HAZELWOOD
D A C H PL A N N I N
G
ACCESS AND OWNERSHIP
• Identification of land owners• Clarification of ownership
rights• Negotiation of new
ownership rights• Conversion of interest into a
transaction
PLANNING AND DESIGN PROCESS• Planning Permission in Principal
• Coordination of multidisciplinary team
• Approval of Matters Specific in Conditions• Coordination of multidisciplinary
team
• Variation of Planning Permission
• Discharge of planning conditions
• Notice of completion of development
BUILDING WARRANT• Detailed design• Construction detail• Heating design• Drainage design/test• SAP calculation• Electrical Certificate • Heating and Hot Water
compliance • Energy Performance
Certificate• Sustainability Label • Air Infiltration Test • Application for Temporary
Occupation to be provided.
CONSTRUCTION MANGEMENTIdentify high quality contractorsAgree fees and terms of appointmentPut site Insurance in placeAgree programme for work and material
delivery Set up account with local building suppliersOrganise skip/portaloo hire Install security fencingOrganise tool hireSchedule and co-ordinate the works on siteCoordinate service connections (telephone,
water, electricity, etc)Structural work in accordance with engineers
details and spec
CONSTRUCTION
CONSTRUCTION
CONSTRUCTION