Hampton Roads Pedestrian and Bicycle Advisory Committee HRTPO Transportation Technical Advisory Committee November 6, 2013 Carl E. Jackson III, AICP Transportation Planning Specialist Hampton Roads District
Transcript
Page 1: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Hampton RoadsPedestrian and Bicycle Advisory Committee

HRTPO Transportation Technical Advisory Committee

November 6, 2013

Carl E. Jackson III, AICPTransportation Planning SpecialistHampton Roads District

Page 2: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Purpose

• Legislation introduced in 1997 by Senator Thomas K. Norment (R-3rd) pertaining to bicycles. Senate Joint Resolution 311 made a request for the Commissioner of VDOT to appoint a bicycle/pedestrian coordinator for each highway construction district

• Hampton Roads was among the first districts to respond and the Hampton Roads Pedestrian and Bicycle Advisory Committee (PABAC) was created in 1999 to address issues pertaining to bicyclist and pedestrians.

• Hampton Roads is currently one of only a few districts in the state that has a regularly scheduled advisory committee.

2

Page 3: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Mission

Mission: “Foster reduced traffic congestion and more livable communities byencouraging the safe and continued use of bicycle and pedestrian facilitiesthrough multi-faced education of the pedestrian and bicycling community,vehicle operators, policy makers and facility designers, for the purpose ofensuring recognition of pedestrians and bicyclist as necessary components of amultimodal transportation system.”

Goals:1. Educate, promote and encourage pedestrian and bicycle safety2. Advocate for the needs and interests of the walking and bicycling community3. Promote the construction and maintenance of bicycle and pedestrian facilities4. Support the development of comprehensive pedestrian and bicycle plan5. Promote the development of livable communities that support non-motorized

travel

3

Page 4: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Committee Representation

Eric L. Stringfield, Director Transportation Planning and Land Development –Chair

Mitzi Crystal, AICP, PTP; Senior Planning Specialist- Co Chair

Carl E. Jackson III, AICP; Planning Specialist-Committee Secretary

4

VDOT Hampton Roads Transportation Planning

VDOT Statewide Bicycle & Pedestrian

VDOT Location & Design

Virginia Department of Conservation Resources

Hampton Roads Transportation Planning Organization

Accomack-Northampton Planning District CommissionCrater Planning District CommissionHistoric Triangle Bicycle Association

Tidewater Bicycle Association

Norfolk Bike & Pedestrian Commission

Hampton Roads Transit

Williamsburg Area Transit Authority

Other Advocacy Groups

Citizens

City of Chesapeake

City of Hampton

City of Newport News

City of Norfolk

City of Portsmouth

City of Poquoson

City of Suffolk

City of Virginia Beach

City of Williamsburg

James City County

Southampton County

York County

Isle of Wight County

Gloucester County

Page 5: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bicycle and Pedestrian Policy

In accordance with the Commonwealth Transportation Board’s Policy for Integrating Bicycle and Pedestrian Accommodations, all (VDOT) projects

start with the assumption that some accommodation will be provided. In order for an exception to be made and accommodation not to be provided, the

provision of a potential accommodation must fall into one of six categories established in the policy:

1. Scarcity of Population, Travel and Attractors2. Environmental or Social Impacts3. Safety would be compromised4. Total cost excessive or disproportionate5. Purpose and scope does not facilitate accommodation6. Bicycle and pedestrian travel prohibited by law

5

Page 6: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bicycle and Pedestrian Facility Identification Tool

Bike and Pedestrian Accommodations Width Height Speed Signs Barrier Paved

Min Max

Shared RoadwayBicycles travel on existing streets and highways without bikeway designations.

9 ft 12 ft n.a 55 mph n.a n.a Yes

Paved ShoulderA paved portion of the roadway to the right of the edge stripe on which bicyclists may ride.

4 ft 8 ft n.a n.a No No Yes

Bicycle Lane

Bike lanes are a portion of the roadway designed by striping, signing, and/or pavement markings for preferential or exclusive use of bicycles.

4-5 ft 7 ft 8 ft 50 mph Yes No Yes

Shared Use PathShared use paths are facilities physically separated from motorized vehicular traffic by an open space (buffer) or barrier

8 ft 18 ft 8 ft 12-30 mph Yes Yes Yes

TrailsTrails are defined as pedestrian routes developed primarily for outdoor recreational purposes.

2 ft 10 ft 8 ft n.a Yes No No

Sidewalk

That portion of a public right of way between the curb line or lateral line of a roadway and the adjacent property line that is improved for use by pedestrians.

5 ft 10 ft 7 ft n.a No Yes Yes6

Page 7: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

7

Hampton Roads District Bicycle & Pedestrian Facilities November 2013

Page 8: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

8

• Status Report• PROGRAMMED BIKE AND PED PROJECTS

• 145 Total Projects Programmed in the District • 71 Projects Active (PE/Construction Underway)• 52 Projects Completed • Remaining projects are unscheduled and not included in the

Six-Year Program

Page 9: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, October 2013

9

• Status Report• BIKE AND PED. PROJECT MILESTONES

• 188 miles of projects planned and/or programmed in district

• Approximately 45 miles of projects have been completed

• However, 128 miles of projects have yet to be completed

Remaining projects are currently inactive and unscheduled for various reasons.

• The committee’s intent is to assist with the advancement of projects into completion and to increase the overall mileage of bike/ped facilities in the region.

Completed Projects

45 mi

Page 10: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike-Pedestrian Projects by City/County

10

Page 11: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

11

• PROJECT HIGHLIGHTS• PROGRESS REPORT ON SELECT ACTIVE PROJECTS

• UPC #13714; Lakeside Drive (York County)• UPC #50057; Ironbound Road (James City County)• UPC #11816; Middle Ground Blvd (Newport News)• UPC #14603; Lynnhaven Parkway (Virginia Beach)• UPC #17568; Nansemond Parkway(Suffolk)

Page 12: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

12

• #13714 LAKESIDE DRIVE• Roadway reconstruction from

Route 17 to Route 621, includes paved shoulder (3 ft width)

• Project is under construction and should be completed by early 2015.

YORK COUNTY

PPMS # Project NumberProject/Route

NameProject

Description Ad DateSYP

Estimate Expenditures Comments

13714 0620-099-176, R201 Lakeside Dr Paved

Shoulder 2/13 $7,790,000 $2,972,750 ConstructionUnderway

Page 13: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

13

• #50057 IRONBOUND ROAD• Roadway widening from Route

616 to Route 747 near VDOT residency, bike lane and shared-use path.

• Construction was completed earlier this year.

JAMES CITY COUNTY

PPMS # Project NumberProject/Route

NameProject

Description Ad DateSYP

Estimate Expenditures Comments

50057 0615-047-172, M501 Ironbound Rd Bike Lane

Shared Use 5/10 $14,078,912 $14,078,912 Construction Complete

Page 14: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

14

• #50057 IRONBOUND ROAD

Page 15: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

15

• #50057 IRONBOUND ROAD

Page 16: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

16

• #50057 IRONBOUND ROAD

Page 17: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

17

• #11816 MIDDLE GROUND BLVD• Roadway extension includes a shared

use path on both sides from Jefferson Avenue to Warwick Boulevard.

• Construction is underway and should be completed by late 2014

NEWPORT NEWS

PPMS # Project NumberProject/Route

NameProject

Description Ad DateSYP

Estimate Expenditures Comments

11816 U000-121-112 Middle Ground Blvd

Shared UsePath 10/10 $69,987,617 $41,033,874 Construction

Underway

Page 18: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

18

• #14603 LYNNHAVEN PKWY• Roadway widening from

Centerville Turnpike to Indian River Road (3 ft width)

• Construction has been advertised but not awarded, construction is anticipated to begin this summer

VIRGINIA BEACH

PPMS # Project NumberProject/Route

NameProject

Description Ad DateSYP

Estimate Expenditures Comments

14603 U000-134-V42, C501

LynnhavenPkwy

Shared Use Path 7/13 $33,114287 $11,593,822 Construction

Underway

Page 19: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

19

• #17568 NANSEMOND PKWY• Roadway widening at the corner of

Shoulders Hill Road near Suffolk/ Chesapeake Line, includes Sidewalk and Shared Use Path

• Construction was completed earlier this year. Path will be extended with later phases.

SUFFOLK

PPMS # Project NumberProject/Route

NameProject

Description Ad DateSYP

Estimate Expenditures Comments

17568 0337-133-101 Nansemond Dr Shared Use Path 1/11 $18,718,295 $8,981,477 Construction

Complete

Page 20: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

20

• #17568 NANSEMOND PKWY

Page 21: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

21

• #17568 NANSEMOND PKWY

Page 22: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Bike Project Report, November 2013

22

• #17568 NANSEMOND PKWY

Page 23: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

PABAC Committee Report, November 2013

23

• Future Initiatives• Performance Measures• Regional Bicycle and Pedestrian Map• Active Transportation Plan• Provide Technical Assistance to TPO Staff

Next Quarterly Meeting, January 2014

Page 24: Hampton Roads Pedestrian and Bicycle Advisory Committee...PPMS #Project Number Project/Route Name Project Description Ad Date SYP Estimate Expenditures Comments 13714 0620-099-176,

Thank You

24

Carl E. Jackson III, AICPTransportation Planning Specialist

Virginia Department of TransportationHampton Roads District

757.925.2596 [email protected]