HCL’s Oracle Database Upgrade &
Migration Capabilities
2
Agenda
Oracle Database CoE – Methodologies
Oracle Database Experience Snapshot – Case Studies
Client testimonies for Database Upgrades & Migrations3
2
1
3
DBA Center of Excellence
DB Architecture Group
Data Architecture & Design Logical & Physical Model – ErWin Forward & Reverse engineering DB models –
Release Management Database migration Star and Snow Flake schema design for
DWH application design
Performance Engineering Group
Dedicated DBA Team to optimize the application and DB performance criteria
High Availability (RAC) & DR Performance management Closely Interact with application developers in designing
for optimal performance
Security, Standards & Best Practices Support Group
Industry standard security best practices adherence SOX Compliance Industry & Customer specific standards compliance Advanced Security & Audit
Research & Innovation group
Beta testing and assessment Advanced (Multi-Master) replication, High availability (RAC)
& DR (Data Guard) RCA, Incident & Problem management R & D for DBA Innovation Platform support research
DBA CoE Highlights
Streamlined Knowledge Transition Methodology and DBA Cross Training on Database Products Advanced Certified Partner with Oracle Long Term Support (Onsite-Offshore Model) Quick Turnaround time for Issues 85% of HCL DBAs are certified on Oracle 10g 50% of HCL DBAs are hands-on with Oracle11g
4
Database Services
Service Level Management
Consistent end-user satisfactionProcess based service delivery
Reduced costs of operationsContinuous improvement
Domain expertise on top SLM
Technical
GroupsDatabase
COE
Oracle SQL Server SybaseDB/2
Services
Monitoring
Administration
Problem Management
Patch Management
Performance Tuning & Optimization
Consolidation/ Roll Out/ Migration
5
DBA Activities
Change the business (Implementations/ Upgrades)
Installation, Configuration & Upgrade Upgrade/ Migration Analysis Preparing Installation/ Upgrade/ Migration Check-list Capturing the issues faced during Installation, Configuration, Upgrade, Migration etc., Documenting the resolutions Special configurations {Hardware Load balancing, Heterogeneous installation etc.,}
Database Design and Configuration Analyse short and long term database growth trends Logical & Physical Design Reverse & Forward Engineering Redesign/ Consolidation Capacity planning
Maximum Availability Architecture Implementation Analysis of current architecture Set up and manage different levels of Oracle database HA based on client's requirements including
Standby Databases Oracle Data Guard Oracle Replication Oracle Advanced Queuing Oracle RAC
6
DBA Activities
Run the business (Support)
Regular Database & Application Management Regular DBA Procedures Backup and Recovery (RMAN, hot backup, cold backup – Scheduled/on-demand etc.,) Application development Support Patch Application Cloning support instances Minor upgrades Change Control Management
Pro-active Monitoring Resource utilization {Memory, CPU, Space etc.,} Collect statistics to pinpoint resource bottlenecks, monitor database and Application matrices Analyse short and long term database growth trends User access Creating and maintaining alerts for database and application monitoring attributes
Troubleshooting & Tuning Incident Management Problem Management – Root Cause Analysis Periodic performance analysis & identification of tuning activities Database reorganizations and row re-sequencing for performance
User Administration and Security Implementation Oracle advanced security options Application security management
7
Database Implementation Methodology
8
Assess
Plan
Develop
Upgrade
Optimize
Maintain
Evaluate the value available in target release
Plan and prepare Roadmaps for Upgrade
Pre-upgrade tasks and steps
Upgrade & Post-Upg tasks
Tune the Upgrade
Support
HCL’s Upgrade Methodology
9
Typical Upgrade Process Flow
Evaluate new release
Install new release
Perform initial upgrade pass
Test/ make adjustments
Perform test move to Prod.
Test
Final TestingSchedule cut
over date
Make adjustments
Make final adjustments
Start the process
Go Live
Upgrade?
Ready?
Acceptable
Stay put
Yes
No
Yes
No
Yes
No
10
HCL RoleProject Background
Case Study 1 – Tier One Automotive Supplier in North America and Europe
Benefits
Client will benefit from the advanced data compression features of the Oracle 11g and Increased performance in Daily ETL Loads
Upgrade of Oracle Datawarehouse Database & ETL tool informatica
Oracle Database and informatica runs on Solaris 5.9
As part of IT road map of client the upgrade was performed to increase the performance of daily ETL loads at the same time to utilize the new features like advance data compression in the new 11g version
HCL is providing L1 and L2 support from Offshore
HCL is responsible for maintaining mission critical Application databases for the customer
Oracle Database upgrade from release 9i (9.2.0.8) to 11g Release 1 (11.1.0.7)
Upgrade the entire application (Informatica + Database) for Datawarehouse Management system
11
Case Study 2 – Leading Publishing Company based out of UK
HCL RoleProject Background Benefits
Client will benefit the new features of the Application and more robust Integration with their sub-systems
Upgrade of Oracle Content Management Applications & sub system
Oracle CMS and Sub-Systems runs on Solaris and Windows
As part of IT road map of client the upgrade was performed as Designer repository was one of the integrated sub system
HCL is providing L1 and L2 support for Customer from Onsite and Offshore
HCL is responsible for maintaining mission critical Application databases for the customer
Oracle Database upgrade from release 9i (9.2.0.4) to 11g Release 1 (11.1.0.7)
Upgrade the entire application (Application stack + Database) for Content Management system and their sub-system
12
Case Study 3 – A Live Events Company based in California
HCL RoleProject Background Benefits
This helped the Client move to High Availability Architecture to cater to the growing business and the increasing number of users
18 months old implementation of E-Business Suite 11i
Oracle Applications 11.5.10.2 running on 9.2.0.6 database
Two node architecture with database on one node and all the application services on another node
Intended to be 9i RAC on OCFS but 2nd RAC Node never worked due to OCFS issues hence being used as a single instance
Upgrading from 9.2.0.6 to 10.2.0.4 in a High Availability RAC Architecture on RHAS 5.1
Oracle Database migration from 32-bit Linux server to new 64-bit Linux server with 64-bit O/S
Oracle Database upgrade from release 9i (9.2.0.6) to 10g Release 2 (10.2.0.4)
Converted 10g database (10.2.0.4) from single-instance to RAC (Real Application Clusters)
Configured ASM on RAW devices on EMC SAN
13
Case Study 4 – Largest Provider of Conferencing Services in Europe
ChallengesDatabase Upgrade Benefits
Implemented a system with a centralized repository, hardware, and a common interface for the client’s business across the globe, which resulted in further reduction of their TCO and maintenance
The new enhanced features of 10g like Merge & Schedulers were used to restructure the application, which helped in reducing the time of Data Warehouse loads by 50% and helped manage it more efficiently
Building the RAC Database
TAF Configuration
Deploying the Application to the RAC environment
TAF Testing, and
Structured Testing & Tuning
Migrated terabytes of data from the 9i database to the new 10g database RAC
Added 6 Node Cluster for performance
Platforms migrated from AIX 4.3.3 to Linux 3.0 ES
Platforms migrated from UK DWHS 9i RAC to US Global DWHS 10g RAC Rel 2
The company’s globalization project demanded a common Business Intelligence system across the globe which would provide them a single storage location of all their business data with maximum performance benefits and high availability
The existing 9i RAC nodes were serving only users based in UK and was fast becoming outdated as the business demanded more advanced features
14
Case Study 5 – Leading Manufacturer of Software & Storage for Info. Management
ChallengesInfrastructure Benefits
New Technology components are configured like Hardware Load Balancing, 48 Application Nodes, Mobile Applications Servers and Automatic memory tuning
Oracle Enterprise Manager has been integrated with OEBS sign on, through which client can see all the patches applied on the system and can monitor Concurrent Manager Activities etc.
Shared Appltop Load Balance – new Technology introduced where it reduces drastically the down time of Applications and Improve the Performance
Oracle 11i Applications with 48 Applications Server and DB Server maintain by HCL Onsite & Offshore team
DR server maintain in different location and data synchronized online by every 15 minutes
Upgrade of Application as well as database
24*7 Production Support and Minimum production down time for maintenance
SUN OS
Configuring 48 Application Nodes with single Database
AchievementsDBA Support
Maintain common instance for application and other tools
HCL DBA team spread with 6 Onsite DBA’s and 4 offshore DBA
65 databases are maintained by DBA team
Completed the Database Upgrade activity with in a scheduled period
Patches applied on Heterogeneous Network
Hardware Load Balancer with 48 nodes were maintained
15
Case Study 6 – Leading Provider of Simulation Software & Services
ChallengesInfrastructure Benefits
Shared Appl_top along with Distributed Admin reduced the down time of Applications
Shared APPL_TOP also reduced the over-all disk requirements
Distributed AD enabled better resource utilization
Oracle’s recommended and supported Level of RDBMS, Java Plug-in with Oracle EBS
Recommend patch-set level for Critical Patch Updates
Oracle 11i Applications on Solaris Servers. Application Support being done HCL team
Several Application Technology Stack need to be upgraded
Version of EBS to be maintained @ 11.5.1.0.2
Upgrade of following technology stacks in single downtime window Developer 6i Patch
set Upgrade Application Technology Group
Patch level change { 5 to 6} 9.2.0.7 to 11.1.0.7 upgrade JInitiator to SUN JRE Migration JDK upgrade Shared Appl_top migration Critical patches update HR Family Pack upgrade Vertex Tax Engine Upgrade
AchievementsDBA Support
Regular Support and Maintenance of Oracle EBS environments
Technical Upgrades
Regular Patching and Cloning
Support for Enhancements and Customizations
Completed the Database Upgrade activity with in a scheduled period
Reduced patching window because of shared Appl_top and distributed processing
Adherence to Oracle’s recommended patch set level
16
Case Study 7 – A Lifestyle Merchandising Company Operating Specialty Retail Stores
ChallengesInfrastructure Benefits
Scalable and high available environment for Production instance because of RAC Implementation
Greater business productivity
Costs reduction as Oracle Databases are created on Linux Platform
Customer is better placed to plan and leverage the new features of 11g. Recommendations have been given to the customer on same
Client is currently using db2 and mssql to maintain their enterprise information
The requirement was to migrate data from db2 and mssql to Oracle 11g database
The requirement was also to implement 2-node RAC for new Oracle 11g database
Testing of the upgrade required lot of coordination effort
Setting up RAC cluster environment with Red Hat Linux and porting database into RAC environment
Performance tuning of new Oracle Database when benchmarking from db2 could not be used directly
Defining new administration procedure for RAC Database
AchievementsDBA Support
RAC Implementation
Database Migration to 11g
Performance tuning
Post Production Support
Completed the Database Upgrade activity with in a scheduled period
17
Case Study 8 – Leading Automated Test Equipment Manufacturer in Semi-Conductor
ChallengesInfrastructure Benefits
Datawarehouse Applications and Database are compatible and in Supported Platform
Customer is better placed to plan and leverage the new features of upgraded DB Versions
Enabled Customer to save on 3rd Party utility licenses
Enabled better customer satisfaction
Client is currently using 150+ Oracle Databases and 50+ MSSql Databases to maintain their enterprise information
HCL is collaboratively running the clients IT Division and DBA services are part of thisMulti-Service Delivery Engagement
One of the requirement was to upgrade their Enterprise Datawarehouse Oracle Databases from 8.1.6 to 9.2.0.8
Another requirement was to upgrade their Parts and Drawing Application (SMARTEAM) database from 9.x to 10.2.x with Advanced 8 Site Multi-Master Replication
Datawarehouse Upgrade Complex Upstream and
Downstream applications. New DB Version integration
incompatibility in certain old Legacy Upstream System
Cannot afford longer downtime No Direct Upgrade Path to
8.1.x to 9.x
SMARTEAM All sites have to be
upgraded simultaneously Ensuring Multi-Master
Replication is intact after Upgrade
Achievements
DB Upgrade with Planned minimum downtime, Multiple DBA’s were engaged for multi Database Upgrade
18
Client Appreciations…
Thank you for your hard work during the upgrade. Overall, the process went extremely well and is a result of your dedication in both preparation and execution of this highly visible project…persistence and teamwork prevailed! I am especially pleased with the success of working with a 'remote' team. We were able to coordinate a smooth continuous schedule that contributed to achieving our goal without any major incident and ahead of schedule! Congratulations on a job well done!
– Paula Hockster, IT Director {A leading provider of Simulation Software and related services.}
“
”
On Technical upgrade of EBS Environment…On Technical upgrade of EBS Environment…
The migration of our Conferencing Oracle Applications E-Business suite from a UK AIX/RS6000 infrastructure to a US LINUX/Intel based infrastructure posed a significant number of managerial, technical and logistical challenges. The three-man (HCL) Database Administration Team ably resolved all the challenges this major application migration posed them. The team utilized their technical skills, experience and applied their own original approach to resolve each of the challenges successfully and delivered the migration on time and on budget.
– Andrew Gray, Globalization Programme/ Project Manager, RLT Member
“
”
On Migration of EBS Environment…On Migration of EBS Environment…
I wanted to send you a quick email to say a big THANK YOU for all the work that you have been doing not just this past weekend, but throughout the globalization process. I really do appreciate the level of commitment and calibre that you bring to the team.
– Global CIO
“”
On RAC Implementation…On RAC Implementation…
19
HCL’s Value Proposition
Point out overlooked issues deep within your database environments that may be causing poor performance/ slowing down your operations.
Database administration is not restricted to Core Database infrastructure alone, but spans across the application landscape as well, giving you a robust support framework.
Take advantage of our DBA maintenance services and decrease the chance of sudden failure. Our team pro-actively monitors problem areas and fixes them before they can cause havoc due to instance down times/ systems crash.
Regular MIS reports and Dashboard generated tracks; evaluation of application and database performance and growth, with pro-active steps taken to mitigate risk and improve system up-time.
With requirements on DB management increasing by the day, HCL’s strong skill-base of experts give you the flexibility to find the right resource with the right knowledge to augment your team during project crunches.
Checklist based assessment
Application Practice
Increased Availability
Improved Performance &
Risk Mgmt.
Flexibility
20
Next Steps…