PUB Corenet Form Changes
Transcript
Page 1: Handout for CBPU Subm

PUB Corenet Form Changes

Page 2: Handout for CBPU Subm

Table of Contents

Summary of Corenet Form Changes ................................................................................................ 1 – 5

Forms with Changes ............................................................................................................................ 1

Forms with No Changes ...................................................................................................................... 5

Corenet Forms with Changes ......................................................................................................... 7 – 37

1 Development Control (DC) Clearance Forms ................................................................................... 7

1.1 Guide for Development Control (DC) Clearance Forms ....................................................... 7

1.2 Select Fields – DC Clearance Forms ................................................................................... 11

2 Detailed Plan (DP) Form ................................................................................................................. 22

2.1 Guide for Detailed Plan (DP) Form ..................................................................................... 22

2.2 Select Fields – DP Form ...................................................................................................... 24

3 Completion of Work Form ............................................................................................................. 27

3.1 Guide for Completion of Work Form ................................................................................. 27

3.2 Select Fields – Completion of Work Form.......................................................................... 29

4 Temporary Occupation Permit (TOP) Forms .................................................................................. 30

4.1 Guide for Temporary Occupation Permit (TOP) Forms ..................................................... 30

4.2 Select Fields – TOP Forms .................................................................................................. 32

5 Certificate of Statutory Completion (CSC) Forms .......................................................................... 33

5.1 Guide for Certificate of Statutory Completion (CSC) Forms .............................................. 33

5.2 Select Fields – CSC Forms ................................................................................................... 34

6 Water Submission Forms ............................................................................................................... 35

6.1 Guide for Water Submission Forms ................................................................................... 35

6.2 Select Fields – Water Submission Forms ........................................................................... 36

Appendix ............................................................................................................................... 38 – 149

Page 3: Handout for CBPU Subm

1

Summary of Corenet Form Changes

Forms with Changes

File Number Form Name Changes

ENV-CBPU-DCCLR-NEW SUBMISSION Application for Development Control

(DC) Clearance - New Submission

Includes fields to classify minor and major projects;

For minor projects, fields will be included to allow DC and DP to be submitted at

the same time.

PUB (C&W) Checklist will be a section of the DC form

(No need for separate checklist to be submitted)

ENV-CBPU-DCCLR-

RESUBMISSION/AMENDMENT/REVISION

Application for Development Control

(DC) Clearance –

Resubmission/Amendment/Revision

PUB-DD-CHECKLIST Checklist for Drainage DC Plans

PUB-BPU-CLRDP01 Application for Clearance Certificate

for Detailed Plan on Drainage and

Sewerage (Sanitary/Sewer) Works

[Under Section 33(1) of the

Sewerage and Drainage Act (SDA),

Chapter 294]

Drainage DP, Sewerage DP, Sewerage Form A, Sewerage Form D and Sewerage

RC Trench combined into 1 form. Previously known as PUB-DD-CLRDPDRA01 &

PUB-SEW-CLRDPSEW01.

• For Form A & Form D, please fill Section A1: Sanitary Work

• For RC Trench, please fill Section A2: Sewerage Work, RC Trench

PUB-BPU-COMPOFWORK Certificate of Completion and

Inspection of Sanitary, Sewerage and

Drainage Works

[Under Section 35(1)(e) and (f) of

the Sewerage and Drainage Act

(Chapter 294)]

All completion of work forms for Sewerage, Sanitary, M&E and Drainage to

merge into one form. Previously known as Form C, Form C1, Annex A, Annex C

and Annex D.

• For Form C, please fill the COMPOFWORK form

• For Annex A, Annex C and Form C1, please fill in Section A2: Sanitary

Work

• For Annex D, please fill in Section A1: Sewerage Work

Page 4: Handout for CBPU Subm

2

File Number Form Name Changes

PUB-BPU-COMPOFWORK Certificate of Completion and

Inspection of Sanitary, Sewerage and

Drainage Works

[Under Section 35(1)(e) and (f) of

the Sewerage and Drainage Act

(Chapter 294)]

It is known that these different forms are submitted by different QPs at different

stages of the development of the project. Hence built into the form is the

feature which allows one particular section of the form to be submitted. (For

example, if only the civil PE is ready to make his submissions, he can proceed to

do so using the form). If more than one QP/PE is ready to make theirs, more

sections of the form may be submitted at the same time by selecting the

relevant sections.

ENV-CBPU-CLRTOP01-NEW SUBMISSION Application for Clearance of

Temporary Occupation Permit (TOP)

- New Submission

New declarations added for developer/owner to endorse with regards to:

• maximum allowable peak surface runoff stipulated in the COP and

constructed according to approved plans

• SOP of the maintenance, operation and monitoring of the detention

tank system

• Inspection of crest levels being constructed to approved plans

annually/every 3 years upon obtaining the TOP

• Submission of the following documents as required annually upon

obtaining the TOP

New attachments added:

• “As – built drawings for detention tank systems”

• “SOP for pumped drainage system”

• “SOP for flood barrier”

ENV-CBPU-CLRTOP01-RESUBMISSION Application for Clearance of

Temporary Occupation Permit (TOP)

- Resubmission

ENV-CBPU-CLRCSC01-NEW SUBMISSION Application for Compliance

Certificate - New Submission

[Under Section 33(7) of the

Environmental Protection and

Management Act (Chapter 94A) and

Compliance Certificate under

Section 33(8) of the Sewerage and

Drainage Act (Chapter 294)]

Attachments section modified to comply with revised Code of Practice on

Surface Water Drainage.

Page 5: Handout for CBPU Subm

3

File Number Form Name Changes

ENV-CBPU-CLRCSC01-RESUBMISSION Application for Compliance

Certificate – Resubmission

[Under Section 33(7) of the

Environmental Protection and

Management Act (Chapter 94A) and

Compliance Certificate under

Section 33(8) of the Sewerage and

Drainage Act (Chapter 294)]

Attachments section modified to comply with revised Code of Practice on

Surface Water Drainage.

PUBWTR-0-PPC01 Pre-Planning Consultation Modified fields to indicate water demand for Potable and NEWater.

PUBWTR-0-WLP01 Notification of Water Service Work

by Licensed Water Service Plumber

Modified fields to indicate water demand for Potable and NEWater.

PUBWTR-0-WSW01 Notification of Water Service Work

by Professional Engineer

Modified fields to indicate water demand for Potable and NEWater.

PUBWTR-0-CSC01 Certificate of Satisfactory

Completion of Water Service Work

by Professional Engineer

Added new section - “Particulars of the Licensed Water Service Plumber”

PUBWTR-0-MCG01 Form for Manufacturing Category Include fields to indicate water demand for Potable and NEWater.

PUBWTR-0-NMC01 Form for Non-Manufacturing

Category

PUBWTR-0-RCG01 Form for Residential Category

PUBWTR-0-TSP01 Form for Temporary Category

PUB-SEW-FORM_A Notice to Commencement of

Sanitary/Sewerage Works

Not in Use from 28 Feb 2014

Page 6: Handout for CBPU Subm

4

File Number Form Name Changes

PUB-SEW-FORM_C1 Certificate of Completion and

Inspection for the Mechanical and

Electrical Works for Sewerage

Installation

Not in Use from 28 Feb 2014

PUB-SEW-FORM_D Supplementary Information to the

Application for Clearance Certificate

for Detailed Plan on Sewerage

(M&E) Works

Not in Use from 28 Feb 2014

PUB-SEW-FORM_D1 Details of Standby Generator &

Automatic Transfer Switch

Not in Use from 28 Feb 2014

PUB-SEW-FORM_D2 Omission of Standby Generator/

Alternate Power Supply Owner's

Undertaking Form

Not in Use from 28 Feb 2014

PUB-SEW-FORM_DP Application for Clearance Certificate

for Detailed Plans on Sewerage

(M&E Works)

Not in Use from 28 Feb 2014

PUB-SEW-ANNEX_A Declaration By Qualified Person on

Chargeable Sanitary Appliances

Installed

Not in Use from 28 Feb 2014

PUB-SEW-ANNEX_C

Plumbers/Contractor's Confirmation

of Completion of Sanitary/Sewerage

Works

Not in Use from 28 Feb 2014

PUB-SEW-ANNEX_D Hydrostatic (Water) Tests for

Sanitary Drainlines & Sewers

(<600mm DIA) and CCTV Inspection

Survey (>600mm DIA Sewers)

[Annex D to Form C/QP]

Not in Use from 28 Feb 2014

Page 7: Handout for CBPU Subm

5

PUB-SEW-RC TRENCH Certificate of Completion for RC

Trench

Not in Use from 28 Feb 2014

PUBWTR-0-WSP01 Application for License As a Water

Service Plumber

Not in Use from 28 Feb 2014

PUBWTR-0-WSR01 Application for Renewal of Water

Service Plumber Licence

Not in Use from 28 Feb 2014

PUBWTR-0-PWS01 Application for Potable Water

Supply

Not in Use from 28 Feb 2014

Page 8: Handout for CBPU Subm

6

Forms with No Changes

File Number Form Name

PUB-SEW-CLR-OVER-SEW Application for Approval of Works Affecting Public Sewerage System

PUB-SEW-FORM DLP End of Defects Liability Period Inspection for Public Sewers

PUB-SEW-FORM_B Application for Work in Public Sewerage System

PUB-SEW-FORM_B1 Notice for Carrying out Sewer Connection Work

PUBWTR-0-WSW02 Certification of Satisfactory Completion of Water Service Work by Licensed Water Service Plumber

PUB-DD-CSIDRA Certificate of Inspection for Drainage Works

PUB-DD-PCWVDRA Pre-consultation /Waiver Application Form on Drainage Matters

PUB-SEW-PCWVSEW Pre-consultation /Waiver Application Form on Sewerage Matters

Page 9: Handout for CBPU Subm

6

Corenet Forms with Changes

Page 10: Handout for CBPU Subm

7

1.1 Guide for Development Control (DC) Clearance Forms

ENV-CBPU-DCCLR-NEW SUBMISSION

Application for Development Control (DC) Clearance – New Submission

a) The DC clearance form is updated to support the work flow process. As part of an effort to

improve our service to the industry, PUB has introduced the classification of projects into

major and minor. This allows processing through separate tracks so that minor projects can be

processed more quickly.

b) A development is considered a minor project if it meets all of the following criteria:

• The development area is less than 0.2 Ha

• The development is 3 storeys or less

• No linkage to MRT

• No Basements (no pumping system)

• No Drainage Reserve affected

• Single Residential, shophouse or simple infrastructure projects that does not generate

used water or Change of Use (e.g. conversion of void deck to Child Care Centre)

• Has used water discharge flow rate of less than 2 litres per second

c) All other projects are classified as major projects.

d) For minor projects, QPs may submit both the DC plan and Detailed Plan (DP) at the same time,

allowing for shorter processing time. Previously, QPs need to obtain DC clearance before DP

can be submitted.

e) On the second page of the forms, there is a section called Development Details. This section

must be filled to allow the sorting of the project – into major or minor – to take place.

Accurate information is necessary to facilitate processing of the submissions.

Please refer to Section 1.2 for more information on the “Select” fields and how they can affect

your submissions.

Page 11: Handout for CBPU Subm

8

f) For projects sorted as minor, QP will be directed to the next section – “SUBMISSION FOR

DEVELOPMENTAL CONTROL (DC) CLEARANCE WITH DETAIL PLAN”.

g) For projects sorted as major, QP will be directed to the next section – “SUBMISSION FOR

DEVELOPMENTAL CONTROL (DC) PLAN”.

h) There are sections in the form that must be selected and filled only when the project involves

the respective sections. For example, if the project involves:

(i) sanitary/sewerage work, Section A needs to be selected and filled by QP

(ii) sanitary/sewerage AND drainage work, Section A and Section B need to be selected and

filled by QP

i) The selection of the section can be done by marking the checkbox.

Please select name of owner or QP

Please select name of QP/PE

submitting

Please select name of owner or QP

Page 12: Handout for CBPU Subm

9

j) If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill

that particular section.

k) Compulsory fields within these sections must be duly filled only when the section is selected

for submission. The sections are listed as follows:

Submission for Development Control (DC) Clearance Plan (for MAJOR projects only)

Section A – Sanitary/ Sewerage Work

Section B – Drainage Work

Submission for Development Control (DC) Clearance with Detail Plan (for MINOR projects only)

Section A1 – Sanitary, M&E Work (Used Water)

Section A2 – Sewerage Work, RC Trench

Section B – Drainage Work

Section C – Infrastructure or other works affecting Sewer & Drainage (e.g. covered link way,

bus stop)

l) To make attachments and declarations, QPs can similarly mark the provided checkboxes.

m) The Catchment & Waterways department’s Checklist for DC plans is now part of the DC

clearance forms. Please fill up the fields in the checklist if the project involves drainage works.

QPs need not submit a separate signed copy of the checklist for DC submission.

(i) Development site with area less than 0.2 hectares will be directed to the checklist

below.

Page 13: Handout for CBPU Subm

10

(ii) Development site with area greater than or equal to 0.2 hectares will be directed to the

checklist below.

n) There are a number of “Select” fields that can be found throughout the forms. These fields,

when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 1.2 for more information on the “Select” fields and how they can affect

your submissions.

o) Compulsory fields are highlighted in yellow, as shown in Appendix 1. These must be filled to

enable successful submission of the forms in Corenet.

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

Application for Development Control (DC) Clearance –

Resubmission/Amendment/Revision

p) Please refer to Appendix 2 for the ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

form.

Page 14: Handout for CBPU Subm

11

1.2 Select Fields – DC Clearance Forms

Field Detail

This field can be found on Page 41

This field can be found on Page 42

This field can be found on Page 42

Industrial

Factories, warehouses, power plants, industrial parks

Non Industrial

Residential, commercial and institutional developments

Please select one of the three options:

New Erection

Reconstruction

A&A (Addition and Alteration)

Please select the most appropriate type of development for

your project.

Page 15: Handout for CBPU Subm

12

Field Detail

This field can be found on Page 42

This field can be found on Page 42

Please choose the catchment where your project is located.

For projects that take place in more than one catchment, please

select one catchment.

Used Water Catchment No.

The used water catchments in Singapore are divided into 6 regions:

1) Bedok

2) Jurong

3) Kim Chuan

4) Kranji

5) Seletar

6) Ulu Pandan

Drainage Catchment No.

The drainage catchments in Singapore are divided into 10 regions:

The used water and drainage catchment maps are available at the link

below.

http://www.pub.gov.sg/customer/QPPortal/Pages/CatchmentMaps.as

px

1) Jurong 6) Bukit Timah

2) Kranji 7) (A) Singapore River

3) Pandan (B) Stamford Marina

4) Woodlands 8) Geylang

5) Kallang 9) Punggol

10) Changi

Page 16: Handout for CBPU Subm

13

Field Detail

This field can be found on Page 52

This field can be found on Page 52

Items have to be clearly indicated on plan.

Select YES from the corresponding fields in the checklist in order

to proceed with the DC submission.

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Page 17: Handout for CBPU Subm

14

Field Detail

This field can be found on Page 52 – 53

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Page 18: Handout for CBPU Subm

15

Field Detail

This field can be found on Page 53 – 54

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Page 19: Handout for CBPU Subm

16

Field Detail

This field can be found on Page 54

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Page 20: Handout for CBPU Subm

17

Field Detail

This field can be found on Page 54 – 55

This field can be found on Page 55

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

With direct / indirect linkage

Developments with linkages (direct or indirect) to special

underground facilities such as MRT stations shall comply with

the minimum platform level and crest level (Clause 2.1.1c and

Clause 2.2) as stated in the latest addendum or edition to the

Code of Practice on Surface Water Drainage.

Quoting the example of Orchard MRT station, developments with

direct linkage are Ion Orchard and Wisma Atria which are directly

connected to Orchard MRT station. Developments with indirect

linkages are Ngee Ann City and Lucky Plaza which are indirectly

connected to MRT Station through another building with direct

or indirect connection to Orchard MRT Station.

Page 21: Handout for CBPU Subm

18

Field Detail

This field can be found on Page 55 – 56

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Page 22: Handout for CBPU Subm

19

Field Detail

This field can be found on Page 56 – 57

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Page 23: Handout for CBPU Subm

20

Field Detail

This field can be found on Page 58

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Page 24: Handout for CBPU Subm

21

Field Detail

This field can be found on Page 58

This field can be found on Page 45

Select YES if items are provided.

Select NOT APPLICABLE if items are not relevant to the project.

Pumping Installation

A minimum of two pumps – duty and standby pumps – shall be

provided.

Ejector

The pit for the sewage ejector or solids divertor installation shall

be adequately sized (min. 3m x 3m) and shall include a working

space for maintenance.

Sump

A screen chamber shall be provided before the pump sump.

When the depth of pump sump or screen chamber exceeds 6m,

intermediate platforms shall be provided.

Access opening shall be provided directly above the pumps for

ease of maintenance.

Carpark

A screen chamber is NOT needed for carpark pump sump.

Swimming Pool

Backwash from swimming pool filter.

Page 25: Handout for CBPU Subm

22

2.1 Guide for Detailed Plan (DP) Form

PUB-BPU-CLRDP01

Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage

(Sanitary / Sewer) Works

[Under Section 33(1) of the Sewerage and Drainage Act (SDA), Chapter 294]

a) Projects classified as major, as described in Chapter 1, will undergo a separate DP submission

process. This can be done with the PUB-BPU-CLRDP01 form.

b) Previously, there were two forms for DP submissions, one for sewerage works (PUB-SEW-

CLRDPSEW01) and one for drainage works (PUB-DD-CLRDPDRA01). These two forms are now

combined into one single PUB-BPU-CLRDP01 form.

c) There are sections in the form that must be selected and filled only when the project involves

the respective sections. For example, if the project involves:

(i) sanitary work, Section A1 needs to be selected and filled by QP

(ii) sanitary AND drainage work, Section A1 and Section B need to be selected and filled by

QP

d) The selection of the section can be done by marking the checkbox.

e) If the box is unchecked, the whole section will be greyed out and the QP will not be able to fill

that particular section.

f) Compulsory fields within these sections must be duly filled only when the section is selected

for submission. The sections are listed as follows:

Section A1 – Sanitary Work

Section A2 – M&E Works (Used Water)

Section A3 – Sewerage Work, RC Trench

Section B – Drainage Work

OLD DP Forms NEW DP Form

PUB-SEW-CLRDPSEW01

PUB-DD-CLRDPDRA01 PUB-BPU-CLRDP01

Page 26: Handout for CBPU Subm

23

g) To make attachments and declarations, QPs can similarly mark the provided checkboxes.

h) There are a number of “Select” fields that can be found throughout the forms. These fields,

when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 2.2 for more information on the “Select” fields and how they can affect

your submissions.

i) Compulsory fields are highlighted in yellow, as shown in Appendix 3. These must be filled to

enable successful submission of the forms in Corenet.

t

Page 27: Handout for CBPU Subm

24

2.2 Select Fields – DP Form

Field Detail

This field can be found on Page 92

Sanitary

Includes works on any sanitary plumbing or drainage system and

the fixing, alteration and repair of a sanitary appliance

Sewer

Includes engineering works for the construction, alteration and

maintenance of any sewerage system

Sewage Treatment Plant

Refers to sewage treatment works, septic tank, imhoff tank,

percolating filter, sludge digestion tank, or any tank designed for

the pre-treatment, treatment or the stabilisation of sewage

Drainage

If the project involves drainage works only, this field can be left

unfilled. QP can proceed to fill up Section B: Drainage Work of

the PUB-BPU-CLRDP01 form to submit for DP clearance.

Page 28: Handout for CBPU Subm

25

Field Detail

This field can be found on Page 92

This field can be found on Page 92

New Submission

First DP submission for the particular project

Resubmission

Subsequent DP submission(s) of the same project

- Revised Plan Submission

- Amendment Plan Submission

Industrial

Factories, warehouses, power plants, industrial parks

Non Industrial

Residential, commercial and institutional developments

Page 29: Handout for CBPU Subm

26

Field Detail

This field can be found on Page 94

Pumping Installation

A minimum of two pumps – duty and standby pumps – shall be

provided.

Ejector

The pit for the sewage ejector or solids divertor installation shall

be adequately sized (min. 3m x 3m) and shall include a working

space for maintenance.

Sump

A screen chamber shall be provided before the pump sump.

When the depth of pump sump or screen chamber exceeds 6m,

intermediate platforms shall be provided.

Access opening shall be provided directly above the pumps for

ease of maintenance.

Carpark

A screen chamber is NOT needed for carpark pump sump.

Swimming Pool

Backwash from swimming pool filter.

Page 30: Handout for CBPU Subm

27

3.1 Guide for Completion of Work Form

PUB-BPU-COMPOFWORK

Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works

[Under Section 35(1)(e) and (f) of the Sewerage and Drainage Act (Chapter 294)]

a) The PUB-BPU-COMPOFWORK form puts together all the Completion of Work forms for

Sewerage, Sanitary, M&E and Drainage. These forms were previously known as Form C, Form

C1, Annex A, Annex C and Annex D. This is to give the Lead QP an overview of the various

Completion of Work forms that has to be submitted to PUB over the course of the project.

b) It is known that these different forms are submitted by different QPs at different stages of the

development of the project. Hence, built into the form is a feature which allows one particular

section of the form to be submitted even if other required sections are not ready for

submission. (For example, if only the Civil PE is ready to make his submissions, he can proceed

to do so using the form even if the M&E PE is not ready to submit theirs). If more than one

QP/PE are ready to make their submissions, more sections of the form may be submitted at

the same time by selecting the relevant sections.

c) The table below shows the options and the respective sections that will be made available.

Selection Options Sections Available for Submission

Completion of Sewerage

Work only

Section A1 – Sewerage Work

Application for PUB

Clearance for Temporary

Occupation Permit (TOP)

Section A2 – Sanitary Work

Section A3 – RC Trench Completion

Section B – Drainage Work

Section C – Infrastructure Works Affecting Sewer & Drainage

Application for PUB

Clearance for

Certificate of Statutory

Completion (CSC)

Section D – Application for PUB Clearance for CSC

Application for PUB

Clearance for both

Temporary Occupation

Permit (TOP) &

Certificate of Statutory

Completion (CSC)

Section A2 – Sanitary Work

Section A3 – RC Trench Completion

Section B – Drainage Work

Section C – Infrastructure Works Affecting Sewer & Drainage

Section D – Application for PUB Clearance for CSC

Page 31: Handout for CBPU Subm

28

d) The options are available on the first page of the PUB-BPU-COMPOFWORK form.

e) For Application for PUB Clearance for Certificate of Statutory Completion (CSC), please be

reminded to submit the Certificate of Inspection for Drainage Works (PUB-DD-CSIDRA)

together with the PUB-BPU-COMPOFWORK form.

f) There are a number of “Select” fields that can be found throughout the forms. These fields,

when clicked, will show a drop-down menu with options for the QP to choose accordingly.

Please refer to Section 3.2 for more information on the “Select” fields and how they can affect

your submissions.

g) Compulsory fields are highlighted in yellow, as shown in Appendix 4. These must be filled to

enable successful submission of the forms in Corenet. Compulsory fields under the sections

A1, A2, A3, B, C and D must be duly filled only when the section is selected for submission.

Page 32: Handout for CBPU Subm

29

3.2 Select Fields – Completion of Work Form

Field Detail

This field can be found on Page 101 & 106

Please select the appropriate options:

a change

no change

This field can be found on Page 101 & 106

Please select one of the three options:

New Erection

Reconstruction

A&A (Addition and Alteration)

Page 33: Handout for CBPU Subm

30

4.1 Guide for Temporary Occupation Permit (TOP) Forms

ENV-CBPU-CLRTOP01-NEW SUBMISSION

ENV-CBPU-CLRTOP01-RESUBMISSION

Application for Clearance of Temporary Occupation Permit (TOP) – New Submission

Application for Clearance of Temporary Occupation Permit (TOP) – Resubmission

a) The following new declarations are added:

• The crest levels, platform levels, flood protection levels are in compliance with Code

of Practice on Surface Water Drainage and constructed according to approved plans.

• The maximum stormwater discharge from the development is in compliance with the

maximum allowable peak runoff stipulated in the COP and constructed according to

approved plans.

• As the QP, you will need to declare the following “I have liaised with the Developer/

Owner to ensure that a Maintenance/Managing Agent has been established to

undertake the SOP of the maintenance, operation and monitoring of the detention

tank system.”

b) The following new attachments are added to allow the submission of the following documents

(in line with the current edition of Code of Practice on Surface Water Drainage):

• As – built survey plans indicating crest levels, platform levels, flood protection levels

based on approved flood protection measures

• As – built drawings for detention tank systems and final design calculations, and

factory test report for its pumping system

• Standard Operating Procedure for pumped drainage system(basement / detention

tank)

• Standard Operating Procedure for flood barrier

• Developer/Owner declaration on the following - I shall inspect and declare that the

crest levels are constructed to approved plans annually / every 3 years upon obtaining

the TOP

• Developer/Owner declaration on the following:

- I shall submit the following documents as required annually upon obtaining

the TOP

- Certificate of inspection on flood barriers on site, including leak test

certificate

- Amendments to SOP for flood barrier

- Certificate of inspection on pumped drainage system (basement/detention

tank)

- Certificate of inspection on ABC Waters design features

Page 34: Handout for CBPU Subm

31

c) To make attachments and declarations, QPs can mark the checkboxes provided.

d) Compulsory fields are highlighted in yellow, as shown in Appendix 5 & Appendix 6. These must

be filled to enable successful submission of the forms in Corenet.

Page 35: Handout for CBPU Subm

32

4.2 Select Fields – TOP Forms

Field Detail

This field can be found on Page 110 & 114

Industrial

Factories, warehouses, power plants, industrial parks

Non Industrial

Residential, commercial and institutional developments

Page 36: Handout for CBPU Subm

33

5.1 Guide for Certificate of Statutory Completion (CSC) Forms

ENV-CBPU-CLRCSC01-NEW SUBMISSION

ENV-CBPU-CLRCSC01-RESUBMISSION

Application for Compliance Certificate – New Submission

Application for Compliance Certificate – Resubmission

[Under Section 33(7) of the Environmental Protection and Management Act (Chapter 94A) and

Compliance Certificate under Section 33(8) of the Sewerage and Drainage Act (Chapter 294)]

a) To indicate attachments and declarations, QPs can mark the checkboxes provided.

b) Compulsory fields are highlighted in yellow, as shown in Appendix 7 and Appendix 8. These

must be filled to enable successful submission of the forms in Corenet.

Page 37: Handout for CBPU Subm

34

5.2 Select Fields – CSC Forms

Field Detail

This field can be found on Page 119 & 124

Industrial

Factories, warehouses, power plants, industrial parks

Non Industrial

Residential, commercial and institutional developments

Page 38: Handout for CBPU Subm

35

6.1 Guide to Water Submission Forms

PUBWTR-0-MCG01

PUBWTR-0-NMC01

PUBWTR-0-RCG01

PUBWTR-0-TSP01

PUBWTR-0-PPC01

PUBWTR-0-WLP01

PUBWTR-0-WSW01

PUBWTR-0-CSC01

Form for Manufacturing Category

Form for Non-Manufacturing Category

Form for Residential Category

Form for Temporary Category

Pre-Planning Consultation

Notification of Water Service Work by Licensed Water Service Plumber

Notification of Water Service Work by Professional Engineer

Certificate of Satisfactory Completion of Water Service Work by Professional Engineer

a) New fields are included to indicate water demand for PUB Water (Potable Water) and

NEWater in the following forms:

File Name Form Name

PUBWTR-0-PPC01 Pre-Planning Consultation

PUBWTR-0-WLP01 Notification of Water Service Work by Licensed

Water Service Plumber

PUBWTR-0-WSW01 Notification of Water Service Work by

Professional Engineer

PUBWTR-0-MCG01 Form for Manufacturing Category

PUBWTR-0-NMC01 Form for Non-Manufacturing Category

PUBWTR-0-RCG01 Form for Residential Category

PUBWTR-0-TSP01 Form for Temporary Category

b) New section is added to indicate the particulars of Licensed Water Service Plumber in the

following form:

File Name Form Name

PUBWTR-0-CSC01 Certificate of Satisfactory Completion of Water Service Work by

Professional Engineer

c) Compulsory fields are highlighted in yellow, as shown in Appendix 9 – 16. These must be filled

to enable successful submission of the forms in Corenet.

Page 39: Handout for CBPU Subm

36

6.2 Select Fields – Water Submission Forms

Field Detail

This field can be found on Page 137, 143 and 147

Please select the most appropriate type of development for

your project.

This field can be found on Page 143 and 147

Please select the most appropriate work nature of your project.

Page 40: Handout for CBPU Subm

37

Field Detail

This field can be found on Page 140

Please select the most appropriate work nature of your project.

Page 41: Handout for CBPU Subm

38

Appendix

Page 42: Handout for CBPU Subm

39

List of Appendix

Appendix 1 – ENV-CBPU-DCCLR-NEW SUBMISSION .................................................................. 41 – 64

Application for Development Control (DC) Clearance – New Submission

Appendix 2 – ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION ............................. 65 – 90

Application for Development Control (DC) Clearance – Resubmission/Amendment/Revision

Appendix 3 – PUB-BPU-CLRDP01 ................................................................................................ 91 – 96

Application for Clearance Certificate for Detailed Plan on Drainage and Sewerage (Sanitary/Sewer)

Works

Appendix 4 – PUB-BPU-COMPOFWORK ................................................................................... 97 – 109

Certificate of Completion and Inspection of Sanitary, Sewerage and Drainage Works

Appendix 5 – ENV-CBPU-CLRTOP01-NEW SUBMISSION ........................................................ 110 – 113

Application for Clearance of Temporary Occupation Permit (TOP) – New Submission

Appendix 6 – ENV-CBPU-CLRTOP01-RESUBMISSION/AMENDMENT/REVISION ................... 114 – 118

Application for Clearance of Temporary Occupation Permit (TOP) –

Resubmission/Amendment/Revision

Appendix 7 – ENV-CBPU-CLRCSC01-NEW SUBMISSION ......................................................... 119 – 123

Application for Compliance Certificate – New Submission

Appendix 8 – ENV-CBPU-CLRCSC01-RESUBMISSION/AMENDMENT/REVISION ................... 124 – 128

Application for Compliance Certificate – Resubmission/Amendment/Revision

Appendix 9 – PUBWTR-0-MCG01 ............................................................................................ 129 – 130

Form for Manufacturing Category

Appendix 10 – PUBWTR-0-NMC01 ......................................................................................... 131 – 132

Form for Non-Manufacturing Category

Appendix 11 – PUBWTR-0-RCG01 ..................................................................................................... 133

Form for Residential Category

Appendix 12 – PUBWTR-0-TSP01 ............................................................................................ 134 – 136

Form for Temporary Category

Appendix 13 – PUBWTR-0-PPC01 ........................................................................................... 137 – 139

Pre-Planning Consultation

Appendix 14 – PUBWTR-0-WLP01 .......................................................................................... 140 – 142

Notification of Water Service Work by Licensed Water Service Plumber

Appendix 15 – PUBWTR-0-WSW01 ......................................................................................... 143 – 146

Notification of Water Service Work by Professional Engineer

Appendix 16 – PUBWTR-0-CSC01 ............................................................................................ 147 – 148

Certificate of Statutory Completion of Water Service Work by Professional Engineer

Page 43: Handout for CBPU Subm

40

Appendix 17 – Contact List ................................................................................................................ 149

Page 44: Handout for CBPU Subm

41

APPLICATION FOR DEVELOPMENT CONTROL (DC)CLEARANCE - NEW SUBMISSION

ENV-CBPU-DCCLR-NEW SUBMISSION

This form may take you 10 minutes to fill in. You will need the following information to fill in the form:-

- Particulars of Project - Particulars of Qualified Person

Date: 19/03/2014

To: Central Building Plan Unit

National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for theworks.

2. This form is to be accompanied by the relevant attachments.

3. Please read the DC checklist before filling the form.

Particulars of Project

Project Reference Number

Project Title

Location Description[Include Lot/Plot, MK/TS,Building Address, HouseNo and Road information]

Particulars of Application

Development ProposalApplication

Select

File Ref No/Case ID

Dated

SIP/DIP from CBPU(if applicable)

Appendix 1

Razis
Highlight
Razis
Highlight
Page 45: Handout for CBPU Subm

42

ENV-CBPU-DCCLR-NEW SUBMISSION

Particulars of Qualified Person

Name Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Development Details

Type of Submission Select

Type of Development Select

Is there basement? Yes No

Is there sewer connection to neighbour house?

Yes No

Is there public sewer in the development lot?

Yes No

No.of storeys in development

Storeys

Total used water discharge

Area of development

DR in the development?

Proposed MIN PLATFORM LEVEL

Max Adjacent Road

Any linkage to MRT

Used Water Catchment No.

Drainage Catchment No.

Select

Select

L/s

ha

mRL

mRL

Please refer to www.pub.gov.sg for catchment maps of used water and drainage.

Yes No

Yes No

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 46: Handout for CBPU Subm

43

Confirmation

ENV-CBPU-DCCLR-NEW SUBMISSION

Roof gutters (including rain water down pipes and outlets, and roof scupper drains) are banned as an anti-mosquito breeding measure for all new developments. Waiver in writing must be obtained from National Environment Agency to erect roof gutters at the DC stage prior to BP submission

I confirm that :

a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or

b) waiver for roof gutter has been obtained from the National Environment

Agency in writing on : File Ref No:

Dated:

c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.

d) Confirmation for a), b) or c) not applicable, for A & A and reconstructionbuilding projects.

Attachments

Development Control Plan

Others, please specify

Add Delete

Razis
Highlight
Page 47: Handout for CBPU Subm

44

SUBMISSION FOR DEVELOPMENT CONTROL (DC)CLEARANCE WITH DETAIL PLAN

Instruction:1. This page of the form is applicable for minor projects.2. First storey plan/site plan for section A1 and B can be submitted as one plan

with clear layer and identification3. Please check all the relevant infromations have been indicated and provided

before submitting

Particulars of Owner(s)

Name

Address

Contact No

Email

Select

SECTION A1: SANITARY, M&E WORK (Used Water)

Attachments

1. Site plan and first storey plan(indicate the sewer setback, propose and existing sewerconnection, top/invert level of manhole(s), and platform levels,propose and existing sanitary drainline.

2. Detailed sanitary plan (to show sanitary line)

3. Is there pumping system(s) for used water? Yes No

Declaration: Name Role

By QP/PE:I have carried out athorough investigation of the existingsewerage system withinand adjacent to the siteand will take everypractical measure toensure that theproposed development will not disrupt or affect any existingsewer/drain-line thatserves other properties/premises.

Phone Email Firm Arch/PEReg No

Select

by QP/PE:I hereby certify that these plans and the works shown therein comply with the provisions of the Sewerage and

Select

(Tick if applicable)

Razis
Highlight
Page 48: Handout for CBPU Subm

45

Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Codeof Practice on the Sewerage and SanitaryWorks

by PE(M/E) if there is pumping system(s)I, being a Professional Engineer hereby certify that the propose mechanical and electrical(M&E) works of the abovementioned project are design in accordance with the current Code of Practice onSewerage and Sanitary Works, Sewerage andDrainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department.

Select

Attachments:

1. Detail plan drawings of used water pumping system(s)

2. Attached Form D2/QP if an alternate power source is not available

3. Design calculations

4. Pump and system curves

5. Relevant equipment catalogues

Please state if any deviation from the COP

Pump Design Condition

Pump Application

Brand Model Estimated Inflow (l/s)

Pumpoperatingcapacity (l/s)

Pumpoperatinghead (m)

Solidsfreepassage Size (mm)

Motor Rating (kw)

Select

Add Delete

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 49: Handout for CBPU Subm

46

Particulars of Plumber/Contractor

Name Select

Firm Details

Contact No

Email

please indicate your membership/license

PUB LP

SPS registered

N.A.

Expected Date of Commencement

Expected Date of Completion

Tick if ApplicableSECTION A2: SEWERAGE WORK, RC Trench

Attachments:

1. Detail sewerage planTo show: propose sewer alignment with diameter, material,

top/invert level, existing sewer alignment to be abandoned (if any)

2. Design & calculation of RC trench (if applicable)

Declaration Name Role Phone Email Firm Arch/PEReg No

by PE (Civil):I hereby certify that the sewerage plans and the works shown therein comply with the provisions of the Sewerage andDrainageAct (Chapter 294), theSewerage andDrainage (Sanitary Works) Regulations, the currentCode of Practice on theSewerage and SanitaryWorks.

Select

Particulars of Plumber/ContractorTick if same as in Sanitary Work

Name

NRIC/Passport No.

Firm Details

Contact No

Select

Razis
Highlight
Page 50: Handout for CBPU Subm

47

Email

please indicate your membership/license

PUB LP

SPS registered

N.A.

Expected Date of Commencement

Expected Date of Completion

Tick if applicableSECTION B: DRAINAGE WORK

Attachment:

1. Site Plan and First Sty Plan

2. Basement Plans

3. Detail of Drainage Work

4. DC Checklist

5. Proposed plan showing crest levels, platform levels with andwithout flood barriers at various entrance and exit points, andflood barrier installed at all points of entry and exit for buildingpremises or for entire development

Declaration Name Role Phone Email Firm Arch/PEReg No

I certify that the drainagework are designed in fullcompliance with PUBrequirements includingSewerage and DrainageAct (Chapter 294) andcurrent edition of COP onSurface Water Drainage

Select

Please state if any deviation from the COP

SECTION C: Infrastructure or other works affecting Sewer & Drainage (eg. Covered link way, bus stop)

Attachment:

1. First storey plan, showing sewer setback, sewer alignment, diameter,manhole & sewer ID.

2. Cross sectional plan

3. Sewer and drainage plan

4. Proposed plan showing crest levels, platform levels with and withoutflood barriers at various entrance and exit points, and flood barrierinstalled at all pints of entry and exit for building premises or for entiredevelopment.

Tick if applicable

Razis
Highlight
Page 51: Handout for CBPU Subm

48

Declaration Name Role Phone Email Firm Arch/PEReg No

I hereby certify that theseplans and the works showntherein comply with theprovisions of the Sewerageand Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works)Regulations, the currentCode of Practice onSewerage and Sanitary Works.

Select

Razis
Highlight
Page 52: Handout for CBPU Subm

49

SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN

DC SUBMISSION

1. This page of the form is applicable for major projects2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan

with clear layer and identification3. Please check all the relevant information have been indicated and provided

before submitting4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the

DC clearance is obtained.

Particulars of Owner(s)

Name Select

Address

Contact No

Email

(Tick if applicable) SECTION A: SANITARY / SEWERAGE WORK

Attachments:

1. Site plan and first storey plan

to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and sewer identification number

2. Is there any sewerage pump system required? Yes No

Declaration

I hereby certify that these plans and theworks shown thereincomply with the provisions of the Sewerage andDrainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Code of Practice on the Sewerage and Sanitary Works.

I have carried out a thorough investigation of the existing sewerage system within the site and will take every practical measure to ensure that the proposed development will not disrupt or affect any existing sewer / drain-line that serves other properties / premises.

Select

Name Role Contact Email FirmArch/PEReg No

Select

Please state if any

Razis
Highlight
Page 53: Handout for CBPU Subm

50

COP

Page 54: Handout for CBPU Subm

51

DC SUBMISSION

(Tick if applicable) SECTION B: DRAINAGE WORK

Attachments:

1. Site Plan and First Sty Plan

2. Basement Plans

3. DC Checklist

4. Proposed plan showing crest levels, platform levelswith and without flood barriers at various entranceand exit points, and flood barrier installed at all pointsof entry and exit for building premises or for entiredevelopment

Declaration

I certify that the drainage workare designed infull compliancewith PUB requirementsincluding Sewerage andDrainage Act(Chapter 294)and currentedition of COPon Surface WaterDrainage

Please state if any deviation from the COP

Select

Name Role Contact Email FirmArch/PEReg No

Razis
Highlight
Page 55: Handout for CBPU Subm

52

PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT

CHECKLIST FOR DC PLANS

PUB-DD-CHECKLIST

*Please use this form if development site is equal to orgreater than 0.2 Ha*

(A) General

1. Date of Drainage InterpretationPlan (DIP) issuance (Please indicate the date of DIP)

2. Site boundary lines are clearlyindicated on plan

Select

3. Existing drains alignment, drain size,drain type, summit point, flow directionand discharge points of internal surfacedrain system are clearly indicated on plan

Select

4. All addition and alteration worksare highlighted

Select

5. For JTC, HDB, URA developments,the drainage masterplan of thedevelopment site is attached togetherwith the submission.

Select

6. There is provision of peak runoff controlmeasures within the development site.

Select

Size of development site Ha

(a) Post-development Runoff Coefficient

(Please indicate value between 0 to 1)

(b) Type of measures to reduce peak runoff

(i) Detention tanks: Volume

*For developments with detention tank systems, please alsofill out section 6 (c) in the form*

(Please indicate size< width (m) x length (m) x

effective depth (m) >)

(ii) Retention/ sedimentation ponds Select

(iii) Green roofs Select

(iv) Planter boxes Select

(v) Porous pavements Select

(vi) ABC Waters Design Features (to be endorsed by an ABC Waters Professional - please fill out Section 7 in the form)

Constructed Wetlands Select

Page 56: Handout for CBPU Subm

53

Bioretention Swales/Basins Select

Rain Gardens Select

(vii) Others

(Please indicate if any)

(c) For developments with detention tank systems

(i) Detention tank incorporates rainwater harvesting feature

Detention volume

Detention volume to meet the requirement as stated in Clause 7.1.5 of the latest edition of Code of Practice on Surface Water Drainage (Detention V)

(Please indicate volume in cubic metre)

Volume set aside for rainwater harvesting storage (Rainwater Harvesting V) (Please indicate volume

in cubic metre)

Total volume of tank (Total V)

Total V = Detention V + Rainwater Harvesting V

0

Select

(ii) Proposed drainage plan indicating catchment and sub-catchment boundaries, and the specific subcatchment of each tank including the outlet discharge point of the internal drainage system to the public drain is attached with the submission.

(iii) Proposed site plan with runoff coefficients and area of development with varying characteristics of catchment/sub-catchment clearly indicated.

Select

(iv) Proposed site plan with features, and catchment/sub-catchment of each feature, to attenuate stormwater runoff to comply with COP requirements clearly indicated.

Select

(v) PE (Civil) -endorsed design calculations or modelling results as per the design calculations templates or equivalent, are included in the submission. If there is any pumped drainage system involved, the civil and structural components shall be endorsed by a PE (Civil) while the mechanical and electrical components shall be endorsed by a PE (Mechanical/Electrical).

Select

(vi) Proposed site layout plans indicating the location and footprint of the detention tank(s), pumping facilities (if applicable), the effective depth of the detention tank(s) and the connection point to the internal drainage system are attached in the submission.

Select

Select

Page 57: Handout for CBPU Subm

54

7. ABC Waters design features are incorporatedwithin the development. *If yes, please also respond

to 7(a), 7(b)*

(a) Names & Registration No. of ABC Waters Professional (Please indicate name & registration

no. of ABC professional)

(b) Concept design and design calculations (e.g. catchment area, treatment area and detainment volume etc for the ABC Waters design feature), endorsed by the ABC Waters Professional are submitted to PUB.

(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.

8. If the proposed development site areaexceeds 0.4 ha, hydraulic calculationsfor the proposed internal drainage facilities,including sub-catchment plans for theproposed development site endorsed by aProfessional Engineer (Civil) to be submittedfor PUB record.

9. There is upstream drainage connectionfrom the neighbouring lots into thedevelopment site.

(B) DRAINAGE RESERVE

10. Drainage Reserve lines and lot boundariesare indicated, dimensioned and highlighted.

11. All embankments and structures are setoutside the Drainage Reserve

12. Drainage Reserve are free from encumbrances

13. Design of embankment and structuresnear a drain or Drainage Reserve (within 2m)must not take into consideration the passiveresistance offered by the existing orproposed drainage structures.(Note clause 5.3 of the latest edition ofCode of Practice on Surface WaterDrainage). The structural and stabilitycalculations for an embankment or a structurewithin 2 m from the edge of Drainage Reserveshall be endorsed by a Professional Engineerand submitted to the Board for record atDetailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)

14. MPL of development mRL

15. All proposed/existing platform levelsare clearly indicated on plan

Page 58: Handout for CBPU Subm

55

16. The proposed platform levels androad/ground levels adjacent to theinternal drain outlet discharge point areclearly indicated

17. For addition and alteration workssubmission, the existing platform levelsare indicate

18. Linkages (direct/indirect) to specialunderground facilities and basements,if any, are indicated and complied withthe latest Code of Practice on SurfaceWater Drainage

Select

19. Flood barrier (as stipulated in Section 2.4 ofthe latest Code of Practice on SurfaceWater Drainage), if any, is incorporated intothe development site.

*If Yes, please also respond to 19(a)*

(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission

For developments where flood barriers are automated and/or with more than 2points of entry/exit, the following document shall be submitted at Detailed Planningstage.-- Details on the Standard Operating Procedure (SOP) including the operation and maintenance of the flood barrier to be endorsed by Mechanical and/ or ElectricalQP or PE, and the developer/ building owner.-- Details on the size, type and design of the flood barrier.

Page 59: Handout for CBPU Subm

56

(D) PROPOSED DRAINAGE WORKS

20. Proposed/ existing drains and drains to bedeleted are clearly indicated usingdifferent colour

Select

21. Alignment, summit point, flow direction, type& size and outlet discharge points of theproposed internal surface drains are clearlyindicated.

Select

22. Connection point to existing drain is indicated Select

23. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan.

Select

24. Sump size is indicated Select

25. Vertical grating at internal drain outletdischarge point is provided

Select

26. External drainage works (including culvertdetails) to be submitted separately duringDetailed Planning stage. This shall be clearlyannotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL

27. Crest level of access ways and openingsleading into the basement is indicated andcomplied with the latest Code of Practiceon Surface Water Drainage

Select

28. Proposed sizes and flow direction of cut offdrains are indicated

Select

(F) COMMON DRAIN

29. Alignment, size and flow of existingcommon drain within the developmentlot are indicated.

Select

30. If there is common drain within thedevelopment site, the following shall beendorsed on the plan:

Select

"Surface runoff from the site and allneighbouring lots shall continue to beallowed to discharge through the commondrain within the site."

31. There is no permanent structure erectedabove and over the common drain

Select

32. If the proposal involves the reconstructionof common drain, the proposed commondrain shall be at least 450mm wide asstipulated in Section 4.5 of Code ofPractice on Surface Water Drainage or

Select

Page 60: Handout for CBPU Subm

57

any other sizes as directed by PUB

33. Details of the proposed common drain tobe submitted by Professional Engineer(Civil) separately to PUB for approvalduring Detailed Planning/ Building Planstage. This is to be annotated on the plan

Select

34. The position of the existing/proposedboundary wall/fence is clearly indicated

Select

Page 61: Handout for CBPU Subm

58

(G) PUMPED DRAINAGE SYSTEM

35. Pumped drainage system complies with thelatest Code of Practice on Surface WaterDrainage. Details of pumped drainagesystem and design computations dulyendorsed by PE shall be submittedseparately to PUB for record during DetailedPlanning stage

Select

36. Source catchment area with surface runoffleading into the pumped drainage system isclearly indicated

Select

37. The location, size, inlet and outletconnections of the rainwater pump sumpfor the proposed pumped drainage systemare clearly indicated

Select

(H) RETAINING WALL

38. If a retaining wall is erected to raise theground level of the development site aboveadjacent premises, adequate internaldrainage system provided to effectivelyintercept and drain away runoff including thesub-soil flow from the development site

Select

39. If a retaining wall is erected to lower theground level of the development site,adequate internal drainage system providedto effectively intercept and drain awayexisting sub-soil and overland flowsdischarging through the development sitefrom the adjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES

40. Minimum 600mm high solid boundary wallaround development site is erected toprevent surface runoff from overflowing intoadjacent premises on lower ground

Select

I hereby confirm that the above items have been complied with and endorsed on the plans.

I hereby certify that the standard endorsement below will also be certified on the plans:-

(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water Drainage and the Sewerage and Drainage (Surface Water Drainage) Regulations 2007.

(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.(c) The runoff within, upstream of and adjacent to the development lot can be

effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or

Page 62: Handout for CBPU Subm

59

sub-basement to the external roadside drains.

* Public Utilities Board (PUB) reserves the right to report any false declaration ofinformation to the relevant professional bodies for action in accordance to theAct/ethnics governing all the Qualified Professional.*

Page 63: Handout for CBPU Subm

60

PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT

CHECKLIST FOR DC PLANS*Please use this form if development site is less than 0.2 Ha*

PUB-DD-CHECKLIST

(A) General

1. Date of Drainage Interpretation Plan (DIP) issuance

2. Site boundary lines are clearly indicated on plan

3. Existing drains alignment, drain size, drain type,summit point, flow direction and dischargepoints of internal surface drain system areclearly indicated on plan

4. All addition and alteration works are highlighted

5. For JTC, HDB, URA developments, the drainagemasterplan of the development site is attachedtogether with the submission.

6. ABC Waters design features are incorporated withinthe development.

Select

(a) Names & Registration No. of ABC Waters Professional

(b) Concept design and design calculations, endorsed by the ABC Waters Professional are submitted to PUB.

Select

(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.

Select

7. If the proposed development site area exceeds0.4 ha, hydraulic calculations for the proposedinternal drainage facilities, includingsub-catchment plans for the proposed developmentsite endorsed by a Professional Engineer (Civil) tobe submitted for PUB record.

Select

8. There is upstream drainage connection from the neighbouring lots into the development site.

Select

Select

Select

Select

Select

Page 64: Handout for CBPU Subm

61

PUB-DD-CHECKLIST

(B) DRAINAGE RESERVE

9. Drainage Reserve lines and lot boundaries are indicated, dimensioned and highlighted.

Select

10. All embankments and structures are set outsidethe Drainage Reserve

11. Drainage Reserve are free from encumbrances

12. Design of embankment and structures near a drainor Drainage Reserve (within 2m) must not take intoconsideration the passive resistance offered by theexisting or proposed drainage structures. (Noteclause 5.3 of the latest edition of Code of Practiceon Surface Water Drainage). The structural andstability calculations for an embankment or astructure within 2 m from the edge of DrainageReserve shall be endorsed by a ProfessionalEngineer and submitted to the Board for record atDetailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)

13. MPL of development mRL

14. All proposed/existing platform levels are clearlyindicated on plan

Select

15. The proposed platform levels and road/ground levels adjacent to the internal drain outlet discharge point are clearly indicated

Select

16. For addition and alteration works submission, theexisting platform levels are indicated

Select

17. Linkages (direct/indirect) to special undergroundfacilities and basements, if any, are indicated andcomplied with the latest Code of Practice onSurface Water Drainage

Select

18. Flood barrier (as stipulated in Section 2.4 of thelatest Code of Practice on Surface WaterDrainage), if any, is incorporated into thedevelopment site.

Select

(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission

Select

For developments where flood barriers are automated and/or with more than 2 points of entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.-- Details on the standard operating procedure (SOP) including the proposed maintenance plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person, and the developer/owner.-- Details on the size, type and design of the flood barrier.

(D) PROPOSED DRAINAGE WORKS

Page 65: Handout for CBPU Subm

62

19. Proposed/ existing drains and drains to be deletedare clearly indicated using different colour

Select

20. Alignment, summit point, flow direction, type & sizeand outlet discharge points of the proposedinternal surface drains are clearly indicated

Select

21. Connection point to existing drain is indicated Select

22. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan

Select

23. Sump size is indicated Select

24. Vertical grating at internal drain outlet dischargepoint is provided

Select

25. External drainage works to be submitted separatelyduring Detailed Planning/ Building Plan stage. Thisshall be clearly annotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL

26. Crest level of access ways and openings leadinginto the basement is indicated and complied withthe latest Code of Practice on Surface WaterDrainage

Select

27. Proposed sizes and flow direction of cut off drainsare indicated

Select

Page 66: Handout for CBPU Subm

63

PUB-DD-CHECKLIST

(F) COMMON DRAIN

28. Alignment, size and flow of existing common drainwithin the development lot are indicated

Select

29. If there is common drain within the developmentsite, the following shall be endorsed on the plan:

Select

“Surface runoff from the site and all neighbouring lots shall continue to be allowed to discharge through the common drain within the site.”

30. There is no permanent structure erected aboveand over the common drain

Select

31. If the proposal involves the reconstruction ofcommon drain, the proposed common drainshall be at least 450mm wide as stipulated inSection 4.5 of Code of Practice on Surface WaterDrainage or any other sizes as directed by PUB

Select

32. Details of the proposed common drain to besubmitted by Professional Engineer (Civil)separately to PUB for approval during DetailedPlanning/ Building Plan stage. This is to beannotated on the plan

Select

33. The position of the existing/proposed boundary wall / fence is clearly indicated

Select

(G) PUMPED DRAINAGE SYSTEM

34. Pumped drainage system complies with the latestCode of Practice on Surface Water Drainage.Details of pumped drainage system and designcomputations duly endorsed by PE shall besubmitted separately to PUB for record duringDetailed Planning / Building Plan stage

Select

35. Source catchment area with surface runoff leadinginto the pumped drainage system is clearly indicated

Select

36. The location, size, inlet and outlet connections ofthe rainwater pump sump for the proposedpumped drainage system are clearly indicated

Select

(H) RETAINING WALL

37. If a retaining wall is erected to raise the groundlevel of the development site above adjacentpremises, adequate internal drainage systemprovided to effectively intercept and drain away runoff including the sub-soil flow from thedevelopment site

Select

38. If a retaining wall is erected to lower the groundlevel of the development site, adequate internaldrainage system provided to effectively interceptand drain away existing sub-soil and overland flowsdischarging through the development site from theadjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES

39. Minimum 600mm high solid boundary wall arounddevelopment site is erected to prevent surfacerunoff from overflowing into adjacent premises onlower ground

Select

I hereby confirm that the above items have been complied with and endorsed on the plans.

Page 67: Handout for CBPU Subm

64

(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water

Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007. (b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.

(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or sub-basement to the external roadside drains.

* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professionalbodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *

Page 68: Handout for CBPU Subm

65

APPLICATION FOR DEVELOPMENT CONTROL (DC)CLEARANCE - RESUBMISSION/AMENDMENT/REVISION

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

This form may take you 10 minutes to fill in. You will need the following information to fill in the form:- - Particulars of Project - Particulars of Qualified Person

Date: 19/03/2014

To: Central Building Plan Unit

National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for theworks.

2. This form is to be accompanied by the relevant attachments.

3. Please read the DC checklist before filling the form.

Information

1. For enquiries on application of status, please call 67319681 / 67319513

Particulars of Project

Project Reference Number

New Project Title

(if original project title is revised)

Location Description for

revised project titleabove

[Include Lot/Plot, MK/TS,Building Address, HouseNo and Road information]

Particulars of Application

Submission Type Select

File Ref No/Case ID

Dated

Previous DC Advice fromCBPU (for resubmissioncase)

Previous DC Clearancefrom CBPU (foramendment/revision)

Appendix 2

Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 69: Handout for CBPU Subm

66

CBPU Processing Officergiven in DC advice/clearance

Remarks

Particulars of Qualified Person

Name Please Select

Role In Project

Registration No

Razis
Highlight
Razis
Highlight
Page 70: Handout for CBPU Subm

67

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

Particulars of Qualified Person (Continue)

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Development Details

Type of Submission Select

Type of Development Select

Is there basement? Yes No

Is there sewer connection to neighbour house?

Yes No

Is there public sewer in the development lot?

Yes No

No.of storeys in development

Total used water discharge

Area of development

DR in the development?

Proposed MIN PLATFORM LEVEL

Max Adjacent Road

Any linkage to MRT

Used Water Catchment No.

Drainage Catchment No.

Select

Select

Storeys

L/s

ha

mRL

mRL

Please refer to www.pub.gov.sg for catchment maps of used water and drainage.

Yes No

Yes No

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 71: Handout for CBPU Subm

68

Confirmation (Applicable for amendment/revised DC submission only)

ENV-CBPU-DCCLR-RESUBMISSION/AMENDMENT/REVISION

Roof gutters (including rain water down pipes and outlets, and roof scupper drains) are banned as an anti-mosquito breeding measure for all new developments. Waiver in writing must be obtained from National Environment Agency to erect roof gutters at the DC stage prior to BP submission

I confirm that :

a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or

b) waiver for roof gutter has been obtained from the National Environment

Agency in writing on : File Ref No:

Dated:

c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.

d) Confirmation for a), b) or c) not applicable, for A & A and reconstructionbuilding projects.

Attachments

Development Control Plan

Any change to previous PUB (C&W) checklist under same projectreference number? (If yes, please tick and enclose updated checklist)

Others, please specify

Add Delete

Page 72: Handout for CBPU Subm

69

SUBMISSION FOR DEVELOPMENT CONTROL (DC)CLEARANCE WITH DETAIL PLAN

Instruction:1. This page of the form is applicable for minor projects.2. First storey plan/site plan for section A1 and B can be submitted as one plan

with clear layer and identification3. Please check all the relevant infromations have been indicated and provided

before submitting

Particulars of Owner(s)

Name

Address

Contact No

Email

Select

SECTION A1: SANITARY, M&E WORK (Used Water)

Attachments:

1. Site plan and first storey plan(indicate the sewer setback, propose and existing sewerconnection, top/invert level of manhole(s), and platform levels,propose and existing sanitary drainline.

2. Detailed sanitary plan (to show sanitary line)

3. Is there pumping system(s) for used water? Yes No

Declaration: Name Role

By QP/PE:I have carried out athorough investigation of the existingsewerage system withinand adjacent to the siteand will take everypractical measure toensure that theproposed development will not disrupt or affect any existingsewer/drain-line thatserves other properties/premises.

Phone Email Firm Arch/PEReg No

Select

by QP/PE:I hereby certify that these plans and the works shown therein comply with the provisions of the Sewerage and

Select

(Tick if applicable)

Razis
Highlight
Page 73: Handout for CBPU Subm

70

Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Codeof Practice on the Sewerage and SanitaryWorks

by PE(M/E) if there is pumping system(s)I, being a Professional Engineer hereby certify that the propose mechanical and electrical(M&E) works of the abovementioned project are design in accordance with the current Code of Practice onSewerage and Sanitary Works, Sewerage andDrainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department.

Select

Attachments:

1. Detail plan drawings of used water pumping system(s)

2. Attached Form D2/QP if an alternate power source is not available

3. Design calculations

4. Pump and system curves

5. Relevant equipment catalogues

Please state if anydeviation from the COP

Pump Design Condition

Pump Application

Brand Model Estimated Inflow

(l/s)

Pumpoperating

capacity (l/s)

Pumpoperatinghead (m)

Solidsfree

passage Size (mm)

Motor Rating (kw)

Select

Add Delete

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 74: Handout for CBPU Subm

71

Particulars of Plumber/Contractor

Name

Firm Details

Contact No

Email

Select

please indicate your membership/license

PUB LP

SPS registered

N.A.

Expected Date of Commencement

Expected Date of Completion

SECTION A2: SEWERAGE WORK, RC Trench

Attachment:

1. Detail sewerage planTo show: propose sewer alignment with diameter, material,

top/invert level, existing sewer alignment to be abandoned (if any)

2. Design & calculation of RC trench (if applicable)

Declaration Name Role Phone Email Firm Arch/PEReg No

by PE (Civil):I hereby certify that the sewerage plans and the works shown therein comply with the provisions of the Sewerage andDrainageAct (Chapter 294), theSewerage andDrainage (Sanitary Works) Regulations, the currentCode of Practice on theSewerage and SanitaryWorks.

Select

Particulars of Plumber/ContractorTick if same as in Sanitary Work

Tick if applicable

Name

NRIC/Passport No.

Firm Details

Contact No

Select

Razis
Highlight
Page 75: Handout for CBPU Subm

72

Email

please indicate your membership/license

PUB LP

SPS registered

N.A.

Expected Date of Commencement

Expected Date of Completion

SECTION B: DRAINAGE WORKTick if applicable

Attachment:

1. Site Plan and First Sty Plan

2. Basement Plans

3. Detail of Drainage Work

4. DC Checklist

5. Proposed plan showing crest levels, platform levels with andwithout flood barriers at various entrance and exit points, andflood barrier installed at all points of entry and exit for buildingpremises or for entire development

Declaration Name Role Phone Email Firm Arch/PEReg No

I certify that the drainagework are designed in fullcompliance with PUBrequirements includingSewerage and DrainageAct (Chapter 294) andcurrent edition of COP onSurface Water Drainage

Select

Please state if any deviation from the COP

SECTION C: Infrastructure or other works affecting Sewer & Drainage (eg. Covered link way, bus stop)

Tick if applicable

Attachment:

1. First storey plan, showing sewer setback, sewer alignment, diameter,manhole & sewer ID.

2. Cross sectional plan

3. Sewer and drainage plan

4. Proposed plan showing crest levels, platform levels with and withoutflood barriers at various entrance and exit points, and flood barrierinstalled at all pints of entry and exit for building premises or for entiredevelopment.

Razis
Highlight
Page 76: Handout for CBPU Subm

73

Declaration Name Role Phone Email Firm Arch/PEReg No

I hereby certify that theseplans and the works showntherein comply with theprovisions of the Sewerageand Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works)Regulations, the currentCode of Practice onSewerage and Sanitary Works.

Select

Razis
Highlight
Page 77: Handout for CBPU Subm

75

SUBMISSION FOR DEVELOPMENT CONTROL (DC) PLAN

DC SUBMISSION

1. This page of the form is applicable for major projects2. First Storey Plan/Site Plan for Section A and B can be submitted as one plan

with clear layer and identification3. Please check all the relevant information have been indicated and provided

before submitting4. Detailed Plan for sanitary, sewer, and drainage works shall be submitted after the

DC clearance is obtained.

Particulars of Owner(s)

Name Select

Address

Contact No

Email

(Tick if applicable) SECTION A: SANITARY / SEWERAGE WORK

Attachments:

1. Site plan and first storey plan

to show: The sewer setback, propose and existing sewer connection,top/invert level of MH, and platform levels, propose and existing sanitary drainline, propose public sewer (if any), manhole and sewer identification number

2. Is there any sewerage pump system required? Yes No

Declaration

I hereby certify that these plans and theworks shown thereincomply with the provisions of the Sewerage andDrainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulationsand the current Code of Practice on the Sewerage and Sanitary Works.

I have carried out a thorough investigation of the existing sewerage system within the site and will take every practical measure to ensure that the proposed development will not disrupt or affect any existing sewer / drain-line that serves other properties / premises.

Select

Name Role Contact Email FirmArch/PEReg No

Select

Please state if any

Razis
Highlight
Razis
Highlight
Page 78: Handout for CBPU Subm

76

COP

Page 79: Handout for CBPU Subm

77

DC SUBMISSION

(Tick if applicable) SECTION B: DRAINAGE WORK

Attachments:

1. Site Plan and First Sty Plan

2. Basement Plans

3. DC Checklist

4. Proposed plan showing crest levels, platform levelswith and without flood barriers at various entranceand exit points, and flood barrier installed at all pointsof entry and exit for building premises or for entiredevelopment

Declaration

I certify that the drainage workare designed infull compliancewith PUB requirementsincluding Sewerage andDrainage Act(Chapter 294)and currentedition of COPon Surface WaterDrainage

Please state if any deviation from the COP

Select

Name Role Contact Email FirmArch/PEReg No

Razis
Highlight
Page 80: Handout for CBPU Subm

78

PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT

CHECKLIST FOR DC PLANS

PUB-DD-CHECKLIST

*Please use this form if development site is equal to orgreater than 0.2 Ha*

(A) General

1. Date of Drainage InterpretationPlan (DIP) issuance (Please indicate the date of DIP)

2. Site boundary lines are clearlyindicated on plan

Select

3. Existing drains alignment, drain size,drain type, summit point, flow directionand discharge points of internal surfacedrain system are clearly indicated on plan

Select

4. All addition and alteration worksare highlighted

Select

5. For JTC, HDB, URA developments,the drainage masterplan of thedevelopment site is attached togetherwith the submission.

Select

6. There is provision of peak runoff controlmeasures within the development site.

Select

Size of development site Ha

(a) Post-development Runoff Coefficient

(Please indicate value between 0 to 1)

(b) Type of measures to reduce peak runoff

(i) Detention tanks: Volume

*For developments with detention tank systems, please alsofill out section 6 (c) in the form*

(Please indicate size< width (m) x length (m) x

effective depth (m) >)

(ii) Retention/ sedimentation ponds Select

(iii) Green roofs Select

(iv) Planter boxes Select

(v) Porous pavements Select

(vi) ABC Waters Design Features (to be endorsed by an ABC Waters Professional - please fill out Section 7 in the form)

Constructed Wetlands Select

Page 81: Handout for CBPU Subm

79

Bioretention Swales/Basins Select

Rain Gardens Select

(vii) Others

(Please indicate if any)

(c) For developments with detention tank systems

(i) Detention tank incorporates rainwater harvesting feature

Detention volume

Detention volume to meet the requirement as stated in Clause 7.1.5 of the latest edition of Code of Practice on Surface Water Drainage (Detention V)

(Please indicate volume in cubic metre)

Volume set aside for rainwater harvesting storage (Rainwater Harvesting V) (Please indicate volume

in cubic metre)

Total volume of tank (Total V) 0

Total V = Detention V + Rainwater Harvesting V

Select

(ii) Proposed drainage plan indicating catchment and sub-catchment boundaries, and the specific subcatchment of each tank including the outlet discharge point of the internal drainage system to the public drain is attached with the submission.

(iii) Proposed site plan with runoff coefficients and area of development with varying characteristics of catchment/sub-catchment clearly indicated.

Select

(iv) Proposed site plan with features, and catchment/sub-catchment of each feature, to attenuate stormwater runoff to comply with COP requirements clearly indicated.

Select

(v) PE (Civil) -endorsed design calculations or modelling results as per the design calculations templates or equivalent, are included in the submission. If there is any pumped drainage system involved, the civil and structural components shall be endorsed by a PE (Civil) while the mechanical and electrical components shall be endorsed by a PE (Mechanical/Electrical).

Select

(vi) Proposed site layout plans indicating the location and footprint of the detention tank(s), pumping facilities (if applicable), the effective depth of the detention tank(s) and the connection point to the internal drainage system are attached in the submission.

Select

Select

Page 82: Handout for CBPU Subm

80

7. ABC Waters design features are incorporatedwithin the development.

Select

*If yes, please also respond to 7(a), 7(b)*

(a) Names & Registration No. of ABC Waters Professional (Please indicate name & registration

no. of ABC professional)

(b) Concept design and design calculations (e.g. catchment area, treatment area and detainment volume etc for the ABC Waters design feature), endorsed by the ABC Waters Professional are submitted to PUB.

(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.

8. If the proposed development site areaexceeds 0.4 ha, hydraulic calculationsfor the proposed internal drainage facilities,including sub-catchment plans for theproposed development site endorsed by aProfessional Engineer (Civil) to be submittedfor PUB record.

9. There is upstream drainage connectionfrom the neighbouring lots into thedevelopment site.

(B) DRAINAGE RESERVE

10. Drainage Reserve lines and lot boundariesare indicated, dimensioned and highlighted.

11. All embankments and structures are setoutside the Drainage Reserve

12. Drainage Reserve are free from encumbrances

13. Design of embankment and structuresnear a drain or Drainage Reserve (within 2m)must not take into consideration the passiveresistance offered by the existing orproposed drainage structures.(Note clause 5.3 of the latest edition ofCode of Practice on Surface WaterDrainage). The structural and stabilitycalculations for an embankment or a structurewithin 2 m from the edge of Drainage Reserveshall be endorsed by a Professional Engineerand submitted to the Board for record atDetailed Planning stage.

(C)MINIMUM PLATFORM LEVEL (MPL)

14. MPL of development mRL

15. All proposed/existing platform levelsare clearly indicated on plan

Select

Page 83: Handout for CBPU Subm

81

16. The proposed platform levels androad/ground levels adjacent to theinternal drain outlet discharge point areclearly indicated

17. For addition and alteration workssubmission, the existing platform levelsare indicate

18. Linkages (direct/indirect) to specialunderground facilities and basements,if any, are indicated and complied withthe latest Code of Practice on SurfaceWater Drainage

Select

19. Flood barrier (as stipulated in Section 2.4 ofthe latest Code of Practice on SurfaceWater Drainage), if any, is incorporated intothe development site.

Select

*If Yes, please also respond to 19(a)*

(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission

Select

For developments where flood barriers are automated and/or with more than 2points of entry/exit, the following document shall be submitted at Detailed Planningstage.-- Details on the Standard Operating Procedure (SOP) including the operation and maintenance of the flood barrier to be endorsed by Mechanical and/ or ElectricalQP or PE, and the developer/ building owner.-- Details on the size, type and design of the flood barrier.

Page 84: Handout for CBPU Subm

82

(D) PROPOSED DRAINAGE WORKS

20. Proposed/ existing drains and drains to bedeleted are clearly indicated usingdifferent colour

Select

21. Alignment, summit point, flow direction, type& size and outlet discharge points of theproposed internal surface drains are clearlyindicated.

Select

22. Connection point to existing drain is indicated Select

23. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan.

24. Sump size is indicated Select

25. Vertical grating at internal drain outletdischarge point is provided

Select

26. External drainage works (including culvertdetails) to be submitted separately duringDetailed Planning stage. This shall be clearlyannotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL

27. Crest level of access ways and openingsleading into the basement is indicated andcomplied with the latest Code of Practiceon Surface Water Drainage

Select

28. Proposed sizes and flow direction of cut offdrains are indicated

Select

(F) COMMON DRAIN

29. Alignment, size and flow of existingcommon drain within the developmentlot are indicated.

Select

30. If there is common drain within thedevelopment site, the following shall beendorsed on the plan:

Select

"Surface runoff from the site and allneighbouring lots shall continue to beallowed to discharge through the commondrain within the site."

31. There is no permanent structure erectedabove and over the common drain

Select

32. If the proposal involves the reconstructionof common drain, the proposed commondrain shall be at least 450mm wide asstipulated in Section 4.5 of Code ofPractice on Surface Water Drainage or

Select

Page 85: Handout for CBPU Subm

83

any other sizes as directed by PUB

33. Details of the proposed common drain tobe submitted by Professional Engineer(Civil) separately to PUB for approvalduring Detailed Planning/ Building Planstage. This is to be annotated on the plan

Select

34. The position of the existing/proposedboundary wall/fence is clearly indicated

Select

Page 86: Handout for CBPU Subm

84

(G) PUMPED DRAINAGE SYSTEM

35. Pumped drainage system complies with thelatest Code of Practice on Surface WaterDrainage. Details of pumped drainagesystem and design computations dulyendorsed by PE shall be submittedseparately to PUB for record during DetailedPlanning stage

Select

36. Source catchment area with surface runoffleading into the pumped drainage system isclearly indicated

Select

37. The location, size, inlet and outletconnections of the rainwater pump sumpfor the proposed pumped drainage systemare clearly indicated

Select

(H) RETAINING WALL

38. If a retaining wall is erected to raise theground level of the development site aboveadjacent premises, adequate internaldrainage system provided to effectivelyintercept and drain away runoff including thesub-soil flow from the development site

Select

39. If a retaining wall is erected to lower theground level of the development site,adequate internal drainage system providedto effectively intercept and drain awayexisting sub-soil and overland flowsdischarging through the development sitefrom the adjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES

40. Minimum 600mm high solid boundary wallaround development site is erected toprevent surface runoff from overflowing intoadjacent premises on lower ground

Select

I hereby confirm that the above items have been complied with and endorsed on the plans.

I hereby certify that the standard endorsement below will also be certified on the plans:-

(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water Drainage and the Sewerage and Drainage (Surface Water Drainage) Regulations 2007.

(b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.(c) The runoff within, upstream of and adjacent to the development lot can be

effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or

Page 87: Handout for CBPU Subm

85

sub-basement to the external roadside drains.

* Public Utilities Board (PUB) reserves the right to report any false declaration ofinformation to the relevant professional bodies for action in accordance to theAct/ethnics governing all the Qualified Professional.*

Page 88: Handout for CBPU Subm

86

PUBLIC UTILITIES BOARD (PUB)CATCHMENT & WATERWAYS DEPARTMENT

CHECKLIST FOR DC PLANS*Please use this form if development site is less than 0.2 Ha*

PUB-DD-CHECKLIST

(A) General

1. Date of Drainage Interpretation Plan (DIP) issuance

2. Site boundary lines are clearly indicated on plan

3. Existing drains alignment, drain size, drain type,summit point, flow direction and dischargepoints of internal surface drain system areclearly indicated on plan

4. All addition and alteration works are highlighted

5. For JTC, HDB, URA developments, the drainagemasterplan of the development site is attachedtogether with the submission.

6. ABC Waters design features are incorporated withinthe development.

Select

(a) Names & Registration No. of ABC Waters Professional

(b) Concept design and design calculations, endorsed by the ABC Waters Professional are submitted to PUB.

Select

(c ) Hydraulic calculation for the overflow system, endorsed by ABC Waters Professional (PE) are submitted to PUB.

Select

7. If the proposed development site area exceeds0.4 ha, hydraulic calculations for the proposedinternal drainage facilities, includingsub-catchment plans for the proposed developmentsite endorsed by a Professional Engineer (Civil) tobe submitted for PUB record.

Select

8. There is upstream drainage connection from the neighbouring lots into the development site.

Select

Select

Select

Select

Select

Page 89: Handout for CBPU Subm

87

PUB-DD-CHECKLIST

(B) DRAINAGE RESERVE

9. Drainage Reserve lines and lot boundaries are indicated, dimensioned and highlighted.

Select

10. All embankments and structures are set outsidethe Drainage Reserve

Select

11. Drainage Reserve are free from encumbrances Select

12. Design of embankment and structures near a drainor Drainage Reserve (within 2m) must not take intoconsideration the passive resistance offered by theexisting or proposed drainage structures. (Noteclause 5.3 of the latest edition of Code of Practiceon Surface Water Drainage). The structural andstability calculations for an embankment or astructure within 2 m from the edge of DrainageReserve shall be endorsed by a ProfessionalEngineer and submitted to the Board for record atDetailed Planning stage.

Select

(C)MINIMUM PLATFORM LEVEL (MPL)

13. MPL of development mRL

14. All proposed/existing platform levels are clearlyindicated on plan

Select

15. The proposed platform levels and road/ground levels adjacent to the internal drain outlet discharge point are clearly indicated

Select

16. For addition and alteration works submission, theexisting platform levels are indicated

Select

17. Linkages (direct/indirect) to special undergroundfacilities and basements, if any, are indicated andcomplied with the latest Code of Practice onSurface Water Drainage

Select

18. Flood barrier (as stipulated in Section 2.4 of thelatest Code of Practice on Surface WaterDrainage), if any, is incorporated into thedevelopment site.

Select

(a) Proposed plans indicating the crest levels and/or platform levels with and without flood barrier at various entrance and exit points are attached together with the submission

Select

For developments where flood barriers are automated and/or with more than 2 points of entry/exit, the following document shall be submitted at Detailed Planning/ Building Plan stage.-- Details on the standard operating procedure (SOP) including the proposed maintenance plan of the flood barrier to be endorsed by a Civil and/or Mechanical Qualified Person, and the developer/owner.-- Details on the size, type and design of the flood barrier.

(D) PROPOSED DRAINAGE WORKS

Page 90: Handout for CBPU Subm

88

19. Proposed/ existing drains and drains to be deletedare clearly indicated using different colour

Select

20. Alignment, summit point, flow direction, type & sizeand outlet discharge points of the proposedinternal surface drains are clearly indicated

Select

21. Connection point to existing drain is indicated Select

22. Proposed internal surface drains are able todischarge into roadside/ outlet drain asshown on plan

Select

23. Sump size is indicated Select

24. Vertical grating at internal drain outlet dischargepoint is provided

Select

25. External drainage works to be submitted separatelyduring Detailed Planning/ Building Plan stage. Thisshall be clearly annotated on plan

Select

(E) OPENING LEADING TO BASEMENT LEVEL

26. Crest level of access ways and openings leadinginto the basement is indicated and complied withthe latest Code of Practice on Surface WaterDrainage

Select

27. Proposed sizes and flow direction of cut off drainsare indicated

Select

Page 91: Handout for CBPU Subm

89

PUB-DD-CHECKLIST

(F) COMMON DRAIN

28. Alignment, size and flow of existing common drainwithin the development lot are indicated

Select

29. If there is common drain within the developmentsite, the following shall be endorsed on the plan:

Select

“Surface runoff from the site and all neighbouring lots shall continue to be allowed to discharge through the common drain within the site.”

30. There is no permanent structure erected aboveand over the common drain

Select

31. If the proposal involves the reconstruction ofcommon drain, the proposed common drainshall be at least 450mm wide as stipulated inSection 4.5 of Code of Practice on Surface WaterDrainage or any other sizes as directed by PUB

Select

32. Details of the proposed common drain to besubmitted by Professional Engineer (Civil)separately to PUB for approval during DetailedPlanning/ Building Plan stage. This is to beannotated on the plan

Select

33. The position of the existing/proposed boundary wall / fence is clearly indicated

Select

(G) PUMPED DRAINAGE SYSTEM

34. Pumped drainage system complies with the latestCode of Practice on Surface Water Drainage.Details of pumped drainage system and designcomputations duly endorsed by PE shall besubmitted separately to PUB for record duringDetailed Planning / Building Plan stage

Select

35. Source catchment area with surface runoff leadinginto the pumped drainage system is clearly indicated

Select

36. The location, size, inlet and outlet connections ofthe rainwater pump sump for the proposedpumped drainage system are clearly indicated

Select

(H) RETAINING WALL

37. If a retaining wall is erected to raise the groundlevel of the development site above adjacentpremises, adequate internal drainage systemprovided to effectively intercept and drain away runoff including the sub-soil flow from thedevelopment site

Select

38. If a retaining wall is erected to lower the groundlevel of the development site, adequate internaldrainage system provided to effectively interceptand drain away existing sub-soil and overland flowsdischarging through the development site from theadjacent premises

Select

(I) DRAINAGE AFFECTING OTHER PREMISES

39. Minimum 600mm high solid boundary wall arounddevelopment site is erected to prevent surfacerunoff from overflowing into adjacent premises onlower ground

Select

I hereby certify that the standard endorsement below will also be certified on the plans:-

I hereby confirm that the above items have been complied with and endorsed on the plans.

Page 92: Handout for CBPU Subm

90

(a) The planning, design, construction activities and procedures for plan submission shall comply fully with the requirements as stipulated in the latest edition of the Code of Practice on Surface Water

Drainage and The Sewerage and Drainage (Surface Water Drainage) Regulations 2007. (b) The capacity of internal drains shall be sufficient to intercept and discharge all runoff from the development site.

(c) The runoff within, upstream of and adjacent to the development lot can be effectively drained away without causing flooding within the lot or in areas outside the lot.(d) There is no direct connection from the internal drains within the basement or sub-basement to the external roadside drains.

* Public Utilities Board (PUB) reserves the right to report any false declaration of information to the relevant professionalbodies for action in accordance to the Act/ethnics governing all the Qualified Professional. *

Page 93: Handout for CBPU Subm

91

APPLICATION FOR CLEARANCE CERTIFICATE FOR DETAILED PLAN ON DRAINAGE AND SEWERAGE

(SANITARY/SEWER) WORKS

PUB-BPU-CLRDP01

[UNDER SECTION 33(1) OF THE SEWERAGE AND DRAINAGEACT (SDA), CHAPTER 294]

This form may take you 10 minutes to fill in. You will need the following information to fill in the form:-

- Particulars of Project - Particulars of Qualified Person

Date: 19/03/2014

To: Central Building Plan Unit

National Environment Agency40, Scotts Road, #13-00Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for theworks.

2. This form is to be accompanied by the relevant attachments.

Information

1. For enquiries on application of status for :a) Industrial development,please call 67319637

b) Non-industrial development,please call 67319628 / 67319653

Particulars of Project

Project Reference Number

Project Title

Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]

Project Address

Plan Type Please Select 001

Appendix 3

Razis
Highlight
Page 94: Handout for CBPU Subm

92

Particulars of Application

Application for

Clearance Certificatefor Detailed Plan onSewerage

Please Select

Submission Type Please Select

Development ProposalApplication

Please Select

NAFile Ref. No. /Case ID

Dated

SIP Reference Numberfrom CBPU (if applicable)

DC Clearance ReferenceNumber from CBPU(if applicable)

Department File ReferenceNo (if applicable)

Razis
Highlight
Razis
Highlight
Page 95: Handout for CBPU Subm

93

PUB-BPU-CLRDP01

(Tick if applicable) SECTION A1: SANITARY WORK

Attachments:

1. Detail Sanitary Plan

2. Detail of Holding Tank/STP/Retention tank (if applicable)

Declaration

I hereby certify that these plans and the works shown therein comply with the provisions of the Sewerage and Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works) Regulations and the current Code of Practice on the Sewerage and Sanitary Works.

Name

Select

Role Phone Email FirmArch / PEReg. No

Please state if any deviance from the COP

Particulars of Plumber/Contractor

Name Please select

Firm Details

Contact No

Email

Please indicate your Registration / LicenseNumber

SPS registered

PUB LP

N.A

Date of Commencement Date of Completion

3. Details of M&E Works (Used Water) Yes No

Declaration

I, being a Professional Engineer hereby certify that the proposed mechanical and electrical (M&E) works of the above mentioned project are in accordance with the current Code of Practice on Sewerage and Sanitary Works, Sewerage andDrainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department and have been fully and accurately reflected in the submitted detail plan drawings.

Name

Select

Role Phone Email FirmArch / PEReg. No

Attachments

Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 96: Handout for CBPU Subm

94

1. Detail plan drawings of used water pumping system(s)

2. Attached Form D2/QP if an alternate power source is not available

3. Design calculations

4. Pump and system curves

5. Relevant equipment catalogues

Please state if anydeviation from the COP

Pump DesignCondition

Pump Application

Brand Model Estimated Inflow

(l/s)

Pumpoperating

capacity (l/s)

Pumpoperatinghead (m)

Solidsfree

passage Size (mm)

Motor Rating (kw)

Select

Add Delete

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 97: Handout for CBPU Subm

95

PUB-BPU-CLRDP01

(Tick if applicable) SECTION A2: SEWERAGE WORK, RC Trench

Attachments:

1. Detail Sewerage Plan (to indicate: diameter, pipe material, gradient, manhole detail, andlongitudinal section)

2. Design & Calculation of RC Trench (if structure is proposed over sewer). PE to endorse in drawing

Declaration

by PE (Civil):I hereby certify that the sewerage plans and the works shown therein comply with the provisions of the Sewerage and Drainage Act (Chapter 294), the Sewerage and Drainage (Sanitary Works)Regulations, the current Code of Practice on the Sewerage and Sanitary Works.

I also declare that I have carried out a thorough investigation of theexisting sewerage system within the site and will take every practical measure to ensure that the proposed developmentwill not disrupt or affect anyexisting sewer/drain-line that serves other properties/premises.

Name

Select

Please state if any deviation from the COP

Date of Commencement

Particulars of Plumber/Contractor

Name Please select

Firm Details

Contact No

Email

Please indicate your Registration / LicenseNumber

SPS registered

PUB LP

N.A

Date of Completion

Role Contact Email FirmArch / PEReg. No

Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 98: Handout for CBPU Subm

96

PUB-BPU-CLRDP01

Please tick if this submission pertains to:

Internal drainage works

External drainage works (entrance culvert/ roadside drain)

(Tick if applicable) SECTION B: DRAINAGE WORK

Attachments:

1. Detail Plan on Drainage Works as required under Section 33(3) and 33(4) of the SDA, Chapter 294

2. As built drawings for drainage works and piling records

3. Leak Test Certificates on installed flood barriers

4. As built survey plans for detention tank system

Declaration

I hereby certify that the drainage work shown on the detailed plans have been designed in accordance with the provisions of the SDA, Chapter 294, Sewerage and Drainage (Surface Water Drainage) Regulations, current Codeof Practice on Surface Water Drainage and the drainage requirements stipulated during planning stage (if applicable) except for those provisions where waivers have been obtained from the Public Utilities Board in writing.

Select

Name Role Contact Email FirmArch / PEReg. No

Please state if any deviation from the COP

Razis
Highlight
Page 99: Handout for CBPU Subm

97

CERTIFICATE OF COMPLETION AND INSPECTION OF SANITARY, SEWERAGE AND DRAINAGE WORKS

[UNDER SECTION 35(1)(e) AND (f) OF THE SEWERAGE ANDDRAINAGE ACT (CHAPTER 294)]

Date: 28/08/2012

To: PUB

Building Plan UnitPUB40 Scotts Road #15-01Environment BuildingSingapore 228231

Instructions

1. The form shall be digitally signed by the appropriate QP/PE

2. The form is to be submitted by the QP/PE appointed undersection 8,9 & 11 of Building Control Act.

Particulars of Project

Project Ref No

Project Title

PUB-BPU-COMPOFWORK

MK-LOT( ie, MK03-12345)

Project Address

Please Select Your Application:

Completion of Sewerage Work only

Application for PUB Clearance for Temporary Occupation Permit (TOP)

Application for PUB Clearance for Certificate of Statutory Completion (CSC)

Application for PUB Clearance for both Temporary Occupation Permit (TOP) & Certificate of Statutory Completion (CSC) (this option is applicable if the QP could confirm that there is no outstanding matters related to PUB (sewerage and drainage)

Appendix 4

Page 100: Handout for CBPU Subm

98

SECTION A1: SEWERAGE WORK

Attachments

1. Site plan and first storey plan

2. As built sewerage plan

To Show:2.1 Length, diameter, gradient, material of the sewer pipe, top & invert level of the manhole2.2 Position of manholes shall follow SVY21 coordinate cadastral base

established by SLA

3. CCTV for the newly constructed sewer (applicable for sewer withdiameter 600mm or larger) to be sent to: 82 Toh Guan Road East#C2-14, Singapore 608575

4 As built pumping installation plan (if applicable)

5 Others (Eg: Sewage Treatment Plant (STP), holding tank)

Declaration (PE Civil)

PE Name

PE Reg no

Role

Ph No

Email

Firm

Select

Declaration (PE Mech.)

PE Name

PE Reg no

PE Reg no

Role

Ph No

Email

Firm

Select

Declaration (PE Elec. )

PE Name

PE Reg no

Role

Ph No

Email

Firm

Select

Razis
Highlight
Page 101: Handout for CBPU Subm

99

I/We, the above name, hereby certify that to the best of my knowledge andbelief, the works were carried out in accordance with the above building plans and detailed plans, the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the Sewerage and Drainage (Sanitary Works) Regulations and any other conditions under which the plans and amendments thereto were approved by PUB.

I

I confirm that I have received the below plumber/ contractor

has executed the sewerage works in accordance with the plans assupplied by the QP/PE and in accordance with the current Code of Practice on Sewerage and Sanitary Works.

Plumber's/Contractor's name

NRIC No. or Passport No.

Firm Name

Email address

Registration/license type

Select

SPS registered

PUB LP

NA

certify that the hydrostatic test has been conducted for

sewers and manholes and the test results have met the requirementsstipulated in Code of Practice on Sewerage and Sanitary Works.

Razis
Highlight
Page 102: Handout for CBPU Subm

100

Application for PUB Clearance for TOPSECTION A2: SANITARY WORK

Attachments:

Tick if applicable

1. As built sanitary plan (to be endorsed by QP)

2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,Singapore 228231, PUB Water Reclamation (Network) Department

3. As built plans for used-water pumping system(s)

Declaration Name Role Phone Email Firm Arch/PEReg No

SelectI hereby certify that to the best of my knowledge and belief, the works were carried out in accordance with the above building plans and detailed plans, the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the Sewerage and Drainage (Sanitary Works) Regulations and any other conditions under which the plans and amendments thereto were approved.

I have checked and certifiedthat there is no change in the condition of the existingsewer(s) and manhole(s)between the pre and postconstrcution CCTV inspectionreport.

I confirm that I have receivedthe plumber's confirmation that the below plumber/contractor has executed thesanitary plumbing works inaccordance with the plansas supplied by the QP and inaccordance with the currentCode of Practice on Sewerage and SanitaryWorks

I, being a Professional Engineer (M/E) hereby certify that to the best of my knowledge and belief, the completed mechanical and electrical (M&E) works of the above mentioned project are in accordance

Select

Select

Select

Page 103: Handout for CBPU Subm

101

with the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department and have been fully and accurately reflected in the submitted "As built" plans.

I also confirm that the installedM&E equipment are safe for operation

Plumber's/Contractor's name

NRIC No. or Passport No.

Firm Name

Email address

Registration/license type

Select

SPS registered

PUB LP

NA

3. Declaration of Chargeable Sanitary Appliances Installed.

There is Select to the original number of chargeable sanitary appliances in the premises

4. Details of Chargeable Sanitary Appliances

4a. Type of Submission For "New Erections", the existing buildings are unaffected. Select

Attachments:

4b. The allotment of address from the comptroller of property tax

4c. Floor layout plan showing the location of the appliances

4d. SP Services' Ltd Utilities Bill

The number of chargeable sanitary appliances in the premises upon completion of this project are as follows:

House No. or Unit No. (Eg. #01-01)

Previous quantites of chargeablesanitary appliances at the affected area before commencement of project

Quantities of chargeable sanitary appliances after completion of project

WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink

Add Delete (Add or Delete row for house no. or unit no.)

#Common Area Previous quantites of chargeablesanitary appliances before commencement of project

Quantities of chargeable sanitaryappliances after commencement of project

WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink

Razis
Highlight
Razis
Highlight
Page 104: Handout for CBPU Subm

102

SECTION A3: RC TRENCH COMPLETION(RC TRENCH shall not be backfilled before inspection)

Declaration Name Role Phone Email Firm Arch/PEReg No

I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.

Select

I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.

I or my authorised representative (with letter of authorisation to be provided) will be present during PUB (WRN)'s inspection.

After the inspection I will submit the photographs of the RC trench.

[Note: The photographs taken in sequence showing the process ofconstructing, backfilling and covering up the RC trench shall show clearly, among other things, the width, depth, base of the trench, the fill materials and the condition of the sewer pipe. Adequatenumber of photographs taken to capture all details above andpasted on A4 papers and clearly labelled.]

Attachment:

As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench and position of the existing sewer.

If Applicable

If Applicable

Page 105: Handout for CBPU Subm

103

SECTION B: DRAINAGE WORK

External drainage work has not yet completed

Site Area: ha

Attachment:

1. As constructed drainage plan(to show as built platform level, crest level and floodprotection levels)

2. Internal drainage Hydraulic calculations submissions(for developments more than 0.4 Ha)

Declaration

I certify that the drainagework are designed in full compliance with PUB requirement including Sewerage and Drainage (Chapter 294) Actand COP on Surface Water Drainage

SECTION C: Infrastructure works affecting Sewer & Drainage (eg. Covered link way, bus stop)

Tick if applicable

Name

Select

Declaration by PE(Civil)

Name

PE Reg No

Role

Ph No

Email

Firm

Select

DeclarationI hereby certify that the work has been completed in compliance with the approved drawing, Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.

Attachment:

1. Post Construction CCTV to the public sewer (when required in DC Clearance).Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,PUB Water Reclamation (Network) Department

2. As constructed drawing showing the sewer setback

3. As built topographical survey plan

Role Phone Email Firm Arch/PEReg No

Razis
Highlight
Razis
Highlight
Page 106: Handout for CBPU Subm

104

Section D: Application for PUB Clearance for CSC

Attachments:

1. As constructed drainage plan (to show as built platform level, crest leveland flood protection levels)

2. Post rectification CCTV to the public sewer or drainline(when required). To be sent to: 40 Scotts Rd #15-01, Singapore228231, PUB Water Reclamation (Network) Department

3. As built topographical survey plan

Declaration

by PE (Civil):I certify that the drainage workare designed in full compliance with PUB requirement including Sewerage and Drainage Act (Chapter 294) and COP on Surface Water Drainage.

Name Role Phone Email Firm Arch/PEReg No

I am requesting for PUB Clearance for CSC and confirms there is no further outstanding work.

Select

Select

Razis
Highlight
Page 107: Handout for CBPU Subm

105

Application for PUB Clearance for TOPSECTION A2: SANITARY WORK

Attachments:

Tick if applicable

1. As built sanitary plan (to be endorsed by QP)

2. Post Construction CCTV to the existing public sewer. To be sent to: 40 Scotts Rd #15-01,Singapore 228231, PUB Water Reclamation (Network) Department

3. As built plans for used-water pumping system(s)

Declaration Name Role Phone Email Firm Arch/PEReg No

SelectI hereby certify that to the best of my knowledge and belief, the works were carried out in accordance with the above building plans and detailed plans, the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and the Sewerage and Drainage (Sanitary Works) Regulations and any other conditions under which the plans and amendments thereto were approved.

I have checked and certifiedthat there is no change in the condition of the existingsewer(s) and manhole(s)between the pre and postconstrcution CCTV inspectionreport.

I confirm that I have receivedthe plumber's confirmation that the below plumber/contractor has executed thesanitary plumbing works inaccordance with the plansas supplied by the QP and inaccordance with the currentCode of Practice on Sewerage and SanitaryWorks

by PE (M/E)I, being a Professional Engineer hereby certify that to the best of my knowledge and belief, the completed mechanical and electrical (M&E) works of the above mentioned

Select

Select

Select

Page 108: Handout for CBPU Subm

106

project are in accordance with the current Code of Practice on Sewerage and Sanitary Works, Sewerage and Drainage Act (Chapter 294) and other sewerage requirements as stipulated by Water Reclamation (Network) Department and have been fully and accurately reflected in the submitted "As built" plans.

I also confirm that the installedM&E equipment are safe for operation

Plumber's/Contractor's name

NRIC No. or Passport No.

Firm Name

Email address

Registration/license type

Select

SPS registered

PUB LP

NA

3. Declaration of Chargeable Sanitary Appliances Installed.

There is Select to the original number of chargeable sanitary appliances in the premises

4. Details of Chargeable Sanitary Appliances

4a. Type of Submission For "New Erections", the existing buildings are unaffected Select

Attachments:

4b. The allotment of address from the comptroller of property tax

4c. Floor layout plan showing the location of the appliances

4d. SP Services' Ltd Utilities Bill

The number of chargeable sanitary appliances in the premises upon completion of this project are as follows:

House No. or Unit No. (Eg. #01-01)

Previous quantites of chargeablesanitary appliances at the affected area before commencement of project

Quantities of chargeable sanitary appliances after completion of project

WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink

Add Delete (Add or Delete row for house no. or unit no.)

#Common Area Previous quantites of chargeablesanitary appliances before commencement of project

Quantities of chargeable sanitaryappliances after commencement of project

Razis
Highlight
Razis
Highlight
Page 109: Handout for CBPU Subm

107

WC Urinal Bidet Slop Sink WC Urinal Bidet Slop Sink

SECTION A3: RC TRENCH COMPLETION(RC TRENCH shall not be backfilled before inspection)

Declaration Name Role Phone Email Firm Arch/PEReg No

I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.

Select

I herby certify that theRC trench has beenconstructed is readyfor PUB (WRN)'s auditinspection beforebackfilling and covering up the trench.

I or my authorised representative (with letter of authorisation to be provided) will be present during PUB (WRN)'s inspection.

After the inspection I will submit the photographs of the RC trench.

[Note: The photographs taken in sequence showing the process ofconstructing, backfilling and covering up the RC trench shall show clearly, among other things, the width, depth, base of the trench, the fill materials and the condition of the sewer pipe. Adequatenumber of photographs taken to capture all details above andpasted on A4 papers and clearly labelled.]

Attachment:

As-built plan (endorsed by PE) showing the layout and dimensions of the RC trench and position of the existing sewer.

If Applicable

Page 110: Handout for CBPU Subm

108

SECTION B: DRAINAGE WORKIf Applicable

External drainage work has not yet completed

Site Area: ha

Attachment:

1. As constructed drainage plan(to show as built platform level, crest level and floodprotection levels)

2. Internal drainage Hydraulic calculations submissions(for developments more than 0.4 Ha)

Declaration

I certify that the drainagework are designed in full compliance with PUB requirement including Sewerage and Drainage (Chapter 294) Actand COP on Surface Water Drainage

SECTION C: Infrastructure works affecting Sewer & Drainage (eg. Covered link way, bus stop)

Tick if applicable

Name

Select

Declaration by PE(Civil)

Name

PE Reg No

Role

Ph No

Email

Firm

Select

DeclarationI hereby certify that the work has been completed in compliance with the approved drawing, Sewerage and Drainage Act (Chapter 294), and Code of Practice for Sewerage and Sanitary Works.

Attachment:

1. Post Construction CCTV to the public sewer (when required in DC Clearance).Report and DVD should be sent to 40 Scotts Rd #15-01, Singapore 228231,PUB Water Reclamation (Network) Department

2. As constructed drawing showing the sewer setback

3. As built topographical survey plan

Role Phone Email Firm Arch/PEReg No

Razis
Highlight
Razis
Highlight
Page 111: Handout for CBPU Subm

109

Section D: Application for PUB Clearance for CSC

Attachments:

1. As constructed drainage plan (to show as built platform level, crest leveland flood protection levels)

2. Post rectification CCTV to the public sewer or drainline(when required). To be sent to: 40 Scotts Rd #15-01, Singapore228231, PUB Water Reclamation (Network) Department

3. As built topographical survey plan

Declaration

by PE (Civil):I certify that the drainage workare designed in full compliance with PUB requirement including Sewerage and Drainage Act (Chapter 294) and COP on Surface Water Drainage.

Name Role Phone Email Firm Arch/PEReg No

I am requesting for PUB Clearance for CSC and confirms there is no further outstanding work.

Select

Select

Razis
Highlight
Page 112: Handout for CBPU Subm

110

APPLICATION FOR CLEARANCE OF TEMPORARYOCCUPATION PERMIT (TOP) - NEW SUBMISSION

This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-

- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.

Date: 19/03/2014

Central Building Plan UnitTo:

National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).

2. This form is to be accompanied by the relevant attachments.

Information

1. Service Standard :Within 7 working days.

2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project

Project Reference Number

Project Title

Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]

Please Select 001Plan Type

Add Delete

Particulars of Application

Development Proposal Application

Please Select

ENV-CBPU-CLRTOP01-NEW SUBMISSIONAppendix 5

Razis
Highlight
Razis
Highlight
Page 113: Handout for CBPU Subm

111

Date of CBPU DC Clearance

19/03/2014

Application for Temporary Occupation Permit

Pollution Control Works

Sewerage Works

Drainage Works (for crest levels , platform levels, flood protection levels based on approved flood protection measures)

Environmental Health (Sanitary Facilities)

Remarks: Application for Partial TOP (if applicable)

File Ref. No. /Case ID

NA Dated

Clearance Certificate for Building Plan on Pollution Control; for Industrial Plant Works (if applicable)

Clearance Certificate for Building Plan on Environmental Health (if applicable)

Clearance Certificate for Detailed Plan on Sewerage (Sanitary Works)(if applicable)

Clearance Certificate for Detailed Plan on Sewerage (Sewer Works)(if applicable)

Clearance Certificate for Detailed Plan on Sewerage (M&E Works)(if applicable)

Clearance Certificate for Detailed Plan on Drainage Works

Plan Submission for the location of Mechanical Equipment and its noise abatement measures tobe incorporated at the development premises

Razis
Highlight
Page 114: Handout for CBPU Subm

112

Particulars of Qualified Person

Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Declaration by Qualified Person

I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include Pollution Control, Environmental Health (Sanitary Facilities) Sewerage Works and Drainage Works (platform and crest protection levels only); and my qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in this form are correct;

The works have been carried out and completed.

The crest levels, platform levels, flood protection levels are in compliancewith COP on Surface Water Drainage and constructed according to approved plans.

The maximum stormwater discharge from the development is in compliance with the maximum allowable peak runoff stipulated in the COP and constructed according to approved plans.

I have liaised with the Developer/ Owner to ensure that a Maintenance/Managing Agent has been established to undertake the SOP of the maintenance, operation and monitoring of the detention tank system.

Development with Public Toilet

If there are deviations from any of the above, please indicate in detail, attachments and PUB approval if applicable

I have inspected the public toilets in this development and that they have

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 115: Handout for CBPU Subm

113

been completed in accordance with the provision of sanitary facilities stipulated in the Code of Practice on Environmental Health, except for those provisions where waivers have been obtainted from the National Environment Agency

Development has no public toilet

Attachments

Dated

Certificate of Completion and Inspection for Sanitary Works

(PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for the Mechanical and Electrical Works for Sewerage Installation (PUB-BPU-COMPOFWORK)

Certificate of Inspection for Drainage Works

As built survey plans indicating crest levels, platform levels, flood protection levels based on approved flood protection measures

As built drawings for detention tank systems and final design calculations, and factory test report for its pumping system.

Standard Operating Procedure for pumped drainage system(basement/ detention tank)

Standard Operating Procedure for flood barrier

Developer/Owner declaration on the following - I shall inspect and declare that the crest levels are constructed to approved plans annually/every 3 years upon obtaining the TOP

Developer/Owner declaration on the following - I shall submit the following documents as required annually upon obtaining the TOP.- Certificate of inspection on flood barriers on site, including leak test certificate.- Amendments to SOP for flood barrier.- Certificate of inspection on pumped drainage system (basement/detention tank).- Certificate of inspection on ABC Waters design features.

Page 116: Handout for CBPU Subm

114

APPLICATION FOR CLEARANCE OF TEMPORARYOCCUPATION PERMIT (TOP) - RESUBMISSION

This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-

- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.

Date: 19/03/2014

Central Building Plan UnitTo:

National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).

2. This form is to be accompanied by the relevant attachments.

Information

1. Service Standard :Within 7 working days.

2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project

Project Reference Number

Project Title

Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]

Please Select 001Plan Type

Add Delete

Particulars of Application

Development Proposal Application

Please Select

ENV-CBPU-CLRTOP01-RESUBMISSIONAppendix 6

Razis
Highlight
Razis
Highlight
Page 117: Handout for CBPU Subm

115

Date of CBPU DC Clearance

19/03/2014

Application for Temporary Occupation Permit

Pollution Control Works

Sewerage Works

Drainage Works (for crest levels , platform levels, flood protection levels based on approved flood protection measures)

Environmental Health (Sanitary Facilities)

Remarks: Application for Partial TOP (if applicable)

Previous TOP Advice fromCBPU (if applicable)

CBPU Processing Officer

File Ref. No. /Case ID

NA Dated

Clearance Certificate for Building Plan on Pollution Control; for Industrial Plant Works (if applicable)

Clearance Certificate for Building Plan on Environmental Health (if applicable)

Clearance Certificate for Detailed Plan on Sewerage (Sanitary Works)(if applicable)

Clearance Certificate for Detailed Plan on Sewerage (Sewer Works)(if applicable)

Clearance Certificate for Detailed Plan on Sewerage (M&E Works)(if applicable)

Clearance Certificate for Detailed Plan on Drainage Works (if applicable)

Plan Submission for the location of Mechanical Equipment and its noise abatement measures tobe incorporated at the

Razis
Highlight
Razis
Highlight
Page 118: Handout for CBPU Subm

116

development premises

Razis
Highlight
Page 119: Handout for CBPU Subm

117

Particulars of Qualified Person

Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Declaration by Qualified Person

I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include Pollution Control, Environmental Health (Sanitary Facilities) Sewerage Works and Drainage Works (platform and crest protection levels only); and my qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in this form are correct;

The works have been carried out and completed.

The crest levels, platform levels, flood protection levels are in compliance with COP on Surface Water Drainage and constructed according to approved plans.

The maximum stormwater discharge from the development is in compliance with the maximum allowable peak runoff stipulated in the COP and constructed according to approved plans.

I have liaised with the Developer/ Owner to ensure that a Maintenance/Managing Agent has been established to undertake the SOP of the maintenance, operation and monitoring of the detention tank system.

If there are deviations from any of the above, pleaseindicate in detail, attachments and PUB approval ifapplicable.

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 120: Handout for CBPU Subm

118

Development with Public Toilet

I have inspected the public toilets in this development and that they have been completed in accordance with the provision of sanitary facilities stipulated in the Code of Practice on Environmental Health, except for those provisions where waivers have been obtainted from the National Environment Agency

Development has no public toilet

Attachments

Dated

Certificate of Completion and Inspection for Sanitary Works

(PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)

Certificate of Completion and Inspection for the Mechanical and Electrical Works for Sewerage Installation (PUB-BPU-COMPOFWORK)

Certificate of Inspection for Drainage Works

As built survey plans indicating crest levels, platform levels, flood protection levels based on approved flood protection measures

As built drawings for detention tank systems and final design calculations, and factory test report for its pumping system.

Standard Operating Procedure for pumped drainage system (basement/ detention tank)

Standard Operating Procedure for flood barrier

Developer/Owner declaration on the following - I shall inspect and declare that the crest levels are constructed to approved plans annually/every 3 years upon obtaining the TOP

Developer/Owner declaration on the following - I shall submit the following documents as required annually upon obtaining the TOP.- Certificate of inspection on flood barriers on site, including leak test certificate.- Amendments to SOP for flood barrier.- Certificate of inspection on pumped drainage system (basement/detention tank).- Certificate of inspection on ABC Waters design features.

Page 121: Handout for CBPU Subm

119

APPLICATION FOR COMPLIANCE CERTIFICATE -NEW SUBMISSION

[UNDER SECTION 33(7) OF THE ENVIRONMENTALPROTECTION AND MANAGEMENT ACT (CHAPTER 94A) AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)

OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]

This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-

- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.

Date: 19/03/2014

To: Central Building Plan Unit

National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).

2. This form is to be accompanied by the relevant attachments.

Information

1. Service Standard : Within 7 working days.

2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project

Project Reference Number

Project Title

Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]

Please Select 001Plan Type

Add Delete

Particulars of Application

ENV-CBPU-CLRCSC01-NEW SUBMISSION

Development Proposal Please Select

Appendix 7

Razis
Highlight
Razis
Highlight
Page 122: Handout for CBPU Subm

120

Application

Date of CBPU DC Clearance

Application for Compliance Certificate and Clearancefor Certificate of Statutory Completion

Environmental Health Works

Pollution Control Works

Sewerage Works

Drainage Works

File Ref. No. /Case ID

NA Dated

Clearance Certificate for Building Plan on Pollution Control for Industrial Plant Works (if applicable)

Clearance Certificate for Building Plan on Environmental Health (if applicable)

Clearance Certificate for Detailed Plan onSewerage (Sanitary Works) (if applicable)

Clearance Certificate for Detailed Plan on Sewerage (if applicable)

Razis
Highlight
Razis
Highlight
Page 123: Handout for CBPU Subm

121

Particulars of Application (Continue)

File Ref. No. /NA Dated

Clearance Certificate for Detailed Plan on Sewerage (M&E Works) (if applicable)

Clearance Certificate for Detailed Plan on Drainage Works (if applicable)

Particulars of Qualified Person

Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Declaration by Qualified Person

I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include

Environmental Health Works,

Pollution Control Works,

Sewerage Works,

Drainage Works; and my

qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in this form are correct;

The works have been carried out and completed. For industrial plant works, all related pollution control equipment and facilities have been installed/ completed according to the approved plans as listed in Particulars of Project and Application

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 124: Handout for CBPU Subm

122

Confirmation

1) I confirm that:

a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or

b) waiver for roof gutter has been obtained from the National Environment

Agency in writing on : File Ref No:

Date:

c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.

d) Confirmation for a), b) or c) not applicable, for A&A and reconstructionbuilding projects.

Attachments

Dated

1. Certificate of Completion and Inspection for BuildingPlan for Environmental Health

2. Certificate of Completion and Inspection for SanitaryWorks (PUB-BPU-COMPOFWORK)

3. Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)

4. Certificate of Completion and Inspection for theMechanical and Electrical Worksfor Sewerage Installation (PUB-BPU-COMPOFWORK)

5. Certificate of Inspection for Drainage Works

Page 125: Handout for CBPU Subm

123

Attachments (Continue)

6. As Constructed drainage drawings in accordance to COP forSurface Water Drainage Appendix 5

7. As-built survey plans indicating crest levels, platform levelsand flood protection levels in accordance to COP forSurface Water Drainage Appendix 2

Page 126: Handout for CBPU Subm

124

APPLICATION FOR COMPLIANCE CERTIFICATE -RESUBMISSION

[UNDER SECTION 33(7) OF THE ENVIRONMENTALPROTECTION AND MANAGEMENT ACT (CHAPTER 94A) AND COMPLIANCE CERTIFICATE UNDER SECTION 33(8)

OF THE SEWERAGE AND DRAINAGE ACT (CHAPTER 294)]

This form may take you 15 minutes to fill in. You will need the following information to fill in the form:-

- Particulars of Project - Particulars of Qualified Person - Supporting completion and inspection certificates.

Date: 19/03/2014

To: Central Building Plan Unit

National Environment Agency40, Scotts Road #13-00Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person responsible for theproject(s).

2. This form is to be accompanied by the relevant attachments.

Information

1. Service Standard : Within 7 working days.

2. For enquiries on application of status, please call 67319783 / 67319527

Particulars of Project

Project Reference Number

Project Title

Location Description[Include Lot/Plot, MK/TS,House No, Building Address and Road information]

Please Select 001Plan Type

Add Delete

Particulars of Application

ENV-CBPU-CLRCSC01-RESUBMISSION

Development Proposal Please Select

Appendix 8

Razis
Highlight
Razis
Highlight
Page 127: Handout for CBPU Subm

125

Application

Date of CBPU DC Clearance

Application for Compliance Certificate and Clearancefor Certificate of Statutory Completion

Environmental Health Works

Pollution Control Works

Sewerage Works

Drainage Works

Previous CSC Advice fromCBPU (if applicable)

CBPU Processing Officer

File Ref. No. /Case ID

NA Dated

Clearance Certificate for Building Plan on Pollution Control for Industrial Plant Works (if applicable)

Clearance Certificate for Building Plan on Environmental Health (if applicable)

Clearance Certificate for Detailed Plan onSewerage (Sanitary Works) (if applicable)

Clearance Certificate for Detailed Plan on Sewerage (if applicable)

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 128: Handout for CBPU Subm

126

Particulars of Application (Continue)

File Ref. No. /NA Dated

Clearance Certificate for Detailed Plan on Sewerage (M&E Works) (if applicable)

Clearance Certificate for Detailed Plan on Drainage Works (if applicable)

Particulars of Qualified Person

Name Please Select

Role In Project

Registration No

Firm Name

UEN

Firm Address

Telephone No.

Extension No

Fax No.

Email Address

Declaration by Qualified Person

I confirm that:

I am the Qualified Person appointed under Section 6(3) or 9(2)(b) of the Building Control Act (Cap. 29) in respect of the works described which include

Environmental Health Works,

Pollution Control Works,

Sewerage Works,

Drainage Works; and my

qualification is appropriate to the nature of these works;

The particulars of Project, Application and Submission Checklists given in this form are correct;

The works have been carried out and completed. For industrial plant works, all related pollution control equipment and facilities have been installed/ completed according to the approved plans as listed in Particulars of Project and Application

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 129: Handout for CBPU Subm

127

Confirmation

1) I confirm that:

a) there are no roof gutters (including rain water down pipes andoutlets, and roof supper drains) provided for in the developmentproposal; or

b) waiver for roof gutter has been obtained from the National Environment

Agency in writing on : File Ref No:

Date:

c) There are roof gutters (including rain water down pipes and outlets,and roof scupper drains) provided in the development proposal. Waiverapplication from ENV-CBPU-WVRG is attached.

d) Confirmation for a), b) or c) not applicable, for A&A and reconstructionbuilding projects.

Attachments

Dated

1. Certificate of Completion and Inspection for BuildingPlan for Environmental Health

2. Certificate of Completion and Inspection for SanitaryWorks (PUB-BPU-COMPOFWORK)

3. Certificate of Completion and Inspection for SewerageWorks (PUB-BPU-COMPOFWORK)

4. Certificate of Completion and Inspection for theMechanical and Electrical Worksfor Sewerage Installation (PUB-BPU-COMPOFWORK)

5. Certificate of Inspection for Drainage Works

Page 130: Handout for CBPU Subm

128

Attachments (Continue)

6. As- Constructed drainage drawings in accordance to COP forSurface Water Drainage Appendix 5

7. As-built survey plans indicating crest levels, platform levelsand flood protection levels in accordance to COP forSurface Water Drainage Appendix 2

Page 131: Handout for CBPU Subm

129

FORM FOR MANUFACTURING CATEGORY

Date: 24/02/2014

Instructions

1. This form is to be digitally signed by the Licensed Water Service Plumber/Professional Engineer.

Details of PUB Water / NEWater requirement

Nature of manufacturing products

BAI (Business ActivityIndicator)

The measure of business activity that takes into account the core businessoperations specific to the site. (e.g. No of wafers for wafer fab plant, no ofoccupants in an office building, metric tonnes of wash load for a laundry etc)

Production rate BAI/mth

If Yes, please complete the following.

PUBWTR-0-MCG01

PUB Water

Manufacturing use

Please submit a copy of the water balance chart indicating the quantity of waterrequired at each manufacturing process. See Annex A.

Any water recycling

No

Percentage of water recycling (See Annex B)

If No, please complete the following.

Reasons for not recycling water

No of occupants

Any Canteen?

%

Yes

NEWater

m³/mth m³/mth

Yes

No

Domestic use

Toilet Flushing

No of staff that take shower

Showering

Cooling Usage

PUB Water NEWater

No of cooling tower

m³/mth

m³/mth m³/mth

m³/mth

Appendix 9

MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
Page 132: Handout for CBPU Subm

130

Refrigerating capacity and operating hoursof individual cooling towers:

Tons hr/mth

Add Delete

Total make-up water required for cooling towers

m³/mth m³/mth

Reasons for not using air-cooled/refrigerant-cooled air con system

Other Usage

PUB Water NEWater

No of toilets

Toilets washing m³/mth m³/mth

Other usage (Please specify) E.g. General washing, etc

m³/mth m³/mth

Add Delete

Total 0 m³/mth 0 m³/mth

Total water requirements

0 m³/mth 0 m³/mth

Other sources of water

Water usage areas Type of water Water required

m³/mth

Add Delete

Please indicate waterusage areas to be installed with private meters or submeters:

MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
Page 133: Handout for CBPU Subm

131

FORM FOR NON-MANUFACTURING CATEGORY

Date: 24/02/2014

Instructions

1. This form is to be digitally signed by the Licensed Water Service Plumber/Professional Engineer.

Details of PUB Water / NEWater requirement

PUBWTR-0-NMC01

PUB Water NEWater

Project Description

BAI (Business Activity Indicator)

The measure of business activity that takes intoaccount the core business operations specific tothe site. (e.g. No of wafers for wafer fab plant, noof occupants in an office building, metric tonnesof wash load for a laundry etc)

No of occupants

Any Canteen? Yes

No

Domestic use (m3/mth)

Toilet Flushing (m3/mth) (m3/mth)

No of occupantsthat take shower

Showering (m3/mth)

Cooling usage

PUB Water NEWater

No of cooling towers

Refrigerating capacityand operating hours of individual cooling towers:

Tons hr/mth

Add Delete

Total make-up water required for cooling towers

(m3/mth) (m3/mth)

Reasons for not using air-cooled / refrigerant cooled air con system

Other usage

PUB Water NEWater

Appendix 10

MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
Page 134: Handout for CBPU Subm

132

No of toilets

Toilets washing (m3/mth) (m3/mth)

Other areas (Please specify, eg: F&B, Shops, Laundry, Fountain, Swimming Pool, General /Car park Washing, Irrigation etc

(m3/mth) (m3/mth)

Add Delete

Total 0 (m3/mth) 0 (m3/mth)

Total water requirements 0 (m3/mth) 0 (m3/mth)(m3/mth)

For Retails (if applicable)

No of shoppers

For Hotels (if applicable)

No of Hotel rooms

Other sources of water

Please indicate waterusage areas Type of water Water required

Add Delete

Please indicate waterusage areas to beinstalled with privatemeters or submeters

(m3/mth)

MUTALIB
Highlight
MUTALIB
Highlight
Page 135: Handout for CBPU Subm

133

PUBWTR-0-RCG01

FORM FOR RESIDENTIAL CATEGORY

Date: 24/02/2014

Instructions

1. This form is to be digitally signed by the Licensed Water ServicePlumber/Professional Engineer.

Details of PUB Water / NEWater requirement

PUB Water NEWater

No of Units

Household usage m³/mth

Swimming Pool (make-up water)

m³/mth

Common Amenities

m³/mth m³/mth

Add Delete

General Washing m³/mth m³/mth

Gardening m³/mth m³/mth

Other usage (Please specify)

m³/mth m³/mth

Add Delete

Total water requirements 0 m³/mth 0 m³/mth

Other sources of water

Please indicate water usage areas

Type of water Water required

m³/mth

Add Delete

Appendix 11

MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
Page 136: Handout for CBPU Subm

134

FORM FOR TEMPORARY CATEGORY

Date: 24/02/2014

Instructions

1. This form is to be digitally signed by the Licensed Water Service Plumber/Professional Engineer.

Details of PUB Water / NEWater requirement

Construction Site (Staff / Workers use)

PUBWTR-0-TSP01

PUB Water NEWater

No of staff & construction workers

Domestic use (m3/mth)

Toilet Flushing (m3/mth) (m3/mth)

No of staff & construction workers that take shower

Showering (m3/mth)

Any Canteen? Yes

No

Washing use

PUB Water NEWater

Washing vehicle (m3/mth) (m3/mth)

Washing Frameworks/Steel bars/Moulds

(m3/mth) (m3/mth)

Other washing (pl specify)

(m3/mth) (m3/mth)

Add Delete

Total 0 (m3/mth) 0 (m3/mth)

Concreting use (m3/mth) (m3/mth)

Recycling of wash water Yes

No

If Yes,please complete the following

Percentage of water recycling %

If No,please complete the following

Reasons for not recycling water

Other usage (Please specify)E .g. Architectural works, Canteen Use

Appendix 12

MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
Page 137: Handout for CBPU Subm

135

(m3/mth) (m3/mth)

Add Delete

Total 0 (m3/mth) 0 (m3/mth)

Page 138: Handout for CBPU Subm

136

(Continue)

Workers dormitory

PUB Water NEWater

Any workers dormitory? Yes

No

If Yes, please specify the no. of workers

Workers dormitory consumption (m3/mth)

Total water requirements 0 (m3/mth) 0 (m3/mth)

Other sources of water

Please indicate water usage areas

Type of water Water required

(m3/mth)

Add Delete

Type of Project

Construction Site Location

Total Built-Up Floor Area M 2

Started from

MUTALIB
Highlight
Page 139: Handout for CBPU Subm

137

PRE-PLANNING CONSULTATION

Date: 24/02/2014

PUBWTR-0-PPC01

To: PUB Water

Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Qualified Person.

2. Design of water service installation including the mode of supply shall complywith the Public Utilities (Water Supply) Regulations and the SingaporeStandard CP 48 - Code of Practice for Water Services.

3. Water meter shall be located above ground near to the main entrance of theabove development and shall be easily accessible for maintenance andreading.

4. There shall be no risk of contamination to PUB potable water supply systemthrough backflow.

5. Potable water storage cisterms should not be located below sanitary pipesand other non-potable water pipes.

6. This form is to be accompanied by the relevant documents (refer toSubmission Checklists).

Particulars of Project

Project Reference Number

Development Type Please Select

Location Description

[Include Lot/lot, MK/TS, Address/Road and Building Name if any]

Project Description

Estimated PUB Water Requirement (m³/mth)

Estimated NEWater Requirement (m³/mth)

Appendix 13

Page 140: Handout for CBPU Subm

138

Platform Level of Development (mRL)

Reduced Level of Highest Direct SupplyWater Fitting (mRL)

Issue For Discussion

Page 141: Handout for CBPU Subm

139

Particulars of the Qualified Person

Name Please Select

Name of Company

UEN

Submission Checklists

1 Site Plan

Page 142: Handout for CBPU Subm

140

NOTIFICATION OF WATER SERVICE WORK BY LICENSEDWATER SERVICE PLUMBER

Date: 24/02/2014

To: PUB Water

Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Licensed Water Service Plumber.

2. This form is to be accompanied by the relevant documents(refer to Submission Checklists).

Particulars of Project

Notification Number

Project Description

Location Description

[Include Lot/lot, MK/TS, Address/Road and Building Name if any]

Nature of Work Please Select

Estimated Water Requirements

PUB Water (m3/mth)

NEWater (m3/mth)

Commencement Date

Expected Completion Date

Platform Level of Development (mRL)

Reduced Level of Highest Direct SupplyWater Fitting (mRL)

Particulars of Customer

Name Please Select

Name of Company

PUBWTR-0-WLP01Appendix 14

MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
Page 143: Handout for CBPU Subm

141

UEN

Address

Telephone No.

Extension No.

Fax No.

Particulars of the Licensed Water Service Plumber

Name Please Select

Residential Address

MUTALIB
Highlight
Page 144: Handout for CBPU Subm

142

Particulars of Licensed Water Service Plumber (Continue)

Mailing Address (if different from above)

Telephone No. (O)

Telephone No. (H)

Extension No.

Fax No.

Pager No.

Handphone No.

Licence No.

I/C No.

Declaration by Licensed Water Service Plumber

1 I, , the undersigned, hereby certify

that the water service installation at the premises is designed infull compliance with the Public Utilities Board's requirementsincluding the Public Utilities (Water Supply) Regulations, Singapore Standard CP 48 - Code of Practice for Water Services, Authorities' requirements and other statutoryrequirements. I also confirm that potable water storage cisterns shall not be located below sanitary pipes and other non-potablewater pipes. All the water fittings installed in the water serviceinstallation are of types that comply with standards prescribed/stipulated by PUB and all water conservation measures willbe adopted.

2 The site plan, the water schematic drawing/s and the breakdownof water requirements, if any, of the above developments areattached herewith.

Submission Checklists

1 Site Plan

2 Water Reticulation Schematic Drawing

MUTALIB
Highlight
MUTALIB
Highlight
Page 145: Handout for CBPU Subm

143

NOTIFICATION OF WATER SERVICE WORK BYPROFESSIONAL ENGINEER

Date: 24/02/2014

To: PUB Water

Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Professional Engineer.

2. This form is to be accompanied by the relevant documents(refer to Submission Checklists).

3. Please note that for "Particulars of Licensed Water Service Plumber", themember role of "Licensed Water Service Plumber" is required when updatingthe member's details.

Particulars of Project

Pre-Planning Consultation Yes

No

Date of Pre-Planning Consultation with PUB

Type of Submission New Submission

Resubmission

PUB Ref WSN 92433 / / /

Project Reference Number

Development Type Please Select

Location Description

[Include Lot/lot, MK/TS,Address/Road and Building Name if any]

Project Description

Nature of Work Please Select

PUBWTR-0-WSW01Appendix 15

MUTALIB
Highlight
MUTALIB
Highlight
Page 146: Handout for CBPU Subm

144

Estimated Water Requirement

PUB Water (m3/mth)

NEWater (m3/mth)

Commencement Date

Expected Completion Date

Particulars of the Professional Engineer

Name Please Select

Name of Company

UEN

Address

MUTALIB
Highlight
Page 147: Handout for CBPU Subm

145

Particulars of the Professional Engineer (Continue)

Telephone No.

Extension No.

Fax No.

Particulars of the Owner/Developer

Name Please Select

Name of Company

UEN

Address

Telephone No.

Extension No.

Fax No.

Particulars of the Licensed Water Service Plumber

Name Please Select

Address

Telephone No.

Extension No.

Fax No.

Declaration by Professional Engineer

1 I,hereby certify that the water service installation is designed in full compliance with the Public Utilities Board's requirements includingthe Public Utilities (Water Supply) Regulations, Singapore StandardCP 48 - Code of Practice for Water Services, Authorities' requirements and other statutory requirements. I also confirm that potable water storage cisterns shall not be located below sanitary pipes and other non-potable water pipes. All the water fittingsinstalled in the water service installation are of types that complywith standards prescribed/stipulated by PUB and all water conservation measures will be adopted.

2 The site plan, the water schematic drawing/s and the breakdown ofwater requirements, if any, of the above developments are attachedherewith.

Submission Checklists

1 Site Plan

, the Professional Engineer-in-charge

MUTALIB
Highlight
MUTALIB
Highlight
MUTALIB
Highlight
Page 148: Handout for CBPU Subm

146

2 Water Reticulation Schematic Drawing

Page 149: Handout for CBPU Subm

147

PUBWTR-0-CSC01

CERTIFICATE OF SATISFACTORY COMPLETION OF WATER SERVICE WORK BY PROFESSIONAL ENGINEER

Date: 19/03/2014

To: PUB Water

Water Supply (Network) DepartmentPublic Utilities Board40 Scotts Road #22-01Environment BuildingSingapore 228231

Instructions

1. This form is to be digitally signed by the Professional Engineer.

Particulars of Project

Project Reference Number

Development Type Please Select

Project Description

Development Address

Nature of Work Please Select

Water Utility Account Number

Commencement Date

Expected Completion Date

Particulars of the Professional Engineer

Name Please Select

Name of Company

UEN

Particulars of the Licensed Water Service Plumber

Name Please Select

Telephone No.

Extension No.

Fax No.

Appendix 16

Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Razis
Highlight
Page 150: Handout for CBPU Subm

FORM-PE-CSC Mar 19 2014 at 13:12:53 PM Page 2

Page 151: Handout for CBPU Subm

148

Declaration by Professional Engineer

1 I, the Professional Engineer-in-charge

hereby certify that I have supervised the construction of the water service installation of the above development and inspected the completed water service installation. I confirm that to the best of my knowledge and belief, the water service installation was carried out in accordance with the Public Utilities Board's requirements including the Public Utilities (Water Supply) regulations, Singapore Standard CP 48-Code of Practice for Water Services, Authorities' requirements and other statutory requirements. I also confirm that potable water storage cisterns have not been located below sanitary pipes and other non-potable water pipes. All the water fittings installed in the water service installation are of the types that comply with standards prescribed / stipulated by PUB and all water conservation measures have been adopted. I further certify that the said water service installation and the associated electrical devices and equipment have been tested and are safe and acceptable for operation.

Razis
Highlight
Page 152: Handout for CBPU Subm

149

Appendix 17 – Contact List

PUB Building Plan Unit (BPU)

Address

Building Plan Unit

PUB

40 Scotts Road #15-01

Environment Building

Singapore 228231

For further enquiries on Corenet form changes, please contact PUB BPU at:

Hotline: 67313512

Email: [email protected]


Recommended