8/18/2019 Harsco SCB Climbing System
1/11
© 2013 Harsco Corporation, All Rights Reserved.
GLOBAL WATER INITIATIVE
Turate, Italy | January 29, 30 2013
SCB CLIMBING SYSTEM
8/18/2019 Harsco SCB Climbing System
2/11
1WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
1
Safety
Ethical in Thought, Word and Deed
Disciplined Thought, DisciplinedAction and Disciplined People
Transparency
Personal Accountability and
Responsibility
Customers
Targeted Market
BHAG
Envisioned Future
Value Creation
Value Capture
Value Selling
Be the Best
SustainableSuperior
Performance(20-Mile March)
Customers
Employees
Shareholders
Suppliers
Uncompromising Integrity and
Ethical Business Practices Harsco Integrity Framework:
Code of Conduct
Security Practices
Internal Control
To build teams that win with integrity anywhere in the world
Harsco's Core Ideology
Core Values
People “the A-Team” Human Capital Framework:
Global Talent Management System for Recruiting,Developing, Retaining and Assessing Human Capital
Continuous Improvement Continuous Improvement
Discipline through Lean and Six
Sigma Methods Business Transformation
Value Creation Discipline Economic Value Added (EVA®)
Value Selling Culture
3
2 4
Safety Practices
Global Management Practices
Core Purpose
8/18/2019 Harsco SCB Climbing System
3/11
2WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
SCB Climbing system – General arrangementWhen the thickness of the wall is relevant and the traditional tie-rodssystem isn’t efficient the Harsco SCB system for dam finds its perfectapplication.The system’s bracket is designed to support the pressure of the
concreting phases and its weights caused by formwork.
8/18/2019 Harsco SCB Climbing System
4/11
3WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
SCB Climbing unit – 3d view
8/18/2019 Harsco SCB Climbing System
5/11
4WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
SCB Climbing system – Operational possibilitiesThe particular geometry of these hydraulic works require systems able toabsorb the most different inclinations both positive and negative (sub-panel casting).The Harsco SCB system is able to absorb different inclinations required bydifferent construction’s type for which it has been studied. The system keeps the different work floors in
horizontal position in order to make safe and easy staff allocation and passage on them. The system fits topositive and negative inclinations with a few simple steps.
8/18/2019 Harsco SCB Climbing System
6/11
5WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
SCB Climbing system – Typical climbing sequences
Vertical waler SCB
Walkway bracket
Adjustable braceSCB
Dam bracketSCB
Formwork
Vertical waler SCB
Walkway bracket
Adjustablebrace SCB
Dam bracket SCB
Formwork
Walkway beam SCB
Railling post
Vertical waler SCB
Walkway bracket
Adjustablebrace SCB
Dam bracket SCB
Formwork
Walkway beam SCB
Railling post
Bottom platform beam SCB
Railling post
Suspension post SCB
The special design,developed by Harsco, ofVertical waler SCB and the
Dam bracket SCB allows theexecution of the first phasewithout additionalcomponents.
8/18/2019 Harsco SCB Climbing System
7/11
6WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
Detail platform fixing
8/18/2019 Harsco SCB Climbing System
8/11
7WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
System’s anchorage
System’s anchorage:
2 different type of standard anchorage are possible.M 30 / DW 20 (allowable force 150 kN)
M 36 / DW 26,5 (allowable force 250 kN)
The anchorage consists in threaded anchor plate, tie rod DW and anchor cone.
The choice of anchorage typology is due to the project’s expected loads.
8/18/2019 Harsco SCB Climbing System
9/11
8WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
Preparation:The anchorage preparation can take place in two ways:
The shuttering skin must be provided with a through drill hole at the correct level.
Then the lead cone is to be screwed to the plywood by using the fit screw TE from behind the shuttering skin.If the drilling of the plywood is not possible, the preparation is done through the nailable fixing disk that isdirectly nailed on the shuttering skin.
System’s anchorage
8/18/2019 Harsco SCB Climbing System
10/11
9WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
Climbing preparation:After cast, before the moving back of formworkfor the dismantling, you unscrew the TE fixingscrew.
Whit the Screw-on plate:The formwork element is loosened from the wallwhen dismantling.The nailable disk remains to be fixed to the tiecone and must be unscrewed with a hexagon
soket screw key.
System’s anchorage
After this, the bracket bearing roll is fastened with
the hexagon fit screw.
Threaded Anchor PlatePVC Tube
Anchor Cone
Screw TE
Anchor Ring
8/18/2019 Harsco SCB Climbing System
11/11
10WE HELP BUILD THE WORLD © 2013 Harsco Corporation, All Rights Reserved.
Climbing anchor options