Date post: | 14-Dec-2015 |
Category: |
Documents |
Upload: | kian-alquilos |
View: | 261 times |
Download: | 12 times |
Republic of the PhilippinesDEPARTMENT OF EDUCATION
Region VII, Central VisayasDivision of Toledo CityNorth Toledo District
MINOLOS ELEMENTARY SCHOOLToledo City
MONTHLY REPORT ON HARDSHIP ALLOWANCE
Name of School: MINOLOS ELEMENTARY SCHOOLMonth and Year: AUGUST 2012
NAME OF TEACHER
Designation
Basic Salary Distance
Rate per Distance
(% of Basic
Salary)
Number of Days Present
in a Month
Total Number of Days
in a Month
AMOUNT
1. Alquilos , Josephus P. T-1 PhP18,549.00 6.5 15% 18 19 PhP2,635.91
2. Bastida , Joey P. T-1 PhP18,549.00 6.5 15% 17 19 PhP2,489.47
3. Canoy , Camela B. T-1 PhP18,549.00 6.5 15% 18 19 PhP2,635.91
4. Kilag , Osias Kit T. T-1 PhP18,549.00 6.5 15% 18 19 PhP2,635.91
5. Lariosa , Jonah Q. T-1 PhP18,549.00 6.5 15% 19 19 PhP2,782.35
6. Poloyapoy , Karl Brian M. T-1 PhP18,549.00 6.5 15% 19 19 PhP2,782.35
7. Poloyapoy , Nestor B. HT3 PhP27,473.00 6.5 15% 19 19 PhP4,120.95
8. Tapilot , Leah Liezl C. T-1 PhP18,549.00 6.5 15% 15 19 PhP2,196.59
9. Villarin , Catherine L. T-1 PhP18,549.00 6.5 15% 17 19 PhP2,489.47
TOTAL PhP24,768.91
Distance in kilometres of the hardship post from the point of available regular motorized land/water transport.
Prepared by:Certified Correct:
NESTOR B. POLOYAPOY Head Teacher III WINEFREDA A. LAMPAWOG
North District Supervisor
Approved:
RONALD. G. GUTAY, Ph. D.Assistant Schools Division Superintendent
Officer In-Charge