HCAL RBX for HB, HE, and HO Status and Planning. R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN 46556 USA. RBX Working Group. Notre Dame - PowerPoint PPT Presentation
Popular Tags:
70
HCAL RBX for HB, HE, and HO Status and Planning R. Ruchti Department of Physics University of Notre Dame Notre Dame, IN 46556 USA
Transcript
Page 1: HCAL RBX for HB, HE, and HO  Status and Planning

HCAL RBX for HB, HE, and HO Status and Planning

R. RuchtiDepartment of Physics

University of Notre DameNotre Dame, IN 46556 USA

Page 2: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 2

RBX Working Group•Notre Dame

–B. Baumbaugh, B. Beiersdorf, L. Castle, T. Loughran, D. Karmgard, J. Marchant, M. McKenna, R. Ruchti, D. Wiand

•Fermilab–A. Baumbaugh, J. Elias, J. Freeman, R. Foltz, S. Los, C. Rivetta, A. Ronzhin, T. Shaw, J. Whitmore

•Florida State–V. Hagopian, K. Johnson

•UI Chicago–D. Dwyer, M. Adams

•Iowa–Y. Onel

•Minnesota–A. Heering

•Mississippi–M. Booke, M. Reep, J. Reidy

Page 3: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 3

HCAL Subsystem Locations

Page 4: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 4

Overview of RBX Placement

Page 5: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 5

RBX contents for all subsystems

• All components reside in an enclosure/shell which acts as mechanical enclosure and distribution point for services.

• All components are modular – and can be inserted and removed as units.

• RM-19 (HB, HE, and HO subsystems)• RM-73 (HB and HE only)• Calibration Module• CCM (Clock and Control Module)• HV/BV termination• LV termination• Water cooling • Gas manifold for nitrogen inerting of ODU/RM

Page 6: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 6

Assembly of HB- in Spain

Page 7: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 7

HB- Wedge being loaded on cradle

Page 8: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 8

HB RBX mounting on Wedge

Page 9: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 9

HB RBX (r,z) viewand (r,r) view

12.323 [313.00]

37.992 [965.00]

LOW VOLTAGE

AND PIPING AREA

4.173 [106.00]

CALIBRATIONMODULE

CCMMODULE

TOP VIEW

FRONT VIEW HB RBX COMPOSITE ASSEMBLY DRAWING

R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 23 FEBRUARY 2001 9 AM CST

COOLING WATERIN & OUT

19-CHANNELRM-1

19-CHANNELRM-2

73-CHANNELRM

19-CHANNELRM-3

19-CHANNELRM-4

CHUNC

Page 10: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 10

HB RBX Front Face

Page 11: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 11

Topics

• Overview of RBX Design and Placement– HB RBX– HE RBX– HO RBX

• Services and Access• Planning and Schedule

Page 12: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 12

Cooling Routing on RBX enclosure outer surface

Page 13: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 13

HB RBX Issues

• Design: compact and limited space• Status: advanced, ready for production• Integration: careful interaction with Tracker and

ECAL services and panels required.• Challenge: accessibility of modules, particularly

the RM-73.• Schedule: Testing of Megatiles in Building 186,

May 2001. Mounting of RBX on HB- wedges Summer 2001 in building 186.

Page 14: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 14

HB RBX Assembly

Full RBX with 19 ch RMs

RBX Interior -- HV distributor and backplane

Page 15: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 15

HB RBX Module Routing Channels

Page 16: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 16

RM-19 QIE Top View

Page 17: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 17

RM-19 QIE Front Face

Page 18: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 18

Readout Module for 19-channel HPD RM19

Page 19: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 19

RM19 Sidewall removed

Page 20: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 20

HB RBX Electrical

Page 21: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 21

RM19 Rear and Front Views

Page 22: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 22

ODU showing patch panel, cookie support plate, HPD, ZIF socket and interface card

Page 23: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 23

Module Extractor (CHUNC)

Page 24: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 24

RM-73

Page 25: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 25

RM-73 Front Face

7.441 [189.00]

3.923 [99.65]

Page 26: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 26

RM-73 Rear View

Page 27: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 27

HB Mapping ExampleQIE Cards to Megatiles

19.4 19.3 19.2 19.1

1 1 1 12 2 2 2

Tower PIN RO Tower PIN RO Tower PIN RO 3 3 3 3Card Card Card 4 4 4 4

16 A13 3 16 A8 2 15 A4 1 5 5 5 515 C15 3 14 B12 2 13 B5 1 6 6 6 612 C2 3 11 L16 2 10 L15 1 7 7 7 79 G2 3 8 G1 2 7 P15 1 8 8 8 86 R12 3 5 R5 2 4 P2 1 9 9 9 93 T13 3 2 T8 2 1 T4 1 10 10 10 10

11 11 11 1112 12 12 1213 13 13 1314 14 14 1415 15 15 1516 16 16 1615 15 15 1516 16 16 16

Page 28: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 28

RBX Services

• Water for cooling in/out• Nitrogen gas for ODU/RM inerting in only• HV/BV + termination• LV• Optical signals QIE out• CCM and slow controls• Laser calibration signals

Page 29: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 29

HV/BV Cable Termination

Page 30: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 30

HV/BV Distributor

Page 31: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 31

Calibration Module

Page 32: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 32

General Comment about RBX and Components

• The structures are modular. This allows us to gain in the schedule, as assembly, Q/C and testing can be “factorized”.

• RBX enclosures can be built, tested and mounted, independent of components which can be added later.

• RM can be fabricated mechanically. ODU can be fabricated. Electronics and HPDs can be incorporated when available.

Page 33: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 33

Additionals

• Copper fittings and jumper between roof and floor water cooling pipes

• Gas manifold• LV module• CCM• CHUNC• RM pinning• Front protection cover Status of Costing Status of Costing

panels• RM-19 (QIE) and RM-73• Retrofit of holes in RBX flooring for mounts

Page 34: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 34

HB RBX Production Status

• HB PPP-1– At CERN in mockup at Prevessin Site.

• HB PPP-2– At Fermilab for electrical integration and 186 testing

• HB PPP-3– At Notre Dame for thermal tests and 186 testing

• HB PPP-4– Under fabrication at an outside vendor and assembled at

Mississippi. Production drawing test bed.• HB RBX production begins April 2001

Page 35: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 35

HB access/serviceability issues

• RM-19• Removal of optical cable protective covers• Removal of optical cables, calibration cables• Removal of any blocking services/cables• Direct extraction using CHUNC

• RM-73, CCM and Calibration Modules• Similar to above, except RM-19s must be removed

first.• Removal of any blocking services/cables.• Extraction using CHUNC

Page 36: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 36

HB access/serviceability issues

• HV/VB termination and LV termination• Removal of RM-19• Extraction using CHUNC• Service in situ

• HV/VB backplane, electrical backplane• Removal of all RM, CCM and Calib Module• Removal of HV/BV and LV terminations• Full extraction

Page 37: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 37

Service Paths + Panels

HB RBX FRONT VIEW WITH SERVICES DRAWING

R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 23 FEBRUARY 2001

Page 38: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 38

Servicing View

HB RBX FRONT VIEW WITH SERVICES DRAWING

R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 23 FEBRUARY 2001

Page 39: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 39

HB Mockup in Lab 5 at Fermilab

19.419.3 CCM Cal 73 19.2

19.419.4 19.1

Page 40: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 40

Mockup at Fermilab

Page 41: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 41

Page 42: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 42

HB RBXExtracting ODU 19.2

Page 43: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 43

View of Mockup: edge of wedge

Page 44: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 44

View behind ECAL cooling conduits

Page 45: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 45

HB RBX environs(lateral shift of TK patch panel)

Page 46: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 46

HB RBXExtracting ODU 19.4

Page 47: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 47

HB RBXExtracting ODU 19.2

Page 48: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 48

HB RBX with TK patch panelno clearance for ODU-73

Page 49: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 49

HB RBXExtracting ODU 19.1

Page 50: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 50

HB RBXODU 73 clearance issues

Page 51: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 51

HB RBXODU 73 clearance problems

Page 52: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 52

Suggestion to allow ODU 73 access

Page 53: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 53

Accessibility Issues

• All optical cables for RM-19 visible and accessible in an unobstructed manner for visibility and access to mounting screws.

• Same requested for RM-73, but may not be possible.• Use of compact extraction tool CHUNC to remove

and reinsert modules• Use of floor tracking to assure proper module

insertion at odd angles.• Mockup studies, Fermilab Lab 5 and Prevessin.

Page 54: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 54

HE RBX Issues

• Design: laterally compact, but good access in principle

• Status: enclosure design quite advanced• Integration: careful interaction with Preshower

(SE) and ECAL (EE) services.• Challenge: cooling issues and ODU fiber routing.• Schedule: PPP in June 2001

Page 55: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 55

HE RBX Status

• Drawings in progress• Builds as much as possible upon the design

of HB where possible. • Layout of various internal modules in

progress• ODU in mockup phase

Page 56: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 56

HE RBX (r,z) view

ThermalInsulator

Page 57: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 57

HE RBX (z,r) viewSection through CCM

ThermalInsulator

Page 58: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 58

HE RBX (z,r) viewSection through Calib Module

ThermalInsulator

Page 59: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 59

HE RBX (r,z) view

RM 19Module

RM 19Module

LV

RM 73Module

RM 19Module

RM 19Module

Calibration CCM

HV

Page 60: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 60

HO RBX Issues

• Design: vertically very compact. Resides within muon absorber which provides for magnetic “focussing” for HPD, and shortened optical cables from HO megatiles.

• Status: enclosure in design, but not advanced• Integration: careful interaction with muon

chamber systems.• Challenge: ODU/HPD cookie placement,

servicing, and optical cable routing to megatiles.• Schedule: PPP in winter 2001

Page 61: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 61

HO RBX Status

• Drawings in formative stage• Awaiting final results from study of

magnetic field situation• Appears that a solution is possible with RBX

located at the large z ends of the muon wheels.

Page 62: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 62

HO RBX Concept

Front part of box Rear Part of boxG-10

HPD

Cal

ibra

tion

TTCLV HV

ODU

HPD

ODU

HPD

ODU

HPD

ODU

QIEElect

QIEElect

QIEElect QIE

ElectQIEElect

TOP View

Front ViewODU ODU ODU ODUCal

Side ViewODUQIETTC

HO RBX Mechanical Sketch

Page 63: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 63

HO (r,z) Schematic

HPD

Cal

ibra

tion

TTC LVHV

ODU

HPD

ODU

HPD

ODU

HPD

ODU

QIEElect

QIEElect

QIEElect QIE

ElectQIEElect

Bottom View

Page 64: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 64

HO RM schematic

HV Connectors

ODU

Cooling by-pass

Base Extrusion for HO ODUs

Page 65: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 65

HO RBX Mechanical: Bottom Coverplate

HPD

Cal

ibra

tion

TTC LVHV

ODU

HPD

ODU

HPD

ODU

HPD

ODU

QIEElect

QIEElect

QIEElect QIE

ElectQIEElect

Bottom View

Bottom Cover/Mechanical Support

Page 66: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 66

HO Mechanical: Top Coverplate

Front part of box Rear Part of boxG-10

HPD

Calib

ratio

n

TTCLV HV

ODU

HPD

ODU

HPD

ODU

HPD

ODU

QIEElect

QIEElect

QIEElect QIE

ElectQIEElect

TOP View

Front ViewODU ODU ODU ODUCal

Side ViewODUQIETTC

HO RBX Mechanical Sketch

TOP Cover/Mechanical Support

Page 67: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 67

Request of CMS

• Approval of HB RBX design and agreement that HB RBX production can begin.

• Approval of design concept of HE RBX and that once full drawing set is available, that production can begin of the HE RBX.

• Approval of design concept and placement of HO RBX within iron of the Muon Wheels.

Page 68: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 68

HB RBX Accessing Issues

12.3228 [313.00]

37.9920 [965.00]

3.9370 [100.00]2.7559 [70.00]

3.9370 [100.00]2.7559 [70.00]

1.9685 [50.00]

LV

3.1496 [80.00]

19.6850 [500.00]

4.0034 [101.69]

1.3447 [34.16]11.8207 [300.25]

CL of RBX vs CL of TPP

1.6406 [41.67]1.5149 [38.48]

6.6929 [170.00]

1.7717 [45.00]

4.3307 [110.00]

2.4340 [61.82]

LOW VOLTAGE

AND PIPING AREA

CALIBRATION

MODULE

CCMMODULE

COOLING WATERIN & OUT

19-CHANNELRM-1

19-CHANNELRM-2

73-CHANNELRM

19-CHANNELRM-3

19-CHANNELRM-4

CHUNC

HB RBX COMPOSITE ASSEMBLY DRAWINGTOP VIEW WITH SERVICES

R. FOLTZ, FERMI LABJ. MARCHANT, UNIV. OF NOTRE DAMEAS OF 27 FEBRUARY 2001

Page 69: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 69

HE ODU Fiber Mockup

Page 70: HCAL RBX for HB, HE, and HO  Status and Planning

PRR for HCAL RBX 1-March 2001 R.Ruchti 70

HE ODU fiber routing test