Hadoop 0.20.2 to 2.0
Jabir Ahmed
•New Features• HA Namenode
• YARN
•Bug fixes & performance improvements
•keeping pace with the community and to be ready to adapt technologies that are being built rapidly over Hadoop
Why Hadoop 2.0 ?
Analytics ReportingData
Streaming via HDFS
Adhoc Querying /Modeling
Real time data
processing
Hadoop Usage @ inmobi
•HDFS & MRV1
•Falcon‣ Active MQ
•HBase
•Conduit‣ Scribe
‣ Conduit Worker
‣ Pintail
Hadoop Eco System
• Zoo-keeper• Oozie• WebHDFS• Pig• Hive • Hcatalog &
Metastore
Cluster Topology
• 5 Production Quality Clusters spread across 5 co-locations
• 30 to 150 Node clusters
• Largest is over 1 Peta Byte
• Average 500TB
• 2,00,000+ Jobs Per day
• 6TB of data generated every day
• 10,000,000,000 Events Generated a day (10 Billion)
Clusters In Inmobi
Cluster topology
Centralized Cluster
Co-located Clusters Co-located Clusters
Upgraded Components
Component Old version New version Other Changes
HDFS 0.20.2 2.0
Job-tracker 0.20.2 2.0
Oozie 3.3.2 3.3.2 Recompiled
Hbase 0.90.6 0.94.6
Webhdfs -NA- 0.0.3 Re-Compiled internally
Falcon 0.2.3 0.4.5
Pig 0.8.1 0.11.0
Zookeeper 3.3.4 3.4.5
Conduit Recompiled
1. Configuration management 1. Heterogeneous clusters
2. Host Level Configurations were really hard to manage
2. Data movement had to continue between clusters which could/would run different version of Hadoop
3. All applications had to be seamlessly migrated with least downtime & NO failures
4. Capacity Challenges1. Network Challenges
2. Hardware Limitations
3. Storage & Computation limitations
5. Expected uptime for each of the clusters in over 99%, which meant we couldn’t keep the cluster down for upgrade for a long time
6. Roll back was not possible
Challenges
How we over came the challenges
1. Configuration Management
Problem‣ We had configurations in debians like
‣ Cluster_Conf_version_1.deb
‣ Cluster_conf_version_2.deb and so on
‣ For 5 cluster and 10 components we would manage a lot of debs each with 15-20 Confs
‣ Changing a property value across the cluster was time consuming
Packages & configurations ‣ Since host specific Configurations were really hard to manage we deprecated debians
‣ Moved entire Package & configuration to puppet
Advantages‣ Under 10 files to manage
‣ Everything was managed via templates and only host/component/cluster specific variables had to be set appropritely
‣ Verification & confidence was higher with puppet while deploying changes in production
1.1 Sample puppet configuration
Template<% mapred_queues.each_pair do |key,value| -%> <!-- setting for queue <%= key %> --> <property> <name>mapred.capacity-scheduler.queue.<%= key %>.capacity</name> <value><%= value %></value> </property><% end -%>
Actual values
$mapred_queues={ ”reporting" => 25, ”analytics" => 12, ”default" => 21, ”Hourly" => 14, ”daily" => 13,
....... }
Apply template file {
"${conf_location}/capacity-scheduler.xml": ensure => present, owner => root, group => root, mode => 644, content => template('grid/hadoop2.0/hadoopCoreConfig/capacity-scheduler.xml');
2. Data Movement
All applications had to change to pull the data from other clusters
distcp across clusters was not possible with the standard hdfs & hftp protocols
We had to use Web-HDFS•Code was patched to allow only reads
All applications & Falcon feeds/data replications had to be tested & migrated to web-hdfs.
Since web-hdfs was a SPOF, it had to be made scalable & high available
All clients reading from HDFS had to also upgrade libraries•Ensured all stacks were compatible to read from upgraded HDFS
• Some applications like falcon & conduit had to be enhanced to use the webhdfs protocol as a pre-requisite.
3. Application Challenges
•2 Versions of applications had to be maintained‣ One for 0.20 and the other for 2.0
‣ To avoid disruption in current business & respective development
•Staging cluster had to be rebuilt to run 2 version of Hadoop for pre prod testing,validation and sign off
•A lot of applications had to be made compatible since some functions & classes were deprecated in 2.0
•Few class path changes were identified in pre-prod testing
Capacity was a limitation since our headroom in other co-locations was only 30% but we were flipping 100% from one region to another
•Network & Infra challenge‣ N/W bandwidth for latency to avoid delays in data movement.
‣ Other stacks also had to check for capacity while we did a failover for the upgrade
•Ensuring we have enough capacity in other cluster to process data while meeting SLA’s
‣ Added physical nodes to existing clusters & dependent stacks if it was required.
‣ Added more conduit/scribe agents to handle the increase in traffic during upgrade.
4. Capacity Challenges
5. Deployment & Upgrade
•Rolling upgrade of clusters• The GSLB was changed to redirect traffic to closest region
• Had to latencies were met as per the business requirement
•Maintenance was scheduled at a time when the impact was least.• The time chosen was when the # of requests were the least for the specific region to ensure
we don’t impact the performance and also don’t require 100% capacity in the failed over region
•Data was processed on another cluster to have business continuity.
•Since datanode upgrade depends on the number of blocks on the datanode we cleaned up HDFS to reduce the blocks on the datanodes which eventually helped in expediting the upgrade process
•Upgrading components in parallel where there was no dependency
5.1 Deployment Sequence
HDFS Datanodes 4 hours
JT Tasktrackers 45 minutes
Zookeeper Hbase Master Region Servers 45 minutes
Oozie 15 minutes
WebHDFS < 15 minutes
Falcon < 10 minutes
Conduit 30 minutes
Most of the nagios checks and metrics collected in ganglia remained the same
New Monitoring
•Monitoring for new services like web-hdfs had to be added.
Monitoring changes
• Nagios had minor changes to monitor the edits since the edits had changed from
‣ edits & edits.new to
‣ edits_0000000000357071448-0000000000357619117 edits_inprogress_0000000000358739241
Ganglia Metrics
•Ganglia was over whelmed with the new RS metric so we had to patch it to skip sending some metric that wasn’t required.
‣ Custom filter was written to filter events that were not used
6. Monitoring & Metrics
•The job tracker had a memory leak and had to be restarted once every 3-4 days
• https://issues.apache.org/jira/browse/MAPREDUCE-5508
• Hbase started emitting 1000’s of metrics per table brining ganglia down & we had to patch it internally to fix it
Issues / Bugs encountered
•One step at a time
• We didn’t want to do a lot of things at one go, so we took small steps and at the end achieved the goal
• Team work, Works!
• Its really hard to do this as a “One Man Show”, we noticed immense sense of trust and responsibility among the team during the entire process
• Every Mistake was a learning
• Every mistake that was done in the initial stages was not a reason to blame each other but we went ahead and fixed it ensuring it didn’t happen again
• Finally
• There were smooth upgrades !
Learning & Best Practices