Metal Roof Coating SystemHarrah Public Schools Vo-Ag Building
Project: Apply Metal Roof Coating to Harrah Public Schools Vo-Ag Building 26,000 sq.ft.
Roof System: NEOGARD Elasta-Gard M (5-yr Warranty)
Owner: Harrah Public SchoolsDean Hughes – Superintendent20670 Walker StreetHarrah, OK 78046405-454-6244
Architect: Choon LimBoynton Williams & Associates900 36th Avenue NW, Ste 100Norman, OK 73072405-329-0423
Contractor: Curt Carpenter C&G Coatings 12348 W 85th Terrace, #1314 913-634-2588
Metal Roof Prior to Application of Coating
Vertical Seam
Horizontal Seam
ScrewLeak Problem Areas
High Pressure Power Wash Substrate
Mist Cost II PrimerApplied at 300 sq.ft./gallon
Vertical Seams & Screws Caulked
Mesh & Coating applied on Horizontal Seams
Application process forhorizontal seams is:- 12 mils urethane coating- Apply mesh-12 mils urethane coating applied over mesh
Polyurethane Foam Around All Protrusions
Roof is Water-Tight!! Ready for Application of Topcoat
Applying 70613 Urethane Topcoat at a rate of 1 gallon/100 sq.ft.
NEOGARD Elasta-Gard M Metal Roof Coating System5-yr warranty