+ All Categories
Home > Documents > Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH...

Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH...

Date post: 11-Jan-2016
Category:
Upload: byron-mills
View: 212 times
Download: 0 times
Share this document with a friend
20
Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All GSC IMT Task Force GSC IMT Task Force Report Report Kohei SATOH Kohei SATOH Managing Director, ARIB Managing Director, ARIB Document No: GSC16-GRSC9-04 Source: ARIB Contact: Kohei SATOH ([email protected]) GSC Session: GRSC-9 Agenda Item: 7.1
Transcript
Page 1: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

GSC IMT Task Force ReportGSC IMT Task Force Report

Kohei SATOHKohei SATOHManaging Director, ARIBManaging Director, ARIB

Document No:

GSC16-GRSC9-04

Source: ARIB

Contact: Kohei SATOH ([email protected])

GSC Session:

GRSC-9

Agenda Item:

7.1

Page 2: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All 2

Highlight of Current ActivitiesHighlight of Current Activities

GSC Task Force on IMT standardization was created under the GRSC by Resolution of GSC-12 (Resolution GSC-12/01).

An objective of the Task Force is to exchange information and views on radio interface technologies for IMT-Advanced among PSOs allowing for efficient, effective and timely development of the IMT-Advanced standard.

Activities would be expected to be carried out during the ITU-R WP5D, 3GPPs and other regional meetings (e.g., IMT-WG of AWG, CJK IMT WG meeting, etc.).

Page 3: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All 3

Strategic DirectionStrategic Direction

The Task Force should be encouraged to actively help in the exchange of information and views with the goal of approval of the Draft New Recommendation on “Detailed radio interface specifications for IMT-Advanced [IMT.RSPEC]” in the Radiocommunication Assembly 2012 (RA-12).

The Task Force should actively support that a new agenda item on IMT spectrum issues for the World Radiocommunication Conference 2015/16 (WRC-15/16) will be adopted in the WRC-12.

Page 4: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All 4

Next Steps / ActionsNext Steps / Actions

The Task Force proposes that GSC– endorses the further continuation of the IMT Task

Force to exchange information and views with goal of approval of the Draft New Recommendation [IMT.RSPEC] and adoption of a new agenda item on IMT spectrum issues for the WRC-15/16 in the WRC-12,

and– requests its PSOs to review their

national/regional activities and to report on their progress to the Task Force and at the next GSC meeting.

Page 5: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All 5

Proposed Modification ofProposed Modification ofResolution GSC-15/1Resolution GSC-15/1

Considering recent activities in ITU-R WP5D, 3GPP, PSOs and others on IMT-Advanced, Resolution GSC-15/01 (Continuing Cooperation on IMT Standardization) should be updated and modified as follows:To update “Recognizing part” as appropriate

To add issues on a new agenda item on IMT spectrum issues for the WRC-15/16 in “Resolves part”

Page 6: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All 6

Supplementary SlidesSupplementary Slides

Page 7: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Schedule for Development of IMT-Advanced Radio Schedule for Development of IMT-Advanced Radio Interface in ITU-R WP5DInterface in ITU-R WP5D

2008 2009 2010 2011#1 #2 #3 #4 #5 #6 #7 #8 #9 #10

WP 5D meetings

Step 1 and 2

Step 3

Step 4

Steps 5,6 and 7

Steps 8

(0)

(1)

(2)

(3)

(4)

(20 months)

(8 months)

(16 months)

(20 months)

(12 months)• Steps in radio interface development process:

7

#11

(0): Issue an invitation to propose RITs March 2008

(1) : ITU proposed cut off for submissionOctober 2009

of candidate RIT and SRIT proposals

Step 5: Review and coordination of outside evaluation activities Step 6: Review to assess compliance with minimum requirements Step 7: Consideration of evaluation results, consensus building and decision Step 8: Development of Radio Interface Recommendation(s)

Step 1: Issuance of the Circular Letter Step 2: Development of candidate RITs Step 3: Reception of the submissions and issuance of an acknowledgement for RIT Step 4: Evaluation of candidate RITs by evaluation groups

• Critical milestones in radio interface development process: (2): Cut off for evaluation report to ITU June 2010

(3) : WP5D decides framework and key October 2010

characteristics of IMT-Advanced RIT and SRIT

(4): WP5D completes development of radio February 2011

interface specification Recommendations

Submission of proposal・ IEEE technology・ 3GPP technology

Correspondence Group

Page 8: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

ITU-R Outside ITU-R Step 1

Issuance of a Circular Letter to invite proposals for radio interface

technologies and evaluations

Step3 Reception of the submissions and issuance of an acknowledgement

for RIT

Step 5 Review and coordination of outside

evaluation activities

Step 6 Review to assess compliance with

minimum requirements

Step 7 Consideration of evaluation results, consensus building, and decision

Step 8 Development of radio interface

Recommendation(s)

Step 2 Development of candidate radio

interface technologies

Descriptions of proposed radio interface technologies and evaluation reports

Radio interface specifications (RSPECs), sufficiently detailed to enable

worldwide compatibility

Coordination between evaluation groups

Submission of

candidate radio

interface

technologiesStep 4

Evaluation of candidate radio interface technologies by

independent evaluation groups, grouping or compromise of the

technologies through consensus building

Step 9 Implementation of

Recommendation(s)

IMT-Advanced Radio Interface IMT-Advanced Radio Interface Development ProcessDevelopment Process

8

Page 9: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Preliminary Draft New Rec. ITU-R M.[IMT.RSPEC]– Document structure of IMT.RSPEC aiming at reduction of document volume was discussed. However, no

consensus was reached and this topic was left for future study after initial release of IMT.RSPEC;– Work for developing Draft New Rec. (DNR) without hyperlinks will be finalized in the 10 th meeting of WP5D.

DNR with hyperlinks will be completed in its 12th meeting; and– Process for revising IMT.RSPEC was discussed. This process will be discussed further and will be decided

in the 10th meeting of WP5D.

Preliminary Draft New Report M.[IMT.RADIO]– Working document towards a Preliminary Draft Report was drafted based on the conclusions of Step 6 and

7 for IMT-Advanced radio interface development;– WP5D adopted Draft New Report M.[IMT.RADIO] and sent it to SG5 to be held in November 2010 for

approval; and– During this drafting process, it was decided that ITU uses the following name as official name for each

technology:• “LTE-Advanced” for 3GPP Technology; and• “WirelessMAN-Advanced” for IEEE Technology.

Preliminary Draft New Report ITU-R M.[IMT.UPDATE]: Analysis and assessment of global broadband wireless services and marketplace for IMT

– Prior to a drafting work, document type of IMT.UPDATE was discussed and it was decided that IMT.UPDATE is to be developed as ITU-R Report;

– Following the above, drafting principle and section structure of the working document towards Preliminary Draft New Report (PDN Report) M.[IMT.UPDATE] were discussed and agreed; and

– PDN Report is expected to be finalized in the 12 th meeting of WP5D.

Standardization Activities of IMT-Advanced Standardization Activities of IMT-Advanced in the 9in the 9thth Meeting of ITU-R WP5D in Chongqing, China (1) Meeting of ITU-R WP5D in Chongqing, China (1)

9

Page 10: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Development of IMT-Advanced Radio Interface– Review to access compliance with minimum requirements (Step 6);

• Step 6 of IMT-Advanced development process was commenced in the 8th meeting of WP5D;• Between 8th and 9th meetings of WP5D, there was no contribution received on intermediary conclusion reached

in the 8th meeting based on review of the all final evaluation reports with a focus on technical aspects; and• Therefore, it was agreed that all six technical proposals met all minimum requirements specified by ITU and the

Step 6 of IMT-Advanced development process was completed.

– Consideration of evaluation results, consensus building, and decision (Step 7);• As a result of the consensus building in ITU-R among the six technology proposals, the following two groupings

are agreed by ITU-R:– The RITs and SRITs proposed in IMT-ADV/6(Japan), IMT- ADV/8(3GPP OPs) and IMT-ADV/9(China) are grouped

into the technology identified in ITU as “LTE-Advanced”, developed by the Third Generation Partnership Project (3GPP) , for Step 7 and subsequent IMT-Advanced development; and

– The RITs proposed in IMT-ADV/4(IEEE), IMT-ADV/5(Japan) and IMT- ADV/7(TTA) are grouped into the technology identified in ITU as “WirelessMAN-Advanced”, developed by IEEE, for Step 7 and subsequent IMT-Advanced development.

– The following conclusions have been reached in ITU-R in consideration of IMT-Advanced process for Steps 4 through 7;

• Both “LTE-Advanced” and “WirelessMAN-Advanced” are acknowledged to individually satisfy the requirements of Resolution ITU-R 57 for the required number of the test environments. These requirements are specified in Report ITU-R M.2133; and

• Consequently, both “LTE-Advanced” and “WirelessMAN- Advanced” are accepted for inclusion in the standardization phase of the IMT-Advanced process and should proceed to Step 8.

– Liaison Statement was sent to RIT/SRIT Proponents on IMT-Advanced development with draft IMT.RADIO and working document for IMT.RSPEC attached.

Standardization Activities of IMT-Advanced Standardization Activities of IMT-Advanced in the 9in the 9thth Meeting of ITU-R WP5D in Chongqing, China (2) Meeting of ITU-R WP5D in Chongqing, China (2)

10

Page 11: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Workshop on Future IMT– During the 9th meeting of WP5D, the followings were agreed;

• The title of the workshop is “Workshop towards IMT.UPDATE”; and

• The workshop is to be held till October of 2011.

– With regard to details of the workshop including the date/place, there were various opinions between participants. Followings are examples of opinion;

• Global scale workshop ? or Multiple regional workshops ?

• Workshop held back to back with WP5D meeting ? or Workshop held independently of WP5D meeting ?

– It was agreed as a way forward to set up Correspondence Group (CG) after the 9 th meeting of WP5D and further details will be discussed and agreed in CG by E-mail; and

– It was also agreed that Rapporteur from each region will be assigned for this special subject as soon as possible after the 9th meeting of WP5D.

Standardization Activities of IMT-Advanced Standardization Activities of IMT-Advanced in the 9in the 9thth Meeting of ITU-R WP5D in Chongqing, China (3) Meeting of ITU-R WP5D in Chongqing, China (3)

11

Page 12: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Preliminary Draft New Rec. ITU-R M.[IMT.RSPEC]– Preliminary Draft New Recommendation M.[IMT.RSPEC] was finalised without

hyperlinks with specifications of the transposing organizations and preliminary agreed;

– The working document of the process for revising IMT.RSPEC was updated based on input contributions; and

– The Liaison statement was sent to the GCS proponents and transposing organizations.

Preliminary Draft New Report ITU-R M.[IMT.UPDATE]: Analysis and assessment of global broadband wireless services and marketplace for IMT

– Working document for PDN Report was updated;– It was agreed that the document structure consists of main body and some

Annexes of the detailed information; and– PDN Report is expected to be finalized in the 12th meeting of WP5D.

Standardization Activities of IMT-Advanced Standardization Activities of IMT-Advanced in the 10in the 10thth Meeting of ITU-R WP5D in Are, Sweden (1) Meeting of ITU-R WP5D in Are, Sweden (1)

12

Page 13: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Structure of Preliminary Draft New Recommendation ITU-R M.[IMT.RSPEC]

Standardization Activities of IMT-Advanced Standardization Activities of IMT-Advanced in the 10in the 10thth Meeting of ITU-R WP5D in Are, Sweden (2) Meeting of ITU-R WP5D in Are, Sweden (2)

13

Scope   This recommendation identifies

Related ITU-R Recommendations, Reports and Resolutions

Considerations   - Technical characteristics of IMT-Advanced Peak data rate: 100Mbps for high mobility 1GHzbps for low mobility - Others  Recommendations

- The radio interfaces for IMT-Advanced are “LTE-Advanced” and “WirelessMAN-Advanced”- Each specifications are defined in Annex 1(LTE-Advanced) and Annex 2(WirelessMAN-Advanced )

Annex 1Specification of the LTE-Advanced radio interface technology Background 1.1 Overview of the radio interface technology 1.2 Detailed specification of the radio interface technology(*1)

Annex 2Specification of the WirelessMAN-Advanced radio interface technology Background 2.1 Overview of the radio interface technology 2.2 Detailed specification of the radio interface technology(*1)

Global Core Specifications (GCS) (*2)

*1: Detailed specifications are described as hyperlink to the documents of regional SDOs.*2: GCS will be submitted from international standardizing organizations (3GPP, IEEE) and uploaded to ITU-R website.

Page 14: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Preliminary Draft New Rec. ITU-R M.[IMT.RSPEC]– PDNR M.[IMT.RSPEC] was updated;

– Liaison statement was sent to GCS proponents on the result of meeting; and

– The working document of the process for revising M.[IMT.RSPEC] was updated.

Preliminary Draft New Report ITU-R M.[IMT.UPDATE]: Analysis and assessment of global broadband wireless services and marketplace for IMT

– Working document was updated based on input contributions from some countries.

– PDN Report is expected to be finalized in the 12th meeting of WP5D; and

– Correspondence Group was established and started to proceed the document updating works during summer vacation season.

Question, Resolution and Opinion– To discuss the Question, Resolution and Opinion related to WP5D, new Adhoc group was

established in WG General Aspects;

– Working document for revision of Question 229-2/5 (Future development of the terrestrial component of IMT) was drafted based on input contributions and carried forward to next meeting;

– Input contribution for revision of Question 77-6/5 was carried forward to next meeting; and

– Working document for revision of Resolutions 17, 50, 56, 57 and Opinion 92 were drafted and carried forward. Liaison statement was sent to WP4A on the results of this meeting.

Standardization Activities of IMT-Advanced Standardization Activities of IMT-Advanced in the 11in the 11thth Meeting of ITU-R WP5D in Waikoloa, Hawaii Meeting of ITU-R WP5D in Waikoloa, Hawaii

14

Page 15: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Schedule for Development of Schedule for Development of Draft New Recommendation ITU-R M.[IMT.RSPEC]Draft New Recommendation ITU-R M.[IMT.RSPEC]

15

2010 2011 2012

RA

SG5

WP5D

Nov. Nov.

SG5#5- IMT.RADIO was approved ( New Report ITU-R M.2198)

SG5#6- Draft New Rec. IMT.RSPEC will be adopted

WP5D#8- Completion of

evaluation process

June Oct. July Oct.April

WP5D#9- PDN Report IMT.RADIO was adopted

WP5D#11 WP5D#12・ Completion of PDNR IMT.RSPEC (with hyperlinks)

WP5D#10- Finalization of PDNR IMT.RSPEC (without hyperlinks)

Jan.

RA-12- New Rec. IMT.RSPEC will be approved

Related organizations provide the transposition references (hyperlinks)

*This slide is extracted from the document of Terrestrial Service Committee, Telecommunications Council, MIC, Japan (5th May 2010)

Page 16: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

The Standardization Subcommittee under the Advanced Wireless Communications Study Committee (ADWICS) is conducting technical studies on IMT-Advanced and promotes its standardization through contributions to ITU-R and other activities.

ARIB has transposed the Global Core Specifications listed on Sections 1.2.1 and 2.2.1 of the Preliminary Draft New Rec. ITU-R M.[IMT.RSPEC] to ARIB Standard

ARIB new standards STD-T104 (LTE-Advanced) and STD-T105 (WirelessMAN-Advanced) were approved at the ARIB Standards Assembly held on 16th September 2011

In accordance with the liaison statement Document 5D/973, ARIB submitted the requested information (hyperlinks to the transposed material) to complete the transposition references for incorporation into the preliminarily agreed draft new Recommendation ITU-R M.[IMT.RSPEC] (Document 5D/1072)

Recent Activities on IMT-Advanced Recent Activities on IMT-Advanced in ARIBin ARIB

16

Page 17: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Activities of the Asia-Pacific Activities of the Asia-Pacific Telecommunity Wireless Group (AWG) (1)Telecommunity Wireless Group (AWG) (1)

A major objective of the Asia-Pacific Telecommunity Wireless Group (AWG) is to promote new wireless applications in the Asia-Pacific region and in this regard:• Working Group on Spectrum Aspects (WG-SPEC) of the AWG identifies

the spectrum requirements for new radio technologies and develops plans for harmonized spectrum usage for radiocommunication systems in the region

WG-SPEC developed the “APT Common Views on the Revision of Rec. ITU-R M.1036-3: Frequency arrangements for the UHF band”

• WG-SPEC also develops optimum sharing methodologies between radio services and methods ensuring compatibility between systems, and investigates the impact of interference to radiocommunication services from other sources

The group completed the draft new Report “Implementation Issues Associated with use of the band 698-806 MHz by Mobile Services”

17

Page 18: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Activities of the Asia-Pacific Activities of the Asia-Pacific Telecommunity Wireless Group (AWG) (2)Telecommunity Wireless Group (AWG) (2)

• Working Group on Technology Aspects (WG-TECH) of the AWG provides cost effective and timely radiocommunication solutions in technology aspects by developing Recommendations and Reports and studies advanced technologies for new wireless applications

• WG-TECH cooperates with relevant external research and standardization organizations, and conducts technical consultation based upon the requests of APT administrations, ensuring that the requirements and needs of the developing countries are reflected in the work and deliverables of the WG

WG TECH developed a draft “APT Common Views on Regional Specific Information for ITU-R M.[IMT.UPDATE]” to explain the situation of some countries in Region 3

The 10th and 11th meetings of the AWG were held on 22nd to 25th March 2011 in Bangkok, Thailand, and on 14th to 17th September 2011 in Chiang Mai, Thailand, respectively.

The 12th meeting of the AWG will be held on 10th to 13th April 2012 in China.

18

Page 19: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Recognizing:

a) that Resolution ITU-R 56 describes a naming scheme for International Mobile Telecommunications whereby “IMT-Advanced” applies to those systems, system components, and related aspects that include new radio interface(s) that support the new capabilities of systems beyond IMT-2000;

b) that Resolution ITU-R 57 outlines the essential criteria and principles that will be used in the process of developing the Recommendations and Reports for IMT-Advanced, including Recommendation(s) for the radio interface specification;

c) that ITU-R Study Group 5 and ITU-T Study Group 13 are continuing studies on IMT (encompassing both IMT-2000 and IMT-Advanced);

d) that ITU-R Study Group 5 is completing the evaluation of candidate technologies for IMT-Advanced;

e) that core network(s) are increasingly becoming access technology agnostic;

f) that IMT and other rapidly emerging wireless broadband access technologies will make high-speed wireless access services available where this was not previously possible, thereby enabling access to advanced telecommunication, computing and entertainment services and capabilities, not only for urban but also for rural and other low density environments;

g) that WRC-07 identified some additional spectrum for the implementation of IMT systems;

h) that work on evolution of the radio technologies may converge to use similar techniques; and

i) that there are related international, regional and national research activities in this area.

Continuing Cooperation on IMT Standardization

Resolution GSC-15/01 on IMT Resolution GSC-15/01 on IMT Standardization (1)Standardization (1)

19

Page 20: Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Document No: GSC16-GRSC9-04 Source:

GSC16-GRSC9-04

Halifax, 31 Oct – 3 Nov 2011 ICT Accessibility For All

Resolves:1) to encourage 3GPP, 3GPP2, IEEE, Participating Standards Organizations (PSOs) and

others to continue to work on enhancing the IMT standards as an essential part of future telecommunication, computing and entertainment standards;

2) to encourage use of IMT technologies for broadband services;3) to encourage the harmonization of candidate proposals for the radio interface

technologies for IMT and related networking standards;4) to invite 3GPP, 3GPP2, PSOs and others to take care of the evolution of the current

systems and the long-term evolution for such systems taking into account copyrights, working procedures, IPR aspects etc. and report to the next meeting for review;

5) to exchange information and views on candidate radio interface technologies for IMT-Advanced among PSOs allowing for efficient, effective and timely development of the IMT-Advanced standard and to continue this exchange for the detailed specifications for IMT-Advanced;

6) to exchange information and views on the analysis and assessment of global broadband wireless services and consumer demand for IMT in line with the ITU-R ongoing work on this topic;

7) to encourage the Task Force under the GRSC to actively help in the exchange of information and views mentioned in 5) and 6), with the goal of consensus building; and

8) to review this Resolution at future GSC meetings as required.

Resolution GSC-15/01 on IMT Resolution GSC-15/01 on IMT Standardization (2)Standardization (2)

Continuing Cooperation on IMT Standardization

20


Recommended