04 1107 10079312-01 -BC-00-47-0 3/26/2007 11:43:00 8.82E+03 1107 10079312-01 -SC-00-47-0 3/26/2007 11:45:00 1 .02E+04 1 .08E+04 1107 10079312-01 -BC-00-48-0 3/26/2007 11:47:00 9.73E+03 1107 10079312-01 -SC-00-48-0 3/26/2007 11:50:00 8.26E+03 1.17E+04 1107 10079312-01-BC-00-49-0 3/26/2007 11:51:00 8.54E+03 1107 10079312-01 -SC-00-49-0 3/26/2007 11:54:00 1 .02E+04 1 .05E+04 1107 10079312-01 -BC-00-50-0 3/26/2007 11:56:00 1.01 E+04 1107 10079312-01 -SC-00-50-0 3/26/2007 11:58:00 8.94E+03 1.21 E+04 1107 10079312-01 -BC-00-51 -0 3/26/2007 12:00:00 9.07E+03 1107 10079312-01 -SC-00-51 -0 3/26/2007 12:02:00 1.05E+04 1. 11 E+04 1107 1007

5/2/2007 3o3 of 3

Page 36: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 9312-0001

RELEASE RECORD

ATTACHMENT 3 (LABORATORY DATA)

Revision 0

Page 37: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GeneralNarrative

Page 1 of 10

Page 38: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

General Narrativefor

Connecticut Yankee Atomic Power Co.Work Order: 183245SDG: MSR#07-0129

April 04,2007

Laborato~ry Identification:

GEL Laboratories LLC2040 Savage RoadCharleston, South Carolina 29407(843) 556-8171

Summary

Sample receipt

The samples arrived at GEL Laboratories LLC, Charleston, South Carolina on March 29, 2007 for analysis.Shipping container temperatures were checked, documented, and within specifications. The samples weredelivered with proper chain of custody documentation and signatures. All sample containers arrived without anyvisible signs of tampering or breakage.

Sample Identification The laboratory received the following samples:

LaboratoryIdentification183245001183245002183245003183245004183245005183245006183245007183245008183245009183245010183245011183245012183245013183245014183245015183245016183245017183245018183245019183245020183245021183245022183245023183245024183245025

SampleDescription9312-0001 -001F9312-0001 -002F9312-0001 -003F9312-0001 -003FS9312-0001-004F9312-0001 -00SF9312-0001 -006F93 12-000 1-007F9312-0001 -008F9312-0001 -009F9312-0001 -01OF9312-0001 -01 IF9312-0001-012F9312-0001-013F9312-0001-014F9312-0001-015F9312-0001-016B9312-0001-017B9312-0001-018B9312-0001-019B9312-0001-020-19312-0001-021-19312-0001-022-19312-0001-023-19312-0001-024-1

GEL Laboratories Pfige 2 P(9jBqxp~l 2 Charleston, SC 29417 2040 Savage Road Charleston, SC 29407 P 843.556.8171 F 843.766.1178 w glcmwww.gol.com

Page 39: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

183245026 9312-0001-025-1183245027 9312-0001-026-1

Items of Note

There are no items to note.

Case Narrative

Sample analyses were conducted using methodology as outlined in GEL Laboratories, LLC (GEL) StandardOperating Procedures. Any technical or administrative problems during analysis, data review, and reduction arecontained in the analytical case narratives in the enclosed data package.

Analytical Requ~est

Twenty-five soil samples were analyzed for FSSGAM and Strontium-90. Two soil samples were analyzed forFSSALL.

Data Package

The enclosed data package contains the following sections: General Narrative, Chain of Custody and SupportingDocumentation, Data Review Qualifier Definitions, and data from the following fractions: Radiochemistry.

I certify that this data package is in compliance with the SOW, both technically and for completeness, for otherthan the conditions detailed above. Release of the data contained in this hard copy data package has beenauthorized by the Laboratory Manager or a designee, as verified by the following signature.

o~_'Cheryl JonesProject Manager

GEL Laboratories Kge 3 P(918fX1W1 2 Chafesof, SC 29417 2040 Savage Road Charlesmn. SC 29407 P 843.556.8171 F 843.766.1178 wwg~owww.gol.com

Page 40: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

List of current GEL Certifications as of 29 March 2007

StateCertificationAlaska UST-062ArizonaArkansas

AZ066888-065 1

42DO904046CLIACaliforniaColorado

Connecticut

i01 151CA

GenEngLabs

Dept. of NavyEPA

Florida/NELAPGeorgiaHawaii

PH-0169NFESC 413

WG-15JE87 156

E871 56 (FL/NELAP)N/A

IdahoIllinoisIndianaKansas

N/A200029

C-SC-01E-10332

90129KentuckyLouisianaMaryland

MassachusettsMichiganNevada

New JerseyNew Mexico

03046270

M-SCO1 29903SC 12

SCO02FL NELAP E87156

11501233

New YorkNorth Carolina

North Carolina Drinking WNorth Dakota-

OklahomaPennsylvania

South Carolina

45709R-1589904

68-00485101 20001/10595001/10120002

TennesseeTexas

Texas NELAPU.S. Dept. of Agriculture

US Army Corps of EngineerUtah

VTermont_________Virginia_____.

- -_____Washington__

02934TX2I 3-2006A

Ti104704235-06-TXS-52597

N/A8037697376 GEL-

VT87 15600151C 1641

Page 4 of 110

Page 41: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Chain of Custodyand

SupportingDocumentation

Page 5 of 110

Page 42: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

ON

0C0NCCCl6

000

r=Ili

uC

O =

V)-

a) u~

z

0000)0)0)EE0C)

01,

a)0(9

VO

a) Z

ODrE E

l

:itCO

0

-~

* t-t-1--t-t-t-t-t-I-1-1--i-

Ca13

a),

TIIV

SS

A

06-JS W' IA

VD

SSA

00

o cq

aN

a4P(P

4P

o

LPO

Pw

"

00X

C.

______

(D___________

0____

__D

__

0

0

(D

--

--

0Y0z

0L)

0C.

43~0

0

a)2C

0 =

T

"N

t I-

tn~

tn

Cl

0

Ea)

I-)

~00

a) -

cO

d

Z)

a)a)CO

a)a)Ua)

C-0

a)a)~C

O

a).00~C

O

a)

arC

00

.4

N

0 q

M0

a) N

NN

NN

NN

NN

t-N-a

000000010101010

~_____ 1111C

lClC

lClC

l1

Cl

1C

l1

CliC

l

a)a)CO

-0,a).0a)

Ca)

00000Cl

ON

ClA

0:

Clý

ON

00000Cl

ON

Cl

C)

0*C

lC

l

0000000Cl

CrC

ON

ON

\

C)

C>

-

Cl

Page 6 of 110

Page 43: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Connecticut Yankee Atomic Power Company Chain of Custody Form No. 2007-00092362 Injun Hollow Road, East Hampton. CT 06424860-267-2556 ____ ____ _____________________ _______________________

Project Name: Haddam Neck Decommissioning

Contact Name & Phone:Jack McCarthy 860-267-3924

Analytical Lab (Name, City, State):General Engineering Laboratories2040 Savage RoadCharleston, SC 29407ATT: Cheryl Jones ( 843-556-8171)

Priority:D[30OD. E 15 D. 07D.Other: ___________

Analyses Requested Lab Use Only-- F 7 7 I

Comments:MediaCode

SampleTypeCode

ContainerSize-

&TypeCode

C)

Sample Designation Date Time Comment, Preservation

9312-0001-OIIF 3/24/07 1100 TS G BP X_________9312-0001-012F 3/24/07 1103 TS G BP X __ ________

9312-0001-013F 3/24/07 1105 TS G BP X __

9312-000,1-014F 3/24/07 1110 TS G BP X_______________9312-0001-015F 3/24/07 1112 TS G BP X____________931,2-0001-016B 3/24/07 1116 TS G BP X_________9312-0001-017B 3/24/07 1120 TS G BP X __ ____ ___________

9312-0001-018B 3/24/07 1124 TS G BP X9312-0001-019B 3/24/07 1128 TS G BP X_____

NOTES: P0 #: 002332 MSR #: 07-0129 Z LTP QA El Radwaste QA ElNon QA

1)RD te/Time 2) Rneived By Date/Time

3) ~ ~ ~ ~ ~1 Reinuihe ByDteTme 4 /IAe B

3) Relinquished By Date/Time 6) Reeived By Date/Time

Samples Shipped Via:SFed ExElUPS

7-1 Hand

LIOther

Bill of Lading #

Internal ContainerTemp.:.__ Deg. C

Custody. Sealed?Custody Seal Intact?

YC NO

5) Relinquished By Date/Time 6) Received By Date/Time

Page 44: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Connecticut Yankee Atomic Power Company Chain of Custody Form No. 2007-00 .099362 Injun Hollow Road, East H-ampton, CT 06424

860-267-2556 ___ ____ ____ ______________________ ____________________ _____

Project Name: Haddam Neck Decommissioning Analyses Requested' SLab Use Onlyr *

Contact Name & Phone:Jack McCarthy 860-267-3924

Comments:MediaCode

SampleTypeCode

ContainerSize-

&TypeCode

Analytical Lab (Name, City, State):General Engineering Laboratories2040 Savage RoadCharleston, SC 29407ATT: Cheryl Jones ( 843-556-8171)

Priority: 0 30 D. El 15 D. Z 7 D.Other:_____

00CI-

;0Sample Designation Date Time Comment, Preservation

9312-0001-020-1 3/26/07 1348 TS G BP X- --

9312-0001-021-1 ___ 3/26/07 1350 TS G BP X_____________9312-0001-022-1 3/26/07 1351 TS G BP X __________

9312-0001-023-1 3/26/07 1352 TS G BP X________________93 12-0001-024-1 3/26/07 1353 TS I G BP X _____ __ __ _________

93 12-0001-025-1 3/26/07 1354 TS G BP X ________________

9312-0001-026-1 3/26/07 1355 TS G BP X __

NOTES: PO 4!: 002332 MSR #- 07-0 129 Z LTP QA Eli Radwaste QA EL Non QA

1) Relinciy D t/Time 2)Rc e yDate/Time3) Relnquishd By at/ime 4) Recived By aeTm

5) Relinquished ,By Date/Time 6) Recived By D ate/Time

Samples Shipped Via:0 'Fed ExF1 UPS.Hý Hand

ELI Other

Bill of Lading#

Internal. Container.Temp.:. D eg. C

Custod'v Sealed?Custody Seal Intact?

YJ0 N 0

5) Relinquished By Date/Time 6) Received By Date/Time

Page 45: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Connecticut YankeeStatement of Work for Analytical 'Lab Services .CY-lsc-SOW-o0l

Figure 1. :Sample Check-in List

*Date/Time Received:_=t .. )12"/6L

SDG#- L~1 ZI )~)O?

Work Order Number: tj3 cV3Z5

,Shipping Cctntainer ID:-8 Se E tZ Cano utdy# 5e cmtn-. PV-

I. Custody Seals. oai shipping container intact?:.. Yes No [

2. Custody Seals dated and. signed? Yes WNo[

3. Chain-of-Custody record present? Yes I~No[IJ

4. Cooler temperature 5e e-, 6-EL. 6fk* .ericltepakigmaterials -is: *Wet []Dry-

6:' Number of samples in shipping contain'r _79

7. Sample holding times exceeded? Yes.( No J~j'

.8. Samples have-'

j tape -hazard labels

.jutody seals * zipropriate sample labels

9. Samples are-.

.. 4ngood condition leaking

broken __have air bubbles

10. Were any anomnalies iden~ti~fied in sample receipt? Yes [1No

II.. ,Description of anomalies. (include samnple numbers):.

Sample. CustodiantLab~oratory:,

Telephoned to:______________

__________ 72777. '1

: .FV-J

Page 9 of 110

Page 46: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

w SAMPLE RECEIPT & REVIEW FORM

PM use onlyfClient: ýJ 3\-SDG/ARCOC/Work Order: 1 %&2-43, I &3234$5, 193Z-'ý-Date Received: 3:i 91.0-4i PM(A) Review (ensure non-con-formi sitems Ore resolved prior to signing);

Received By: JTy

Sample Receipt Criteria 0 Comments/Qualifiers. (Required for Non-Conforming Items)

- - -

Shipping c ainers received Circle Applicable: seals broken damaged container leaking container other (describe)

Iintact and s~eale

Samples requiring icolý' Circle Coolant #' ice bags blue ice dry ice none other describei

2 preservation within (4 +1/- 2' ?ReodPreservation method. __________________________

Chain of custody documentsincluded with shipment? __________________________Sample containers intact and Circle Applicable: seals broken damaged container leaking container other (describe)

sealed?________________________________

5Smlsrqiigchemical Sample ID's. containers affected and observed pH:

__ reserv-ation at proper PH?VOA vials free of headspace Ssrnp IDsand containers affected:

6 (defined as < 6mm bubble)?

Are Encore containers present?7 (if yes, immediately deliver to

__VOA laboratory)Samples received. within holding Id's and tests affected:

8_ time'?

SSample ID's-on COC match ID's Sample ID's and containers affect

9on bottles?

,10Date & time on COGC match date Sample ID's affected:

& timne on bottles?

Number of containers received Sample ID's affected.

match number indicated on COG?

12COC form is properly signed in12relinquished/received sections?

Air Bill ,Tracking #'s, & 7q , 0 1Z-41 `i36 ' -2-3- 7'Z 5,& S1 3Z14Additional Comments 7"15 S376-( '-4-Ou -7,ý 7'7 -8t ~3-

7 - 71 7 55Y S

T ~RSO RAD Receipt # ___________

SuspctedHazad Inormaion 11 *If > x2 area background is observed on samples identified as "non-

Susi~ctd HaardInfrmaton ~ Iregulated/non-radioactive", contact the Radiation Safety group for further

A fRadiological Classitication? IIMaxirnum Counts Observed*: ZZC'"*PCB Regulated?

Shipped as DOT1 Hazardous

C Material? If yes, contact Waste

Manager or ESH Manager.Y _1? Regulated as a Foreign Soil

lazard Class Shipped:

IN#i:ls QA ( ae bli~t1PM (or PMA) review of Hazard classification:

Page 10 of 110

Page 47: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

V

-JuJC,

SAMPLE RECEIPT & REVIEW FORMCONTINUATION FORM

/

Client: 14 N V- Date.Received: jT- V age /of

z-oo7- 49ooo

Ze,)o,7- 001 I o

zeoo7- 00o'cil

2o1~oi P)

Page I11 of 10

Page 48: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Data Review QualifierDefinitions

Page 12 of 110

Page 49: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Data Review Qualifier Definitions

Qualifier Explanation

* A quality control analyte recovery is outside of specified acceptance criteria

** Analyte is a surrogate compound

* Result is less than value reported

* Result is greater than value reported

RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RL

A The TIC is a suspected aldol-condensation product

* Target analyte was detected in the associated blank

B Metals-Either presence of analyte detected in the associated blank, or

MDL/IDL < sample value < PQL

BD Results are either below the MDC or tracer recovery is low

C Analyte has been confirmed by GC/MS analysis

D Results are reported from a diluted aliquot of the sample

d 5-day SOD-The 2:1 depletion requirement was not met for this sample

E Organics-Concentration of the target analyte exceeds the instrument calibration range

E Metals-%difference of sample and SD is >10%. Sample concentration must meet flagging criteria

H Analytical holding time was exceeded

h Preparation or preservation holding time was exceeded

J Value is estimated

N Metals-The Matrix spike sample recovery is not within specified control limits

N Organics-Presumptive evidence based on mass spectral library search to make a tentative

identification of the analyte (TIC) . Quantitation is based on nearest internal standard

response factor

N/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration

by 4X or more

ND Analyte concentration is not detected above the reporting limit

UT Gamma Spectroscopy-Uncertain identification

X Consult Case Narrative, Date Summary package, or Project Manager concerning this qualifier

Y QC Samples were not spiked with this compound

Z Paint Filter Test-Particulates passed through the filter, however no free liquids were observed.

GEL Laboratories Ikrge 1 ý0ýPqU~?2 Charleston, SC 29417 2040 Savage Road Charleston, SC 29407 P 843.556.8171 F 843.765.1178 www.gal.com

Page 50: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

RADIOLOGICALANALYSis

Page 14 of 110

Page 51: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Radiochemistry Case NarrativeConnecticut Yankee Atomic Power Co. (YANK)

Work Order 183245

Method/Analysis Information

Product: Aiphaspec Am241, Cm, Solid ALL FSS

Analytical Method: DOE EML HASL-300, Am-05-RC Modified

Prep Method:

Dry Soil Prep GL-RAD-A-021 Method:

Analytical Batch Number:

Prep Batch Number:

Dry Soil. Prep GL-RAD-A-021 Batch Number:

Ash Soil Prep

Dry Soil Prep

621107

621096

621094

Sample ID1832450061832450161201305240120130524112013052421201305243

Client ID9312-0001 -005F9312-0001-015SFMethod Blank (MB)183245006(9312-0001 -00SF) Sample Duplicate (DUP)183245006(9312-0001 -00SF) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-0l I REV# IS.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample GeometryAll counting sources were prepared in the same geometry as the calibration standards.

Page 15 of 110

Page 52: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Oualitv Control (0C) Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245006 (93 12-0001 -005F).

QC InformationAll of the QC samples met the required acceptance limits.

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisNone of the samples in this sample set required reprep or reanalysis.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Manual IntegrationNo manual integrations were performed on data in this batch.

Additional Comments

Additional comments were not required for this sample set.

Gualifier information

Manual qualifiers were not required.

Method/Analysis Information

Page 16 of 110

Page 53: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Product: Liquid Scint Pu241, Solid-ALL FSS

DOE EML HASL-300, Pu- I I -RC ModifiedAnalytical Method:

Prep Method:

Dry Soil Prep GL-RAD-A-021 Method:

Analytical Batch Number:

Prep Batch Number:

Dry Soil Prep GL-RAD-A-021 Batch Number:

Ash Soil Prep

Dry Soil Prep

622105

621096

621094

Sample ID1832450061832450161201307488120130748912013074901201307491

Client ID9312-0001 -00SF9312-0001-015FMethod Blank (MB)183245006(9312-0001 -00SF) Sample Duplicate (DUP)183245006(9312-0001 -00SF) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-035 REV# 9.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample GeometryAll counting sources were prepared in the same geometry as the calibration standards.

Oualitv Control (OC) Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245006 (9312-0001 -00SF).

QC InformationAll of the QC samples met the required acceptance limits.

Page 17 of 110

Page 54: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisSamples 183245006 (9312-0001-005F) and 183245016 (9312-0001-015F) were reprepped due tolow/high carrier/tracer yield.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Manual IntegrationNo manual integrations were performed on data in this batch.

Additional CommentsAdditional comments were not required for this sample set.

Oualifier information

Manual qualifiers were not required.

Method/Analysis Information

Product: Alphaspec Pu, Solid-ALL FSS

Analytical Method: DOE EML HASL-300, Pu- I I1-RC Modified

Prep Method: Ash Soil Prep

Dry Soil] Prep GL-RAD-A-021 Method: Dry Soil] Prep

Analytical Batch Number: 622351

Prep Batch Number: 621096

Dry Soil Prep GL-RAD-A-021 Batch Number: 621094

Page 18 of 110

Page 55: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Sample ID1832450061832450161201308034120130803512013080361201308037

Client ID9312-0001 -00SF9312-0001 -015FMethod Blank (MB)183245006(9312-0001 -00SF) Sample Duplicate (DUP)183245006(9312-0001 -00SF) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-01 I REV# 15.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample Geometry

All counting sources were prepared in the same geometry as the calibration standards.

Quality Control (OC) Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245006 (93 12-0001-005F).

QC Information

All of the QC samples met the required acceptance limits.

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisSamples were reprepped due to low/high carrier/tracer yield.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate from

Page 19 of 110

Page 56: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

referenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Manual IntegrationNo manual integrations were performed on data in this batch.

Additional CommentsAdditional comments were not required for this sample set.

Qualifier information

Manual qualifiers were not required.

Method/Analysis Information

Product:

Analytical Method:

Prep Method:

Analytical Batch Number:

Prep Batch Number:

Gamma,Solid-FSS GAM & ALL FSS 226 Ingrowth Waived

EML HASL 300, 4.5.2.3

Dry Soil Prep

621148

621094

Page 20Oof 110

Page 57: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Sample ID183245001183245002183245003183245004183245005183245006183245007183245008183245009183245010183245011183245012183245013183245014183245015183245016183245017183245018183245019183245020120130534012013053411201305342

Client ID9312-0001 -001F9312-0001-002F9312-0001 -003F9312-0001 -003FS9312-0001 -004F9312-0001 -00SF9312-0001 -006F9312-0001 -007F9312-0001 -008F9312-0001 -009F9312-0001 -OlOF93 12-0001 -01 IF9312-0001-012F9312-0001-013F9312-0001 -014F9312-0001-015F9312-0001-016B9312-0001 -017B9312-0001-018B9312-0001-019BMethod Blank (MB)183245001(9312-0001-001 F) Sample Duplicate (DUP)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-01 3 REV# 14.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample Geometry

All counting sources were prepared in the same geometry as the calibration standards.

Quality Control (0C) Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245001 (9312-0001 -001F).

Page 21 of 110

Page 58: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

QC InformationRefer to Non-Conformance Report.

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysis

None of the samples in this sample set required reprep or reanalysis.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. The following NCR was generated for this SDG:NCR 419166 was generated due to Failed RPD for DUP. 1. The sample (183245001) and the duplicate(1201305341) did not meet the relative percent difference or the relative error ratio requirements forPb-2 12. All other isotopes met the rel ative percent difference requirement. 1. Reporting results.

Additional CommentsAdditional comments were not required for this sample set.

Oualifier information

Page 22 of 110

Page 59: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Qualifier

U'

U'

Reason Analyte

Data rejected due to high counting uncertainty. Potassium-40

Data rejected due to high peak width. Cesium-137

Manganese-54

Data rejected due to interference. Europiumn-155U'

U' Data rejected due to low abundance.

Data rejected due to no valid peak.

Manganese-54

Actiniumn-228

Amnericiumn-24 1

Cesium- 134

Potassium-40

Thallium-208

Bismuth-2 12

Sample

1201305340

183245003

183245005

183245012

183245014

183245018

183245020

183245020

183245005

183245012

183245002

183245006

183245007

183245009

183245010

183245011

183245012

183245013

183245015

183245016

183245017

183245018

183245019

183245005

1201305340

183245001U'

Method/Analysis Information

Page 23 of 110

Page 60: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Product:

Analytical Method:

Prep Method:

Analytical Batch Number:

Prep Batch Number:

Sample ID183245021183245022183245023183245024183245025183245026183245027120130534712013053481201305349

Gamma,Solid-FSS GAM & ALL FSS 226 Ingrowth Waived

EML HASL 300, 4.5.2.3

Dry Soil Prep

621149

621097

Client ID9312-0001-020-19312-0001-021-19312-0001-022-19312-0001-023-19312-0001-024-19312-0001-025-I9312-0001-026-1Method Blank (MB)183245021(9312-0001-020-1) Sample Duplicate (DUP)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-0 13 REV# 14.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample GeometryAll counting sources were prepared in the same geometry as the calibration standards.

Quality Control (00 Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245021 (93 12-0001-020-1).

QC InformationAll of the QC samples met the required acceptance limits.

Page 24 of 10

Page 61: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisNone of the samples in this sample set required reprep or reanalysis.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Qualifier information

Qualifier Reason Analyte

U' Data rejected due to low abundance. Cesium-134

Sample

183245021

183245022

1201305348

Method/Analysis Information

Product: GFPC, Sr9O, solid-ALL FSS

Analytical Method: EPA 905.0 Modified

Prep Method:

Dry Soil Prep GL-RAD-A-021 Method:

Analytical Batch Number:

Prep Batch Number:

Dry Soil Prep GL-RAD-A-021 Batch Number:

Ash Soil Prep

Dry Soil Prep

621123

621096

621094

Page 25 of 110

Page 62: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Sample ID1832450011832450021832450031832450041832450051832450061832450071832450081832450091832450101832450111832450121832450131832450141832450151832450161832450171832450181832450191832450201201305273120130527412013052751201305276

Client ID9312-0001 -001F9312-0001 -002F9312-0001 -003F9312-0001 -003FS9312-0001 -004F9312-0001 -005F9312-0001 -006F9312-0001 -007F9312-0001 -008F9312-0001 -009F9312-0001 -01IOF9312-0001 -01 IF9312-0001-01 2F9312-0001-013F9312-0001-014F9312-0001-015F9312-0001-016B9312-0001-017B9312-0001-01 8B9312-0001-01 9BMethod Blank (MB)183245001(9312-0001-001 F) Sample Duplicate (DUP)183245001(9312-0001 -GOlF) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-004 REV# 11.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample GeometryAll counting sources were prepared in the same geometry as the calibration standards.

Oualitv Control (0C0 Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Page 26 of 110

Page 63: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Designated QCThe following sample was used for QC: 183245001 (93 12-0001 -001F).

QC InformationAll of the QC samples met the required acceptance limits.

Technical Information:

Holding Time

All sample procedures for this sample set were performed within the required holding time.

Preparation InformationAU preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisSample 183245005 (93 12-0001-004F) was recounted due to a negative result greater than three timesthe error. Sample 1201305276 (LCS) was recounted due to low/high recovery.

Chemical RecoveriesAll chemical recoveries meet the required acceptance limits for this sample set.

MiscelIlaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Qualifier information

Manual qualifiers were not required.

Method/Analysis Information

Product: GFPC, Sr9O, solid-ALL FSS

Analytical Method: EPA 905.0 Modified

Prep Method: Ash Soil Prep

Dry Soil Prep GL-RAD-A-021 Method: Dry Soil Prep

Analytical Batch Number: 621125

Prep Batch Number: 621098

Dry Soil Prep GL-RAD-A-021 Batch Number: 621097

Page 27 of 10

Page 64: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Sample ID1832450211832450221832450231832450241832450251832450261832450271201305281120130528212013052831201305284

Client ID9312-0001-020-19312-0001-021-19312-0001-022-19312-0001-023-19312-0001-024-19312-0001-025-19312-0001-026-1Method Blank (MB)183245021(9312-0001-020-I) Sample Duplicate (DUP)183245021(9312-0001-020-I) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-004 REV# 11.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample Geometry

All counting sources were prepared in the same geometry as the calibration standards.

Quality Control (0C) Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245021 (9312-0001 -020-1).

QC InformationAll of the QC samples met the required acceptance limits.

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Page 28 of 10

Page 65: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Sample Re-prep/Re-analysisNone of the samples in this sample set required reprep or reanalysis.

Chemical RecoveriesAll chemical recoveries meet the required acceptance limits for this sample set.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Qualifier information

Manual qualifiers were not required.

Method/Analysis Information

Product: Liquid Scint Tc99, Solid-ALL FSS

Analytical Method:

Analytical Batch Number:

Sample ID1832450061832450161201305310120130531112013053121201305313

DOE EML HASL-300, Tc-02-RC Modified

621139

Client ID9312-0001 -00SF9312-0001-015FMethod Blank (MB)183245006(9312-0001 -00SF) Sample Duplicate (DUP)183245006(9312-0001 -00SF) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-005 REV# 14.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Page 29 of 110

Page 66: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample Geometry

All counting sources were prepared in the same geometry as the calibration standards.

Quality Control (OC) Information:.

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245006 (931 2-0Q001-005F).

QC InformationAll of the QC samples met the required acceptance limits.

Technical Information:

Holding Time

All sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisSample 183245016 (9312-0001-015F) was recounted due to a negative result greater than three timesthe error. Sample 1201305312 (9312-0001-005F) was recounted due to low/high recovery.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Oualifier information

Manual qualifiers were not required.

Method/Analysis Information

Page 3Oof 110

Page 67: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Product: Product:Liquid Scint Fe55, Solid-ALL FSS

Analytical Method: DOE RESL Fe-I, Modified

Ash Soil PrepPrep Method:

Dry Soil Prep GL-RAD-A-021 Method:

Analytical Batch Number:

Prep Batch Number:

Dry Soil Prep GL-RAD-A-021 Batch Number:

Dry Soil Prep

621136

621096

621094

Sample ID1832450061832450161201305300120130530112013053021201305303

Client ID9312-0001 -00SF9312-0001-015FMethod Blank (MB)183245006(9312-0001 -00SF) Sample Duplicate (DUP)183245006(9312-0001-005F) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-040 REV# 4.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample Geometry

All counting sources were prepared in the same geometry as the calibration standards.

Quality Control (0C0 Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245006 (9312-0001 -00SF).

QC InformationAll of the QC samples met the required acceptance limits.

Page 31 of 110

Page 68: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisNone of the samples in this sample set required reprep or reanalysis.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Qualifier information

Manual qualifiers were not required.

Method/Analysis Information

Product: Liquid Scint Ni63, Solid-ALL FSS

Analytical Method: DOE RESL Ni-I, Modified

Prep Method:

Dry Soil Prep GL-RAD-A-021 Method:

Analytical Batch Number:

Prep Batch Number:

Dry Soil Prep GL-RAD-A-021 Batch Number:

Ash Soil Prep

Dry Soil Prep

621137

621096

621094

Sample ID1832450061832450161201305304120130530512013053061201305307

Client ID9312-0001 -00SF9312-0001 -015FMethod Blank (MB)183245006(9312-0001 -00SF) Sample Duplicate (DUP)183245006(9312-0001 -00SF) Matrix Spike (MS)Laboratory Control Sample (LCS)

Page 32 of 110

Page 69: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-022 REV# 8.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample GeometryAll counting sources were prepared in the same geometry as the calibration standards.

Quality Control (OC) Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245006 (93 12-0001-005F).

QC InformationAll of the QC samples met the required acceptance limits.

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysis

None of the samples in this sample set required reprep or reanalysis.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Page 33 of 10

Page 70: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Qualifier information

Manual qualifiers were not required.

Method/Analysis Information

Product: LSC, Tritium Dist, Solid - 3 pCilg

Analytical Method:

Analytical Batch Number:

Sample ID183245006183245016120130531612013053171201305318.1201305319

EPA 906.0 Modified

621141

Client ID9312-0001 -00SF9312-0001-015FMethod Blank (MB)183255002(931 2-0003-002F) Sample Duplicate (DUP)183255002(931 2-0003-002F) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-002 REV# 14.

Calibration Information:

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample GeometryAll counting sources were prepared in the same geometry as the calibration standards.

Ouality Control (00) Information:

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183255002 (9312-0003-002F).

QC InformationAll of the QC samples met the required acceptance limits.

Page 34of 110

Page 71: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisNone of the samples in this sample set required reprep or reanalysis.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Qualifier information

Manual qualifiers were not required.

Method/Analysis Information

Product: Liquid Scint C14, Solid AII,FSS

Analytical Method:

Analytical Batch Number:

Sample ID1832450061832450161201305324120130532512013053261201305327

EPA EERF C-01 Modified

621144

Client ID9312-0001 -00SF9312-0001-015SFMethod Blank (MB)183245006(9312-0001 -00SF) Sample Duplicate (DUP)183245006(9312-0001-005F) Matrix Spike (MS)Laboratory Control Sample (LCS)

SOP ReferenceProcedure for preparation, analysis and reporting of analytical data are controlled by GEL LaboratoriesLLC as Standard Operating Procedure (SOP). The data discussed in this narrative has been analyzed inaccordance with GL-RAD-A-003 REV# 9.

Page 35 of 110

Page 72: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Calibration Information.

Calibration InformationAll initial and continuing calibration requirements have been met.

Standards InformationStandard solution(s) for these analyses are NIST traceable and used before the expiration date(s).

Sample GeometryAll counting sources were prepared in the same geometry as the calibration standards.

Quality Control (OC) Information:.

Blank InformationThe blank volume is representative of the sample volume in this batch.

Designated QCThe following sample was used for QC: 183245006 (93 12-0001-005F).

QC InformationAll of the QC samples met the required acceptance limits.

Technical Information:

Holding TimeAll sample procedures for this sample set were performed within the required holding time.

Preparation InformationAll preparation criteria have been met for these analyses.

Sample Re-prep/Re-analysisSamples 1201305324 (MB), 1201305325 (9312-0001-005F), 1201305326 (9312-0001-005F) and1201305327 (LCS) were recounted due to detector error.

Miscellaneous Information:

NCR DocumentationNonconformance reports are generated to document any procedural anomalies that may deviate fromreferenced SOP or contractual documents. A nonconformance report (NCR) was not generated for thisSDG.

Additional CommentsAdditional comments were not required for this sample set.

Qualifier information

Manual qualifiers were not required.

Certification Statement

Page 36 of 110

Page 73: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Where the analytical method has been performed under NELAP certification, the analysis has met allof the requirements of the NELAC standard unless otherwise noted in the analytical case narrative.

Review Validation:

GEL requires all analytical data to be verified by a qualified data validator. In addition, all datadesignated for CLP or CLP-like packaging will receive a third level validation upon completion of thedata package.

The following data validator verified the information presented in this case narrative:

/7 LtIl

Reviewer/Date:

Page 37 of 110

Page 74: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL Laboratories LLCForm GEL-NCRRev. 06/05

NCR Report No.: 419166

Revision No.: 1

COMPANY - WIDE NONCONFORMANCE REPORT

Mo.Day Yr.04-APR-07

Division:Radiochemistry

Quality Criteria:Specifications

Type:Process

Instrument Type: Test / Method: j Matrix Type: Client Code:GAMMA SPECTROMETER EML HASL 300, 4.5.2.3 Solid YANK

Batch ID: Sample Numbers:621148 See Below

Potentially affected work order(s)(SDG): 183245(MSR#07-01 29)

Application Issues:

Failed RPD for DUP

Specification and RequirementsNonconformance Description:

1. The sample (183245001) and the duplicate (1201305341) did not meetthe relative percent difference or the relative error ratio requirements forPb-21 2. All other isotopes met the relative percent differencerequirement.

NRG Disposition:

i1. Reporting results.

Originator's Name:

Shenise Euland

Quality Review:

Data Validator/Group Leader:

Melanie Aycock 04-APR-0704-APR-07

Director:

Page 1

Page 38 of 10

Page 75: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

SAMPLE DATASUMMARY

Page 39 of 110

Page 76: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis Reportfor

YANKOOlI Connecticut Yankee Atomric Power Co.

Client SDG: MSR#07-0129 GEL Work Order: 183245

The Qualifiers in this report are defined as follows:* A quality control analyte recovery is outside of specified acceptance criteria

**Analyte is a surrogate compoundU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification

ND The analyte concentration is not detected above the detection limit.

The above sample is reported on a dry weight basis except where prohibited by the analytical procedure.

Where the analytical method has been performed under NELAP certification, the analysis has met all of therequirements of the NELAC standard unless qualified on the Certificate of Analysis.

This data report has been prepared and reviewed in accordance with GEL Laboratories LLCstandard operating procedures. Please direct any questions to your Prolect Manager, Cheryl Jones.

Reviewed by

Page 40 of 110

Page 77: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company :Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack-.McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID: 9312-0001-OOIF Project: YANK01204Sample ID: 183245001 Client ID: YANKOOIMatrix: TS Vol. Recv.:Collect Date: 24-MAR-07Receive Date: 29-MAR-07Collector: ClientMoisture: .178%

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D

Rad Gamma Spec AnalysisGczrnma,Solid-FSS GAM & ALL ESS 226 In growthWaivedActinium-228 0.454 +/-0.150 0.0552 +/-0.150 0.110 pCi/g MJHI 04/02/07 1204 621148Americium-241 U 0.0498 +/-0.066 0.0543 +/-0.066 0.109 pCi/gBismuth-212 UI 0.00 +/-0.207 0.118 +/-0.207 0.236 pCi/gBismuth-214 0.371 +/-0.0773 0.0298 +/-0.0773 0.0595 pCi/gCesium-134 U 0.0207 +/-0.0199 0.018 +/-0.0199 0.036 pCi/gCesium-137 U 0.0128 +/-0.0247 0.0163 +/-0.0247 0.0326 pCi/gCobalt-60 U 0.0139 +/-0.0215 0.0173 +/-0.0215 0.0347 pCi/gEuropium-152 U -0.0239 +/-0.0558 0.0413 +/-0.0558 0.0826 pCi/gEuropium-154 U 0.00648 +/-0.0619 0.053 +/-0.0619 0.106 pCi/gEuropium-ISS U 0.0856 +/-0.0514 0.0483 +/-0.0514 0.0966 pCi/gLead-2 12 0.534 +/-0.0676 0.0231 +/-0.0676 0.0463 pCi/gLead-214 0.436 +/-0.0773 0.0307 +/-0.0773 0.0614 pCi/gManganese-54 U 0.0173 +/-0.0166 0.0158 +/-0.0166 0.0315 pCi/gNiobium-94 U 0.00137 +/-0.0179 0.0152 +/-0.0179 0.0303 pCi/gPotassium-40 9.22 +/-0.883 0.142 +/-0.883 0.285 pCi/gRadium-226 0.371 +/-0.0773 0.0298 +/-0.0773 0.0595 pCi/gSilver-108m U 0.00822 +/-0.0162 0.0146 +/-0.0162 0.0291 pCi/gThallium-208 0.159 +/-0.034 0.0156 +/-0.034 . 0.03 11 pCi/g

Rad Gas Flow Proportional CountingGFPC, SO9O, solid-ALL FSSStrontium-90 U -0.0117 +/-0.0206 0.0196 +/-0.0206 0.047 pCi/g KSDI 04/03/07 2021 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.3

2 EPA 905.0 Modified

Page 41 of 10

Page 78: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress : 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-OOIF Project: YANK01204Sample ID: 183245001 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Strontium Carrier GFPC, Sr9O, solid-ALL FSS 56 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limit* Sample results are rejected* Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UT Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 42 of 10

Page 79: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analy:sis

Company : Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-002F183245002TS24-MAR-0729-MAR-07Client9.2 1%

Project:Client ID:Vol. Recv.:

YANK01 204YANKOO I

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gamma, Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.715 +/-0.180 0.0606 +/-0.180 0.121 pCi/g MIHI 04/02/07 1205 621148Americium-241 U 0.0651 +/-0.0825 0.0722 +/-0.0825 0.144 pCi/gBismuth-212 U 0.224 +/-0.279 0.138 +/-0.279 0.275 pCi/gBismuth-214 0.562 +/-0.0875 0.0322 +/-0.0875 0.0643 pCi/gCesium-] 34 UI 0.00 +/-0.037 0.021 +/-0.037 0.042 pCi/gCesium-]137 0.0715 +/-0.0264 0.0185 +/-0.0264 0.037 pCi/gCobalt-60 U-0.000781 +/-0.0197 0.0168 +/-0.0197 0.0337 pCi/gEuropium-152 U -0.00608 +/-0.0657 0.0456 +/-0.0657 0.091 pCi/gEuropium-154 U -0.0382 +/-0.0656 0.0534 +1-0.0656 0.107 pCi/gEuropium-155 U 0.0834 +/-0.0747 0.0503 +/-0.0747 0.101 pCi/gLead-21 2 0.726 +/-0.0786 0.0261 +/-0.0786 0.0521 pCi/gLead-214 0.580 +/-0.0866 0.0286 +/-0.0866 0.0572 pCi/gManganese-54 U -0.00752 +/-0.0211 0.0175 +/-0.0211 0.035 pCi/gNiobium-94 U 0.00481 +/-0.0167 0.0148 +/-0.0167 0.0295 pCi/gPotassium-40 12.5 +/-1.18 0.161 +/-1.18 0.322 pCi/gRadium-226 0.562 +/-0.0875 0.0322 +/-0.0875 0.0643 pCi/gSilver-108m U -0.0171 +/-0.0166 0.014 +/-0.0166 0.028 pCi/gThallium-208 0.242 +/-0.0458 0.0155 +/-0.0458 0.031 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U 0.00183 +/-0.0212 0.0175 +/-0.0212 0.0421 pCi/g KSD1 04/03/072021 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 43 of 110

Page 80: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - wvww.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Client Sample ID: 9312-0001-002F Project: YANK01204Sample ID: 183245002 Client ID: YANKOO I

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Di

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 62 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejected* Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +I-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 44 of 10

Page 81: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www gel corn

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack;McCarthy

Project: Soils P04* 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-003F183245003TS24-MAR-0729-MAR-07Client5.54%

Project:Client ID:Vol. Recv.:

YANK01204YANKOOI

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 1.07 +/-0.271 0.0834 +/-0.271 0.167 pCilg MJHI1 04/02/07 1208 621148Americium-241 U 0.0192 +/-0.0424 0.0349 +/-0.0424 0.0698 pCi/gBismuth-212 0.747 +/-0.406 0.184 +/-0.406 0.368 pCilgBismuth-214 0.708 +/-0.139 0.0435 +/-0.139 0.087 pCilgCesium-134 U 0.0307 +/-0.0423 0.0314 +/-0.0423 0.0627 pCilgCesium-137 UI 0.00 +/-0.0451 0.0253 +1-0.0451 0.0505 pCilgCobalt-60 U 0.0242 +/-0.0352 0.03 17 +/-0.0352 0.0634 pCilgEuropium-152 U -0.0266 ±/-0.1 10 0.0544 +/-0.110 0.109 pCi/gEuropium-154 U 0.0121 ±/-0.102 0.0865 +/-0.102 0.173 pCi/gEuropium-l55 U 0.0968 +/-0.0756 0.0523 +/-0.0756 0.104 pCi/gLead-212 0.928 +1-0.106 0.0313 +/-0.106 0.0625 pCilgLead-2 14 0.707 +/-0.118 0.0406 +/-0.118 0.0811 pCi/gManganese-54 U -0.00186 +/-0.0293 0.0254 +/-0.0293 0.0509 pCi/gNiobium-94 U 0.021 +/-0.0289 0.0236 +/-0.0289 0.0472 pCi/gPotassium-40 15.7 +/-1.24 0.281 +/-1.24 0.562 pCi/gRadium-226 0.708 +/-0.139 0.0435 +/-0. 139 0.087 pCi/gSilver-1O8m U -0.008 +/-0.0217 0.0185 +/-0.0217 0.037 pCi/gThallium-208 0.303 +/-0.0614 0.0227 +/-0.0614 0.0454 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U -0.0177 +/-0.022 0.0209 +/-0.022 0.0481 pCi/g KSDI 04/03/07 2021 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.32 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 45 of 110

Page 82: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-003F Project: YANK01204Sample ID: 183245003 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 60 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol -condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejected* Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 46 of 110

Page 83: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress : 362 Injun Hollow Rd

Contact:

Project:

East Hampton, Connecticut 06424Mr. Jack McCarthy

Soils P04* 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-003FS183245004TS24-MAR-0729-MAR-07Client5.56%

Project:Client ID:Vol. Recv.:

YANKO01204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.967 +/-0.215 0.0724 +1-0.2 15 0.145 pCi/g MIHI 04/02/07 1426 621148Americium-241 U 0.0464 +/-0.111 0.0945 +/-0.111 0.189 pCi/gBismuth-212 0.603 +/-0.292 0.163 +/-0.292 0.326 pCi/gBismuth-214 0.604 +/-0.108 0.0386 +/-0.108 0.0771 pCi/gCesium-I 34 U 0.0247 +/-0.0303 0.0268 +/-0.0303 0.0535 pCi/gCesium-I 37 0.0527 +/-0.0352 0.0201 +/-0.0352 0.0402 pCi/gCobalt-60 U 0.0238 +/-0.0342 0.025 +/-0.0342 0.0499 pCi/gEuropium-152 U 0.0209 +/-0.0733 0.0538 +/-0.0733 0.108 pCi/gEuropium-154 U -0.0372 +/-0.0814 0.0659 +/-0.0814 0.132 pCi/gEuropium-155 U 0.0653 +/-0.1 10 0.0563 +/-0.110 0.113 pCi/gLead-2 12 0.886 +/-0.096 0.0333 +/-0.096 0.0666 pCi/gLead-214 0.764 +/-0.126 0.0401 +/-0.126 0.0802 pCi/gManganese-54 U 0.0275 +/-0.0283 0.0231 +/-0.0283 0.0461 pCi/gNiobium-94 U 0.0131 +/-0.0297 0.0209 +/-0.0297 0.0418 pCi/gPotassium-40 15.7 +/-1.46 0.174 +/-1.46 0.348 pCi/gRadium-226 0.604 +/-0.108 0.0386 +/-0.108 0.0771 pCi/gSilver-108m U 0.00504 +/-0.0216 0.0188 +/-0.0216 0.0376 pCi/gThallium-208 0.355 +/-0.0589 0.019 +/-0.0589 0.038 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U -0.016 +/-0.0211 0.0199 +/-0.0211 0.0455 pCi/g KSDI 04/03/07 2021 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.32 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Page 47 of 10

Page 84: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: 'Mr. Jack McCarthyProject: Soils POS# 002332

Client Sample ID: 9312-0001-003FS Project: YANK01204Sample ID: 183245004 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 75 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 48 of 10

Page 85: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: .. Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-004F183245005TS24-MAR-0729-MAR-07Client5.97%

Proiect:Client ID:Vol. Recv.:

YANKO 1204YANK001

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gamnma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 UI 0.00 +1-0.144 0.128 +1-0.144 0.257 pCi/g MJHI 04/02/07 1409 621148Americium-241 U 0.00396 +/-0.105 0.0871 +/-0.105 0.174 pCi/gBismuth-212 0.431 +/-0.296 0.157 +/-0.296 0.315 pCi/gBismuth-214 0.492 +/-0.100 0.0339 +/-0.100 0.0678 pCi/gCesium-134 U 0.0403 +/-0.0384 0.023 +/-0.0384 0.0459 pCi/gCesium-137 0.0682 +/-0.0348 0.0192 +/-0.0348 0.0383 pCi/gCobalt-60 U 0.000422 +/-0.0197 0.0166 +/-0.0197 0.0331 pCi/gEuropium-152 U -0.00217 +/-0.0652 0.0479 +/-0.0652 0.0957 pCi/gEuropium-154 U -0.077 +/-0.0831 0.054 +/-0.0831 0.108 pCi/gEuropium-I155 U 0.0303 +/-0.0639 0.0593 +/-0.0639 0.119 pCi/gLead-2 12 0.628 +/-0.0723 0.0269 +/-0.0723 0.0537 pCi/gLead-214 0.599 +/-0.0888 0.033 +/-0.0888 0.066 pCi/gManiganese-54 UI 0.00 +/-0.0353 0.0155 +/-0.0353 0.031 pCi/gNiobium-94 U 0.0166 +/-0.0202 0.0182 +/-0.0202 0,0364 pCi/gPotassium-40 UI 0.00 +/-0.958 0.871 +/-0.958 1.74 pCi/gRadium-226 0.492 +/-0.100 0.0339 +/-0.100 0.0678 pCi/gSilver-108m U -0.0246 +/-0.0186 0.0149 +/-0.0186 0.0297 pCi/gThallium-208 0.222 +/-0.0435 0.0175 +/-0.0435 0.035 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U -0.00371 +/-0.0222 0.0193 +/-0.0222 0.0462 pCi/g KSDI 04104/07 1038 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

2

3

EML HASL 300, 4.5.2.3EPA 905.0 Modified

EPA 905.0 Modified

Page 49 of 10

Page 86: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-004F Project: YANK01204Sample ID: 183245005 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 56 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 5Oof 110

Page 87: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analvsis

Company : Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils P04* 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-005F183245006TS24-MAR-0729-MAR-07Client2.21%

Project:Client ID:Vol. Recv.:

YANK01204YANK001

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch 1P

Rad Alpha Spec Analysis

Alphaspec Am24J, Cm, Solid ALL FSSAmericium-241 U -Curium-242 UCurium-243/244 U

Aiphaspec Pu, Solid-ALL FSSPlutonium-238 UPlutonium-239/240 U

Liquid Scint Pu24J, Solid-ALL FSSPlutonium-241 U

Rad Gamma Spec Analysis

-0.03940.000.00

+/-0.0816+/-0.083

+/-0.0794

0.03630.000.00

+/-0.0818+/-0.083

+/-0.0794

0.1820.1150.110

0.1950.151

18.1

0.0429 +/-0.0969 0.0522 +/-0.09710.059 +/-0.0943 0.0301 +/-0.0946

-3.12 +/-10.1 8.60 +/-10.1

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228Americium-241 UBismuth-2 12Bismuth-2 14Cesium-134 UICesium-I 37Cobalt-60 UEuropium-152 UEuropium-154 UEuropium-155 U-Lead-212Lead-214Manganese-54 UNiobium-94 UPotassium-40Radium-226Silver-108m U 0Thallium-208

Rad Gas Flow Proportional Counting

GFPC, 5r90, solid-ALL FSSStrontium-90 U

Rad Liquid Scintillation Analysis

LSG, Tritiumn Dist, Solid - 3 pCi/gTritium U

0.6690.0462

0.4310.5 150.00

0.05550.002 14-0.0538-0.01980.00446

0.5790.561

0.007930.00603

10.50.515

.0009760.204

+/-0. 133+/-0.0606

+/-0.162+/-0.0687+/-0.0315+/-0.0202+/-0.0164+/-0.0472+/-0.0441+/-0.0349+/-0.0605

+/-0.071+/-0.0145+/-0.0133

+/-0.802+/-0.0687

+/-0.012+/-0.0313

0.03570.04890.08220.02090.01480.01150.01260.02870.03720.03250.0169

0.0210.01120.0103

0.0950.02090.01 03

0.011

+/-0. 133+/-0.0606+/-0.162

+/-0.0687+/-0.0315+/-0.0202+/-0.0164+/-0.0472+/-0.0441+/-0.0349+/-0.0605+/-0.071

+/-0.0145+/-0.0133+/-0.802

+/-0.0687+/-0.012

+/-0.0313

0.07 140.09780.164

0.04 170.02950.02290.02520.05740.07430.06490.03390.04 190.02230.02050.190

0.04170.02070.022

0.0434

1.80

pCi/gpCi/gpCi/g

pCi/gpCi/g

pCi/g

pCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/g

pCi/g

pCi/g

MIHI 04/02/07 1511 621148

KSDI 04/03/07 2022 621123

AXD2 03/31/07 1247 621141

GXRI 04/03/07 0933 621107

GXRI 04/04/07 2258 622351

BXLI 04/05/07 1354 622105

-0.0135 +/-0.0195 0.0186 +/-0.0195

0.761 +/-1.06 0.859 +/-1.06

Page 51 of 110

Page 88: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of AnalysisCertificate ofAnaksis

Company : Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:

931 2-0001-005F183245006

Proiect:Client ID:Vol. Reev.:

YANK01204YANK001

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Rad Liquid Scintillation Analysis

Liquid Scint C04, Solid AIIFSSCarbon-14 U 0.0236 +/-0.090 0.075 +/-0.090 0.154 pCi/g AXD2 03/30/07 1847 621144

Liquid Scint Fe5S, Solid-ALL FSSIron-55 U -26.4 +/-34.3 25.3 +/-34.3 53.1 pCi/g MXPI 04/02/07 2041 621136

Liquid Scint Ni63, Solid-ALL FSSNickel-63 U -11.2 +/-9.41 8.39 +/-9.41 17.6 pCi/g MXP1 04/02/07 1548 621137

Liquid Scint Tc99, Solid-ALL FSSTechnetium-99 U -0.155 +/-0.229 0.196 +/-0.229 0.401 pCi/g MXPI 04/03/07 1246 621139

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I DOE EML HASL-300, Am-05-RC Modified

2 DOE EML HASL-300, Pu-lI 1-RC Modified

3 DOE EML HASL-300, Pu-lI l-RC Modified

4 DOE EML HASL-300, Pu- I I1-RC Modified

5 DOE EML HASL-300, Pu-lIl-RC Modified

6 EML HASL 300, 4.5.2.3

7 EPA 905.0 Modified

8 EPA 906.0 Modified

9 EPA EERF C-01 Modified

10 DOE RESL Fe-I, Modified

I1I DOE RESL Ni-I, Modified

12 DOE EML HASL-300, Tc-02-RC Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Americium-243 TracerPlutonium-242 TracerPlutonium-242 TracerStrontium Carrierlror-59 TracerNickel Carrier

Alphaspec Am24l, Cm, Solid ALLAlphaspec Pu, Solid-ALL FSSLiquid Scint Pu241, Solid-ALL FýGFPC, Sr90, solid-ALL ESSLiquid Scint Fe55, Solid-ALL ESLiquid Scint Ni63, Solid-ALL FS

748170726478

(15%-125%)(15%-125%)(25%-I125%)(25%-125%)(15%-125%)(25%-I 25%)

Page 52 of 110

Page 89: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - wvww.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-005F Proiect: YANK01204Sample ID: 183245006 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D~

Technetium-99m Tracer Liquid Scint Tc99, Solid-ALL FS 85 (15%-125%)

Notes:

The Qualifiers in this report are defined as follows:

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD1 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +f-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 53 of 110

Page 90: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-006F183245007TS24-MAR-0729-MAR-07Client3.5 1%

Proiect:Client ID:Vol. Recv.:

YANK01204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch 1D

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.817 +/-0.136 0.0405 +/-0.136 0.081 pCi/g MIHI 04/02/07 1512 621148Americium-241 U 0.00132 +/-0.0861 0.0703 +/-0.0861 0.141 pCi/gBismuth-212 0.528 +/-0.171 0.0918 +/-0.171 0.184 pCi/gBismuth-214 0.664 +/-0.0809 0.0209 +/-0.0809 0.0417 pCi/gCesium-134 UI 0.00 +/-0.0211 0.0147 +/-0.0211 0.0294 pCi/gCesium-137 0.0412 +/-0.0173 0.0108 +/-0.0173 0.0215 pCi/gCobalt-60 U 0.00201 +/-0.0137 0.0116 +/-0.0137 0.0232 pCi/gEuropium-152 U -0.0156 +1-0.044 0.0303 +/-0.044 0.0605 pCi/gEuropium-154 U -0.0493 +/-0.0477 0.0376 +/-0.0477 0.0751 pCi/gEuropium-ISS U 0.0379 +/-0.0504 0.0363 +/-0.0504 0.0725 pCi/gLead-212 0.853 +/-0.101 0.0178 +/-0.101 0.0356 pCi/gLead-214 0.714 +/-0.0865 0.0227 +/-0.0865 0.0453 pCi/gManganese-54 U 0.0154 +/-0.0185 0.0103 +/-0.0185 0.0206 pCi/gNiobium-94 U 0.00406 +/-0.0 126 0.011 +/-0.0126 0.0219 pCi/gPotassium-40 14.3 +/-1.09 0.116 +/-1.09 0.233 pCi/gRadium-226 0.664 +/-0.0809 0.0209 +/-0.0809 0.0417 pCi/gSilver-lO8m U 0.0022 +/-0.0129 0.0101 +/-0.0129 0.0203 pCi/gThallium-208 0.249 +/-0.033 0.0117 +/-0.033 0.0233 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U 0.000837 +/-0.0244 0.0203 +/-0.0244 0.0475 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.32 EPA 905.0 Modified

Surrogate/T racer recovery Test Recovery% Acceptable Limits

Page 54 of 110

Page 91: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company :Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: .:Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-006F Project: YANKOI1204Sample ID: 183245007 Client ID: YANKOQ I

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, SrOO, solid-ALL FSS 71 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD1 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 55 of 110

Page 92: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company : Connecticut Yankee Atomic PowerAddress; 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001 -007F183245008TS24-MAR-0729-MAR-07Client7.81%

Proiect:Client ID:Vol. Recv.:

YANK01204YANK0OI

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.910 +/-0.160 0.0409 +/-0.160 0.0817 pCi/g MJHI 04/02/07 1513 621148Americium-241 U 0.0826 +/-0.0682 0.0566 +/-0.0682 0.113 pCilgBismuth-212 0.588 +/-0.182 0.0882 +/-0.182 0.176 pCilgBismuth-214 0.661 +/-0.084 0.0227 +/-0.084 0.0453 pCilgCesium-134 U 0.0268 +/-0.019 0.0151 +/-0.019 0.0302 pCilgCesium-137 U -0.00643 +/-0.0161 0.0114 +/-0.0161 0.0227 pCilgCobalt-60 U -0.0045 +/-0.0 146 0.0119 +/-0.0146 0.0239 pCilgEuropium-152 U -0.0708 +/-0.0434 0.0308 +/-0.0434 0.0616 pCi/gEuropium-154 U -0.0425 +/-0.0436 0.0341 +/-0.0436 0.0682 pCi/gEuropium-ISS U 0.0503 +/-0.0496 0.0357 +/-0.0496 0.0715 pCi/gLead-212 0.847 +/-0.0765 0.0181 +/-0.0765 0.0363 pCi/gLead-214 0.737 +/-0.0804 0.023 +/-0.0804 0.046 pCi/gManganese-54 U 0.00748 +/-0.0161 0.0124 +/-0.0161 0.0248 pCi/gNiobium-94 U 0.00969 +/-0.0129 0.0108 +/-0.0129 0.0215 pCi/gPotassium-40 15.3 +/-1.19 0.108 +1-1.19 0.216 pCi/gRadium-226 0.661 +/-0.084 0.0227 +/-0.084 0.0453 pCi/gSilver-108m U -0.00395 +/-0.0122 0.0105 +/-0.0122 0.0209 pCi/gThallium-208 0.309 +/-0.0426 0.0115 +/-0.0426 0.023 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U -0.00423 +/-0.0231 0.0201 +/-0.0231 0.0471 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Page 56 of 110

Page 93: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel~com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-007F Project: YANK01204Sample ID: 183245008 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty [C TPU MDA Units DF Analyst Date Time Batch b

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 69 (25%-1 25%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by CC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 57 of 110

Page 94: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - wvww.gel.com

Certificate of Anallsis

Company: Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

931 2-0001-008F183245009TS24-MAR-0729-MAR-07Client3.29%

Project:Client ID:Vol. Recv.:

YANKO 1204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.934 +/-0.150 0.0379 +/-0.150 0.0758 pCi/g MIHI 04/02/07 1515 621148Americium-241 U 0.0407 +/-0.0474 0.0368 +/-0.0474 0.0735 pCi/gBismuth-212 0.510 +/-0.172 0.0814 +/-0.172 0.163 pCi/gBismuth-214 0.602 +/-0.076 0.0195 +/-0.076 0.039 pCi/gCesium-134 UI 0.00 +/-0.0202 0.0135 +/-0.0202 0.027 pCi/gCesium-]137 U -0.00217 +/-0.0143 0.0104 +/-0.0143 0.0209 pCi/gCobalt-60 U 0.00237 +1-0.0134 0.0113 +/-0.0134 0.0227 pCi/gEuropium-152 U 0.0119 +/-0.0413 0.0286 +/-0.0413 0.0571 pCi/gEuropium-154 U -0.00741 +/-0.0446 0.0343 +/-0.0446 0.0685 pCi/gEuropium-155 U 0.0514 +/-0.0407 0.0301 +/-0.0407 0.0601 pCi/gLead-212 0.875 +1-0.0764 0.0161 +/-0.0764 0.0321 pCi/gLead-214 0.689 +/-0.0776 0.0201 +/-0.0776 0.0402 pCi/gManganese-54 U 0.00835 +/-0.0124 0.0112 +/-0.0124 0.0223 pCi/gNiobium-94 U 0.00908 +/-0.0122 0.0104 +/-0.0122 0.0207 pCi/gPotassium-40 15.7 +/-1.06 0.0963 +/-1.06 0.193 pCi/gRadium-226 0.602 +/-0.076 0.0195 +/-0.076 0.039 pCi/gSilver-108m U -0.0051 +/-0.0108 0.00934 +/-0.0108 0.0187 pCi/gThallium-208 0.285 +/-0.0348 0.0102 +/-0.0348 0.0203 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U 0.0282 +/-0.0288 0.0202 +/-0.0288 0.0472 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 58 of 110

Page 95: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analy:sis

Company Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-008F Project: YANK01204Sample ID: 183245009 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr9O, solid-ALL FSS 70 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GCIMS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 59 of 110

Page 96: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company :Connecticut Yankee Atomic PowerAddress : 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-009F183245010TS24-MAR-0729-MAR-07Client4.49%

Proiect:Client ID:Vol. Recv.:

YANK0 1204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date .Time Batch P'

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 1.41 +/-0.215 0.0478 +/-0.215 0.0956 pCilg MJHI1 04/02/07 1516 621148Americium-241 U 0.05 15 +/-0.0732 0.0586 +/-0.0732 0.117 pCi/gBismuth-212 0.972 +/-0.231 0.095 +/-0.231 0.190 pCi/gBismuth-2 14 1.11 +/-0.127 0.0252 +/-0.127 0.0504 pCi/gCesium-] 34 UI 0.00 +1-0.0268 0.0187 +/-0.0268 0.0374 pCi/gCesium-] 37 U 0.0047 +/-0.0203 0.0143 +/-0.0203 0.0285 pCi/gCobalt-60 U -0.00423 +/-0.0173 0.0145 +/-0.0173 0.0289 pCi/gEuropium-152 U -0.0 192 +/-0.0461 0.034 +1-0.0461 0.0679 pCi/gEuropium-]54 U -0.0363 +/-0.0567 0.0431 +/-0.0567 0.0861 pCi/gEuropium-ISS U 0.0672 +/-0.0606 0.0412 +/-0.0606 0.0824 pCi/gLead-212 1.24 +/-0.104 0.0202 +1-0.104 0.0403 pCi/gLead-214 1.22 +/-0.121 0.0253 +/-0.121 0.0506 pCi/gManganese-54 U 0.0203 +/-0.0219 0.0127 +/-0.0219 0.0255 pCi/gNiobium-94 U 0.00836 +/-0.0147 0.0129 +/-0.0147 0.0257 pCi/gPotassium-40 20.4 +/-1.47 0.114 +/-1.47 0.229 pCi/gRadium-226 1.11I +/-0.127 0.0252 +/-0.127 0.0504 pCi/gSilver-108m U 0.00904 +/-0.0142 0.0122 +/-0.0142 0.0244 pCi/gThallium-208 0.395 +/-0.0481 0.0128 +/-0.0481 0.0256 pCi/g

Rad Gas Flow Proportional CountingGFPC, SO9O, solid-ALL FSSStrontium-90 U 0.00266 +/-0.0262 0.02 17 +/-0.0262 0.0485 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 60 of 110

Page 97: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - wvww.gel.com

Certificate of Analysis

Company Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-009F Project: YANK01204Sample ID: 183245010 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr9O, solid-ALL FSS 63 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain ]IdentificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceededThe above sample is reported on a dry weight basis.

Page 61 of 10

Page 98: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils P04* 002332

Report Date: April 5, 2007

Client Sample ID: 9312-0001-OlOF Project: YANK01204Sample ID: 183245011 Client ID: YANKO0lMatrix: TS Vol. Recv.:Collect Date: 24-MAR-07Receive Date: 29-MAR-07Collector: ClientMoisture: 4.22%

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gainma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.686 +/-0.127 0.0363 +1-0.127 0.0725 pCi/g MIHI 04/02/07 1517 621148Americium-241 U 0.0377 +/-0.0472 0.0364 +/-0.0472 0.0729 pCi/gBismuth-212 0.537 +/-0.175 0.0747 +/-0.175 0.149 pCi/gBismuth-214 0.561 +/-0.0724 0.0208 +/-0.0724 0.0416 pCilgCesium-134 UI 0.00 +/-0.0173 0.0126 +/-0.0173 0.0253 pCi/gCesium-137 0.0799 +/-0.0234 0.0112 +/-0.0234 0.0223 pCi/gCobalt-60 U 0.00397 +/-0.0137 0.0118 +/-0.0137 0.0235 pCi/gEuropium-152 U 0.0167 +/-0.0467 0.0286 +/-0.0467 0.0571 pCi/gEuropium- 154 U -0.0381 +/-0.0403 0.0318 +/-0.0403 0.0635 pCi/gEuropium-ISS U 0.0325 +/-0.0365 0.0302 +/-0.0365 0.0604 pCi/gLead-212 0.683 +/-0.063 0.016 +/-0.063 0.032 pCi/gLead-214 0.666 +/-0.0806 0.0203 +/-0.0806 0.0405 pCi/gManganese-54 U -0.00141 +/-0.0123 0.0106 +/-0.0123 0.0211 pCi/gNiobium-94 U 0.00888 +/-0.0119 0.0103 +/-0.0119 0.0206 pCi/gPotassium-40 11.8 +/-0.856 0.0912 +/-0.856 0.182 pCi/gRadium-226 0.561 +/-0.0724 0.0208 +/-0,0724 0.0416 pCi/gSilver-I 08m U -0.00434 +/-0.0111 0.00946 +/-0.0111 0.0189 pCi/gThallium-208 0.218 +/-0.0338 0.0102 +/-0.0338 0.0203 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U 0.0079 +/-0.0261 0.0211 +/-0.0261 0.0472 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.32 EPA 905.0 Modified

Page 62of 110

Page 99: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Ce rtificate of Analysis

Company Connecticut Yankee Atomic PowerAddress: 362 lnjun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-01 OF Project: YANK0 1204Sample ID: 193245011 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 64 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.131 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.Ul Gamma Spectroscopy--Uncertain identificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 63 of 110

Page 100: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company : Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-01 IF183245012TS24-MAR-0729-MAR-07Client9.94%

Proiect:Client ID:Vol. Recv.:

YANK01 204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 1.21 +/-0.181 0.0449 +/-0.181 0.0897 pCilg MIHI 04/02/07 1518 621148Americium-241 UI 0.00 +/-0.0237 0.020 +/-0.0237 0.040 pCi/gBismuth-212 0.705 +/-0.196 0.0996 +/-0.196 0.199 pCilgBismuth-214 1.01 +/-0.114 0.0236 +1-0.114 0.0472 pCilgCesium-134 UI 0.00 +/-0.0285 0.0175 +/-0.0285 0.0351 pCi/gCesium-137 U -0.0203 +1-0.0193 0.0125 +1-0.0193 0.025 pCi/gCobalt-60 U 0.0257 +/-0.0234 0.0131 +/-0.0234 0.0261 pCi/gEuropium-152 U -0.0467 +/-0.0394 0.0304 +/-0.0394 0.0608 pCi/gEuropium-154 U -0.0628 +/-0.0492 0.0381 +/-0.0492 0.0762 pCi/gEuropium-iSS UI 0.00 +/-0.0511 0.0307 +/-0.0511 0.0613 pCilgLead-212 1.24 +/-0.135 0.0177 +/-0.135 0.0353 pCilgLead-214 1.14 +/-0.119 0.0225 +/-0.119 0.0449 pCi/gManganese-54 U 0.0105 +/-0.0155 0.0134 +/-0.0155 0.0268 pCi/gNiobium-94 U 0.00351 +/-0.0142 0.0121 +/-0.0142 0.0241 pCi/gPotassium-40 18.4 +1-1.30 0.0912 +/-1.30 0.182 pCilgRadium-226 1.01 +/-0.114 0.0236 +/-0.114 0.0472 pCilgSilver-108m U -0.0143 +/-0.0124 0.0105 +/-0.0124 0.0209 pCilgThallium-208 0.421 +/-0.0498 0.0122 +/-0.0498 0.0244 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U -0.0162 +/-0.022 0.021 +/-0.022 0.049 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 64 of 110

Page 101: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-01 IF Project: YANK01204Sample ID: 183245012 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 61 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.131 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejected* Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifierY QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 65 of 10

Page 102: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of AnalysisCertificate ofA alvsis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-012F183245013TS24-MAR-0729-MAR-07Client6.43%

Project:Client ID:Vol. Recv.:

YANK0 1204YANKO0l

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.816 +/-0.137 0.0309 +/-0.137 0.0618 pCi/g MJHI 04/02/07 1528 621148Americium-241 U 0.0449 +/-0.0409 0.0352 +/-0.0409 0.0704 pCi/gBismuth-212 0.654 +/-0.171 0.0706 +/-0.171 0.141 pCi/gBismuth-214 0.511 +/-0.0697 0.0184 +/-0.0697 0.0368 pCi/gCesium-] 34 UI 0.00 +/-0.0183 0.0131 +/-0.0183 0.0262 pCi/gCesium-]137 U 0.012 +/-0.0117 0.00988 +/-0.0117 0.0197 pCilgCobalt-60 U 0.00394 +/-0.0114 0.00983 +/-0.0114 0.0196 pCilgEuropium-152 U -0.036 +/-0.0318 0.0249 +/-0.0318 0.0498 pCi/gEuropium-154 U -0.0316 +/-0.0361 0.0288 +/-0.0361 0.0575 pCi/gEuropium-155 U 0.0238 +/-0.0393 0.0295 +/-0.0393 0.059 pCi/gLead-212 0.778 +/-0.0661 0.015 +/-0.0661 0.030 pCi/gLead-214 0.604 +/-0.0645 0.0184 +/-0.0645 0.0368 pCi/gManganese-54 U 0.00303 +/-0.0113 0.0101 +/-0.0113 0.0201 pCi/gNiobium-94 U 0.00658 +/-0.0104 0.00914 +/-0.0104 0.0183 pCi/gPotassium-40 13.1 +/-0.940 0.0838 +/-0.940 0.168 pCi/gRadium-226 0.511 +/-0.0697 0.0184 +/-0.0697 0.0368 pCi/gSilver-108m U -0.0129 +/-0.00974 0.00819 +/-0.00974 0.0164 pCi/gThallium-208 0.233 +/-0.0309 0.0102 +/-0.0309 0.0204 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U 0.0084 +/-0.0214 0.0164 +/-0.0214 0.0399 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.32 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Page 66 of 110

Page 103: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analy:sis

Company Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-012F Project: YANK01204Sample ID: 183245013 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 64 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected al dol -condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD1 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy---Uncertain identificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +I-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 67 of 110

Page 104: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-013F183245014TS24-MAR-0729-MAR-07Client.163%

Project:Client ID:Vol. Recv.:

YANKO01204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pt

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.691 +1-0.136 0.0462 +/-0.136 0.0923 pCi/g MJHI 04/02/07 1535 621148Americium-241 U 0.00635 +/-0.0224 0.0182 +/-0.0224 0.0363 pCi/gBismuth-212 0.496 +/-0.189 0.101 +/-0.189 0.202 pCi/gBismuth-214 0.580 +/-0.0828 0.0228 +/-0.0828 0.0456 pCi/gCesium-134 U 0.0327 +/-0.023 0.017 +/-0.023 0.0339 pCi/gCesium-] 37 U 0.01 38 +/-0.0207 0.0118 +/-0.0207 0.0236 pCi/gCobalt-60 U 0.00202 +/-0.017 0.0142 +/-0.017 0.0284 pCi/gEuropium-152 U 0.00641 +/-0.0349 0.0295 +/-0.0349 0.059 pCi/gEuropium-154 U 0.01 84 +/-0.0474 0.0405 +/-0.0474 0.081 pCi/gEuropium-155 UI 0.00 +/-0.0489 0.0298 +/-0.0489 0.0595 pCi/gLead-21 2 0.737 +/-0.0758 0.0158 +/-0.0758 0.0315 pCi/gLead-214 0.560 +/-0.0713 0.0218 +/-0.0713 0.0436 pCi/gManganese-54 U 0.0022 +/-0.0195 0.0134 +/-0.0195 0.0267 pCi/gNiobium-94 U -0.00857 +/-0.0139 0.0113 +/-0.0139 0.0226 pCi/gPotassium-40 13.2 +/-0.970 0.118 +/-0.970 0.235 pCi/gRadium-226 0.580 +/-0.0828 0.0228 +/-0.0828 0.0456 pCi/gSilver-108m U 0.00976 +/-0.0118 0.0108 +/-0.0118 0.0215 pCi/gThallium-208 0.258 +/-0.0382 0.0119 +/-0.0382 0.0237 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, so/id-ALL FSSStrontium-90 U -0.00074 +/-0.0218 0.0184 +/-0.0218 0.0445 pCi/g KSDI 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.3

2 EPA 905.0 Moditied

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 68 of 110

Page 105: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-013F Project: YANK01204Sample ID: 183245014 Client ID: YANKOO I

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Dt

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 63 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound< Result is less than value reportedŽ> Result is greater than value reportedA The TIC is a suspected aldol-condensation product13 For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by CC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLhi Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 69of 110

Page 106: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthyProject: Soils P04* 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-014F183245015TS24-MAR-0729-MAR-07Client4.35%

Project:Client ID:Vol. Recv.:

YANKO 1204YANK00l

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch PI

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.868 +1-0.146 0.0359 +/-0.146 0.0717 pCi/g MJH 1 04/02/07 1524 621148Americium-241 U 0.0525 +1-0.0539 0.0464 +/-0.0539 0.0927 pCi/gBismuth-212 0.716 +/-0.203 0.0789 +/-0.203 0.158 pCi/gBismuth-214 0.597 +/-0.0771 0.0193 +/-0.0771 0.0386 pCilgCesium-134 UI 0.00 +/-0.0176 0.0135 +/-0.0176 0.0269 pCilgCesium-137 U -0.00646 +/-0.014 0.0102 +/-0.014 0.0204 pCi/gCobalt-60 U -0.00185 +/-0.0127 0.0108 +/-0.0127 0.0215 pCi/gEuropium-152 U -0.0392 +/-0.0407 0.0268 +/-0.0407 0.0536 pCi/gEuropium- 154 U -0.00108 +/-0.0451 0.0333 +/-0.0451 0.0666 pCi/gEuropium-ISS U 0.051 +/-0.043 0.0322 +/-0.043 0.0644 pCi/gLead-212 0.908 +/-0.078 0.0164 +/-0.078 0.0329 pCi/gLead-214 0.704 +/-0.0794 0.020 +/-0.0794 0.0399 pCi/gManganese-54 U 0.00355 +/-0.0141 0.00984 +/-0.0141 0.0197 pCi/gNiobium-94 U 0.00125 +/-0.0114 0.00992 +/-0.0114 0.01 98 pCi/gPotassium-40 15.7 +/-1.15 0.0835 +/-1.15 0.167 pCi/gRadium-226 0.597 +/-0.0771 0.0193 +/-0.0771 0.0386 pCi/gSilver-108m U -0.00155 +/-0.0109 0.00972 +/-0.0109 0.0194 pCi/gThallium-208 0.264 +/-0.0323 0.0106 +/-0.0323 0.0211 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL ESSStrontium-90 U -0.0349 +/-0.0253 0.023 +/-0.0253 0.0483 pCi/g KSD1 04/03/07 2022 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 70 of 10

Page 107: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-014F Proiect: YANK01204Sample ID: 183245015 Client ID: YANKOO I

Vol. Recv.:

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 69 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows:

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GCI/vS analysisD Results are reported from a diluted aliquot of the sample1-1 Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limit* Sample results are rejected*J Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 71 of 10

Page 108: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company :Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-015F183245016TS24-MAR-0729-MAR-07Client6.8 1%

Proiect:Client ID:Vol. Recv.:

YANK0 1204YANKO0l

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P'

Rad Alpha Spec Analysis

Alphaspec Am24l, Cm, Solid ALL FSSAmericium-241 UCurium-242 UCurium-243/244 U -

Aiphaspec Pu, Solid-ALL FSSPlutonium-238 UPlutonium-239/240 U -

Liquid Scint Pu24J, Solid-ALL FSSPlutonium-241 U

Rad Gamma Spec Analysis

0.01570.00

-0.0742

+/-0.105+/-0.0693

+/-0.171

0.0800.00

0.166

+/-0. 105+/-0.0693+/-0.172

0.2510.09580.423

0.3930.245

13.5

-0.042 +1-0.152 0.144 +/-0.152-0.0373 +1-0.0845 0.0698 +/-0.0845

-6.64 +/-7.32 6.45 +/-7.32

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228IAmericium-241 U 0.Bismuth-212 2Bismuth-2 14Cesium-I 34 UICesium-] 37 U -0.Cobalt-60 U 0.Europium-152 U -0.CEuropium-154 U -0.Europium-155 U 0.Lead-212Lead-214Manganese-54 U 0,Niobium-94 U 0.CPotassium-40Radium-226Silver-108m U 0.CThallium-208

Rad Gas Flow Proportional Counting

GFPC, SOO0, solid-ALL ESSStrontium-90 U 0.OC

Rad Liquid Scintillation Analysis

LSC', Tritium Dist, Solid - 3 pCi/gTritium U

+/-0.134+/-0.0402

+/-0.168+/-0.0733

+/-0.025+/-0.0135+/-0.0127+/-0.0385+/-0.0398+/-0.0357+/-0.0801+/-0.0729+/-0.0149+/-0.0122

+/-1.18+/-0.0733+/-0.0156+/-0.0364

0.03990.03440.08940.02040.01470.01150.01130.03010.03240.033

0.01 740.02 180.01110.01 060.07930.02040.01 070.0107

+/-0. 134+/-0.0402

+/-0. 168+/-0.0733

+/-0.025+/-0.0135+/-0.0127+/-0.0385+/-0.0398+/-0.0357+/-0.0801+/-0.0729+/-0.0149+/-0.0122

+/-1.18+/-0.0733+/-0.0156+/-0.0364

0.07970.06880.179

0.04070.02940.023

0.02250.06020.06480.066

0.03470.043 60.02210.02 120.158

0.04070.02 150.0213

0.0386

1.94

pCi/gpCi/gpCi/g

pCi/gpCi/g

pCi/g

pCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/g

pCi/g

pCi/g

MIHI 04/02/07 1526 621148

KSDI 04/03/07 2022 621123

AXD2 03/31/07 1349 621141

GXR1 04/04/07 0820 621107

GXR1 04/04/07 2258 622351

BXLI 04/05/07 1410 622105

+/-0.0194 0.0162 +/-0.0194

0.00 +/-1.10 0.926 +/1-l0

Page 72 of 10

Page 109: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company : Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:

9312-0001-015F183245016

Proiect:Client ID:Vol. Recv.:

YANK01204"YANKOO I

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Liquid Scintillation Analysis

Liquid Scint 014, Solid AIIFSSCarbon-14 U -0.00223 +/-0.0902 0.0758 +/-0.0902 0.155 pCi/g AXD2 03/30/07 1950 621144

Liquid Scint Fe5S, Solid-ALL FSSIron-55 U -2.52 +/-31.0 22.1 +/-31.0 46.6 pCi/g MXPI 04/02/07 2057 621136

Liquid Scint Ni63, Solid-ALL FSSNickel-63 U 2.19 +/-10.5 8.70 +/-10.5 18.2 pCi/g MXP1 04/02/07 1605 621137

Liquid Scint Tc99, Solid-ALL FSSTechnetium-99 U -0.214 +/-0.216 0.186 +/-0.216 0.382 pCi/g MXPI 04/04/07 2357 621139

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I DOE EML HASL-300, Am-05-RC Modified

2 DOE EML HASL-300, Am-05-RC Modified

3 DOE EML HASL-300, Pu- I Il-RC Modified4 DOE EML HASL-300, Pu-]Il-RC Modified

5 DOE EML HASL-300, Pu- Il-RC Modified

6 DOE EML HASL-300, Pu- Il-RC Modified7 EML HASL 300, 4.5.2.3

8 EPA 905.0 Modified

9 EPA 906.0 Modified10 EPA EERF C-01 ModifiedI I DOE RESL Fe-I, Modified12 DOE RESL Ni-I, Modified

13 DOE EML HASL-300, Tc-02-RC Modified

14 DOE EML HASL-300, Tc-02-RC Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Americium-243 TracerPlutonium-242 TracerPlutonium-242 Tracer

Aiphaspec Am24i, Cm, Solid ALLAiphaspec Pu, Solid-ALL FSSLiquid Scint Pu24 1. Solid-ALL Fý

898391

(15%-125%)(15%-125%)(25%-125%)

Page 73 of 110

Page 110: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analy:sis

Company Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jaok McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-015F Project: YANK01204Sample ID: 183245016 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU M~DA Units DF Analyst Date Time Batch P

Strontium Carrier GFPC, Sr90, solid-ALL FSS 76 (25%-125%)Iron-59 Tracer Liquid Scint Fe55, Solid-ALL FS 64 (15%-125%)Nickel Carrier Liquid Scint Ni63, Solid-ALL FS 75 (25%-125%)Technetium-99m Tracer Liquid Scint Tc99, Solid-ALL FS 85 (15%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.131 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GCIMS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limit* Sample results are rejected* Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 74 of 10

Page 111: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company : Connecticut Yankee Atomic PowerAddress: 362 lnjun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

93 12-000 1-0 16B183245017TS24-MAR-0729-MAR-07Client4.59%

Project:Client ID:Vol. Remv:

YANK0 1204YANK0OI

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pt

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.947 +/-0.176 0.0419 +1-0.176 0.0837 pCi/g MJHI 04/02/07 1538 621148Americium-241 U 0.067 +/-0.0671 0.0572 +/-0.0671 0.114 pCi/gBismuth-212 0.727 +/-0.232 0.102 +/-0.232 0.205 pCi/gBismuth-214 0.757 +/-0.0878 0.0242 +/-0.0878 0.0483 pCi/gCesium-]134 UI 0.00 +/-0.0199 0.0161 +1-0.0199 0.0322 pCi/gCesium-] 37 U 0.0171 +1-0.018 0.0138 +/-0.018 0.0276 pCilgCobalt-60 U-0.000465 +/-0.0161 0.0136 +/-0.0161 0.0271 pCilgEuropium-152 U 0.0532 +/-0.0642 0.0342 +/-0.0642 0.0683 pCi/gEuropium-154 U -0.0763 +/-0.0545 0.0428 +/-0.0545 0.0856 pCi/gEuropium-ISS U 0.0574 +/-0.0527 0.0376 +/-0.0527 0.0752 pCi/gLead-212 0.984 +/-0.087 0.0199 +/-0.087 0.0398 pCi/gLead-214 0.890 +/-0.104 0.0242 +/-0.104 0.0485 pCi/gManganese-54 U 0.0137 +/-0.0157 0.014 +/-0.0157 0.028 pCi/gNiobium-94 U 0.00465 +/-0.0143 0.0127 +/-0.0143 0.0254 pCi/gPotassium-40 16.3 +/-1.18 0.120 +/-1.18 0.240 pCi/gRadium-226 0.757 +/-0.0878 0.0242 +/-0.0878 0.0483 pCi/gSilver-108m U -0.00239 +/-0.0131 0.0116 +/-0.0131 0.0232 pCi/gThallium-208 0.317 +/-0.0415 0.0127 +/-0.0415 0.0254 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U -0.0351 +/-0.0247 0.023 +/-0.0247 0.049 pCi/g KSDI 04/03/07 2023 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery. Test Recovery% Acceptable Limits

Page 75 of 110

Page 112: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company :Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-000-016B Project: YANK01204Sample ID: 183245017 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D'

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 47 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows:

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GCIMS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifierY QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 76 of 110

Page 113: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-017B183245018TS24-MAR-0729-MAR-07Client6.44%

Proiect:Client ID:Vol. Recv.:

YANKO 1204YANKOO I

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM &ALL ESS 226 In growthWaivedActinium-228 0.977 +1-0.201 0.0637 +/-0.201 0.127 pCi/g MJHI 04/02/07 1540 621148Americium-241 U 0.036 +/-0.0285 0.0228 +/-0.0285 0.0455 pCi/gBismuth-212 0.998 +/-0.257 0.122 +/-0.257 0.243 pCi/gBismuth-214 0.822 +/-0.119 0.0293 +/-0.119 0.0585 pCi/gCesium-134 UI 0.00 +/-0.0304 0.0219 +/-0.0304 0.0439 pCi/gCesium-137 U 0.000501 +/-0.0196 0.0172 +/-0.0196 0.0343 pCi/gCobalt-60 U 0.00658 +/-0.0213 0.0181 +/-0.0213 0.0363 pCi/gEuropium-152 U-0.000124 +/-0.0526 0.0373 +/-0.0526 0.0745 pCi/gEuropium-I 54 U -0.00655 +/-0.0721 0.0598 +/-0.0721 0.120 pCi/gEuropium-ISS UI 0.00 +/-0.0643 0.0342 +/-0.0643 0.0683 pCi/gLead-212 1.03 +/-0.101 0.0206 +/-0.101 0.0411 pCi/gLead-214 0.870 +/-0.104 0.0261 +/-0.104 0.0522 pCi/gManganese-54 U -0.0133 +/-0.0204 0.0169 +/-0.0204 0.0339 pCi/gNiobium-94 U 0.00641 +/-0.0177 0.0156 +/-0.0177 0.0312 pCi/gPotassium-40 16.9 +/-0.930 0.174 +/-0.930 0.348 pCi/gRadium-226 0.822 +/-0.119 0.0293 +/-0.119 0.0585 pCi/gSilver-108m U -0.00299 +/-0.0187 0.0138 +/-0.0187 0.0275 pCi/gThallium-208 0.330 +/-0.0547 0.0156 +/-0.0547 0.03 13 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL ESSStrontium-90 U 0.0091 +/-0.0166 0.0127 +/-0.0166 0.0293 pCi/g KSDI 04/03/07 2231 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.32 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Page 77 of 10

Page 114: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company Connecticut Yankee Atomic PowerAddress : 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-017B Proiect: YANK01204Sample ID: 183245018 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D~

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 64 (25%-i125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 78 of 10

Page 115: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company :Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-018B183245019TS24-MAR-0729-MAR-07Client2.18%

Project:Client ID:Vol. Recv.:

YANK0 1204YANK001

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.901 +/-0.143 0.034 +/-0.143 0.0679 pCi/g MJHI 04/02/07 1546 621148Americium-241 U 0.041 +/-0.0726 0.0632 +/-0.0726 0.126 pCi/gBismuth-212 0.542 +/-0.166 0.0755 +/-0.166 0.151 pCi/gBismuth-214 0.596 +/-0.0738 0.0186 +/-0.0738 0.0372 pCi/gCesium-] 34 UI 0.00 +/-0.0162 0.0136 +/-0.0162 0.0271 pCi/gCesium-137 U -0.0044 +/-0.0125 0.0107 +/-0.0125 0.0213 pCi/gCobalt-60 U 0.0071 +/-0.0138 0.012 +/-0.0138 0.0241 pCi/gEuropium-152 U -0.0338 +/-0.0478 0.0286 +/-0.0478 0.0572 pCi/gEuropium-154 U -0.029 +/-0.043 0.0351 +/-0.043 0.0701 pCi/gEuropium-155 U 0.046 +/-0.0461 0.0364 +/-0.0461 0.0727 pCi/gLead-212 0.802 +/-0.072 0.0174 +/-0.072 0.0348 pCi/gLead-214 0.689 +/-0.0753 0.0195 +/-0.0753 0.0389 pCi/gManganese-54 U 0.0222 +/-0.0158 0.012 +/-0.0158 0.0239 pCi/gNiobium-94 U 0.0049 +/-0.0118 0.0103 +/-0.0118 0.0206 pCi/gPotassium-40 14.8 +/-1.12 0.0746 +/-1.12 0.149 pCi/gRadium-226 0.596 +/-0.0738 0.0186 +/-0.0738 0.0372 pCi/gSilver-108m U -0.00189 +/-0.01 1 0.00983 +/-0.011 0.01 97 pCi/gThallium-208 0.253 +/-0.0356 0.0104 +/-0.0356 0.0208 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U -0.00185 +/-0.0146 0.0125 +/-0.0146 0.0285 pCi/g KSDI 04/03/07 2232 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.32 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 79 of 110

Page 116: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-018B Project: YANK01204Sample ID: 183245019 Client ID: YANKOQI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 84 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GCJMS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 80 of 110

Page 117: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analy:sis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

93 12-0001-0 19B183245020TS24-MAR-0729-MAR-07Client6.55%

Proiect:Client ID:Vol. Recv.:

YANK0 1204YANKOO I

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL ESS 226 In growthWaivedActinium-228 0.822 +1-0.125 0.0287 +/-0.125 0.0574 pCi/g MJHI 04/02/07 1547 621148Americium-241 U 0.00221 +/-0.0599 0.0501 +/-0.0599 0.100 pCi/gBismuth-212 0.452 +/-0.131 0.0607 +/-0.131 0.121 pCi/gBismuth-214 0.514 +/-0.0663 0.0162 +/-0.0663 0.0323 pCi/gCesium-]134 U 0.0189 +/-0.0163 0.0106 +/-0.0163 0.0211 pCi/gCesium-] 37 U 0.0171 +/-0.0155 0.00872 +/-0.0155 0.0174 pCi/gCobalt-60 U 0.0053 +/-0.0104 0.00919 +/-0.0104 0.0184 pCi/gEuropium-152 U -0.0192 +/-0.0294 0.0229 +/-0.0294 0.0457 pCi/gEuropium-154 U -0.0102 +/-0.037 0.0268 +/-0.037 0.0536 pCi/gEuropium- 155 ul 0.00 +/-0.044 0.0291 +/-0.044 0.0581 pCi/gLead-21 2 0.728 +/-0.0649 0.0134 +/-0.0649 0.0268 pCi/gLead-214 0.563 +/-0.0637 0.0157 +/-0.0637 0.0314 pCi/gManganese-54 UI 0.00 +/-0.0137 0.00784 +/-0.0137 0.0157 pCi/gNiobium-94 U -0.00827 +/-0.00935 0.00764 +/-0.00935 0.0153 pCi/gPotassium-40 12.2 +/-0.835 0.0805 +/-0.835 0.161 pCi/gRadium-226 0.514 +/-0.0663 0.0162 +/-0.0663 0.0323 pCi/gSilver-108m U 0.00612 +/-0.0083 0.00758 +/-0.0083 0.0152 pCi/gThallium-208 0.210 +/-0.0276 0.00783 +/-0.0276 0.0157 pCi/g

Rad Gas Flow Proportional CountingGFPC, SO9O, solid-ALL FSSStrontium-90 U 0.0173 +/-0.0275 0.0213 +/-0.0275 0.0477 pCi/g KSDI 04/03/07 2232 621123

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1138 621094

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.32 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 81 of 10

Page 118: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-019B Project: YANK01204Sample ID: 183245020 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D'

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr9O, solid-ALL FSS 56 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GCIMS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.Ul Gamma Spectroscopy--Uncertain identificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 82 of 110

Page 119: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID: 93 12-0001-020-1 Project: YANKO 1204Sample ID: 183245021 Client ID: YANKO0lMatrix: TS Vol. Recv.:Collect Date: 26-MAR-07Receive Date: 29-MAR-07Collector: ClientMoisture: 1.52%

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 1.53 +/-0.273 0.0781 +/-0.273 0.156 pCi/g MJHI1 04/03/07 0958 621149Americium-241 U -0.0412 +/-0.127 0.102 +/-0.127 0.203 pCi/gBismuth-212 1.24 +/-0.343 0.177 +/-0.343 0.354 pCi/gBismuth-214 1.72 +/-0.201 0.0417 +/-0.201 0.0834 pCi/gCesium-134 UI 0.00 +/-0.0391 0.0319 +/-0.0391 0.0638 pCi/gCesium-137 U 0.00215 +/-0.0314 0.0234 +/-0.0314 0.0468 pCi/gCobalt-60 U 0.0276 +/-0.0282 0.0259 +/-0.0282 0.0518 pCi/gEuropium- 152 U -0.0264 +/-0.094 0.0628 +/-0.094 0.126 pCi/gEuropium-154 U 0.0221 +/-0.100 0.0752 +/-0.100 0.150 pCi/gEuropium-ISS U 0.119 +1-0.1 14 0.0745 +/-0.114 0.149 pCi/gLead-212 1.71 +/-0.159 0.0382 +/-0.159 0.0763 pCi/gLead-2 14 1.68 +/-0.189 0.0487 +/-0.189 0.0974 pCi/gManganese-54 U 0.0119 +/-0.0307 0.0232 +/-0.0307 0.0463 pCi/gNiobium-94 U 0.01 26 +/-0.026 0.0228 +/-0.026 0.0455 pCi/gPotassium-40 25.6 +/-2.07 0.186 +/-2.07 0.373 pCi/gRadium-226 1.72 +/-0.201 0.0417 +/-0.201 0.0834 pCi/gSilver-108m U -0.00652 +/-0.0249 0.02 17 +/-0.0249 0.0434 pCi/gThallium-208 0.564 +/-0.0846 0.0224 +/-0.0846 0.0448 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U -0.0124 +/-0.0237 0.0214 +/-0.0237 0.0485 pCi/g NXL3 04/03/07 1641 621125

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-02 I LXM2 03/29/07 1137 621097

The following Analytical Methods were performedMethod Description

2

EML HASL 300,4.5.2.3EPA 905.0 Modified

Page 83 of 110

Page 120: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-020-1 Project: YANK01204Sample ID: 183245021 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch PI

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, SrOO, solid-ALL FSS 55 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows:

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 84of 110

Page 121: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analvsis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-021-1183245022TS26-MAR-0729-MAR-07Client1.24%

Proiect:Client ID:Vol. Recv.:

YANK01 204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 1.33 +/-0.272 0.0666 +/-0.272 0.133 pCi/g MJHI1 04/03/07 0959 621149Americium-241 U 0.110 +/-0.0799 0.0691 +/-0.0799 0.138 pCi/gBismuth-212 0.738 +/-0.284 0.174 +/-0.284 0.347 pCilgBismuth-214 1.16 ±/-0.153 0.0386 +/-0.153 0.0772 pCilgCesium-134 UI 0.00 +/-0.0527 0.0288 +/-0.0527 0.0575 pCi/gCesium-137 U -0.00499 +/-0.0287 0.0208 +/-0.0287 0.0415 pCilgCobalt-60 U -0.0238 +/-0.0258 0.0197 +/-0.0258 0.0395 pCilgEuropium-152 U -0.0743 +/-0.0781 0.0576 +/-0.0781 0.115 pCilgEuropium-154 U 0.015 +/-0.080 0.0592 +/-0.080 0.118 pCi/gEuropium-ISS U 0.0994 +/-0.0844 0.0657 +/-0.0844 0.131 pCi/gLead-21 2 1.35 +/-0.128 0.03 5 +/-0.128 0.0699 pCilgLead-214 1.26 +/-0.141 0.0441 +/-0.141 0.0881 pCi/gManganese-54 U 0.0208 +/-0.0326 0.0229 +/-0.0326 0.0457 pCi/gNiobium-94 U 0.00391 +/-0.0231 0.0198 +/-0.0231 0.0397 pCi/gPotassium-40 20.2 +/-1.63 0.201 +/-1.63 0.401 pCi/gRadium-226 1.16 +/-0.153 0.0386 +/-0.153 0.0772 pCi/gSilver-108m U -0.0348 +/-0.0237 0.0185 +/-0.0237 0.0371 pCi/gThallium-208 0.448 +/-0,0582 0.0208 +/-0.0582 0.0416 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U 0.00941 +/-0.0269 0.0214 +/-0.0269 0.0488 pCi/g NXL3 04/03/07 1703 621125

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1137 621097

The following Analytical Methods were performedMethod Description

I ~~EML HASL 300,4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 85 of 110

Page 122: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-021-1 Project: YANK01204Sample ID: 183245022 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Di

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 54 (25%-I 25%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD1 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejected* Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.Ul Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +I-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceededThe above sample is reported on a dry weight basis.

Page 86 of 110

Page 123: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

93 12-0001-022-1183245023TS26-MAR-0729-MAR-07Client6.25%

Project:Client ID:Vol. Recv.:

YANKO01204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch D~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 IngrowthWaivedActinium-228 1.65 +/-0.377 0.142 +/-0.377 0.283 pCi/g MJHI 04/03/07 1005 621149Americium-241 U 0.0858 +/-0.0729 0.0589 +/-0.0729 0.118 pCi/gBismuth-212 1.43 +/-0.586 0.279 +/-0.586 0.558 pCi/gBismuth-214 1.64 +/-0.258 0.071 +/-0.258 0.142 pCi/gCesium-134 U 0.0887 +/-0.0734 0.0596 +/-0.0734 0.119 pCi/gCesium-] 37 U 0.0107 +/-0.051 0.0451 +/-0.051 0.0901 pCi/gCobalt-60 U -0.0159 +/-0.0563 0.045 +/-0.0563 0.090 pCi/gEuropium-152 U 0.0703 +/-0.176 0.0939 +/-0.176 0.188 pCi/gEuropium-154 U -0.0491 +/-0.190 0.129 +/-0.190 0.258 pCi/gEuropium-ISS U 0.148 +/-0.123 0.0926 +/-0.123 0.185 pCi/gLead-212 1.83 +/-0.198 0.0525 +/-0.198 0.105 pCi/gLead-214 1.90 +/-0.257 0.0697 +/-0.257 0.139 pCi/gManganese-54 U -0.0188 +/-0.0496 0.0412 +/-0.0496 0.0823 pCi/gNiobium-94 U 0.0504 +/-0.0465 0.0432 +/-0.0465 0.0863 pCi/gPotassium-40 26.7 +/-2.06 0.286 +/-2.06 0.572 pCi/gRadium-226 1.64 +/-0.258 0.071 +/-0.258 0.142 pCi/gSilver-1O8m U 0.0229 +/-0.0396 0.031 +/-0.0396 0.062 pCi/gThallium-208 0.578 +/-0.140 0.0372 +/-0.140 0.0744 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U 0.00 135 +/-0.0261 0.02 17 +/-0.0261 0.0485 pCi/g NXL3 04/03/07 1704 621125

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1137 621097

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Page 87 of 110

Page 124: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 93 12-0001-022-1 Project: YANKOI2O4Sample ID: 183245023 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Di

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 64 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 88 of 110

Page 125: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress :362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthyProject: Soils PO#~ 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-023-1183245024TS26-MAR-0729-MAR-07Client2.79%

Project:Client ID:Vol. Recv.:

YANKO 1204YANKO0l

Parameter Qualifier Result Uncertainty ILC TPU MDA Units DF Analyst Date Time Batch P~

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 2.16 +/-0.390 0.140 +/-0.390 0.280 pCi/g MIHI 04/03/07 1207 621149Americium-241 U 0.0788 +/-0.0736 0.0574 +/-0.0736 0.115 pCi/gBismuth-212 1.14 +/-0.457 0.265 +/-0.457 0.530 pCi/gBismuth-214 1.72 +/-0.268 0.068 +/-0.268 0.136 pCi/gCesium-134 U 0.0729 +/-0.0624 0.0461 +/-0.0624 0.0921 pCilgCesium-137 U -0.0231 +/-0.0446 0.036 +/-0.0446 0.072 pCi/gCobalt-60 U 0.0077 +/-0.0416 0.0355 +/-0.0416 0.0709 pCilgEuropium-152 U -0.0148 +/-0.121 0.0918 +/-0.121 0.183 pCilgEuropium- 154 U -0.0416 +/-0.146 0.119 +1-0.146 0.237 pCi/gEuropium-155 U -0.00664 +/-0.102 0.0907 +/-0.102 0.181 pCilgLead-212 2.12 +/-0.264 0.10511 +/-0.264 0.102 pCi/gLead-214 1.88 +/-0.255 0.0699 +/-0.255 0.140 pCi/gManganese-54 U 0.0215 +/-0.0474 0.0384 +/-0.0474 0.0767 pCi/gNiobium-94 U -0.0356 +/-0.0441 0.0347 +/-0.0441 0.0694 pCi/gPotassium-40 25.8 +/-2.29 0.282 +/-2.29 0.563 pCi/gRadium-226 1.72 +/-0.268 0.068 +/-0.268 0.136 pCi/gSilver-108m U 0.0278 +/-0.0384 0.0346 +/-0.0384 0.0692 pCi/gThallium-208 0.597 +/-0.0964 0.0366 +/-0.0964 0.0732 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U -0.0172 +/-0.0249 0.0224 +/-0.0249 0.0489 pCi/g NXL3 04/03/07 1704 621125

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1137 621097

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Page 89 of 110

Page 126: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - wvww.gei.com

Certificate of Analysis

Company Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-023-1 Project: YANK01204Sample ID: 183245024 Client ID: YANKOOI

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 49 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceededThe above sample is reported on a dry weight basis.

Page 90 of 110

Page 127: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certific2tI~ of A n~i 1V~i5~Certificate ofAnalvsis

Company Connecticut Yankee Atomic PowerAddress :362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-024-I183245025TS26-MAR-0729-MAR-07Client8.93%

Project:Client ID:Vol. Recv.:

YANK01204YANKOO 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 1.89 +1-0.405 0.129 +/-0.405 0.258 pCi/g MJHI 04/03/07 1208 621149Americium-241 Ui 0.0723 +/-0.0792 0.0658 +/-0.0792 0.132 pCi/gBismuth-212 1.59 +/-0.724 0.276 +/-0.724 0.551 pCi/gBismuth-214 1.76 +/-0.251 0.0675 +/-0.251 0.135 pCi/gCesium-134 U 0.0981 +/-0.0836 0.0511 +/-0.0836 0.102 pCi/gCesium-137 U 0.000663 +/-0.0563 0.041 +/-0.0563 0.082 pCi/gCobalt-60 U 0.01 67 +/-0.0472 0.0408 +/-0.0472 0.0816 pCi/gEuropium-152 U -0.00532 +/-0.124 0.0993 +/-0.124 0.198 pCi/gEuropium-154 U -0.0596 +/-0.146 0.118 +/-0.146 0.235 pCi/gEuropium-155 U 0.100 +/-0.112 0.103 +/-0.112 0.205 pCi/gLead-212 1.76 +/-0.196 0.0562 +/-0.196 0.112 pCi/gLead-214 1.82 +/-0.231 0.0691 +/-0.231 0.138 pCi/gManganese-54 U 0.00262 +/-0.0475 0.0413 +/-0.0475 0.0826 pCi/gNiobium-94 U 0.0433 +/-0.0446 0.0396 +/-0.0446 0.0792 pCi/gPotassium-40 24.1 +/-2.18 0.420 +/-2.18 0.839 pCi/gRadium-226 1.76 +/-0.251 0.0675 +/-0.251 0.135 pCi/gSilver-I 08m U -0.00324 +/-0.0392 0.0339 +/-0.0392 0.0677 pCi/gThallium-208 0.571 +/-0.110 0.0383 +/-0.1 10 0.0765 pCi/g

Rad Gas Flow Proportional Counting

GFPC, SO9O, solid-ALL FSSStrontium-90 U -0.0 174 +/-0.0253 0.0225 +/-0.0253 0.0487 pCi/g NXL3 04/03/07 1704 621125

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1137 621097

The following Analytical Methods were performedMethod Description

I EML HASL 300,4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery % Acceptable Limits

Page 91 of 10

Page 128: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company : Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 93 12-0001-024-1 Project: YANK01204Sample ID: 183245025 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date TimneBatch P'

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS -55 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 92 of 110

Page 129: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www gel.com

Certificate of Analysis

Company : Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-025-I183245026TS26-MAR-0729-MAR-07Client8.18%

Proiect:Client ID:Vol. Recv.:

YANKO 1204YANKOG 1

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228Americium-241Bismuth-21 2Bismuth-214Cesium-I 34Cesium-I 37Cobalt-60Europium- 152Europium-I 54Europium- 155Lead-21 2Lead-214

1.35U -0.00336

1.671.37

U 0.0854U 0.0059U 0.0147U 0.012U -0.00904U 0.0646

1.191.37

+/-0.289+/-0.0551+/-0.660+/-0.2 17

+/-0.0698+/-0.0451+/-0.0339+/-0.0883

+/-0.128+/-0.0827

+/-0.153+/-0. 187

+/-0.0368+/-0.0344

+1-1.89+/-0.2 17

+/-0.0294+/-0.096

0.1090.0463

0.2320.05210.04540.03340.0299

0.0770.105

0.07740.05030.04480.03070.0280.250

0.05210.0244

0.030

+/-0.289+/-0.0551

+/-0.660+/-0.217

+/-0.0698+/-0.0451+/-0.0339+/-0.0883

+/-0.128+/-0.0827

+/-0.153+/-0.187

+/-0.0368+/-0.0344

+1-1.89+/-0.2 17

+/-0.0294+/-0.096

0.2180.0925

0.4640.104

0.09080.06680.0598

0.1540.2100.1550.101

0.08960.0614

0.0560.5000.104

0. 04880.0599

0. 0495

pCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/gpCi/g

pCi/g

MJHI 04/03/07 1209 621149

NXL3 04/03/07 1710 621125

Manganese-54 U -Niobium-94 U -Potassium-40Radium-226Silver-108m UThallium-208

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U

.0.00848

.0.0088220.41.37

-0.01910.427

-0.0131 +/-0.0239 0.0217 +/-0.0239

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1137 621097

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 93 of 110

Page 130: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company: Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 9312-0001-025-I Project: YANK01204Sample ID: 183245026 Client ID: YANKOOI

Vol. Recv.:

Parameter Quallifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 46 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows:

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.131 Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GC/MS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limitR Sample results are rejectedU Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.UI Gamma Spectroscopy--Uncertain identification* Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceededThe above sample is reported on a dry weight basis.

Page 94 of 10

Page 131: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

(i~rtific2te of A n2Iv~i~Certificate ofA alvsis

Company :Connecticut Yankee Atomic PowerAddress: 362 Injun Hollow Rd

East Hampton, Connecticut 06424Contact: Mr. Jack McCarthy

Project: Soils PO# 002332

Report Date: April 5, 2007

Client Sample ID:Sample ID:Matrix:Collect Date:Receive Date:Collector:Moisture:

9312-0001-026-I183245027TS26-MAR-0729-MAR-07Client7.87%

Proiect:Client ID:Vol. Recv.:

YANK01 204YANKOO I

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch P

Rad Gamma Spec Analysis

Gamma,Solid-FSS GAM & ALL FSS 226 In growthWaivedActinium-228 0.884 +/-0.479 0.146 +/-0.479 0.291 pCi/g MJHI1 04/03/07 1210 621149Americium-241 U 0.0568 +/-0.078 0.0549 +/-0.078 0.110 pCi/gBismuth-212 U 0.575 +/-0.449 0.308 +/-0.449 0.616 pCi/gBismuth-2 14 1.56 +/-0.244 0.0589 +/-0.244 0.118 pCi/gCesium-134 U 0.0979 +/-0.0723 0.0519 +/-0.0723 0.104 pCi/gCesium-137 U -0.0145 +/-0.0448 0.0382 +/-0.0448 0.0764 pCi/gCobalt-60 U 0.00834 +/-0.0505 0.043 +/-0.0505 0.0859 pCi/gEuropium-152 U 0.0373 +/-0.112 0.0911 +/-0.112 0.182 pCi/gEuropium-154 U 0.0667 +/-0.172 0.131 +/-0.172 0.263 pCi/gEuropium-155 U 0.0269 +1-0.105 0.0816 +1-0.105 0.163 pCi/gLead-212 1.36 +/-0.160 0.048 +/-0.160 0.0959 pCi/gLead-214 1.42 +/-0.202 0.0637 +/-0.202 0.127 pCi/gManganese-54 U 0.057 +/-0.0454 0.043 +/-0.0454 0.0859 pCi/gNiobium-94 U 0.0453 +/-0.0681 0.0352 +/-0.0681 0.0704 pCi/gPotassium-40 23.1 +/-1.92 0.282 +/-1.92 0.563 pCi/gRadium-226 1.56 +/-0.244 0.0589 +/-0.244 0.118 pCi/gSilver-108m U -0.00173 +/-0.0378 0.0324 +/-0.0378 0.0648 pCi/gThallium-208 0.469 +/-0.108 0.0386 +/-0.108 0.0771 pCi/g

Rad Gas Flow Proportional Counting

GFPC, Sr9O, solid-ALL FSSStrontium-90 U -0.00858 +/-0.0193 0.0179 +/-0.0193 0.0434 pCi/g NXL3 04/03/07 1710 621125

The following Prep Methods were performedMethod Description Analyst Date Time Prep Batch

Dry Soil Prep Dry Soil Prep GL-RAD-A-021 LXM2 03/29/07 1137 621097

The following Analytical Methods were performedMethod Description

I EML HASL 300, 4.5.2.3

2 EPA 905.0 Modified

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Page 95 of 110

Page 132: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Certificate of Analysis

Company :Connecticut Yankee Atomic PowerAddress 362 Injun Hollow Rd

East Hampton, Connecticut 06424 Report Date: April 5, 2007Contact: Mr. Jack McCarthyProject: Soils PO# 002332

Client Sample ID: 93 12-0001-026-I Project: YANK01204Sample ID: 183245027 Client ID: YANKO0l

Vol. Recv.:

Parameter Qualifier Result Uncertainty LC TPU MDA Units DF Analyst Date Time Batch Pi

Surrogate/Tracer recovery Test Recovery% Acceptable Limits

Strontium Carrier GFPC, Sr90, solid-ALL FSS 64 (25%-125%)

Notes:

The Qualifiers in this report are defined as follows

** Analyte is a surrogate compound* Result is less than value reported* Result is greater than value reportedA The TIC is a suspected aldol-condensation productB For General Chemistry and Organic analysis the target analyte was detected in the associated blank.BD Results are either below the MDC or tracer recovery is lowC Analyte has been confirmed by GCIMS analysisD Results are reported from a diluted aliquot of the sampleH Analytical holding time was exceededJ Value is estimatedN/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or moreND Analyte concentration is not detected above the detection limit* Sample results are rejected* Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.Ul Gamma Spectroscopy--Uncertain identificationX Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier* QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RLh Preparation or preservation holding time was exceeded

The above sample is reported on a dry weight basis.

Page 96 of 110

Page 133: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

I

QUALITYCONTROL

DATA

I I

Page 97 of 110

Page 134: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryClient : Connecticut Yankee Atomic Power

362 Injun Hollow Rd

Renort Date: April 5, 2007Page 1 of 13

East Hampton, ConnecticutContact: Mr. Jack McCarthy

Workorder: 183245

Parmname

Rad Alpha SpecBatch 621107

QC1201305241 183245006 DUPAmericium-24 1

Curium-242

Curium-243/244

NOM Sample QuqJ OC Unit- RPD% REC% Ranue Anist Date Time

u -0.0394Uncert: +/-0.08 16

TPU: +/-0.0818

U 0.00Uncert: +/-0.083

TPU: +/-0.083

U 0.00Uncert: +1-0.0794

TPU: +/-0.0794QC1201305243

Americium-24 I

Curium-242

Curium-243/244

QCI 201305240Americium-24 I

LCS

MB

12.4

Uncert:

TPU:

Uncert:

TPU:14.8

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

U -0.0452

+1-0.0683+/-0.0684

U 0.00

+/-0.0676+/-0.0676

U -0.0555+/-0.0411

+/-0.0418

11.2

+/-1.06

+/-1.79U 0.00

+/-0.0518+/-0.0518

14.2+/-1.19

+/-2.18

U -0.0487

+/-0.0641

+/-0.0641U 0.00

+/-0.0603+/-0.0603

U 0.0459

+/-0.0861+/-0.0863

pCi/g 14

pCi/g 0

pCi/g 200

pCi/g

Curium-242

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

(0% -100%) GXRI 04/03/07 09:33

(0%- 100%)

(0% - 100%)

90 (75%-125%)

96 (75%-125%)

Curium-243/244

QCI 201305242Americium-24 I

Curium-242

Curium-243/244

183245006 MS3.5 U -0.0394

Uncert: +/-0.08 16

TPU: +/-0.0818

U 0.00Uncert: +/-0.083

TPU: +/-0.08316.1 U 0.00Uncert: +/-0.0794

TPU: +/-0.0794

U

12.0+/-1.16+/-1.940.0303

+/-0.0594

+/-0.0595

14.9+/-1.29+/-2.33

89 (75%-125%)

93 (75%-125%)

Batch 622105

QC1201307489 183245006 DUPPlutonium-24 I U -3.12 U -8.22 pCi/g 0 (0% -100%) BXLI 04/05/07 15:31

Page 98 of 110

Page 135: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245

Parmname

Rad Alpha SpecBatch 622105

Page 2 of 13

NOM Sample Qual - QC Units RPD% REC% Range Anist Date Time

QC1201307491 LCSPlutonium-24 I

QC1201307488 MBPlutonium-24 1

QC1201307490 183245006 MISPlutonium-241

Uncert:

TPU:

138Uncen:

TPU:

Uncert:

TPU:

140 UUncert:

TPU:

+/-10.1

+1-10.1+/-9.75+/-9.75

113+/-14.9

+/-19.1

U -1.9

pCi/g

pCi/g

pCi/g

82 (75%-125%) 04/05/07 16:04

04/05/07 15:15

04/05/07 15:48-3.12

Batch 622351

120+/-13.1+/-17.4

-0.0 147+/-0.0204

86 (75%-125%)

QC1201308035 183245006 DUPPlutonium-238

Plutonium-239/240

QC1201308037 LCSPlutonium-238

Plutonium-239/240

QC 1201308034 MBPlutonium-238

Plutonium-239/240

QC1201308036 183245006 MISPlutonium-238

u 0.0429Uncert: +/-0.0969

TPU: +/-0.0971

u 0.059Uncert: +/-0.0943

TPU: +/-0.0946

Uncert:

TPU:12.7Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

U 0.0429Uncert: +/-0.0969

TPU: +/-0.097113.7 U 0.059Uncert: +/-0.0943

TPU: +/-0.0946

u

+/-0.0204U 0.0306

+/-0.060+/-0.0601

U 0.0151+/-0.0602+/-0.0603

12.9+/-1.20+1- 1.91

U -0.00689+1-0.0135+/-0.0135

U -0.0138+/-0.0 191+/-0.0192

pCilg 409

pCi/g 63

pCi/g

pCi/g

(0% - 100%) GXR I

(0% -100%)

(75%-125%)

102 (75%-125%)

04/04/07 22:5 8

pCi/g

pCi/g

pCi/g

pCi/g

u 0.0767+/-0.105+/-0.106

14.9+/- 1.32+/-2.15

(75%-1 25%)

Plutonitim-239/240 109 (75%-125%)

Rad Gamnma SpecBatch 621148

QC1201305341 183245001 DUPActinium-228 0.454

+/-0.150OUncert:0.539

+/-0. 112+/-0.112

pCi/g 17 (0% - 100%) MJHI1 04/02/07 18:03

Page 99 of 110

Page 136: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel .com

QC SummaryWorkorder: 183245 Page 3 of 13

Parmname NOM Sample Qual QC Units RPD% REC% Range Anist Date Time

Rad Gamma SpecBatch 621148

Americium-241

Bismuth-2 12

Bismuth-214

Cesium- 134

Cesium- 137

Cobalt-60

Europium-I 52

Europium- 154

Europium- 155

TPU: +1-0.150u 0.0498

Uncert: +/-0.066TPU: +/-0.066

Ul 0.00Uncert: +/-0.207

TPU: +/-0.2070.371

Uncert: +/-0.0773TPU: +/-0.0773

U 0.0207Uncert: +/-0.0 199

TPU: +/-0.0199U 0.0128

Uncert: +/-0.0247TPU: +/-0.0247

U 0.0139Uncert: +/-0.02 15

TPU: +/-0.0215U -0.0239

Uncert: +/-0.0558TPU: +/-0.0558

U 0.00648Uncert: +/-0.0619

TPU: +/-0.06 19U 0.0856

Uncert: +/-0.05 14TPU: +/-0.05 14

0.534Uncert: +/-0.0676

TPU: +/-0.06760.436

Uncert: +/-0.0773TPU: +/-0.0773

U 0,0173Uncert: +/-0.0166

TPU: +/-0.0 166U 0.00137

Uncert: +/-0.0 179TPU: +/-0.0 179

9.22Uncert: +/-0.883

TPU: +/-0.8830.371

Uncert: +/-0.0773TPU: +/-0.0773

U 0.00822Uncert: +/-0.0 162

U 0.0345+/-0.0596+/-0.0596

0.34 1+/-0.160+/-0.160

0.379+/-0.0602+/-0.0602

U 0.000141+/-0.0267+/-0.0267

U 0.00416+/-0.0193+/-0.0193

U 0.00394+/-0.0151+/-0.0151

U -0.000835+/-0.0358+/-0.0358

U -0.00786+/-0.0404+/-0.0404

U 0.00483+/-0.0343+/-0.0343

0.423+/-0.044+/-0.044

0.415S+/-0.057+/-0.057

U 0.0164+/-0.0143+/-0.0143

U -0.00269+/-0.0117+/-0.0117

9.84+/-0.783+/-0.783

0.379+/-0.0602+/-0.0602

U -0.00827+/-0.00995

pCi/g 36

pCi/g 14

pCi/g 2

pCi/g 197

pCi/g 102

pCi/g 112

pCi/g 187

pCi/g 2080

pCi/g 179

pCi/g 23*

pCi/g 5

pCi/g 5

pCi/g 614

pCi/g 7

pCi/g 2

pCi/g 66000

(0% - 100%)

(0% - 100%)

(0% - 100%)

(0% - 100%)

(0% -100%)

(0% - 100%)

(0% - 100%)

(0% - 100%)

(0% - 100%)

(0%-20%)

(0% - 100%)

(0% - 100%)

(0%- 100%)

(0% -20%)

(0%- 100%)

(0%- 100%)

Lead-212

Lead-214

Manganese-54

Niobium-94

Potassium-40

Radium-226

Silver-I 08m

Page 100 of 110

Page 137: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

Workorder: 183245

Parmname

Rad Gamma SpecBatch 621148

Thallium-208

QC1201305342 LCSActinium-228

Americium-24 I

Bismuth-2 12

Bismuth-2 14

Cesium- 134

Cesium- 137

Cobalt-60

Europium-152

Europium- 154

Europium- 155

Lead-212

Lead-214

Manganese-54

Niobium-94

Potassium-40

QC SummaryPage 4 of 13

NOM Sample Qua] QC Units RPD% REC% Range Anist Date Tim e

TPU:

Uncert:TPU:

Uncert:TPU:

16.0Uncert:

TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

6.20Uncert:

TPU:9.32Uncert:

TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

+1-0.01620.159

+/-0.034+/-0.034

+/-0.009950.133

+/-0.0272+/-0.0272

U 0.455+/-0.477+/-0.477

13.7+/-2.15+/-2.15

U 0.848+/-0.760+/-0.760

0.641+/-0.309+/-0.309

U 0.014+/-0.115+/-0.115

5.84+/-0.487+/-0.487

8.92+/-0.678+/-0.678

U -0.26+/-0.261+/-0.261

U 0.023+/-0.243+/-0.243

U -0.202+/-0.290+/-0.290

0.995+/-0.293+/-0.293

0.864+/-0.307+/-0.307

U -0.0401+/-0.107+/-0.107

U -0.0423+/-0.0934+/-0.0934

U 0.265

pCi/g 18 (0%- 100%)

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

04/02/07 13:59

86 (75%-125%)

94 (75%-125%)

96 (75%-125%)

Page 101 of 110

Page 138: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245 Page 5 of 13

Parmname NOM SaMDie Oual OC IJnit' RPD% REC% Ranee Anist Date Time

Rad Gamma SpecBatch 621148

Radium-226

Silver-i 08m

Thallium-208

QC1201305340Actinium-228

Americium-24 1

Bismuth-2 12

Bismuth-214

Cesium- 134

Cesium- 137

Cobalt-60

Europium- 152

Europium- 154

Europium-] 55

MB

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:-

Uncert:TPU:

Uncert:

TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:

TPU:

+/-1.40+/-1.40

0.641+/-0.309+/-0.309

U 0.0309

+/-0.0841+/-0.0841

0.357+/-0.178+/-0.178

U 0.0219+/-0.0568+/-0.0568

U 0.0142

+/-0.0309+/-0.0309

U 0.0481+/-0.0585+/-0.0585

U -0.00992+/-0.0231+/-0.0231

U 0.00219+/-0.0102+/-0.0102

U -0.00319+/-0.00774+/-0.00774

U -0.00692+/-0.00883+/-0.00883

U 0.00367+/-0.022+/-0.022

U 0.0228+/-0.022+/-0.022

U -0.0278+/-0.0253+/-0.0253

U 0.00794

+/-0.0205+/-0.0205

U -0.022+/-0.0274+/-0.0274

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

(75%-125%)

04/02/07 18:01

Lead-21 2

Lead-214

Page 102 of 10

Page 139: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245 Page 6 of 13

Parmname NOM Sample Oual OC Units RPD% REC % Range AnIst Date Time

Rad Gamma SpecBatch 621148

Manganese-54

Niobium-94

Potassium-40

Radium-226

Silver-I 08m

Thallium-208

Uncert:TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:Batch 621149

QC1 201305348Actinium-228

Americium-24 I

Bismuth-2 12

Bismuth-214

Cesium-I 34

Cesium-137

Cobalt-60

Europium-I 52

Europium- 154

Europium-I 55

183245021 DUP1.53

Uncert: +/-0.273

TPU: +/-0.273

U -0.0412Uncert: +/-0.127

TPU: +/-0.1271.24

Uncert: +/-0.343

TPU: +/-0.3431.72

Uncert: +/-0.201

TPU: +/-0.201

UI 0.00Uncert: +/-0.0391

TPU: +/-0.0391

U 0.00215Uncert: +/-0.0314

TPU: +/-0.03 14

U 0.0276Uncer: +/-0.0282

TPU: +/-0.0282

U -0.0264Uncert: +/-0.094

TPU: +/-0.094

U 0.0221Uncert: +/-0.100

TPU: +/-0.100

U 0.119

U 0.000811+/-0.00741

+/-0.00741U -0.00166

+/-0.00749+/-0.00749

UI1 0.00+/-0.139+/-0.139

U -0.00992+/-0.0231+/-0.0231

U -0.00426

+/-0.00719+/-0.00719

UI1 0.00+/-0.0123+/-0.0123

1.59+/-0.286+/-0.286

U 0.0296+/-0.0983+/-0.0983

1.09+/-0.394+/-0.394

1.65+/-0.195

+/-0.195U 1 0.00

+/-0.0442+/-0.0442

U -0.00812+/-0.0328+/-0.0328

U 0.00443+/-0.0349+/-0.0349

U 0.0111+/-0.0925+/-0.0925

U -0.0225+/-0.0951+/-0.0951

U 0.123

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pci/g

pCi/g 4

pCi/g 1220

pCi/g 13

pCi/g 4

pCi/g 9

pCi/g 344

pCi/g 145

pCi/g 492

pCi/g 22900

pCi/g 31

(0% -100%) MJH1 04/03/07 12:58

(0% - 100%)

(0% -100%)

(0% -20%)

(0%- 100%)

(0% - 100%)

(0% - 100%)

(0% - 100%)

(0% - 100%)

(0%- 100%)

Page 103 of 10

Page 140: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245 Page 7 of 13

Parmname NOM Sample Qual QC Units RPD% REC% Range Anist Date Time

Rad Gamma SpecBatch 621149

Lead-212

Lead-214

Manganese-54

Niobium-94

Potassium-40

Radium-226

Silver-I 08m

Thallium-208

QCI 201305349Actinium-228

Americium-24 I

Uncert: +/-0.114TPU: +/-0.114

1.71Uncert: +/-0.159

TPU: +/-0.1591.68

Uncert: +/-0.189TPU: +/-0.189

U 0.0119Uncert: +/-0.0307

TPU: +/-0.0307U 0.0126

Uncert: +/-0.026TPU: +/-0.026

25.6Uncert: +/-2.07

TPU: +/-2.071.72

Uncert: +/-0.201TPU: +/-0.201

U -0.00652Uncert: +/-0.0249

TPU: +/-0.02490.564

Uncert: +/-0.0846TPU: +/-0.0846

+/-0.120+/-0.120

1.72+1-0.155+/-0.155

1.94+/-0.205+/-0.205

U -0.00151+/-0.0268+/-0.0268

U 0.0123+/-0.0256+/-0.0256

24.1+/- 1.82+/-1.82

1.65+/-0. 195+/-0. 195

U -0.0062+/-0.0235+/-0.0235

0.506+/-0.0705+/-0.0705

1.50+/-0.705+/-0.705

14.2+/-1.49+/- 1.49

U 0.645+/-0.763+/-0.763

0.697+/-0.253

+/-0.253U 0.0839

+/-0.105+/-0. 105

5.80+/-0.571+/-0.571I

9.36+/-0.701+/-0.701I

pCi/g 1

pCi/g 15

pCi/g 258

pCi/g 3

pCi/g 6

pCi/g 4

pCi/g 5

pCi/g 11I

(0% -20%)

(0% -20%)

(0% -100%)

(0% - 100%)

(0% -20%)

(0%- 100%)

(0%- 100%)

(0% -20%)

LCS

Bismuth-2 12

Bismuth-2 14

Cesium- 134

Cesium- 137

Cobalt-60

Uncert:TPU:

16.0Uncert:

TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

6.20Uncert:

TPU:9.32Uncert:

TPU:

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

pCi/g

89 (75%-125%)

04/03/07 13:00

94 (75%-125%)

100 (75%-125%)

Page 104 of 10

Page 141: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245 Page 8 of 13

Parnmanae

Rad Gamma SpecBatch 621149

NOM Sample Qua] OC Units RPD% REC% Range Anist Date Time

Europium-I 52

Europium- 154

Europium-1I55

Lead-212

Lead-214

M anganese-54

Niobium-94

Potassium-40

Radium-226

Silver- lO8m

Thallium-208

QCI 201305347Actinium-228

Americium-24 I

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncert:TPU:

Uncent:TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

U ncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:TPU:

Uncert:

U -0.176+/-0.243+/-0.243

U 0.00147+/-0.242+/-0.242

U 0.0771+/-0.250+/-0.250

0.907+/-0. 176+/-0.176

0.454+/-0.238+/-0.238

U 0.0229+/-0.0932+/-0.0932

U -0.0465+/-0.084±/-0.084

U 0.383+/-0.835+/-0.835

0.697+/-0.253+/-0.253

U -0.0512+/-0.0813+/-0.0813

0.328+/-0.152+/-0.152

U -0.00165+/-0.0486+/-0.0486

U 0.0179+/-0.0243+/-0.0243

U -0.0577+/-0.110+/-0.110

U 0.0128+/-0.0306+/-0.0306

U 0.00507+/-0.0126

pCilg

pCilg

pCi/g

pCi/g

pCilg

pCilg

pCilg

pCilg

pCi/g

pCilg

pCi/g

pCi/g

pCilg

pCi/g

pCilg

pCilg

(75%-1 25%)

MB04/03/07 12:57

Bismuth-2 12

Bismuth-2 14

Cesium-I 34

Page 105 of 10

Page 142: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245 Page 9 of 13

Parmname NOM Sample Qual QC Units RPD% REC% Range Anist Date Time

Rad Gamma SpecBatch 621149

TPU:Cesium- 137

Cobalt-60

Europium-152

Europium- 154

Europium- 155

Lead-21 2

Lead-214

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

Uncert:

TPU:

+/-0.0126U 0.00189

+/-0.012

+/-0.012U 0.00173

+/-0.0135+/-0.0135

U 0.00881+/-0.0314

+/-0.0314U -0.0162

+/-0.040+/-0.040

U 0.0195+/-0.032+/-0.032

U -0.0286+/-0.0274+/-0.0274

U -0.0156+/-0.0217+/-0.0217

U 0.00042+/-0.0108+/-0.0108

U -0.00626+/-0.012

+/-0.012U 0.200

+/-0.186+/-0.186

U 0.0128+/-0.0306+/-0.0306

U -0.000226+/-0.0111+/-0.0111

U -0.000331+/-0.0177+/-0.0177

pCi/g

pCi/g

pCi/g

pCi/g

pCilg

pCi/g

pCi/g

pCi/g

pCi/g

pCilg

pCi/g

PCi/g

pCi/g

Manganese-54

Niobium-94

Potassium-40

Radium-226

Silver- 108m

Thallium-208

Rad Gas FlowBatch 621123

QC1201305274 183245001 DUPStrontium-90

QC120I 305276 LCSStrontium-90

u -0.01 17Uncert: +/-0.0206

TPU: +/-0.0206

U -0.00416+/-0.0137+/-0.0137

pCi/g 0 (0% -100%) KSDI 04/03/07 22:32

1.41 1.70 pCi/g 121 (75%-125%) 04/04/07 10:38

Page 106 of 10

Page 143: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245 Page 10 of 13

Parmname NOM Sample Qua] QC Units RPD% REC% Range Anist Date Time

Rad Gas FlowBatch 621123

QC1201305273 MBStrontium-90

QC1201 305275 183245001 MSStrontium-90

Uncert:

TPU:

Uncert:

TPU:

+/-0. 106+/-0. 113

U 0.0151+/-0.0141

+/-0.0141

pCi/g

pCilg

04/03/07 22:32

04/03/07 22:311.53 UUncert:

TPU:

-0.0 117+/-0.0206+/-0.0206

1.24+/-0.103+/-0.108

81 (75%-125%)

Batch 621125

QC1201305282 183245021 DUPStrontium-90

QCI2OI 305284 LCSStrontium-90

QC1201305281 MBStrontium-90

QC1201305283 183245021 MISStrontium-90

Rad Liquid ScintillationBatch 621136

QC1201305301 183245006 DUPIron-S55

u -0.0124Uncert: +/-0.0237

TPU: +/-0.0237

1.40Uncert:

TPU:

Uncert:

TPU:

1.41 U -0.0124Uncert: +/-0.0237

TPU: +/-0.0237

U 0.013+/-0.0268+/-0.0268

1.38+/-0.0937

+/-0.103

U -0.00552+/-0.0133+/-0.0133

1.17+/-0.127+/-0.132

pCj/g 0 (0% - 100%) NXL3

pCi/g

pCi/g

pCi/g

99 (75%-125%)

04/03/07 17:11

04/03/07 17:53

04/03/07 17:11

04/03/07 17:1183 (75%-125%)

U -26.4Uncert: +/-34.3

TPU: +/-34.3

U 2.65+/-34.0+/-34.0

pCi/g 0 (0% - 100%) VIXPl

QC1201305303 LCSIron-55

QC1201305300 MBIron-55

1180Uncert:

TPU:

Uncert:

TPU:

1230 UUncert:

TPU:

1130+/-61.3+/-98.0

pCi/g 96 (75%-125%)

04/02/07 22:19

04/02/07 22:51

04/02/07 22:02

04/02/07 22:35

U -26.4 pCi/g

+/-28.2+/-2 8.2

QC1201305302 183245006 MISIron-55 -26.4

+/-34.3+/-34.3

1180+/-69.4+/-110

pCi/g 96 (75%-125%)

Batch 621137

QC1201305305 183245006 DUPNickel-63 U -11.2 U -8.44 pCi/g 0 (0% - 100%) NIXPI 04/02/07 17:27

Page 107 of 10

Page 144: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel~com

QC SummaryWorkorder: 183245 Page 11 of 13

Parmname NOM Sanmle Oual OC Units RPD% REC% Range Anist Date Time

Rad Liquid ScintillationBatch 621137

QC1201 305307 LCSNickel-63

QC1201305304 MBNickel-63

QC1201305306 183245006 MSNickel-63

Uncert:

TPU:

556Uncert:

TPU:

Uncert:

TPU:

591 UUncert:

TPU:

+/-9.41+/-9.41

477

+/-25.4+/-30.6

U 2.75

pCi/g

pCi/g

pCi/g

86 (75%-125%) 04/02/07 17:59

04/02/07 17:10

04/02/07 17:43-11.2+/-9.41+/-9.41

Batch 621139

QC1201305311 183245006 DUPTechnetium-99

QC1201305313 LCSTechnetium-99

QC1201305310 MBTechnetium-99

QC1201305312 183245006 MISTechnetium-99

u -0.155Uncert: +/-0.229

TPU: +/-0.229

U

505+/-27.3

+/-33.0

-0.139

+/-0.236

+/-0.236

16.4

+/-0.466+/-0.623

85 (75%-125%)

pCi/g 0 (0% - 100%) m4PI

19.6Uncert:

TPU:

Uncert:

TPU:

20.0 UUncert:

TPU:

U -0.281

+/-0.210

+/-0.210

pCi/g

pCi/g

pCi/g

84 (75%-125%)

04/03/07 15:56

04/03/07 17:00

04/03/07 15:25

04/05/07 09:59-0.155

+/-0.229

+/-0.229

15.0

+/-0.676

+/-0.776

75 (75%-125%)

Batch 621141

QC1201305317 183255002 DUPTritium U -0.106

Uncert: +/-1.06TPU: +/-1.06

U 0.451+/-1.03+/-1.03

pCi/g 0 (0% - 100%) 'XXD2 03/31/07 18:55

QC1201305319 LCSTritium

QC1201305316 MBTritium

11.7Uncert:

TPU:

Uncert:

TPU:

11.9 UUncert:

TPU:

12.0+/-1.54

+/-1.55

U -0.232+/-0.991+/-0.991

pCi/g

pCi/g

pCi/g

102 (75%-125%) 03/31/07 20:57

03/31/07 17:53

03/31/07 19:56Q01201305318 183255002 MIS

Tritium -0.106

+1- 1.06+/-1.06

13.2+/- 1.63+/-1.65

111 (75%-125%)

Batch 621144

Page 108 of 10

Page 145: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel.com

QC SummaryWorkorder: 183245 Page 12 of 13

Range Anist Date TimeParmname

Rad Liquid ScintillationBatch 621144

NOM _Sample ua OC Units RPD% REC%

QC]201305325 183245006 DUPCarbon- 14

QC1201305327 LCSCarbon-14

QC1201305324 MBCarbon-14

QC1201305326 183245006 MSCarbon- 14

U 0.0236Uncert: +/-0.090

TPU: +/-0.090

U -0.0 162+/-0.0934+/-0.0934

7.02+/-0.203+/-0.231

pCi/g 0 (0% - 100%) %\XD2 04/02/07 15:22

7.09Uncert:

TPU:

Uncert:

TPU:

U -0.0233+/-0.0925+/-0.0925

pCilg

pCilg

pCi/g

99 (75%-125%) 04/02/07 17:28

04/02/07 14:19

04/02/07 16:257.16Uncert:

TPU:

U 0.0236+/-0.090+/-0.090

6.92+/-0.202

+/-0.229

97 (75%-125%)

Notes:The Qualifiers in this report are defined as follows:

** Analyte is a surrogate compound

* Result is less than value reported

* Result is greater than value reported

A The TIC is a suspected aldol-condensation product

B For General Chemistry and Organic analysis the target analyte was detected in the associated blank.

BD Results are either below the MDC or tracer recovery is low

C Analyte has been confirmed by GC/MS analysis

* Results are reported from a diluted aliquot of the sample

H Analytical holding time was exceeded

J Value is estimated

N/A Spike recovery limits do not apply. Sample concentration exceeds spike concentration by 4X or more

ND Analyte concentration is not detected above the detection limit

R Sample results are rejected

U Analyte was analyzed for, but not detected above the MDL, MDA, or LOD.

UI Gamma Spectroscopy~-Uncertain identification

X Consult Case Narrative, Data Summary package, or Project Manager concerning this qualifier

Y QC Samples were not spiked with this compoundA RPD of sample and duplicate evaluated using +/-RL. Concentrations are <5X the RL

h Preparation or preservation holding time was exceeded

Page 109 of 10

Page 146: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

GEL LABORATORIES LLC2040 Savage Road Charleston SC 29407 - (843) 556-8171 - www.gel .com

QC SummaryWorkorder: 183245 Page 13 of 13

Parmname NOM Sample Qual ~QC Units RPD% REC% Range Anlst Date TimeN/A indicates that spike recovery limits do not apply when sample concentration exceeds spike conc. by a factor of 4 or more.** Indicates analyte is a surrogate compound.A The Relative Percent Difference (RPD) obtained from the sample duplicate (DUP) is evaluated against the acceptence criteria when thesample is greater than five times (5X) the contract required detection limit (RL). In cases where either the sample or duplicate value isless than 5X the RL, a control limit of +/- the RL is used to evaluate the DUP result.For PS, PSD, and SDILT results, the values listed are the measured amounts, not final concentrations.

Where the analytical method has been performed under NELAP certification, the analysis has met all of therequirements of the NELAC standard unless qualified on the QC Summary.

Page 110 of 110

Page 147: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 4 (DQA RESULTS)

Revision 0

Page 148: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 4A(PRELIMINARY DATA REVIEW)

Revision 0

Page 149: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTArNMENTSURVEY UNIT 93 12-0001

RELEASE RECORDAttachment 4

Survey Unit: 931 2-0001

Area Description RCA Containment

Classification 1

Survey Media Surface Soils

Type of Survey Final Status Survey

Number of Measurements 15 Static, 4 Judgmental, 7 Investigative

STATISTICS on TOTALPOPULATION

STATISTICS on NON-PARAMETRIC POPULATION

Cs-i 37

DCGLOp (pCilg): 4.75E+00

Minimum Value: -2.31 E-02

Maximum Value: 7.99E-02

Mean: 1.41 E-02

Median: 4.70E-03

Standard Deviation: 2.83E-02

Co-60

2.29E+00

-2,38E-02

2.76E-02

5.90E-03

3.97E-03

1.18E-02

Sr-SO

9.30E-01

-3.51 E-02

2.82E-02

-5.08E-03

-3.71 E-03

1 .43E-02

DCGLOp (pCilg):

Minimum Value:

Maximum Value:

Mean:

Median:

Standard Deviation:

Cs-i 37

4.75E+00

-2.03E-02

7.99E-02

2.15E-02

1 .20E-02

3.28E-02

Co-60 Sr-SO

2.292+00 9.302-01

-4.50E-03

2.57E-02

5.43E-03

2.14E-03

9.40E-03

-3.49E-02

2.82E-02

-3.51 E-03

-7.40E-04

1 .44E-02

0.29

7.36E-01

0.10

Cs-i 37 Co-60 Sr-SOGPS Coordinates 11FF 1

Sample ID Result MIDA Result IMDAT Result MDA2r [Identified j 2a IIdentified [ 2ar Identified

North East (pcl/g) ______j(PCll)(cl) _____ (pcl/g) (pcllg) (pcllg)

9312-0001 -OO1F 236653.27 668703.89 1.28E-02 ,0.025 3.26E-02 1.39E-02 0.022 3.47E-02 -1.17E-02 0.021 4.70E-02

931 2-0001-002F 236653.27 668744.35 7.15E-02 0.026 3.70E-02 + -7.81 E-04 0.020 3.37E-02 1.83E-03 0.021 4.21 E-02

9312-0001-003F 236618.24 668683.67 0 OOE+00 0.045 5.05E-02 2.42E-02 0.035 6.34E-02 -1.77E-02 0.022 4.81 E-02

931 2-0001-004F 236618.24 668724.12 6.82E-02 0.035 3.83E-02 + 4.22E-04 0.020 3.31 E-02 -3.71 E-03 0.022 4.62E-02

931 2-0001-005F 236618.24 668764,58 5.55E-02 0.020 2.29E-02 + 2.14E-03 0.016 2.52E-02 -1.35E-02 0.020 4.34E-02

9312-0001-006F 236618.24 668805.03 4.12E-02 0.017 2.15E-02 + 2.01E-03 0.014 2.32E-02 8.37E-04 0.024 4.75E-02

9312-0001-007F 236583.20 668663.44 -6.43E-03 0.016 2.27E-02 -4.50E-03 0.015 2.39E-02 -4.23E-03 0.023 4.71 E-02

9312-0001-008F 236583.20 668703.89 -2.17E-03 0.014 2.09E-02 2.37E-03 0.013 2.27E-02 2.82E-02 0.029 4.72E-021

931 2-0001-009F 236583.20 668744.35 4.706 03 0.020 2.856 02 -4.23E-03 0.017 2.896 02 2.66E-03 0.026 4.85E-02

931 2-0001-01OF 236583.20 668784.80 7.99E-02 i0.023 2.23E-02 + 3.97E-03 0.014 2.35E-02 7.90E-03 0.026 4.72E-02 :

9312-0001 -O11 F 236583.20 668825.26 12.03E-02 0.019 2.506 02 2.57E-02 0.023 2.616 E02 + -1.62E-02 0.022 4.906 02

Fractionof DCGL

-0.004

0.017

-0.008

0.011

-0.002

0.0 10

-0.008

0.031

0.002

0.027

-0.010

REVISION 0 Pg fPage I of`4

Page 150: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENTSURVEY UNIT 93 12-0001

RELEASE RECORDAttachment 4

Cs-i 37 Co-60 Sr-90

Sample ID GSCodnts Result 2a MDA Idniid Result 2a MDA Idniid Result 2a MDA IetfeNorth East (pCi/g) (pCi~g) (pCi/g) (pCtlg) (pCtlg) (pCtig)

9312-0001-012F 236548.17 668683.67 1,202 02 0,012 1.972 02 + 3.94E-03 0.011 1 6 28.402 03 0.021 3.99E-02

9312-0001-013F 236548.17 668724.12 1.38E-02 0.021 2.362 02 2.022-03 0.017 2.84E-02 -7.40E-04 0.022 4.452 02

931 2-0001-014F 236548.17 668764.58 -6.46E-03 0.014 2.04E-02 -1.85E-03 0.013 2.152 02 -3.49E-02 0.025 4.83E-02

9312-0001-015F 236513.14 668744.35 -2.302 03 0.014 2.302 02 1.22E-02 0.013 2.25E-02 i1.67E-04 0.019 3.86E-02

9312-0001-OO3FS 236618.24 668683.67 5.27E-02 0.035 4.02E-02 + 2.382-02 0.034 4.99E-02 -1.60E-02 0.021 4.552 02

9312-0001-016-B 236676.51 668734.75 1.71iE-02 0.018 2.76E-02 -4.65E-04 0.016 2.712 E02 -3.512 E02 0.025 4.902 02

9312-0001-017-B 236622.41 668815.99 5.0lE-04 0.020 3.43E-02 6.58E-03 0.021 3.63E-02 9.10E-03 0.017 2.932 02

9312-0001-018-B 236599.54 668836.44 -4.402 03 0.013 2.132-02 7.10E-03 0.014 2.412 E02 -1.85E-03 0.015 2.85E-02

9312-0001-019-B 236594.08 668662.08 1. 71iE02 0.016 1.74E-02 + 5.30E-03 0.010 1.842-02 1.732-02 0.028 4.77E-02

9312-0001-020-I 236596.22: 668760.32 2,152-03 0.031 4.68E-02 2.762-02 0.028 5.182 02 -1.242-02 0.024 4.852 02

9312-0001-021-I 236591.06: 668772.54 -4.992 03 0.029 4.152 02 -2.38E-02 0.026 3.95E-02 9.412 E03 0.027 4.882 02

9312-0001-022-I 236588.64 668780.33 1.072 02 0.051 9.012-02 -1.59E-02 0.056 9.002 02 1.35E-03 0.026 4.85E-02

9312-0001-023-I 236591.73: 668782.14 -2.312 E02 10.045 7.202 02 7.702-03 0.042 7.092 02 -1.722-02 0.025 4.89E-02

9312-0001-024-I 236593.28 668785.43 6.632-04 0.056 8.202-02 1.672-02 0.047 8.162 02 -1.74E202 0.025 4.87E-02

9312-0001-025-I 236598.60! 668800.13 5.902 03 0.045 6.682-02 1,47E-02 0.034 5.982 02 -1.312-02 0.024 4.952 02

9312-0001-026-I 236600,66: 668803.01 -1.452 02 0.045 7.642 02 8.342-03 0.051 8902-8.582 03 0.019 4320

Fractionof DCGL

0.013

0.003

-0.040

0.005

0.004

-0.034

0.013

0.000

0.025

-0.00 1

-0.001

-0.003

-0.020

-0.011

-0.006

-0.009

REVISION 0 Pg fPage 2 of4

Page 151: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENTSURVEY UNIT 93 12-0001

RELEASE RECORDAttachment 4

OTHER RADIONUCLIDES

Sample ID Isotope Reul 2a M Identified ICLP FatoJ(pCI/g) J _____[(PCi/g) J_____ (PCi/g) of DCGL

9312-0001 -001F Cs-134 2.07E-02 0.020 3.60E-02 + 2.8E+00 0.007

9312-0001 -001F Eu-155 8,56E-02 0.051 9.66E-02 + 2.4E+02 0.000

9312-0001 -001F Mn-54 1.73E-02 0.017 3.15E-02 + 1.OE+0i 0.002............... E u......-...................................... ............. ..................... ................ 0...07 5. .......E........ ......2.......................0 0 0 0.......

9312-0001-002F Eu-155 8.34E-02 0.076 1.01E-01 + 2.4E+02 0.000

9312-0001-003F Eu-155 9.68E-02 0.0506 1.0E-01 + 2.4E+02 0.000

931 2-0001-004F Eu-i3 55 .603E-02 0,0618 4.5E-02 + 2.8E+00 0.000

9312-0001-007F Am-241 4 8.2E-02 0.041 7.13E-01 + 1.6E+01 0.003

9312-0001-007F Cs-i 34 32.6E-02 0.023 3.02E-02 + 2.8E+00 0.012

9312-0001-007F Eu 155 5.03E-02 0.043 7.15E-02 + 2.4E+02 0.000

9312-0001-008F Eu15 i 5.14.E-02 10.036 6.01E-02 + 2.4E+02 0.000

9312-0001-016-B Eu 155 6.72E-02 0.053 78.24E-02 + 2.4E+02 0.000

9312-0001-017-B Am-241 4.49E-02 0.029 4.04E-02 + 1.6E+01 0.002

9312-0001-018-B Mn 54 3.27E-02 0.016 2.39E-02 + 1O+i 00931-001-09-BCs 34 .8E-0 006 .2.1E-0 + 2.8E+00 0.007

9312-0001-014-I Eu 155 5.10E-02 01143 1 644E-02 + 24+2 00

9312-0001-0215I Eu 155 4.89E-02 0.084 1.60E-02 + 2.4E+02 0.000

9312-0001-0125I Am241 1.67E-02 0.073 2.1 E-02 + 16+i 009312-001-22- Cs134 8 8E 0 003 119E01 .2 E+01 0.032

9312-0001-016-I Eu 155 1.748E01 0.1532 7.852E01 + 2.4E+02 0.001

931 2-0001-017-I Nb 941 5.60E-02 0.047 8.63E-02 + 1.6E+01 0.012

931 2-0001-018-I Amn241 7.88E-02 0.074 2.39E-02 1 .6E+01 0.005

REVISION 0 Pg fPage 3 of 4

Page 152: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENTSURVEY UNIT 9312-0001

RELEASE RECORDAttachment 4

Sample ID Isotope Re I 2cr M Identified ICLp Fato

(pCi/g) _____j(pCi1g) (Pcilg) of DCGL

931 2-0001-023-1 Cs-134 7,29E-02 0.062 9.21E-02 + 2.8E+00 0.026

9312-0001-024-1 Cs-134 9.81 E-02 0.084 1.02E-01 + 2.8E+00 0.035

9312-0001-025-1 Cs-i 34 8,54E-02 0.070 9.08E-02 + 2.8E+00 0.031

931 2-0001-026-I Cs-i 34 9.79E-02 0.072 1.04E-01 + 2.8E+00 0.035

931 2-0001-026-1 Mn-54 5.70E-02 0.045 8.59E-02 + 1 OE+01 0.005

REVISION 0Pae4o4 Page 4 of 4

Page 153: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAiNMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 4B(GRAPHICAL REPRESENTATION OF

DATA)

Revision 0

Page 154: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

FREQUENCY PLOT FOR CESIUM- 137

Survey Unit: 9312-0001Survey Unit Name: RCA - Containment (CTMT)

Mean: 2.15E-02 pCi/g

Frequency Plot For Cs-I 3710

C.)

U-

6-

4-

2 -

0 I II

-3.60E-03 1.31E-02 2.98E-02 4.65E-02 6.32E-02 7.99E-02

Upper End Value (pCilg)

Upper End Observation ObservationValue Frequency Frequency

-3.60E-03 3 20%1.3 1E-02 6 40%2.98E-02 - 1 7%4.65E-02 1 7%6.32E-02 1 7%7.99E-02 3 20%

Total: 15 100%

I . WomxoW iA L' ,411%]0-7S miftedb ~by Date

/4i'-- /ý-a7Review-ed by/Date 1 of 1

Page 155: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

QUANTILE PLOT FOR CESIUM-i137

Survey Unit: 9312-0001Survey Unit Name: RCA - Containment (CTMT)

Mean: 2.15E-02 pCi/g

Quantile Plot For Cs-I 37

l.OQE-0l

8.OOE-02 f-r+-1--1 -- l1---

6. OOE-02

S4. OOE-02

0

'-2. OOE-02

-2.OOE-02

1~-I-- U

4--

11 T I I IU

0 20 40 60 80 100

Percentage

Cs- 137 Rank Percentage-2.03E-02-6.46E-03-6.43 E-03-2.30E-03-2.1 7E-030.OOE±004.70E-031 .20E-021.28E-021 .38E-024.12E-025.55E-026.82E-027.15E-027.99E-02

123

.456789101112131415

3.3%10.0%16.7%23.3%30.0%36.7%43.3%50.0%56.7%63.3%70.0%76.7%83.3%90.0%96.7%

~7I~-~v 1111~ 107S,4mitted bý9 Date

Reviewed by/Date

Page 156: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

FREQUENCY PLOT FOR COBALT-60

Survey Unit: 93 12-0001Survey Unit Name: RCA - Containment (CTMT)

Mean: 5.43E-03 pCi/g

Frequency Plot For Co-6010

8-

U.

6 -I

4-

2-

0-5.33E-04 5.57E-03 1.06E-02 1.56E-02 2.07E-02 2.57E-02

Upper End Value (pCilg)

Upper End Observation ObservationValue Frequency Frequency

5.33E-04 4 27%5.57E-03 7 47%1 .06E-02 . 0 0%1.56E-02 2 13%2.07E-02 0 0%2.57E-02 2 13%

Total: 15 100%

1411R 10-7Sý mitted b Date

Reviewýe-d by/Date 1o1 of 1

Page 157: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

QUANTILE PLOT FOR COBALT-60

Survey Unit: 93 12-0001Survey Unit Name: RCA - Containment (CTMTr)

Mean: 5.43E-03 pCi/g

Quantile Plot For Co-60

0.

0.(3

3.00E-02

2. 50E-02

2.00E-02

1 .50E-02

1 .00E-02

5.00E-03

0.00E+00

-5.00E-03

-1 .00E-02

U

Hf

U

U U U

U

0

80 100

400 20 40 60 80 100

Percentage

Co-60 Rank Percentage-4. 50E-03-4.23E-03-1.85E-03-7.8 1 E-044.22E-042.01 E-032.02E-032.14E-032.37E-033 .94E-033 .97E-031 .22E-021.39E-022 .42E-022.57E-02

123

.456789101112131415

3.3%10.0%16.7%23.3%30.0%36.7%43.3%50.0%56.7%63.3%70.0%76.7%83.3%90.0%96.7%

ý1-0. WO1VO uJ LA VC ~~j~1g J~7StOý ntte by/Date

C- V -

Revi=~ by/Date

Page 158: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 4C (SIGN TEST)

Revision 0

Page 159: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Connecticut Yankee Decommissioning ProjectHealth Physics Procedure

GPP-GGGR-R5121-001 Attachment B,Rev.CY-OQI MAJOR

Sign Test Calculation Sheet for Multiple Radionuclides

Survey Area Number: 9312 JSurvey Unit Number: 0001 WPIR #: N/A

Survey Area Name: Containment (CTMVT) ~Classification: 1 TYPE I (a error): 0.05 N: 15

Radionuclides: lst Radionuclide 2 nd Radionuclide 3rd Radionuclide 4 th RadionuclideCs-i 37 Co-60 Sr-90

DCGL: 4.75E+00 2,29E+00 9.30E-01

Results lst Results 2 nd Results 3 Id Results 4 th Weighted Sum 1 -W, SignRadionuclide Radionuclide Radionuclide Radionuclide (WI)

(pCi/g) (pCilg) (pCi/g) (pCi/g)

1.28E-02 1.39E-02 -1 .1 7E-02 0.00 1.00 +___ I___7.15E-02 -7.81 E-04 1.83E-03 0.02 0.98 +10.OOE+00 2.42E-02 -1 .77E-02 -0.01 1.01 +16.82E-02 4.22E-04 -3.71 E-03 _______0.01 0.99+15.55E-02 2.14E-03 -1.35E-02 0.00 1.00 +14.12E-02 2.O1 E-03 8.37E-04 ________0.01 0.99 +1-6,43E-03 -4.50E-03 -4.23E-03 -0.01 1.01 +1-2.17E-03 2.37E-03 2.82E-02 0.03 0.97 +1 ___

4370E-03 -4,23E-03 2.66E-03 0.00 1.00 +1 __

7.99E-02 3.97E-03 7.90E-03 ________0.03 0.97 +1-2.03E-02 2.57E-02 -1.62E-02 -0.01 1.01 +11 .20E-02 3.94E-03 8.40E-03 0.01 0.99 + 11 .38E-02 2.02E-03 -7.40E-04 ________0.00 1.00 + 1 __

-6,46E-03 -1.85E-03 -3.49E-02 -0.04 1.04 + I-2.30E-03 1.22E-02 1 .67E-04 ________0.01 0.99 +1

Number of positive differences (S+)l 15Meets -the Acceptance Criteria

Performed by: Date:

Date:

4/17/2007

Independent Review by:

Page 1 of I

Page 160: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 4D (QC SPLIT RESULTS)

Revision 0

Page 161: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

Health Physics Procedure 24265-000-G]:'P-CjGCjR-R5124-000-Rev.(,'Y-000 Attachment A1-Icaith Physics Procedure 24265-000-GPP-GGGR-R5 124-000-Rcv.CY-000 Attachment A

Split Sample Assessment Form

Survey Area #: 9312 Survey Unit II 0001 Survey Unit Name: R.CA -Containment (CTMIT)

Sample Plan or WPIR#: N/A MJ: 9 200-0

Sample D.escription: Comparison of split samples collected from sample measurement location #3 and analyzed using gammaspectroscopy by off-site Vendor L.aboratory. The standard sample was 931l2-0001-003F2, the comparison sample was9312-000 1-0031'S.

STANDARD COMP~ARISON

Radionuclide Activity Standard Resolution Agreement Activity Standard Comparison Acceptable

Value Error Range Value Error Ratio (YIN)

K-40 1.5711-4 01 0.620 25 0.75 - t.33 1.57E+01 0.730 1.00 Y

CommentsIL/-UIL Vret' ve~t ons:. S-.1 I Was2) not Me=tLL n III >Uient'

quantities in the field split results at location 9312-0001-003F toevaluate in accordance with procedure. Evaluation using the reportedresults tor K-40 resulted in acceptable agreement between the field-split results at these locations.. Since K-40 was found to be present at anacceptable level of agreement, no further action is warranted.

I able' is p[ovided to sho{w accpitance critei used toC

assess split samples.

Resolufion4 -78- 1516-50

51-200>200

Aareuncnt..Mv&.0 -2,0

0.6 -1.66

0.75 - 1.330.80 -1.25

0.85 -1.18

I iate:

Page I of 1

Page 162: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

CONTAINMENT(FORMER RADIOLOGICALLY CONTROLLED AREA)

SURVEY UNIT 93 12-0001

RELEASE RECORD

ATTACHMENT 4E(COMPASS POWER CURVE)

Revision 0

Page 163: Haddam Neck Plant Final Status Survey (FSS) Final Report - Phase … · 2012. 11. 29. · C*YAPCO FINAL STATUS SURVEY RELEASE RECORD CONTAINMENT (FORMER RADIOLOGICALLY CONTROLLED

DQA Surface Soil Report

Assessment Summary

Siteý

Planner(s).

Survey Unit Name&

Report Number:

Survey Unit Samples:

Reference Area Samples:

Test Performed:

Judgmental Samples:

Assessment Conclusion:

9312

Wojo

9312-0001

1

15

0

Sign Test Result: Not Performed

0 EMVC Result: Not Performed

Reject Null Hypothesis (Survey Unit PASSES)

Retrospective Power Curve

S07

S0.6

-015

S0.6

*035

0 04

S01

III d

.z~Iz_ -~__

-111111 -__

-- 4 _ - _

~iz~ ___ __

0ý0 0,2 04 0.6 0.8 1 0

Unity Rule Sum-of-Ratios, including background

Prospective Power a 1 -beta - Actual Power

- LBGR -- Estimated Power

DCGL -.- Retrospective Power

12

COMPASS 0l.0.0 41107Pg4/18/2007 Page 1