29
Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions 1 INTRODUCTION 1.1 Introduction M/s A.D.S. Spirits Pvt. Ltd. is a grain based distillery which is in its operational phase and is situated near Village- Bakra, Tehsil- Beri, District-Jhajjar, Haryana. This Project has obtained its Environmental Clearance from Ministry of Environment Forest & Climate Change (MoEF& CC), New Delhi with certain conditions. 1.2 Summary of the project: M/s A.D.S. Spirits Pvt. Ltd. is a grain based distillery. The Project is in operational phase. All the construction work had already been done. The production of the project is 60KLPD. The project is having ETP plant, which is well maintained by the maintenance department. The project is having one boiler of 25 TPH capacity and also having a DG sets of 750 KVA capacity which is mentioned in Chapter no.-3. The project has a well-developed green area built around the industry. 1.3 Purpose of the Report As per the “Sub Para (i)” of “Para 10” of EIA Notification 2006, it is stated that “It shall be mandatory for the project proponent to submit half-yearly compliance report in respect of the stipulated prior environmental clearance terms and conditions in hard and soft copies to the concerned regulatory authority, on 1st June and 1st December of each calendar year” and as per compliance condition mentioned in Environment Clearance Letter. The regulatory authorities in this case are MoEF& CC, Delhi, MoEF& CC, Chandigarh and HSPCB, Panchkula. Various scheduled Site Visits were conducted by a team of Experts to Monitor Pollution related parameters as defined by CPCB / HSPCB. Samples for water and soil were also collected by NABL/ MoEF approved laboratory for analysis. Based on the Specific and General Conditions mentioned in the EC Letter, a Compliance Report has been prepared and submitted regularly to the authority. The Environmental assessment has been carried out to verify: 1) The proposed project has not any adverse effect on the project site as well as it’s surrounding. 2) There is compliance with the conditions stipulated in the Environmental Clearance Letter. 3) The Project proponent is implementing the environmental safeguards in true spirit. 4) The non-conformity in the project with respect to the environmental implication of the project. 5) The project proponent is implementing the environmental pollution mitigative measures as suggested in approved Form-1 and Form – 1A, Environmental Management Plan and Building Plan. 1.3 Methodology for Preparation of Report is as follows: 1) Study of EC Letter & Related Documents, 2) Site Visits by a Team of Experts, 1
Transcript
Page 1: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

1

INTRODUCTION

1.1 Introduction

M/s A.D.S. Spirits Pvt. Ltd. is a grain based distillery which is in its operational phase and is situated near Village- Bakra, Tehsil- Beri, District-Jhajjar, Haryana.

This Project has obtained its Environmental Clearance from Ministry of Environment Forest & Climate Change (MoEF& CC), New Delhi with certain conditions. 1.2 Summary of the project:

M/s A.D.S. Spirits Pvt. Ltd. is a grain based distillery. The Project is in operational phase. All the construction work had

already been done. The production of the project is 60KLPD. The project is having ETP plant, which is well maintained

by the maintenance department. The project is having one boiler of 25 TPH capacity and also having a DG sets of 750

KVA capacity which is mentioned in Chapter no.-3. The project has a well-developed green area built around the

industry.

1.3 Purpose of the Report As per the “Sub Para (i)” of “Para 10” of EIA Notification 2006, it is stated that “It shall be mandatory for the project proponent to submit half-yearly compliance report in respect of the stipulated prior environmental clearance terms and conditions in hard and soft copies to the concerned regulatory authority, on 1st June and 1st December of each calendar year” and as per compliance condition mentioned in Environment Clearance Letter. The regulatory authorities in this case are MoEF& CC, Delhi, MoEF& CC, Chandigarh and HSPCB, Panchkula. Various scheduled Site Visits were conducted by a team of Experts to Monitor Pollution related parameters as defined by CPCB / HSPCB. Samples for water and soil were also collected by NABL/ MoEF approved laboratory for analysis. Based on the Specific and General Conditions mentioned in the EC Letter, a Compliance Report has been prepared and submitted regularly to the authority. The Environmental assessment has been carried out to verify:

1) The proposed project has not any adverse effect on the project site as well as it’s surrounding.

2) There is compliance with the conditions stipulated in the Environmental Clearance Letter.

3) The Project proponent is implementing the environmental safeguards in true spirit.

4) The non-conformity in the project with respect to the environmental implication of the project.

5) The project proponent is implementing the environmental pollution mitigative measures as suggested in approved Form-1 and Form – 1A, Environmental Management Plan and Building Plan.

1.3 Methodology for Preparation of Report is as follows:

1) Study of EC Letter & Related Documents,

2) Site Visits by a Team of Experts,

1

Page 2: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

2

3) Monitoring of Environment Parameters, viz. Ambient Air, Water, Noise & Soil by the NABL/Moef labs

4) Interpretation of Monitoring Results.

5) Preparation of half yearly Environmental Compliance Report. 1.4 Generic Structure of Report:

1) Purpose of the Report, explaining the need of a Compliance Report and Methodology Adopted for preparation of Report.

2) Compliance Report, explaining the entire General & specific conditions in the EC Letter and providing details w.r.t. each condition/ guideline.

3) Monitoring Reports & Analysis, showing the level of emission within the project site for various Environment Parameters.

4) Photographs showing status of the project and site.

5) Supporting Documents which are mandatory for the project.

Page 3: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

3

ADHERENCE TO SPECIFIC AND GENERAL

CONDITIONS

PART A – SPECIFIC CONDITIONS

S. No. Conditions of Environmental Clearance Status of Compliance

i. Environmental Clearance accorded is for Grain based distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior permission from the Ministry.

The distillery obtained the Consent to operate from Haryana Pollution Control board vide letter No. 2777414 JHACTO338917 dated 01-02-2014 under Water Act and Air Act for grain based operation only, whenever we will go for molasses based operation than we will take prior permission from the ministry. Consent to operate for grain based production is enclosed as Annexure-1.

ii. Efforts shall be made to reduce PM10levels in the ambient air and a time bound action plan shall be submitted. Bag filter along with stack of adequate height shall be provided to boiler to control particulate emission within 100 mg/Nm3. At no time, the emission levels shall go beyond the prescribed standards. In the event of failure of any pollution control system adopted by the unit, the respective unit shall not be restarted until the control measures are rectified to achieve the desired efficiency.

Adequate measures like green belt & plantations, water sprinkling on haul roads and unpaved areas on regular basis was being under taken to reduce the PM10 level below ambient air quality standards. ESP and bag filters have been installed to minimize the particulate emissions. 40 meters height &1.30 meter diameter of Stack is provided. Stack results are enclosed as Annexure- 2.

iii. The National Ambient Air Quality Emission Standards issued by the Ministry vide G.S.R. No. 826(E) dated 16th November, 2009 shall be followed.

The ambient air quality monitoring was carried out on September 2018 & results of ambient air quality are enclosed as Annexure-2. It depicts that the results are well within the Permissible limits.

iv. Pucca approach road to project site shall be constructed prior to commencing construction activity of the main distillery so as to avoid fugitive emissions.

Pucca roads within the premises and approach for road Preparation has been done and water sprinkling is also being done at regular basis to avoid fugitive emissions.

v. In Plant, control measures for checking fugitive emissions from all the vulnerable sources shall be provided. Fugitive emissions shall be controlled by providing closed storage, closed handling & conveyance of chemicals/materials, multi cyclone separator and water sprinkling system. Dust suppression system including water sprinkling system shall be provided at loading and unloading areas to control dust emissions. Fugitive emissions in the work zone environment, product, raw materials storage area etc. shall be regularly monitored and records should be maintained. The emissions shall conform to the limits proposed by Haryana State Pollution Control Board (HSPCB)

For the control of fugitive emission regular water sprinkling being done in the operation phase. In the operational phase closed storage, closed handling & conveyance of chemicals/materials, multi cyclone separator and water sprinkling systems are being provided. Some measures being taken for control of fugitive emission are given below:

1. Covered Transportation. 2. Materials are in moist form for transportation. 3. Internal and approach road are pucca road 4. Storage is fully covered. 5. Water sprinkling being done on regular basis.

vi. The gaseous emissions from DG Set shall be dispersed through adequate stack height as per CPCB guidelines. Acoustic enclosure shall be provided to the DG sets to mitigate the noise pollution.

DG Set of 750 KVA with acoustic enclosure and stack height as per CPCB guidelines are in operation.

vii. The Company shall upload the status of compliance of the stipulated environmental clearance conditions, including results of monitored data on its website and

The Monitoring results along with Compliance report are being uploaded on our website and updated timely and sent to the concerned authorities on regular basis.

2

Page 4: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

4

S. No. Conditions of Environmental Clearance Status of Compliance

shall update the same periodically. It Shall simultaneously be sent to the Regional Office of MoEF, the respective zonal office of CPCB and the HPSCB. The levels of PM10, SO2, NOX, CO AND HC (Methane) in ambient air shall be monitored and displayed at a convenient location near the main gate of the company and at important public places.

viii. Total fresh water requirement from ground water source shall not exceed 10 KL/KL of alcohol (i.e. 600m3/day) for distillery unit and 230 m3/day for cogeneration unit (2.5 MW) and prior permission for drawl of water shall be obtained from the concerned authorities. A copy of water permission from concerned Authority shall be submitted to the Ministry’s Regional Office at Bhopal. No ground water shall be used.

Total fresh water requirement is estimated to be 830m3/day which will be met by ground water & recycled water. Permission for withdrawal of 900 m3/day of water has already been obtained from the Central Ground Water Authority vides CGWA Letter No. CGWA/IND/Proj/2015-60-R dated 20-04-2015 which is enclosed as Annexure-3 for the ready reference.

ix. Explore the possibility to use canal water instead of ground water. Further, water consumption shall be reduced by adopting 3 R’s (Reduce, Reuse and Recycle) concept in the process.

Only ground water is being used and we are adopting the zero effluent discharge concepts for waste water minimization.

x. Spent wash generation shall not exceed 6Kl/Kl of Alcohol. Spent wash shall be treated through decanter and concentrated in multi-effect evaporator (MEE) to form DWGS. Spent less, effluent from bottle washing, utilities and cogeneration unit shall be treated in effluent treatment plant (ETP) and water quality of treated effluent shall meet the norms prescribed by CPCB/SPCB and recycled in the process and for green belt development. Treated effluent shall be recycled/reused within the factory premises.

The plant is running on grain based mode only. No spent wash is being generated, only dry cake is being used which is being used as cattle feed and sold to authorize vendors. After treatment the treated waste water is being used for green belt & plantation development and reused in process.

xi. No Effluent from distillery and co-generation power plant shall be discharged outside the factory premises and “Zero” discharge concept shall be maintained.

Unit is operating on Zero Discharge concepts. Liquid effluent is subjected to multi effect evaporation & condensation is entirely recycled back to process.

xii. Process effluent/any wastewater shall not be allowed to mix with storm water. Storm water drain shall be passed through guard pond.

Separate lines have been constructed for the discharge of process effluent and storm water.

xiii. Spent wash should be stored in impervious lagoon with HDPE lining as per CPCB guidelines and shall be kept in proper conditions to prevent ground water pollution. Storage capacity of spent wash lagoon should be for 5 days.

Storage capacity for spent wash lagoon is of 5 days and spent wash is being stored in lagoon with High Density Polyethylene lining as per CPCB guidelines.

xiv. Adequate numbers of ground water quality monitoring stations by providing piezometers around the project area shall be put up. Sampling and trend analysis monitoring must be made on monthly basis and report submitted to SPCB and this Ministry. The ground water quality monitoring for pH, BOD, COD, Chloride, sulphate and total dissolved solids shall be monitored and report submitted to the Ministry’s Regional Office at Chandigarh and HSPCB

The monitoring results along with compliance report are being submitted to concerned authorities on regular basis. We have also analyzed drinking water sample collected from the project site. Ground water and Drinking water sample was collected and results are attached as Annexure- 2.

xv. No storage of wet cake shall be done at site. An Additional dryer shall be installed so that at any time wet cake is not sold then wet cake shall be converted

Only dry cake is being generated, which is being sold as cattle feed to M/s Firoz Trading Company Ghaziabad” as per their requirement.

Page 5: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

5

S. No. Conditions of Environmental Clearance Status of Compliance

into dry cake by operating additional dryer.

xvi. Rice husk storage shall be done in such a way that it does not get air borne of fly around due to wind. As proposed, rice husk & coal storage yard shall be properly covered.

Covered storage sheds are provided for the storage of rice husk.

xvii. Boiler ash shall be stored separately as per CPCB guidelines so that it shall not adversely affect the air quality, becoming air borne by wind or water regime during rainy season by flowing along with the storm water. Direct exposure of workers to fly ash & dust shall be avoided.

No storage has been made for boiler ash as total generated ash is being sold to vendor.

xviii. Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 1999 as amendment in 2003. Fly ash shall be provided to cement and brick manufacturers for further utilization.

The ash from Bag House is pneumatically handled by ash handling system and dry ash is collected in silo.

The ash from the boiler is being utilized by nearby brick manufacturers. Ash sold to the brick manufacturer.

xix. Firefighting system shall be as per the norms and cover all areas where alcohol is produced, handled and stored. Provision of foam system for firefighting shall be made to control fire from the alcohol storage tank.

All the fire extinguishing media such as water, dry chemicals, CO2, sand, dolomite etc. are being kept in vital locations. We are certified by Haryana Fire & Emergency Services for having satisfactory fire safety arrangements within the project. Refer Annexure-4 for approval along with the request of renewal.

xx. Risk Assessment shall be carried out to assess the fire and explosion risk due to storage of alcohol and report submitted to the Ministry and its Regional Office at Chandigarh within six months.

Risk Assessment has been done during the impact assessment study.

xxi. Occupational health surveillance programme shall be undertaken as regular exercise for all the employees. The first aid facilities in the occupational health centre shall be strengthened and the regular medical test records of each employee shall be maintained separately.

Occupational health surveillance programme is being taken as regular exercise for all the employees and all records are maintained.

xxii. Dedicated parking facility for loading and unloading of material shall be provided in the factory premises. Unit shall develop and implement good traffic management system for their incoming and outgoing vehicles to avoid congestion on the public road.

Dedicated parking facility for loading and unloading of material has been provided in the factory premises. Good traffic management system is being implemented for incoming and outgoing vehicles to avoid congestion on the public road.

xxiii. As proposed, green belt shall be developed in 5 acres out of acres and plantation shall be done as per the CPCB guidelines in consultation with DFO. Thick greenbelt with suitable plant species shall be developed around the proposed distillery to mitigate the odour problem.

The Green Belt had been developed in 5 acre inside the Plant. The Plantation done as per Consultation with District Forest Officer. The Plantation had done as Native trees as per Consultation of DFO. 1.Total green belt area with no of plant : 1207& grass 2.Total No. of sampling Planted : 896 3.Species Name : Black Ficus, Ashoka, Palm, Pila 4.% Survival Rate :89%

xxiv. All the issues raised during the public hearing/consultation meeting held on 26th May, 2011 shall be satisfactorily implemented.

Noted and issues raised during public hearing/consultation has been implemented.

xxv. Provisions shall be made for the housing for the construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, safe drinking water, medical health care,

Presently the plant is in the operation phase.

Page 6: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

6

S. No. Conditions of Environmental Clearance Status of Compliance

crèche etc. The housing may be in the form of temporary structure to be removed after the completion of the project. All the construction wastes shall be managed so that there is no impact on the surrounding environment.

PART B – GENERAL CONDITIONS

S. No. Conditions of Environmental Clearance Status of Compliance

I. The project authorities shall strictly adhere to the stipulations made by the Haryana State Pollution Control Board.

Noted and we are complying the conditions stipulated in Consent to Operate.

II. No further expansion or modifications in the plant shall be carried out without prior approval of the Ministry of Environment and Forests. In case of deviations or alterations in the project proposal from those submitted to this Ministry for clearance, a fresh reference shall be made to the Ministry to assess the adequacy of conditions imposed and to add additional environmental protection measures required, if any.

Noted. No further expansion or modifications in the plant will be carried out without prior approval of the Ministry of Environment Forest & Climate Change.

III. The locations of ambient air quality monitoring stations shall be decided in consultation with the Haryana State Pollution Control Board (HSPCB) and it shall be ensured that at least one station is installed in the upwind and downwind direction as well as where maximum ground level concentrations are anticipated.

We have already informed Regional Office of HSPCB regarding selection of Ambient Air Quality Monitoring station. The ambient air quality stations are set up.

1. Admin Block on the Roof – for PM10 2. On roof of Pump House – for PM 2.5

IV. The overall noise levels in and around the plant area shall be kept well within the standards by providing noise control measures including acoustic hoods, silencers, enclosure etc. on all sources of noise generation. The ambient noise levels shall conform to the standards prescribed under Environment (Protection) Act, 1986 Rules,1989 viz. 75dBA (day time) and 70dBA (night time).

Same shall be complied. Following measures are being adopted.

Acoustic enclosure for turbine & DG sets are being

used. Green belt development (plantation of dense tress

across the boundary and in plant premises) will help in reducing noise levels in the plant as a result of attenuation of noise generated due to plant operations and transportation.

Earmuffs are being used while running the equipments of the plant.

The noise level monitoring has been carried out and results are enclosed as Annexure-2.

V. The company shall harvest rainwater from the roof-tops of the buildings and storm water drains to recharge the ground water and use the same water for the process activities of the project conserve fresh water.

Rainwater is being utilized for augmentation of ground water recharge through scientifically designed rain water harvesting system.

VI. The company shall obtain Authorization for collection, storage and disposal of hazardous waste under the Hazardous Waste (Management, Handling and Trans-boundary Movement) Rules, 2008 and its amendment time to time and prior permission from HSPCB shall be obtained for disposal of solid/ hazardous waste including boiler ash.

No Hazardous waste is being generated from our plant, so permission for the same is not required.

Page 7: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

7

S. No. Conditions of Environmental Clearance Status of Compliance

VII. During transfer of materials, spillages shall be avoided and garland drains be constructed to avoid mixing of accidental spillages with domestic wastewater and storm water drains.

There will be “Zero Effluent Discharge from the proposed distillery unit.

Liquid effluent being subjected to multiple effect evaporation and condensate being entirely recycled back to process.

We have made the separate drains for liquid effluent and storm water.

VIII. Usage of personnel protection equipments by all employees/workers shall be ensured.

Personnel protection Equipments like Face shield Helmets, Rubber Gumboots, Goggles, Medical facilities etc. are being provided to every employee.

IX. Training shall be imparted to all employees on safety and health aspects of chemicals handling. Pre-employment and routine periodical medical examinations for all employees shall be undertaken on regular basis. Training to all employees on handling of chemicals shall be imparted.

Production of ethanol involves storage handling and use of several chemicals. Some of these chemicals are toxic and hazardous in nature. Information about these chemicals is therefore important for the safety of the employees and the plant. Therefore, safety measures dealing with these chemicals are of vital importance and are being followed judiciously.

1. In order to ensure good health of workers regular health check-up of the plant workers are being carried out.

2. Occupational health surveillance programme is being taken as a regular exercise for all the employees and their records are maintained.

3. Safety precautions are being displayed within the premises on the banners, boards etc.

4. Both On-site & Off-site emergency preparedness plan has been drawn.

X. The company shall also comply with all environmental protection measures and safeguards proposed in the project report submitted to the Ministry. All the recommendations made in the EIA/EMP in respect of environmental management, risk mitigation measures and public hearing relating to the project shall be submitted.

We ensure that specific environmental protection measures and proposed safeguards are adopted.

XI. The company shall undertake CSR activities and all relevant measures for improving the socio-economic conditions of the surrounding area.

Company will take following CSR activity and development of Socio economic condition of the area:

Kuccha road being constructed to pucca road leading to plant site.

Funding plantation programme in the surrounding villages.

Arrangement of medical camps especially for family planning in the villages of the study area.

XII. The Company shall undertake eco-developmental measures including community welfare measures in the project area for the overall improvement of the environment.

Most of our CSR activities are planned for the eco development of the area. Like plantation, funding of plantation programme.

XIII. A separate Environmental Management Cell equipped with full fledged laboratory facilities shall be set up to

We are in the process of providing Environment Management cell equipped with full-fledged laboratory

Page 8: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

8

S. No. Conditions of Environmental Clearance Status of Compliance

carry out the Environmental Management and Monitoring Functions.

facilities to carry out the Environmental Management and Monitoring functions.

XIV. As Proposed, the company shall earmark sufficient funds towards capital costs and recurring cost per annum to implement the conditions stipulated by the Ministry of Environment and Forests as well as the State Government along with the implementation schedule for all the conditions stipulated herein. The funds so earmarked for environment management/ pollution control measures shall not be diverted for any other purpose.

Noted.

XV. A copy of the clearance letter shall be sent by the project proponent to the concerned Panchayat, ZilaParishad/ Municipal Corporation, Urban Local Body and the local NGO, If any, from who suggestions/representations, if any, were received while processing the proposal.

We have already sent clearance letter to the concerned authorities as required.

XVI. The Project Proponent shall also submit six monthly reports on the status of compliance of the stipulated Environmental Clearance Conditions including results of monitored data (both in hard copies as well as by e-mail) to the respective regional office of MoEF, the respective Zonal Office of CPCB and the Haryana State Pollution Control Board. A copy of Environmental Clearance and six monthly compliance status report shall be posted on the website of the company

Noted and we are regularly submitting six month compliance to concerned authorities on six monthly basis.

XVII. The Environmental statement for each financial year ending 31st March in Form V as is mandated shall be submitted to the Haryana State Pollution Control Board as prescribed under the Environmental (Protection) Rules, 1986, as amended subsequently, shall also be put on the website of the company along with the status of the compliance of Environmental Clearance conditions and shall also be sent to the Chandigarh Regional Offices of MoEF by e-mail.

We are submitting the environmental statement report of financial years to the concerned authorities.

XVIII. The Project Proponent shall inform the public that the project has been accorded environmental clearance by the Ministry and copies of the clearance letter are available with the SPCB/Committee and may also be seen at the website of the Ministry at http://envfor.nic.in This shall be advertised within seven days from the date of the issue of the clearance letter, at least in the two local newspaper that are widely circulated in the region of which one shall be in the vernacular language of the locality concerned and a copy of the same shall be forwarded to the concerned Regional Office of the Ministry.

EC Advertisement has already been published in news papers.

XIX. The Project authorities shall inform the Regional Office as well as the Ministry, the date of financial closure and the final approval of the project by the concerned authorities and the date of start of the project.

Complied.

8.0 The Ministry may revoke or suspend the clearance, if Agreed and Noted.

Page 9: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

9

S. No. Conditions of Environmental Clearance Status of Compliance

implementation of any of the above condition is not satisfactory.

9.0 The Ministry reserves the right to stipulate additional conditions, if found necessary. The Company in a time bound manner will implement these conditions.

Yes we agree that the Ministry carry all the rights for addition/modification of the conditions given in the EC.

10.0 The Above conditions will be enforced, inter-alia under the provisions of the Water (Prevention & Control of Pollution) Act,1974, Air (Prevention & Control of Pollution) Act,1981, The Environment (Protection) Act, 1986, Hazardous Waste (Management, Handling and Trans boundary Movement) Rules, 2008 and the Public Liability Insurance Act, 1991 along with their amendments and rules.

We are complying with Consent to Operate under Air and Water Act & other environmental Acts/Rules. The copy of CTO is enclosed as Annexure-1.

Page 10: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

10

DETAILS OF ENVIRONMENTAL MONITORING

3.1 AMBIENT AIR QUALITY MONITORING 3.1.1 Ambient Air Quality Monitoring Stations

Ambient air quality monitoring has been carried out at 3 locationsto assess the quality of ambient air in the project site. This will enable to have a comparative analytical understanding about air quality and the changes in the air environment in the study area with respect to the condition prevailing. The location of the ambient air quality monitoring stations is given in Table3.1.

Table 3.1 Details of Ambient Air Quality Monitoring Stations

S. No. Location Code Location Name/ Description

1 AAQ-1 Near Main Gate

2 AAQ-2 Centre of the Factory

3 AAQ-3 Backside of the Factory

AAQ-1: Near Main Gate The sampler was placed near Main gate and was free from any obstructions. Surroundings of the sampling site represent industrial environmental setting AAQ-2: Centre of the Factory The sampler was placed at centre of the factory and was free from any obstructions. Surroundings of the sampling site represent industrial environmental setting AAQ-3: Backside of the Factory The sampler was placed at backside of the factory and was free from any obstructions. Surroundings of the sampling site represent industrial environmental setting

3.1.2 Ambient Air Quality Monitoring Methodology

Monitoring was conducted in respect of the following parameters:

Particulate Matter 2.5 (PM 2.5) Particulate Matter 10 (PM 10) Sulphur Dioxide (SO2) Oxides of Nitrogen (NOx) Carbon Monoxide (CO) Ammonia (NH3) Lead (Pb) Benzene (C6H6) Benzo(a)pyrene Ozone (O3) Arsenic (As) Nickel (Ni)

3

Page 11: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

11

The duration of sampling of PM 2.5, PM10, SO2 and NOx was 24 hourly continuous sampling per day and CO was sampled for 8 hours continuous, thrice in 24 hour duration monitoring. The monitoring was conducted for one day at the location. This is to allow a comparison with the National Ambient Air Quality Standards. The air samples were analyzed as per standard methods specified by Central Pollution Control Board (CPCB) and IS: 5182. The techniques used for ambient air quality monitoring and minimum detectable levels are given in Table3.2. Fine Particulate Sampler instruments have been used for monitoring Particulate Matter 2.5 (PM2.5 i.e. <2.5 microns), and Respirable Dust Sampler was used for sampling Respirable fraction (<10 microns), gaseous pollutants like SO2, and NOx. Bladder and Aspirator bags were used for collection Carbon Monoxide samples. Gas Chromatography techniques have been used for the estimation of CO.

Table 3.2 Techniques used for Ambient Air Quality Monitoring

3.1.3 Ambient Air Quality Monitoring Results

Two months detailed on-site monitoring results of different parameters are presented in Table No. 3.3.

S. No. Parameter Technique Technical Protocol

1 Particulate Matter 2.5

Fine Particulate Sampler, Gravimetric Method #SOP No. VEL/SOP/01,Section No.63

2 Particulate Matter 10 Respirable Dust Sampler, with cyclone

separator, Gravimetric Method IS-5182 (Part-23)

3 Sulphur dioxide Modified West and Gaeke IS-5182 (Part- II)

4 Oxides of Nitrogen Jacob &Hochheiser IS-5182 (Part-VI)

5 Carbon Monoxide Gas Chromatography IS-5182 (Part-X)

6 Ammonia Distillation Method IS: 11255 (P-6), 1999

7 Lead Atomic Absorption Spectro-photometer IS: 5182 (P-22), 2004

8 Benzene Gas Chromatography IS: 5182 (P-11), 2006

9 Benzo(a)pyrene Gas Chromatography CPCB Guideline

10 Ozone Colorimetry IS: 5182 (P-9), 1974

11 Arsenic Atomic Absorption Spectro-photometer IS: 5182 (P-22), 2004

12 Nickel Atomic Absorption Spectro-photometer IS: 5182 (P-22), 2004

Page 12: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

12

Table 3.3 Ambient Air Quality Monitoring Results

Parameter AAQ1 AAQ2 AAQ3 NAAQS*

Particulate Matter (PM2.5) 51.8 48.5 50.7 60

Particulate Matter (PM10) 94.0 90.6 89.3 100

Nitrogen Dioxide (NO2) 24.8 21.6 31.6 80

Sulphur Dioxide (SO2) 11.5 12.4 10.4 80

Carbon Monoxide (CO) mg/m3 0.56 0.45 0.51 4

Ammonia (NH3), g/m3 10.80 9.73 11.0 400

Lead (Pb), g/m3 **BDL(*DL0.05g/m3) **BDL(*DL0.05g/m3) **BDL(*DL0.05g/m3) 1

Benzene(C6H6) , g/m3 **BDL(*DL 0.1g/m3) **BDL(*DL 0.1g/m3) **BDL(*DL 0.1g/m3) 05

Benzo(a)pyrene, ng/m3 **BDL(*DL 1.0g/m3) **BDL(*DL 1.0g/m3) **BDL(*DL 1.0g/m3) 01

Ozone (O3) , g/m3 20.40 19.06 21.4 180

^Arsenic As, ng/ m3 **BDL(*DL 5.0g/m3) **BDL(*DL 5.0g/m3) **BDL(*DL 5.0g/m3) 6

Nickel Ni, ng/ m3 **BDL(*DL 5.0g/m3) **BDL(*DL 5.0g/m3) **BDL(*DL 5.0g/m3) 20

*NAAQS – National Ambient Air Quality Standards; Schedule-VII, [Rule 3 (3B)], [Part-II-sec.-3(i)] 18.11.2009

#SOP-Laboratory Standard Operating Procedure. **BDL-Below Detection limit. *DL-Detection Limit.

^ This parameter is not covered in our NABL scope.

Page 13: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

13

Figure 3.2 Location-wise Variation in Ambient Air Quality

Figure 3.2 Location-wise Variation of CO in Ambient Air Quality

3.1.4 Discussion on Ambient Air Quality in the Study Area

PM 2.5 levels at the project site are within the permissible limit of 100 μg/m3 and the PM10 levels are too

within the limit 60 μg/m3 in all the sites. SO2, NOx, CO and NH3are observed within the corresponding

stipulated limits (Limit for SO2 and NOx: 80 g/m3, limit for CO: 4.0g/m3and limit for NH3: 400 µg/m3) at

the monitoring location. Station wise variation of ambient air quality parameters has been pictorially shown

in Figure 3.1&3.2.

0102030405060708090

100

AAQ1 AAQ2 AAQ3 Limits

PM2.5 51.8 48.5 50.7 60

PM10 94 90.6 89.3 100

NO2 24.8 21.6 31.6 80

SO2 11.5 12.4 10.4 80

Lim

its

0

0.5

1

1.5

2

2.5

3

3.5

4

AAQ1 AAQ2 AAQ3 Limits

CO 0.56 0.45 0.51 4

Lim

its

CO

Page 14: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

14

3.2 Stack Emission Monitoring

Table 3.4 Details of Stack Monitoring Stations

S. No. Location Code Capacity Location Name

1 BS1 25 TPH

Boiler

Table 3.5 Stack Monitoring Results

Location- BS1

S. No. Parameter Protocol Result Unit Limits

(As Per CPCB)

1. Particulate Matter (PM) at 15 % O2 IS 11255 (P-1) Gravimetric Method 61.59 mg/Nm3 75

2. Oxides of Nitrogen (as NO2) at 15 %

O2 IS 11255 (P-7) Colorimetric Method 54.27 mg/Nm3 710

3. Sulphur Dioxide(as SO2) IS 11255(P-2) Titrimetric Method 38.40 mg/Nm3 --

4. Carbon Monoxide at 15% O2 #SOP No. VEL/SOP/01, Section No. SP 74 11.06 mg/Nm3 150

5. #NMHC (as C) at 15% O2 By Gas Chromatography Method 6.45 mg/Nm3 100

Note: # This parameter is not covered under our NABL Scope.

* SOP -Laboratory Standard operating procedure.

Page 15: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

15

3.3 AMBIENT NOISE MONITORING

3.3.1 Ambient Noise Monitoring Locations The main objective of noise monitoring in the study area is to assess the present ambient noise levels near project site due to various construction allied activities and increased vehicular movement. A preliminary reconnaissance survey has been undertaken to identify the major noise generating sources in the area. Ambient noise monitoring was conducted at 3locations as given in Table3.6.

Table 3.6 Details of Ambient Noise Monitoring Stations

S. No. Location Code Location Name/ Description

1 N1 Near Main Gate

2 N2 Centre of the Factory

3 N3 Backside of the Factory

3.3.2 Methodology of Noise Monitoring

Noise levels were measured using sound level meter. Noise level monitoring was carried out continuously for 24-hours with one hour interval starting at 06:00 hrs to 06:00 hrs next day. The noise levels were monitored on working days only. During each hour Leq were directly computed by the instrument based on the sound pressure levels. Monitoring was carried out at ‘A’ response and fast mode.

3.3.3 Ambient Noise Monitoring Results Two Months ambient noise monitoring results is summarized in Table3.7. The location-wise variation of noise levels are graphically presented in Figure 3.3.

Table 3.7 Ambient Noise Monitoring Results

N1 N2 N3

Day Time Night Time Day Time Night Time Day Time Night Time

Lmax 82.5 64.3 79.3 58.4 71.6 58.2

Lmin 61.7 42.9 52.7 45.9 56.3 45.9

Leq 69.35 57.45 68.57 53.24 68.39 51.74

CPCB LimitLeq in dB(A) (industrial Area)

75.0 70.0 75.0 70.0 75.0 70.0

Page 16: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

16

Figure 3.3 Location-wise Variation of Ambient Noise Levels 3.3.4 Discussion on Ambient Noise Levels in the Study Area

Day Time Noise Levels (Lday): The day time noise level at all the locations were found to within limits prescribed for industrial area i.e. 75 db (A). Night Time Noise Levels (Lnight): The night time noise level at all the locations were found to within limit prescribed for industrial area i.e. 70 dB (A).

0102030405060708090

Day Time NightTime

Day Time NightTime

Day Time NightTime

LMax 82.5 64.3 79.3 58.4 71.6 58.2

Lmin 61.7 42.9 52.7 45.9 56.3 45.9

Leq 69.35 57.45 68.57 53.24 68.39 51.74

Limits 75 70 75 70 75 70

Lim

its

Page 17: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

17

3.4 Point Source Noise Monitoring

Table 3.8 Details of Stack Monitoring Station

S. No. Location Code Location Name

1. PSN1 750 KVA

Table 3.21 DG Noise Monitoring Results

S. No. Parameters Protocol Open the canopy of DG

Set Results dB (A)

Close the canopy of DG Set (0.5 mtr. Distance )

Results dB (A)

Insertion Loss

1. Leq IS 9989 R-2003 99.48 73.71 25.77

2. CPCB Limits in dB(*A)

- 75.0 25.0

Note- * A “decibel” is a unit in which noise is measured

Page 18: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

18

3.5 WATER QUALITY MONITORING

3.5.1 Water Quality Monitoring Locations Keeping in view the importance of water, samples of drinking water and ground water were collected from inside factory and project site for the assessment of impacts of the project on the water quality. Samples of drinking water and ground water were collected from inside factory and project site. The samples were analyzed for various parameters to compare with the standards for water as per IS: 10500. The details of water sampling locations are given in Table 3.10.

Table3.10 Details of Water Quality Monitoring Station

S. No. Location Code Location Name/ Description

1. DW1 Drinking Water (Inside Factory)

2. GW1 Ground Water (Near Project site)

3.5.2 Methodology of Water Quality Monitoring

Sampling of water was carried out on September 2018. Samples were collected and sampling forms are filled in as per the sampling plan. Sample collected for metal content were acidified to <2 pH with 1 ml HNO3. A sample for bacteriological analysis was collected in sterilized glass bottles. Soon after the completion of sampling, chain of custody sheets for the samples are filled in and then they were transported to laboratory for further analysis. Proper care was taken during packing and transportation of samples. All the samples reached the central laboratory within the holding times for different parameters. After ensuring the same the samples were forwarded immediately for analysis.

The samples were analyzed as per the standard procedures specified in 'Standard Methods for the Examination of Water and Wastewater' published by American Public Health Association (APHA) and CPCB. The analytical techniques and the test methods adopted for testing of water are given in Table 3.11&3.12

Page 19: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

19

3.5.3 Water Quality Monitoring Results The detailed water quality monitoring results are presented in Table 3.11 & 3.12.

Table3.11Drinking Water Quality Monitoring Results

S. No. Parameter Test-Method Result Unit

Limits of IS:10500 -2012

Requirement

(Acceptable

Limits)

Permissible limit in the Absence of Alternate

Source

1. pH (at 25 0C) APHA ,4500-H+ B Electrometric Method 7.32 -- 6.5 to 8.5 No Relaxation

2. Colour APHA ,2120 B, Visual Comparison Method *BDL (**DL 5Hazen) Hazen 5 15

3. Turbidity APHA, 2130 B, Nephlelometric Method *BDL (**DL 0. 1 NTU) NTU 1 5

4. Odour APHA, 2150 B , Threshold Test Method Agreeable -- Agreeabl

e

Agreeable

5. Taste APHA , 2160 B, Threshold Test Method Agreeable -- Agreeable Agreeable

6. Total Hardness as CaCO3 APHA , 2340 C, EDTA Titrimetric Method 68.35 mg/l 200 600

7. Calcium as Ca APHA, 3500 Ca B, EDTA Titrimetric Method 21.57 mg/l 75 200

8. Alkalinity as CaCO3 APHA , 2320 B, Titrimetric Method 39.92 mg/l 200 600

9. Chloride as Cl APHA, 4500-Cl- B, Argentometric Method 25.71 mg/l 250 1000

10. #Cyanide as CN APHA , 4500 CN- D *BDL(**DL 0.02 mg/l) mg/l 0.05 No Relaxation

11. Magnesium as Mg APHA , 3500 Mg B, Calculation Method 3.53

mg/l 30 100

12. Total Dissolved Solids APHA , 2540 C, Gravimetric Method 108.00 mg/l 500 2000

13. Sulphate as SO4 APHA , 4500 E, Turbidimetric Method 4.92 mg/l 200 400

14. Fluoride as F APHA , 4500-F- D, SPADNS Method 0.19 mg/l 1.0 1.5

15. Nitrate as NO3 IS 3025 (P-34) ,Chromotropic Method 0.48 mg/l 45 No Relaxation

16. Iron as Fe APHA , 3500-Fe B 1,10 Phenanthroline Method 0.20 mg/l 0.3 No relaxation

17. #Aluminium as Al APHA , 3111 B *BDL(**DL 0.03 mg/l) mg/l 0.03 0.2

18. Boron APHA, 4500B C, Carmine Method *BDL(**DL 0.01mg/l) mg/l 0.5 1

19. Total Chromium as Cr APHA , 3111 B, Direct Air, Acetylene Flame

Method *BDL(**DL 0.03 mg/l) mg/l 0.05

No Relaxation

20. Phenolic Compounds APHA, 5530 C Chloroform Extraction Method *BDL(**DL 0.001 mg/l) mg/l 0.001 0.002

21. #Mineral Oil Clause 6 of IS:3025(Part 39) *BDL(**DL 0.01mg/l) mg/l 0.5 No Relaxation

22. Anionic Detergents as

MBAS

APHA, 5540 C MBAS Method *BDL(**DL 0.02 mg/l) mg/l 0.2 1.0

23. Zinc as Zn APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL(**DL 0.03 mg/l) mg/l 5 15

24. Copper as Cu APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL(**DL 0.03 mg/l) mg/l 0.05 1.5

25. Manganese as Mn APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL(**DL 0.06 mg/l) mg/l 0.1 0.3

26. Cadmium as Cd APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL mg/l 0.003 No Relaxation

27. Lead as Pb APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL mg/l 0.01 No Relaxation

28. #Selenium as Se APHA , 3114 B, Manual Hydride Generation *BDL(**DL 0.01 mg/l) mg/l 0.01 No Relaxation

29. #Arsenic as As APHA , 3114 B, Manual Hydride Generation *BDL(**DL 0.01 mg/l) mg/l 0.01 0.05

30. #Mercury as Hg APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL (**DL 0.001 mg/l) mg/l 0.001 No Relaxation

31. Total Coliform IS 1622,1981(Reaffirmed 2003) <2 MPN/10

0ml

Shall not be detectable in any 100 ml sample

32. E. Coli IS 1622,1981(Reaffirmed 2003) Absent MPN/100

ml

Shall not be detectable in any 100 ml sample

Note:- *BDL-Below Detection Limit, **DL- Detection Limit.

Page 20: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

20

Table 3.12 Ground Water Quality Monitoring Results

S. No. Parameter Test-Method Result Unit

Limits of IS:10500 -2012

Requirement

(Acceptable

Limits)

Permissible limit in the Absence of Alternate

Source

1. pH (at 25 0C) APHA ,4500-H+ B Electrometric Method 7.64 -- 6.5 to 8.5 No Relaxation

2. Colour APHA ,2120 B, Visual Comparison Method *BDL (**DL 5Hazen) Hazen 5 15

3. Turbidity APHA, 2130 B, Nephlelometric Method *BDL (**DL 0. 1 NTU) NTU 1 5

4. Odour APHA, 2150 B , Threshold Test Method Agreeable -- Agreeabl

e

Agreeable

5. Taste APHA , 2160 B, Threshold Test Method Agreeable -- Agreeable Agreeable

6. Total Hardness as

CaCO3

APHA , 2340 C, EDTA Titrimetric Method 347.93 mg/l 200 600

7. Calcium as Ca APHA, 3500 Ca B, EDTA Titrimetric Method 98.26 mg/l 75 200

8. Alkalinity as CaCO3 APHA , 2320 B, Titrimetric Method 310.75 mg/l 200 600

9. Chloride as Cl APHA, 4500-Cl- B, Argentometric Method 148.00 mg/l 250 1000

10. #Cyanide as CN APHA , 4500 CN- D *BDL(**DL 0.02 mg/l) mg/l 0.05 No Relaxation

11. Magnesium as Mg APHA , 3500 Mg B, Calculation Method 24.97

mg/l 30 100

12. Total Dissolved Solids APHA , 2540 C, Gravimetric Method 586.00 mg/l 500 2000

13. Sulphate as SO4 APHA , 4500 E, Turbidimetric Method 54.93 mg/l 200 400

14. Fluoride as F APHA , 4500-F- D, SPADNS Method 0.88 mg/l 1.0 1.5

15. Nitrate as NO3 IS 3025 (P-34) ,Chromotropic Method 9.57 mg/l 45 No Relaxation

16. Iron as Fe APHA , 3500-Fe B 1,10 Phenanthroline Method 0.36 mg/l 0.3 No relaxation

17. #Aluminium as Al APHA , 3111 B *BDL(**DL 0.03 mg/l) mg/l 0.03 0.2

18. Boron APHA, 4500B C, Carmine Method 0.47 mg/l 0.5 1

19. Total Chromium as Cr APHA , 3111 B, Direct Air, Acetylene Flame

Method *BDL(**DL 0.03 mg/l) mg/l 0.05

No Relaxation

20. Phenolic Compounds APHA, 5530 C Chloroform Extraction Method *BDL(**DL 0.001 mg/l) mg/l 0.001 0.002

21. #Mineral Oil Clause 6 of IS:3025(Part 39) *BDL(**DL 0.01mg/l) mg/l 0.5 No Relaxation

22. Anionic Detergents as

MBAS

APHA, 5540 C MBAS Method *BDL(**DL 0.02 mg/l) mg/l 0.2 1.0

23. Zinc as Zn APHA , 3111 B, Direct Air, Acetylene Flame

Method

0.69 mg/l 5 15

24. Copper as Cu APHA , 3111 B, Direct Air, Acetylene Flame

Method

0.38 mg/l 0.05 1.5

25. Manganese as Mn APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL(**DL 0.06 mg/l) mg/l 0.1 0.3

26. Cadmium as Cd APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL mg/l 0.003 No Relaxation

27. Lead as Pb APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL mg/l 0.01 No Relaxation

28. #Selenium as Se APHA , 3114 B, Manual Hydride Generation *BDL(**DL 0.01 mg/l) mg/l 0.01 No Relaxation

29. #Arsenic as As APHA , 3114 B, Manual Hydride Generation *BDL(**DL 0.01 mg/l) mg/l 0.01 0.05

30. #Mercury as Hg APHA , 3111 B, Direct Air, Acetylene Flame

Method

*BDL (**DL 0.001 mg/l) mg/l 0.001 No Relaxation

31. Total Coliform IS 1622,1981(Reaffirmed 2003) <2 MPN/100m

l

Shall not be detectable in any 100 ml sample

32. E. Coli IS 1622,1981(Reaffirmed 2003) Absent MPN/100ml Shall not be detectable in

any 100 ml sample

Note:- *BDL-Below Detection Limit, **DL- Detection Limit.

Page 21: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

21

3.6.4 Discussion on Water Quality in the Study Area The drinking water quality inside factory is observed total alkalinity reaching up to 39.92 mg/L against the

desirable limit of 200 mg/L in drinking water, however, alkalinity is lower than the permissible limit of 600

mg/L. Total Dissolved Solid in the drinking water is 108.00 mg/L, which is lower than the prescribed limit of

500 mg/L in drinking water. In ground water total alkalinity is reaching up to 310.75 mg/L against the desirable

limit of 200 mg/L, however, alkalinity is lower than the permissible limit of 600 mg/L. Total Dissolved Solid in

the ground water is 586.00 mg/L, .However remaining parameters are within the CPCB prescribed limits.

Arsenic and Mercury which are considered to be very risky contaminants were found within the permissible

limit too. The microbiological contaminants (E. Coli & Total Coliform) are absent and <2 per 100 ml of water

sample.

Page 22: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

22

3.6 Waste Water Monitoring

Sampling of ETP water was carried out on September 2018. Samples were collected as grab sample and sampling forms are filled in as per the sampling plan. The preservative sample were properly added to preserve as per standard operating procedures (SOP) and stored immediately in ice boxes, which were ensured for appropriate temperatures. Soon after the completion of sampling, chain of custody sheets for the samples are filled in and then they were transported to laboratory for further analysis. Proper care was taken during packing and transportation of samples. All the samples reached the central laboratory within the holding times for different parameters. After ensuring the same the samples were forwarded immediately for analysis. The samples were analyzed as per the standard procedures specified in 'Standard Methods for the Examination of Water and Wastewater' published by American Public Health Association (APHA) and CPCB. The analytical techniques, the test methods adopted for testing of ETP water & results are given below Table 3.13

3.6.1 Waste Water Quality Monitoring Locations Waste water sample was collected from factory ETP location. The details of waste water sampling locations are given in

Table 3.13

Table 3.13 Details of Waste Water Quality Monitoring

S. No. Location Code Location Name/ Description

1. WW 1 From the ETP Inlet

2. WW2 From the ETP Outlet

3.7.2 Waste water result

Table: 3.14 ETP Inlet Result

S. No. Parameter Test-Method Result Unit

1. pH (at 25 0C) APHA, 4500-H+ B Electrometric Method 5.98 --

2. COD APHA, 5220 B Open Reflux Method 519.44 mg/l

3. BOD (3 Days at 27 0C) APHA 5210 C / IS 3025,P-44, 219.65 mg/l

4. Total Suspended Solids APHA, 2540 D Gravimetric Method 186.10 mg/l

5. Oil and Grease APHA,5520 B Partition Gravimetric Method 8.64 mg/l

Page 23: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

23

Table: 3.15 ETP Outlet Result

*General Standards for Discharge of Environmental Pollutants (Part A): Effluents, as given in Schedule –VI, inserted by Rule 2(d) of

Environment (Protection) Second Amendment Rules, 1993 notified by GSR 422(E) dated 19.05.1993 published in Gazette no. 174 dated

19.05.1993

S.

No. Parameter Test-Method Result Unit

*Standards

In-Land Surface Water

Public Sewers

Land for Irrigation

1. pH (at 25 0C) APHA, 4500-H+ B Electrometric Method 7.65 -- 5.5-9.0 5.5-9.0 5.5-9.0

2. COD APHA, 5220 B Open Reflux Method 62.00 mg/l 250 -- --

3. BOD (3 Days at 27 0C) APHA 5210 C / IS 3025,P-44, 20.00 mg/l 30 350 100

4. Total Suspended Solids APHA, 2540 D Gravimetric Method 19.00 mg/l 100 600 200

5. Oil and Grease

APHA,5520 B Partition Gravimetric

Method <0.2

mg/l 10 20 10

Page 24: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

24

3.8 SOIL MONITORING

3.8.1 Soil Monitoring Locations The objective of the soil monitoring is to identify the impacts of ongoing project activities on soil quality and also predict impacts, which have arisen due to execution of various constructions allied activities. Accordingly, a study of assessment of the soil quality has been carried out. To assess impacts of ongoing project activities on the soil in the area, the Physico-chemical characteristics of soils were examined by obtaining soil samples from selected points and analysis of the same. Single sample of soil was collected from the project site for studying soil characteristics, the location of which is listed in Table 3.16.

Table 3.16Details of Soil Quality Monitoring Location

S. No. Location Code Location Name/ Description

1. S1 Garden Area

3.8.2 Methodology of Soil Monitoring

The sampling has been done in line with IS: 2720 & Methods of Soil Analysis, Part-1, 2nd edition, 1986 of American Society for Agronomy and Soil Science Society of America. The homogenized samples were analyzed for physical and chemical characteristics (physical, chemical and heavy metal concentrations). The soil samples were collected in the month of September 2018. The samples have been analyzed as per the established scientific methods for Physico-chemical parameters. The heavy metals have been analyzed by using Atomic Absorption Spectro-photometer.

Page 25: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

25

3.8.3 Soil Monitoring Results

Single sample of soil is collected from the site to check the quality of soil of the study area .The Physico-

chemical characteristics of the soil, as obtained from the analysis of the soil sample, are presented in Table

3.17.

Table 3.17Physio-Chemical Characteristics of Soil in the Study Area

# SOP-Laboratory Standard operating procedure

3.8.4 Discussion on Soil Characteristics in the Study Area

The soil in study area is characterized by moderate organic content. The soil quality in the project area has not

been affected by the project activities.

S. No. Parameter Test-Method Result Unit

6. pH (at 25 0C) IS : 2720 (P-26) by pH Meter 7.35

--

7. Conductivity IS:14767 by Conductivity meter 0.358 mS/cm

8. Soil Texture IS : 2720 (P-22, RA2003) Silty Loam --

9. Color SOP , SP-78,Issue No.-01& Issue Date-14/02/2013 Yellowish Brown --

10. Water holding capacity SOP , SP-81,Issue No.-01& Issue Date-14/02/2013 21.86 %

11. Bulk density SOP , SP-80,Issue No.-01& Issue Date-14/02/2013 1.42 gm/cc

12. Chloride as Cl SOP , SP-85,Issue No.-01& Issue Date-14/02/2013 39.56 mg/100g

13. Calcium as Ca SOP , SP-82,Issue No.-01& Issue Date-14/02/2013 44.83 mg/100g

14. Sodium as Na SOP , SP-84,Issue No.-01& Issue Date-14/02/2013 51.23 mg/kg

15. Potassium as K SOP , SP-84,Issue No.-01& Issue Date-14/02/2013 84.10 kg/hec.

16. Organic Matter IS:2720 (P-22) Titrimetric Method 0.75 %

17. Magnesium as Mg SOP , SP-83,Issue No.-01& Issue Date-14/02/2013 21.43 mg/100g

18. Available Nitrogen as N IS:14684 Distillation Method 239.61 kg./hec.

19. Available Phosphorus SOP , SP-86,Issue No.-01& Issue Date-14/02/2013 30.52 kg./hec.

20. Zinc (as Zn) USEPA 3050B 2.86 mg/kg

21. Manganese (as Mn ) USEPA 3050B 4.83 mg/kg

22. Lead (as Pb) USEPA 3050B 0.82 mg/kg

23. Cadmium (as Cd ) USEPA 3050B 2.45 mg/kg

24. Chromium (as Cr) USEPA 3050B 1.34 mg/kg

25. Copper (as Cu ) USEPA 3050B 3.91 mg/kg

Page 26: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

26

3.9 Site Photographs

Ambient Air Quality Monitoring

Ambient Air Quality Monitoring

Page 27: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

27

Ambient Noise Level Monitoring

Ambient Noise Level Monitoring

Page 28: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

28

Soil Sampling

Waste Water Sampling

Page 29: Half-yearly Compliance Report of EC (EC No. J-11011/317 ...compliance) dec... · distillery unit (60 KLPD) only and no Molasses based Distillery unit shall be operated without prior

Project: Grain Based Distillery Unit (60 KLPD) & CPP (2.5 MW), Village Bakra, Tehsil Beri, District- Jhajjar (HR) Half-yearly Compliance Report of EC (EC No. –J-11011/317/2010-IA II (I) Dated 12/10/2011) Conditions

29

Waste Water Sampling

Water sampling


Recommended