Description:
AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL3 Commissioning of a SC Circuit 1. Individual System Tests 2. Short-Circuit Tests Antonio Vergara
19
Hardware Commissioning Tools Robin
Transcript
Page 1: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

Hardware Commissioning Tools

Robin

Page 2: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 2

Summary Hardware Commissioning View

Slides from Antonio Vergara (PM Workshop) Inventory of Tools Spotlight on some favourites! Near future -> Vito

Page 3: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 3

Commissioning of a SC Circuit1. Individual System Tests2. Short-Circuit Tests

Antonio V

ergara

Page 4: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 4

Commissioning of a SC Circuit1. Individual System Tests2. Short-Circuit Tests3. Powering Procedure Tests

4. Interlock Tests PIC1

5. Powering Tests

COOL-DOWN

Connection Converter-Magnets

Antonio V

ergara

Page 5: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 5

Single Circuit Powering Test

350A

PIC2 Injection 760A

EESPA FPA

Quench2 kA

Loss PP

EEQuench

6 kA

8.5 kA

12 kA

RB Circuit

PM data

PM data

PM data

PM data

PM data

PM Analysis Results

PM Analysis Results

PM Analysis Results

PM Analysis Results

Antonio V

ergara

The sequence is crucial - RJL

Page 6: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 6

The Commissioning Scenario

RB, RQF,RQDIP Q&D

Correctors

80-120 AInner TripletCorrectors

FRONT 1

FRONT 2

Antonio V

ergara

Page 7: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 7

Parallelisms and Constraints The 3 types of parallelisms:

Parallelisms between sectors Parallelisms between fronts Parallelisms between circuits – SOC

SOC: Set Of Circuits. Battery of circuits commissioned in parallel by the same front

Antonio V

ergaraSeveral: 1s of teams, 10s of tests, 100s of circuits, - RJL

Page 8: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 8

The Commissioning Scenario: Schedule

SECTOR 7-8

2007

JAN

FEB

MAR

APR

MAY

JUNCo

ol-D

own

PIC1

Powe

ring

Test

s13 - 15 weeks

Connection to leads

200 SC Circuits

Antonio V

ergara

Page 9: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 9

Developed Tools The Sequencer Reference and LSA Databases Individual Supervision Systems Alarms – Laser, Logging Test Management Software: SOC

Editor Post-Mortem Local Analysis Tools Post-Mortem Global Analysis Tool MTF

Antonio V

ergara

Page 10: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 10

The LHC Ring Commissioning Tools

CERN Tools CCM Logbook LASER XCluc Equip State SDDS Brwsr

WIC Supervision LSA Function Generation and driving

Others

Measurement System Logging database Naming database Reference Database MTF LSA Database Timber and Meter Old Sequencer Equip Monitor for FGC Equip State Fixed Display Set of the Day Editor PIC Supervision JAPC Monitoring Logging Surveillance

For short circuit tests

CIET Supervision Cryo plant supervision

Cool down

QPS Expert Tool QPS Supervision Circuit Synoptic PM Tools New Sequencer

PIC and P2N

Page 11: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 11

Console Manager Screenshot

Page 12: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 12

Old Sequencer Screenshot

Page 13: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 13

PIC Supervision Screenshot

Page 14: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 14

Cryo Process Supervision Screenshot

Page 15: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 15

Logging Client Screenshot, supplier UNICOS

Page 16: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 16

SOC Editor Screenshot

Page 17: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 17

Reporting and Specifying Bodies

Page 18: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 18

Latest plan

Page 19: Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.

AB-CO TC 8th February 2007 Hardware Commissioning Tools - RJL 19

Last words

Plenty of room to screw up during commissioning, the control system must guide the operator to help avoid mistakes

After commissioning the safety systems the control system must reduce the stress on them