1 1 Kementerian ESDM Republik Indonesia GMB Raja Block FIRM COMMITMENT 1. G&G Studies 2. 2 (two) core holes 3. 1 (one) Exploratory well (Vertical) 4. Production Test
Transcript
  • 31-Oct-16 131/10/20161

    Kementerian ESDM Republik Indonesia

    GMB Raja Block

    FIRM COMMITMENT

    1. G&G Studies2. 2 (two) core holes3. 1 (one) Exploratory well

    (Vertical)4. Production Test

  • 31-Oct-16 231/10/20162

    Kementerian ESDM Republik Indonesia

    Data Availability

  • 31-Oct-16 331/10/20163

    Kementerian ESDM Republik Indonesia

    Geological Setting & Prospect Area

    Figure. Prospect map of GMB Raja

    GEOLOGICAL SETTING

    The GMB Raja is located inSouth Sumatra Basin which is tothe east of the BarisanMountains and extends into theoffshore areas to the northeastand is regarded as a back-arcbasin, which is bounded by theBarisan Mountains to thesouthwest, and the pre-Tertiaryof the Sunda Shelf to thenortheas. The South SumatraBasin was formed during east-west extension at the end of thepre-Tertiary to the beginning ofTertiary times (Daly et al., 1987).

  • 31-Oct-16 431/10/20164

    Kementerian ESDM Republik Indonesia

    GMB Raja Block Terms and Conditions

    No.

    Wilayah Kerja

    Bentuk Kontrak

    Kerja Sama

    Ketentuan Pokok Kontrak Kerja Sama (Term and Conditions)

    Mekanisme Penawaran Blok Luas (Km2)

    Relinquishment FTP**

    (%)

    DMO*** (%)

    Split (GOI : Kontraktor)**** Cost

    Recovery***** (%)

    Bonus Tanda

    Tangan (US$)

    Minimum Komitmen Pasti 3 tahun pertama

    (%)

    Sisa Akhir tahun ke-6* (%)

    Bagian Pemerintah

    (%) After Tax/

    Before Tax

    Bagian Kontraktor

    (%) After Tax/

    Before Tax

    2. GMB Raja 580,5 Kontrak

    Bagi Hasil

    10 80 10 25 100

    - G&G Studies - 2 Core Hole - 1 Exploratory Well - 1 Production Test

    Penawaran Langsung

  • 31-Oct-16 531/10/20165

    Kementerian ESDM Republik Indonesia

    The Terms & Conditions is the owner estimate for the Government Tender participants are free to bid the sharing split and signature bonus The Government chooses the winner of tender from the best offering based on the owner estimate.

    Basic assessment consists of financial ability and technical commitment that is offered by tender participants. Participants which pass the basic assessment are those who fulfill administrative requirements; fulfill technical aspect; and have financial ability to support the firm commitment.

    The Final Assessment is a combination of participants proposal of work program & commitment, signature bonus and sharing split.

    NEW CONCEPT IN THE PETROLEUM BIDDING ROUND 2016New Concept in the Petroleum Bidding Round 2016

  • 31-Oct-16 631/10/20166

    Kementerian ESDM Republik Indonesia

    E-Tendere-wkmigas.esdm.go.id

    Profile DocumentPreparation

    Bid Document Payment Account Registeration(Profile & Document Upload)

    Document & Payment Validation

    Username & Password

    Administration

    Bid Document Download &

    Clarification Forum

    Participation Document

    Submission

    E-Tender Procedure

  • 31-Oct-16 731/10/20167

    Kementerian ESDM Republik Indonesia

    BIDDING ROUND SCHEDULE

    Interested companies are invited to participate and access Bid Document by accessing our website at e-wkmigas.esdm.go.id

    Companies which intend to participate in the tender shall submit their Participation Documents before

    the deadline to this following address :

    Secretariat of OfferingUnconventional Oil & Gas Working Working Acreage Team

    Migas Investment Service RoomDirectorate General of Oil and Gas

    Ministry of Energy and Mineral ResourcesMigas Building 1st Floor Jl. H.R. Rasuna Said Kav.B-5 Jakarta 12910

    Activity ScheduleAccess Bid Document 31 October 15 December 2016

    Clarification Forum 4 November 15 December 2016Documents Submission Deadline 15 December 2016, 14.30 WIB

    GMB Raja Block Bidding Round Schedule