+ All Categories
Home > Documents > Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube...

Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube...

Date post: 18-Jan-2016
Category:
Upload: angelica-robertson
View: 212 times
Download: 0 times
Share this document with a friend
Popular Tags:
9
• Hall clearance completed • Revisiting Water & Cryo Plant • Prepare for shutdown ’04 – beam tube – Contract hole cutting • Negotiating with DF to help target work along at Sheffield • Discussion with ASTeC on RF Support Beam & Infrastructure
Transcript
Page 1: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.

• Hall clearance completed

• Revisiting Water & Cryo Plant

• Prepare for shutdown ’04– beam tube– Contract hole cutting

• Negotiating with DF to help target work along at Sheffield

• Discussion with ASTeC on RF Support

Beam & Infrastructure

Page 2: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Page 3: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Page 4: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.

MICE

• Technical Board meeting– Adopted change control – process in place– Plan to revise MICE design for March CB– This is also the timescale to complete the WBS (ISIS

Shutdowns!)

• WBS– All parts now represented except

slow controls and instrumentation– Negotiations…. Interfaces…

• Absorber review– December 9-10

Page 5: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.

Tasks to end 2003

• Manufacture beam tube

• R&D on absorber window (welding samples)

• Continue Cryogenic & Hydrogen System design (absorber) – establish heat load

• Complete Beam Line performance evaluation

Page 6: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.

Plans for 2004/5

• Cut into synchrotron vault ◄• Bring PSI Solenoid to RAL ◄• Assembly of an RF Test Stand ◄• Engineering design of beam line• Engineering of Target Mechanism• Design MICE support structure• Complete water & Cryo. plant design

– Begin building design (contract)– Start building work (contract)

Page 7: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.

Tracker technology decision

Page 8: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.

• Light yield 4-5 pe• Expectation ~10• Systematic analysis in hand

• Simulation updated to include more realistic models of inefficiency, noise etc.• Reconstruction of simulated data shows adequate performance•Outstanding issue: resolution (MCS dominated) needs to be shown to give adequate resolution in emittance

•MICE adopted SciFi detector as baseline tracker … will be used subject to satisfactory resolution of above

Page 9: Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.

Recommended