+ All Categories
Home > Documents > HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1,...

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1,...

Date post: 05-Aug-2020
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
189
HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB & Old Davis Rd. Existing Conditions Hyatt Expansion TIS Synchro 6 Report Fehr & Peers Associates, Inc. 5/5/2011 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Sign Control Stop Stop Free Free Grade 0% 0% 0% 0% Volume (veh/h) 356 2 64 0 0 0 0 44 15 39 66 0 Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 Hourly flow rate (vph) 379 2 68 0 0 0 0 47 16 41 70 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 177 216 35 242 208 31 70 63 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 177 216 35 242 208 31 70 63 tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1 tC, 2 stage (s) tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2 p0 queue free % 50 100 93 100 100 100 100 97 cM capacity (veh/h) 753 662 1030 631 669 1036 1528 1538 Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3 Volume Total 379 70 31 32 41 35 35 Volume Left 379 0 0 0 41 0 0 Volume Right 0 68 0 16 0 0 0 cSH 753 1013 1700 1700 1538 1700 1700 Volume to Capacity 0.50 0.07 0.02 0.02 0.03 0.02 0.02 Queue Length 95th (ft) 71 6 0 0 2 0 0 Control Delay (s) 14.5 8.8 0.0 0.0 7.4 0.0 0.0 Lane LOS B A A Approach Delay (s) 13.6 0.0 2.8 Approach LOS B Intersection Summary Average Delay 10.3 Intersection Capacity Utilization 36.4% ICU Level of Service A Analysis Period (min) 15
Transcript
Page 1: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 356 2 64 0 0 0 0 44 15 39 66 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 379 2 68 0 0 0 0 47 16 41 70 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 177 216 35 242 208 31 70 63

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 177 216 35 242 208 31 70 63

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 50 100 93 100 100 100 100 97

cM capacity (veh/h) 753 662 1030 631 669 1036 1528 1538

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 379 70 31 32 41 35 35

Volume Left 379 0 0 0 41 0 0

Volume Right 0 68 0 16 0 0 0

cSH 753 1013 1700 1700 1538 1700 1700

Volume to Capacity 0.50 0.07 0.02 0.02 0.03 0.02 0.02

Queue Length 95th (ft) 71 6 0 0 2 0 0

Control Delay (s) 14.5 8.8 0.0 0.0 7.4 0.0 0.0

Lane LOS B A A

Approach Delay (s) 13.6 0.0 2.8

Approach LOS B

Intersection Summary

Average Delay 10.3

Intersection Capacity Utilization 36.4% ICU Level of Service A

Analysis Period (min) 15

Page 2: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 37 3 462 20 380 0 0 68 33

Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

Hourly flow rate (vph) 0 0 0 45 4 557 24 458 0 0 82 40

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 917 588 41 547 628 229 122 458

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 917 588 41 547 628 229 122 458

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 89 99 28 98 100

cM capacity (veh/h) 62 413 1021 415 392 774 1463 1099

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 46 558 24 229 229 41 41 40

Volume Left 45 0 24 0 0 0 0 0

Volume Right 0 557 0 0 0 0 0 40

cSH 414 771 1463 1700 1700 1700 1700 1700

Volume to Capacity 0.11 0.72 0.02 0.13 0.13 0.02 0.02 0.02

Queue Length 95th (ft) 9 159 1 0 0 0 0 0

Control Delay (s) 14.8 20.9 7.5 0.0 0.0 0.0 0.0 0.0

Lane LOS B C A

Approach Delay (s) 20.4 0.4 0.0

Approach LOS C

Intersection Summary

Average Delay 10.4

Intersection Capacity Utilization 36.4% ICU Level of Service A

Analysis Period (min) 15

Page 3: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 244 455 48 98 82 60

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 287 535 56 115 96 71

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 173 1225 115

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 173 1225 115

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 80 39 92

cM capacity (veh/h) 1403 157 937

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 287 535 172 167

Volume Left 287 0 0 96

Volume Right 0 0 115 71

cSH 1403 1700 1700 272

Volume to Capacity 0.20 0.31 0.10 0.61

Queue Length 95th (ft) 19 0 0 93

Control Delay (s) 8.2 0.0 0.0 37.9

Lane LOS A E

Approach Delay (s) 2.9 0.0 37.9

Approach LOS E

Intersection Summary

Average Delay 7.5

Intersection Capacity Utilization 36.8% ICU Level of Service A

Analysis Period (min) 15

Page 4: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 283 254 65 129 17 9

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 333 299 76 152 20 11

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 632 787 482

vC1, stage 1 conf vol 482

vC2, stage 2 conf vol 305

vCu, unblocked vol 632 787 482

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 92 94 98

cM capacity (veh/h) 951 334 584

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 632 76 152 20 11

Volume Left 0 76 0 20 0

Volume Right 299 0 0 0 11

cSH 1700 951 1700 334 584

Volume to Capacity 0.37 0.08 0.09 0.06 0.02

Queue Length 95th (ft) 0 7 0 5 1

Control Delay (s) 0.0 9.1 0.0 16.5 11.3

Lane LOS A C B

Approach Delay (s) 0.0 3.1 14.7

Approach LOS B

Intersection Summary

Average Delay 1.3

Intersection Capacity Utilization 47.4% ICU Level of Service A

Analysis Period (min) 15

Page 5: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.98 0.89

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1807 1602

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1807 1602

Volume (vph) 217 75 9 2 39 185

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87

Adj. Flow (vph) 249 86 10 2 45 213

RTOR Reduction (vph) 0 0 2 0 95 0

Lane Group Flow (vph) 249 86 10 0 163 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.3 15.4 2.6 29.0

Effective Green, g (s) 8.8 15.9 3.1 29.5

Actuated g/C Ratio 0.16 0.30 0.06 0.55

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 292 555 105 885

v/s Ratio Prot c0.14 c0.05 0.01 c0.10

v/s Ratio Perm

v/c Ratio 0.85 0.15 0.10 0.18

Uniform Delay, d1 21.7 13.8 23.8 6.0

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 20.0 0.0 0.1 0.5

Delay (s) 41.7 13.9 24.0 6.4

Level of Service D B C A

Approach Delay (s) 34.5 24.0 6.4

Approach LOS C C A

Intersection Summary

HCM Average Control Delay 22.3 HCM Level of Service C

HCM Volume to Capacity ratio 0.30

Actuated Cycle Length (s) 53.4 Sum of lost time (s) 8.0

Intersection Capacity Utilization 46.2% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 6: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 3 1 2 393 15 61 1 53 98 0 0 0

Peak Hour Factor 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

Hourly flow rate (vph) 4 1 3 524 20 81 1 71 131 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 101 46 1121 1202 177 1417 1163 61

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 101 46 1121 1202 177 1417 1163 61

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 65 99 39 82 100 100 100

cM capacity (veh/h) 1491 1507 126 116 744 32 122 1005

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 8 524 101 72 131

Volume Left 4 524 0 1 0

Volume Right 3 0 81 0 131

cSH 1491 1507 1700 116 744

Volume to Capacity 0.00 0.35 0.06 0.62 0.18

Queue Length 95th (ft) 0 39 0 78 16

Control Delay (s) 3.7 8.7 0.0 77.0 10.9

Lane LOS A A F B

Approach Delay (s) 3.7 7.3 34.3

Approach LOS D

Intersection Summary

Average Delay 13.8

Intersection Capacity Utilization 48.3% ICU Level of Service A

Analysis Period (min) 15

Page 7: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 50 90 284 250 201 296

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 57 102 323 284 228 336

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 57 102 323 284 228 336

Volume Left (vph) 57 0 0 0 228 0

Volume Right (vph) 0 0 0 284 0 336

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.6 7.1 6.5 5.7 7.0 5.8

Degree Utilization, x 0.12 0.20 0.58 0.45 0.44 0.54

Capacity (veh/h) 446 480 542 607 488 589

Control Delay (s) 10.4 10.6 16.7 12.2 14.3 14.3

Approach Delay (s) 10.5 14.6 14.3

Approach LOS B B B

Intersection Summary

Delay 14.0

HCM Level of Service B

Intersection Capacity Utilization 39.9% ICU Level of Service A

Analysis Period (min) 15

Page 8: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1849 1583 1770 1851 1666 1478 1859 1583

Flt Permitted 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1849 1583 1770 1851 1666 1478 1859 1583

Volume (vph) 2 10 296 117 21 1 547 84 196 3 75 7

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 2 11 325 129 23 1 601 92 215 3 82 8

RTOR Reduction (vph) 0 0 138 0 1 0 0 0 65 0 0 7

Lane Group Flow (vph) 0 13 187 129 23 0 0 693 150 0 85 1

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 1.2 51.5 13.2 13.2 50.3 13.2 8.8 8.8

Effective Green, g (s) 1.2 51.5 13.2 13.2 50.3 13.2 8.8 8.8

Actuated g/C Ratio 0.01 0.58 0.15 0.15 0.56 0.15 0.10 0.10

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 25 982 261 273 936 218 183 156

v/s Ratio Prot 0.01 c0.11 0.07 0.01 c0.42 c0.10 c0.05

v/s Ratio Perm 0.01 0.00

v/c Ratio 0.52 0.19 0.49 0.08 0.74 0.69 0.46 0.01

Uniform Delay, d1 43.9 9.1 35.1 32.9 14.7 36.2 38.1 36.4

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 18.1 0.1 1.5 0.1 3.2 8.7 1.9 0.0

Delay (s) 62.0 9.2 36.6 33.1 17.9 44.9 40.0 36.4

Level of Service E A D C B D D D

Approach Delay (s) 11.2 36.0 24.3 39.7

Approach LOS B D C D

Intersection Summary

HCM Average Control Delay 23.5 HCM Level of Service C

HCM Volume to Capacity ratio 0.66

Actuated Cycle Length (s) 89.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 63.1% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 9: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.98 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1683 1770 1604 1676 1765 1500 1743 1822

Flt Permitted 0.87 0.73 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1483 1360 1604 1676 1765 1500 1743 1822

Volume (vph) 12 3 23 76 12 151 26 664 30 24 442 22

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 13 3 25 84 13 166 29 730 33 26 486 24

RTOR Reduction (vph) 0 21 0 0 139 0 0 0 13 0 2 0

Lane Group Flow (vph) 0 20 0 84 40 0 29 730 20 26 508 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 7.7 7.7 7.7 0.5 26.6 26.6 0.5 26.6

Effective Green, g (s) 7.7 7.7 7.7 0.5 26.6 26.6 0.5 26.6

Actuated g/C Ratio 0.16 0.16 0.16 0.01 0.57 0.57 0.01 0.57

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 244 224 264 18 1003 853 19 1036

v/s Ratio Prot 0.03 c0.02 c0.41 0.01 0.28

v/s Ratio Perm 0.01 c0.06 0.01

v/c Ratio 0.08 0.38 0.15 1.61 0.73 0.02 1.37 0.49

Uniform Delay, d1 16.6 17.4 16.8 23.1 7.4 4.4 23.1 6.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.1 1.1 0.3 439.8 2.7 0.0 338.3 0.4

Delay (s) 16.7 18.5 17.0 463.0 10.1 4.4 361.4 6.4

Level of Service B B B F B A F A

Approach Delay (s) 16.7 17.5 26.4 23.6

Approach LOS B B C C

Intersection Summary

HCM Average Control Delay 23.8 HCM Level of Service C

HCM Volume to Capacity ratio 0.66

Actuated Cycle Length (s) 46.8 Sum of lost time (s) 12.0

Intersection Capacity Utilization 56.7% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 10: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 71 2 15 0 0 0 0 78 35 308 27 0

Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87

Hourly flow rate (vph) 82 2 17 0 0 0 0 90 40 354 31 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 784 869 16 852 849 65 31 130

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 784 869 16 852 849 65 31 130

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 65 99 98 100 100 100 100 76

cM capacity (veh/h) 230 218 1060 201 224 986 1580 1453

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 82 20 60 70 354 16 16

Volume Left 82 0 0 0 354 0 0

Volume Right 0 17 0 40 0 0 0

cSH 230 729 1700 1700 1453 1700 1700

Volume to Capacity 0.35 0.03 0.04 0.04 0.24 0.01 0.01

Queue Length 95th (ft) 38 2 0 0 24 0 0

Control Delay (s) 29.0 10.1 0.0 0.0 8.3 0.0 0.0

Lane LOS D B A

Approach Delay (s) 25.3 0.0 7.6

Approach LOS D

Intersection Summary

Average Delay 8.9

Intersection Capacity Utilization 35.5% ICU Level of Service A

Analysis Period (min) 15

Page 11: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 8 1 102 62 87 0 0 327 299

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 0 0 0 9 1 116 70 99 0 0 372 340

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 678 611 186 426 951 49 711 99

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 678 611 186 426 951 49 711 99

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 98 100 89 92 100

cM capacity (veh/h) 280 375 825 481 238 1008 884 1492

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 10 116 70 49 49 186 186 340

Volume Left 9 0 70 0 0 0 0 0

Volume Right 0 116 0 0 0 0 0 340

cSH 454 993 884 1700 1700 1700 1700 1700

Volume to Capacity 0.02 0.12 0.08 0.03 0.03 0.11 0.11 0.20

Queue Length 95th (ft) 2 10 6 0 0 0 0 0

Control Delay (s) 13.1 9.1 9.4 0.0 0.0 0.0 0.0 0.0

Lane LOS B A A

Approach Delay (s) 9.4 3.9 0.0

Approach LOS A

Intersection Summary

Average Delay 1.8

Intersection Capacity Utilization 35.5% ICU Level of Service A

Analysis Period (min) 15

Page 12: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 116 105 395 125 129 247

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 136 124 465 147 152 291

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 612 935 538

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 612 935 538

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 86 40 46

cM capacity (veh/h) 967 253 543

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 136 124 612 442

Volume Left 136 0 0 152

Volume Right 0 0 147 291

cSH 967 1700 1700 738

Volume to Capacity 0.14 0.07 0.36 0.60

Queue Length 95th (ft) 12 0 0 101

Control Delay (s) 9.3 0.0 0.0 25.7

Lane LOS A D

Approach Delay (s) 4.9 0.0 25.7

Approach LOS D

Intersection Summary

Average Delay 9.6

Intersection Capacity Utilization 52.0% ICU Level of Service A

Analysis Period (min) 15

Page 13: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 207 27 13 292 228 54

Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80

Hourly flow rate (vph) 259 34 16 365 285 68

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 292 673 276

vC1, stage 1 conf vol 276

vC2, stage 2 conf vol 398

vCu, unblocked vol 292 673 276

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 99 26 91

cM capacity (veh/h) 1269 383 763

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 292 16 365 285 68

Volume Left 0 16 0 285 0

Volume Right 34 0 0 0 68

cSH 1700 1269 1700 383 763

Volume to Capacity 0.17 0.01 0.21 0.74 0.09

Queue Length 95th (ft) 0 1 0 147 7

Control Delay (s) 0.0 7.9 0.0 37.2 10.2

Lane LOS A E B

Approach Delay (s) 0.0 0.3 32.0

Approach LOS D

Intersection Summary

Average Delay 11.1

Intersection Capacity Utilization 34.7% ICU Level of Service A

Analysis Period (min) 15

Page 14: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.97

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.97 0.87

Flt Protected 0.95 1.00 1.00 1.00

Satd. Flow (prot) 1770 1863 1785 1578

Flt Permitted 0.95 1.00 1.00 1.00

Satd. Flow (perm) 1770 1863 1785 1578

Volume (vph) 227 34 56 18 14 249

Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88

Adj. Flow (vph) 258 39 64 20 16 283

RTOR Reduction (vph) 0 0 18 0 136 0

Lane Group Flow (vph) 258 39 66 0 163 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.1 18.6 6.0 28.8

Effective Green, g (s) 8.6 19.1 6.5 29.3

Actuated g/C Ratio 0.15 0.34 0.12 0.52

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 270 631 206 820

v/s Ratio Prot c0.15 0.02 c0.04 c0.10

v/s Ratio Perm

v/c Ratio 0.96 0.06 0.32 0.20

Uniform Delay, d1 23.7 12.6 22.9 7.3

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 42.0 0.0 0.3 0.5

Delay (s) 65.8 12.6 23.3 7.8

Level of Service E B C A

Approach Delay (s) 58.8 23.3 7.8

Approach LOS E C A

Intersection Summary

HCM Average Control Delay 32.0 HCM Level of Service C

HCM Volume to Capacity ratio 0.36

Actuated Cycle Length (s) 56.4 Sum of lost time (s) 12.0

Intersection Capacity Utilization 46.7% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 15: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 2 3 1 195 1 68 0 63 345 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 2 3 1 203 1 71 0 66 359 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 72 98 509 580 239 984 545 36

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 72 98 509 580 239 984 545 36

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 85 100 80 45 100 100 100

cM capacity (veh/h) 1528 1378 365 334 651 64 350 1036

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 6 203 72 66 359

Volume Left 2 203 0 0 0

Volume Right 1 0 71 0 359

cSH 1528 1378 1700 334 651

Volume to Capacity 0.00 0.15 0.04 0.20 0.55

Queue Length 95th (ft) 0 13 0 18 85

Control Delay (s) 2.5 8.1 0.0 18.4 17.1

Lane LOS A A C C

Approach Delay (s) 2.5 6.0 17.3

Approach LOS C

Intersection Summary

Average Delay 12.8

Intersection Capacity Utilization 47.9% ICU Level of Service A

Analysis Period (min) 15

Page 16: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 171 226 165 247 315 109

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 186 246 179 268 342 118

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 186 246 179 268 342 118

Volume Left (vph) 186 0 0 0 342 0

Volume Right (vph) 0 0 0 268 0 118

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.3 6.8 6.9 6.2 7.3 6.1

Degree Utilization, x 0.38 0.47 0.34 0.46 0.70 0.20

Capacity (veh/h) 469 507 501 561 474 557

Control Delay (s) 13.6 14.5 12.2 13.1 24.4 9.5

Approach Delay (s) 14.1 12.7 20.6

Approach LOS B B C

Intersection Summary

Delay 15.9

HCM Level of Service C

Intersection Capacity Utilization 45.6% ICU Level of Service A

Analysis Period (min) 15

Page 17: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.96 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1831 1583 1770 1793 1675 1478 1862 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1831 1583 1770 1793 1675 1478 1862 1583

Volume (vph) 23 42 545 211 29 10 420 134 284 2 160 22

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 23 43 556 215 30 10 429 137 290 2 163 22

RTOR Reduction (vph) 0 0 180 0 8 0 0 0 128 0 0 19

Lane Group Flow (vph) 0 66 376 215 32 0 0 566 162 0 165 3

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Effective Green, g (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Actuated g/C Ratio 0.06 0.48 0.18 0.18 0.41 0.18 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 119 837 323 327 690 270 248 211

v/s Ratio Prot 0.04 c0.19 c0.12 0.02 c0.34 0.11 c0.09

v/s Ratio Perm 0.05 0.00

v/c Ratio 0.55 0.45 0.67 0.10 0.82 0.60 0.67 0.01

Uniform Delay, d1 35.0 13.5 29.4 26.3 20.2 29.0 31.8 29.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 5.5 0.4 5.1 0.1 7.7 3.8 6.6 0.0

Delay (s) 40.5 13.8 34.5 26.4 27.9 32.7 38.4 29.1

Level of Service D B C C C C D C

Approach Delay (s) 16.7 33.2 29.5 37.3

Approach LOS B C C D

Intersection Summary

HCM Average Control Delay 26.6 HCM Level of Service C

HCM Volume to Capacity ratio 0.70

Actuated Cycle Length (s) 77.2 Sum of lost time (s) 12.0

Intersection Capacity Utilization 68.9% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 18: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Conditions

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.91 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1666 1770 1599 1676 1765 1500 1743 1827

Flt Permitted 0.86 0.91 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1458 1696 1599 1676 1765 1500 1743 1827

Volume (vph) 19 1 43 100 10 165 22 654 46 59 834 23

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 20 1 45 104 10 172 23 681 48 61 869 24

RTOR Reduction (vph) 0 38 0 0 146 0 0 0 19 0 1 0

Lane Group Flow (vph) 0 28 0 104 36 0 23 681 29 61 892 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.2 8.2 8.2 1.1 31.4 31.4 2.4 32.7

Effective Green, g (s) 8.2 8.2 8.2 1.1 31.4 31.4 2.4 32.7

Actuated g/C Ratio 0.15 0.15 0.15 0.02 0.58 0.58 0.04 0.61

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 221 258 243 34 1026 872 77 1106

v/s Ratio Prot 0.02 0.01 0.39 c0.03 c0.49

v/s Ratio Perm 0.02 c0.06 0.02

v/c Ratio 0.13 0.40 0.15 0.68 0.66 0.03 0.79 0.81

Uniform Delay, d1 19.8 20.7 19.9 26.3 7.7 4.8 25.6 8.2

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.3 1.0 0.3 42.2 1.6 0.0 41.2 4.4

Delay (s) 20.1 21.7 20.2 68.5 9.3 4.8 66.8 12.6

Level of Service C C C E A A E B

Approach Delay (s) 20.1 20.7 10.9 16.1

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 14.9 HCM Level of Service B

HCM Volume to Capacity ratio 0.69

Actuated Cycle Length (s) 54.0 Sum of lost time (s) 8.0

Intersection Capacity Utilization 73.5% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 19: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 362 2 64 0 0 0 0 44 15 44 66 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 385 2 68 0 0 0 0 47 16 47 70 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 187 227 35 253 219 31 70 63

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 187 227 35 253 219 31 70 63

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 48 100 93 100 100 100 100 97

cM capacity (veh/h) 739 651 1030 619 658 1036 1528 1538

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 385 70 31 32 47 35 35

Volume Left 385 0 0 0 47 0 0

Volume Right 0 68 0 16 0 0 0

cSH 739 1012 1700 1700 1538 1700 1700

Volume to Capacity 0.52 0.07 0.02 0.02 0.03 0.02 0.02

Queue Length 95th (ft) 76 6 0 0 2 0 0

Control Delay (s) 15.1 8.8 0.0 0.0 7.4 0.0 0.0

Lane LOS C A A

Approach Delay (s) 14.1 0.0 3.0

Approach LOS B

Intersection Summary

Average Delay 10.7

Intersection Capacity Utilization 36.7% ICU Level of Service A

Analysis Period (min) 15

Page 20: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 37 3 469 20 386 0 0 73 37

Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

Hourly flow rate (vph) 0 0 0 45 4 565 24 465 0 0 88 45

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 936 601 44 557 646 233 133 465

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 936 601 44 557 646 233 133 465

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 89 99 27 98 100

cM capacity (veh/h) 57 406 1017 408 382 770 1450 1093

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 46 567 24 233 233 44 44 45

Volume Left 45 0 24 0 0 0 0 0

Volume Right 0 565 0 0 0 0 0 45

cSH 407 767 1450 1700 1700 1700 1700 1700

Volume to Capacity 0.11 0.74 0.02 0.14 0.14 0.03 0.03 0.03

Queue Length 95th (ft) 10 168 1 0 0 0 0 0

Control Delay (s) 15.0 21.7 7.5 0.0 0.0 0.0 0.0 0.0

Lane LOS B C A

Approach Delay (s) 21.2 0.4 0.0

Approach LOS C

Intersection Summary

Average Delay 10.7

Intersection Capacity Utilization 36.7% ICU Level of Service A

Analysis Period (min) 15

Page 21: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 244 468 57 100 85 60

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 287 551 67 118 100 71

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 186 1252 127

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 186 1252 127

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 79 34 92

cM capacity (veh/h) 1388 151 923

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 287 551 185 171

Volume Left 287 0 0 100

Volume Right 0 0 118 71

cSH 1388 1700 1700 257

Volume to Capacity 0.21 0.32 0.11 0.66

Queue Length 95th (ft) 19 0 0 106

Control Delay (s) 8.3 0.0 0.0 42.8

Lane LOS A E

Approach Delay (s) 2.8 0.0 42.8

Approach LOS E

Intersection Summary

Average Delay 8.1

Intersection Capacity Utilization 37.6% ICU Level of Service A

Analysis Period (min) 15

Page 22: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 299 254 65 140 17 9

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 352 299 76 165 20 11

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 651 819 501

vC1, stage 1 conf vol 501

vC2, stage 2 conf vol 318

vCu, unblocked vol 651 819 501

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 92 94 98

cM capacity (veh/h) 936 325 570

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 651 76 165 20 11

Volume Left 0 76 0 20 0

Volume Right 299 0 0 0 11

cSH 1700 936 1700 325 570

Volume to Capacity 0.38 0.08 0.10 0.06 0.02

Queue Length 95th (ft) 0 7 0 5 1

Control Delay (s) 0.0 9.2 0.0 16.8 11.4

Lane LOS A C B

Approach Delay (s) 0.0 2.9 14.9

Approach LOS B

Intersection Summary

Average Delay 1.3

Intersection Capacity Utilization 48.2% ICU Level of Service A

Analysis Period (min) 15

Page 23: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.97 0.89

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1785 1605

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1785 1605

Volume (vph) 217 91 20 6 43 185

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87

Adj. Flow (vph) 249 105 23 7 49 213

RTOR Reduction (vph) 0 0 6 0 98 0

Lane Group Flow (vph) 249 105 24 0 164 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.2 16.9 4.2 29.1

Effective Green, g (s) 8.7 17.4 4.7 29.6

Actuated g/C Ratio 0.16 0.32 0.09 0.54

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 280 589 153 864

v/s Ratio Prot c0.14 c0.06 0.01 c0.10

v/s Ratio Perm

v/c Ratio 0.89 0.18 0.15 0.19

Uniform Delay, d1 22.7 13.6 23.3 6.5

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 26.4 0.1 0.2 0.5

Delay (s) 49.1 13.7 23.5 7.0

Level of Service D B C A

Approach Delay (s) 38.6 23.5 7.0

Approach LOS D C A

Intersection Summary

HCM Average Control Delay 25.1 HCM Level of Service C

HCM Volume to Capacity ratio 0.31

Actuated Cycle Length (s) 55.0 Sum of lost time (s) 8.0

Intersection Capacity Utilization 46.2% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 24: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 3 1 2 397 15 61 1 53 102 0 0 0

Peak Hour Factor 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

Hourly flow rate (vph) 4 1 3 529 20 81 1 71 136 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 101 46 1131 1213 177 1433 1173 61

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 101 46 1131 1213 177 1433 1173 61

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 65 99 38 82 100 100 100

cM capacity (veh/h) 1491 1507 123 114 744 30 120 1005

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 8 529 101 72 136

Volume Left 4 529 0 1 0

Volume Right 3 0 81 0 136

cSH 1491 1507 1700 114 744

Volume to Capacity 0.00 0.35 0.06 0.63 0.18

Queue Length 95th (ft) 0 40 0 80 17

Control Delay (s) 3.7 8.7 0.0 80.0 10.9

Lane LOS A A F B

Approach Delay (s) 3.7 7.3 34.8

Approach LOS D

Intersection Summary

Average Delay 14.0

Intersection Capacity Utilization 48.5% ICU Level of Service A

Analysis Period (min) 15

Page 25: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 52 92 286 250 201 298

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 59 105 325 284 228 339

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 59 105 325 284 228 339

Volume Left (vph) 59 0 0 0 228 0

Volume Right (vph) 0 0 0 284 0 339

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.6 7.1 6.5 5.8 7.0 5.8

Degree Utilization, x 0.12 0.21 0.58 0.45 0.45 0.55

Capacity (veh/h) 446 479 541 605 487 587

Control Delay (s) 10.5 10.7 17.0 12.3 14.4 14.5

Approach Delay (s) 10.6 14.8 14.4

Approach LOS B B B

Intersection Summary

Delay 14.1

HCM Level of Service B

Intersection Capacity Utilization 40.2% ICU Level of Service A

Analysis Period (min) 15

Page 26: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1849 1583 1770 1851 1666 1478 1859 1583

Flt Permitted 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1849 1583 1770 1851 1666 1478 1859 1583

Volume (vph) 2 10 298 117 21 1 549 84 196 3 75 7

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 2 11 327 129 23 1 603 92 215 3 82 8

RTOR Reduction (vph) 0 0 138 0 1 0 0 0 65 0 0 7

Lane Group Flow (vph) 0 13 189 129 23 0 0 695 150 0 85 1

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 1.2 51.9 13.2 13.2 50.7 13.2 8.9 8.9

Effective Green, g (s) 1.2 51.9 13.2 13.2 50.7 13.2 8.9 8.9

Actuated g/C Ratio 0.01 0.58 0.15 0.15 0.56 0.15 0.10 0.10

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 25 983 260 271 939 217 184 157

v/s Ratio Prot 0.01 c0.11 0.07 0.01 c0.42 c0.10 c0.05

v/s Ratio Perm 0.01 0.00

v/c Ratio 0.52 0.19 0.50 0.09 0.74 0.69 0.46 0.01

Uniform Delay, d1 44.1 9.1 35.3 33.2 14.7 36.5 38.3 36.6

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 18.1 0.1 1.5 0.1 3.2 9.2 1.8 0.0

Delay (s) 62.2 9.2 36.8 33.3 17.9 45.6 40.1 36.6

Level of Service E A D C B D D D

Approach Delay (s) 11.2 36.3 24.4 39.8

Approach LOS B D C D

Intersection Summary

HCM Average Control Delay 23.6 HCM Level of Service C

HCM Volume to Capacity ratio 0.66

Actuated Cycle Length (s) 90.0 Sum of lost time (s) 12.0

Intersection Capacity Utilization 63.2% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 27: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.98 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1683 1770 1604 1676 1765 1500 1743 1822

Flt Permitted 0.87 0.73 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1483 1360 1604 1676 1765 1500 1743 1822

Volume (vph) 12 3 23 76 12 151 26 666 30 24 444 22

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 13 3 25 84 13 166 29 732 33 26 488 24

RTOR Reduction (vph) 0 21 0 0 139 0 0 0 13 0 2 0

Lane Group Flow (vph) 0 20 0 84 40 0 29 732 20 26 510 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 7.7 7.7 7.7 0.5 26.7 26.7 0.5 26.7

Effective Green, g (s) 7.7 7.7 7.7 0.5 26.7 26.7 0.5 26.7

Actuated g/C Ratio 0.16 0.16 0.16 0.01 0.57 0.57 0.01 0.57

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 243 223 263 18 1005 854 19 1037

v/s Ratio Prot 0.03 c0.02 c0.41 0.01 0.28

v/s Ratio Perm 0.01 c0.06 0.01

v/c Ratio 0.08 0.38 0.15 1.61 0.73 0.02 1.37 0.49

Uniform Delay, d1 16.6 17.5 16.8 23.2 7.4 4.4 23.2 6.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.1 1.1 0.3 439.8 2.7 0.0 338.3 0.4

Delay (s) 16.8 18.5 17.1 463.0 10.1 4.4 361.5 6.4

Level of Service B B B F B A F A

Approach Delay (s) 16.8 17.5 26.4 23.6

Approach LOS B B C C

Intersection Summary

HCM Average Control Delay 23.8 HCM Level of Service C

HCM Volume to Capacity ratio 0.66

Actuated Cycle Length (s) 46.9 Sum of lost time (s) 12.0

Intersection Capacity Utilization 56.8% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 28: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 76 2 15 0 0 0 0 78 35 314 27 0

Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87

Hourly flow rate (vph) 87 2 17 0 0 0 0 90 40 361 31 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 798 883 16 866 863 65 31 130

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 798 883 16 866 863 65 31 130

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 61 99 98 100 100 100 100 75

cM capacity (veh/h) 224 213 1060 195 219 986 1580 1453

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 87 20 60 70 361 16 16

Volume Left 87 0 0 0 361 0 0

Volume Right 0 17 0 40 0 0 0

cSH 224 722 1700 1700 1453 1700 1700

Volume to Capacity 0.39 0.03 0.04 0.04 0.25 0.01 0.01

Queue Length 95th (ft) 44 2 0 0 25 0 0

Control Delay (s) 31.0 10.1 0.0 0.0 8.3 0.0 0.0

Lane LOS D B A

Approach Delay (s) 27.2 0.0 7.6

Approach LOS D

Intersection Summary

Average Delay 9.4

Intersection Capacity Utilization 36.1% ICU Level of Service A

Analysis Period (min) 15

Page 29: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 8 1 108 62 92 0 0 333 305

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 0 0 0 9 1 123 70 105 0 0 378 347

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 695 624 189 435 970 52 725 105

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 695 624 189 435 970 52 725 105

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 98 100 88 92 100

cM capacity (veh/h) 270 368 821 474 231 1004 874 1485

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 10 123 70 52 52 189 189 347

Volume Left 9 0 70 0 0 0 0 0

Volume Right 0 123 0 0 0 0 0 347

cSH 446 989 874 1700 1700 1700 1700 1700

Volume to Capacity 0.02 0.12 0.08 0.03 0.03 0.11 0.11 0.20

Queue Length 95th (ft) 2 11 7 0 0 0 0 0

Control Delay (s) 13.2 9.2 9.5 0.0 0.0 0.0 0.0 0.0

Lane LOS B A A

Approach Delay (s) 9.5 3.8 0.0

Approach LOS A

Intersection Summary

Average Delay 1.9

Intersection Capacity Utilization 36.1% ICU Level of Service A

Analysis Period (min) 15

Page 30: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 116 116 407 128 132 247

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 136 136 479 151 155 291

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 629 964 554

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 629 964 554

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 86 36 45

cM capacity (veh/h) 953 243 532

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 136 136 629 446

Volume Left 136 0 0 155

Volume Right 0 0 151 291

cSH 953 1700 1700 697

Volume to Capacity 0.14 0.08 0.37 0.64

Queue Length 95th (ft) 12 0 0 116

Control Delay (s) 9.4 0.0 0.0 27.7

Lane LOS A D

Approach Delay (s) 4.7 0.0 27.7

Approach LOS D

Intersection Summary

Average Delay 10.1

Intersection Capacity Utilization 52.9% ICU Level of Service A

Analysis Period (min) 15

Page 31: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 221 27 13 307 228 54

Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80

Hourly flow rate (vph) 276 34 16 384 285 68

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 310 709 293

vC1, stage 1 conf vol 293

vC2, stage 2 conf vol 416

vCu, unblocked vol 310 709 293

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 99 23 91

cM capacity (veh/h) 1250 372 746

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 310 16 384 285 68

Volume Left 0 16 0 285 0

Volume Right 34 0 0 0 68

cSH 1700 1250 1700 372 746

Volume to Capacity 0.18 0.01 0.23 0.77 0.09

Queue Length 95th (ft) 0 1 0 156 7

Control Delay (s) 0.0 7.9 0.0 40.2 10.3

Lane LOS A E B

Approach Delay (s) 0.0 0.3 34.5

Approach LOS D

Intersection Summary

Average Delay 11.6

Intersection Capacity Utilization 35.5% ICU Level of Service A

Analysis Period (min) 15

Page 32: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.97

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.97 0.87

Flt Protected 0.95 1.00 1.00 1.00

Satd. Flow (prot) 1770 1863 1786 1580

Flt Permitted 0.95 1.00 1.00 1.00

Satd. Flow (perm) 1770 1863 1786 1580

Volume (vph) 227 48 71 22 18 249

Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88

Adj. Flow (vph) 258 55 81 25 20 283

RTOR Reduction (vph) 0 0 21 0 142 0

Lane Group Flow (vph) 258 55 85 0 162 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.0 20.4 7.9 28.4

Effective Green, g (s) 8.5 20.9 8.4 28.9

Actuated g/C Ratio 0.15 0.36 0.15 0.50

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 260 674 260 790

v/s Ratio Prot c0.15 0.03 c0.05 c0.10

v/s Ratio Perm

v/c Ratio 0.99 0.08 0.33 0.20

Uniform Delay, d1 24.6 12.1 22.2 8.0

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 53.4 0.0 0.3 0.6

Delay (s) 78.0 12.2 22.4 8.6

Level of Service E B C A

Approach Delay (s) 66.4 22.4 8.6

Approach LOS E C A

Intersection Summary

HCM Average Control Delay 35.7 HCM Level of Service D

HCM Volume to Capacity ratio 0.37

Actuated Cycle Length (s) 57.8 Sum of lost time (s) 12.0

Intersection Capacity Utilization 46.7% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 33: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 2 3 1 199 1 68 0 63 349 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 2 3 1 207 1 71 0 66 364 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 72 98 517 588 239 996 553 36

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 72 98 517 588 239 996 553 36

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 85 100 80 44 100 100 100

cM capacity (veh/h) 1528 1378 359 329 651 62 345 1036

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 6 207 72 66 364

Volume Left 2 207 0 0 0

Volume Right 1 0 71 0 364

cSH 1528 1378 1700 329 651

Volume to Capacity 0.00 0.15 0.04 0.20 0.56

Queue Length 95th (ft) 0 13 0 18 87

Control Delay (s) 2.5 8.1 0.0 18.6 17.3

Lane LOS A A C C

Approach Delay (s) 2.5 6.0 17.5

Approach LOS C

Intersection Summary

Average Delay 12.9

Intersection Capacity Utilization 48.1% ICU Level of Service A

Analysis Period (min) 15

Page 34: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 173 228 167 247 315 111

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 188 248 182 268 342 121

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 188 248 182 268 342 121

Volume Left (vph) 188 0 0 0 342 0

Volume Right (vph) 0 0 0 268 0 121

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.4 6.8 6.9 6.2 7.4 6.2

Degree Utilization, x 0.38 0.47 0.35 0.46 0.70 0.21

Capacity (veh/h) 469 506 500 560 473 556

Control Delay (s) 13.7 14.6 12.3 13.1 24.6 9.5

Approach Delay (s) 14.2 12.8 20.6

Approach LOS B B C

Intersection Summary

Delay 15.9

HCM Level of Service C

Intersection Capacity Utilization 45.8% ICU Level of Service A

Analysis Period (min) 15

Page 35: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.96 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1831 1583 1770 1793 1675 1478 1862 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1831 1583 1770 1793 1675 1478 1862 1583

Volume (vph) 23 42 547 211 29 10 422 134 284 2 160 22

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 23 43 558 215 30 10 431 137 290 2 163 22

RTOR Reduction (vph) 0 0 180 0 8 0 0 0 127 0 0 19

Lane Group Flow (vph) 0 66 378 215 32 0 0 568 163 0 165 3

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Effective Green, g (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Actuated g/C Ratio 0.06 0.48 0.18 0.18 0.41 0.18 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 119 837 323 327 690 270 248 211

v/s Ratio Prot 0.04 c0.19 c0.12 0.02 c0.34 0.11 c0.09

v/s Ratio Perm 0.05 0.00

v/c Ratio 0.55 0.45 0.67 0.10 0.82 0.60 0.67 0.01

Uniform Delay, d1 35.0 13.5 29.4 26.3 20.2 29.0 31.8 29.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 5.5 0.4 5.1 0.1 7.9 3.8 6.6 0.0

Delay (s) 40.5 13.9 34.5 26.4 28.1 32.8 38.4 29.1

Level of Service D B C C C C D C

Approach Delay (s) 16.7 33.2 29.7 37.3

Approach LOS B C C D

Intersection Summary

HCM Average Control Delay 26.7 HCM Level of Service C

HCM Volume to Capacity ratio 0.70

Actuated Cycle Length (s) 77.2 Sum of lost time (s) 12.0

Intersection Capacity Utilization 69.0% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 36: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Plus Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.91 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1666 1770 1599 1676 1765 1500 1743 1827

Flt Permitted 0.86 0.91 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1458 1695 1599 1676 1765 1500 1743 1827

Volume (vph) 19 1 43 100 10 165 22 656 46 59 836 23

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 20 1 45 104 10 172 23 683 48 61 871 24

RTOR Reduction (vph) 0 38 0 0 146 0 0 0 19 0 1 0

Lane Group Flow (vph) 0 28 0 104 36 0 23 683 29 61 894 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.2 8.2 8.2 1.1 31.5 31.5 2.4 32.8

Effective Green, g (s) 8.2 8.2 8.2 1.1 31.5 31.5 2.4 32.8

Actuated g/C Ratio 0.15 0.15 0.15 0.02 0.58 0.58 0.04 0.61

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 221 257 242 34 1028 873 77 1108

v/s Ratio Prot 0.02 0.01 0.39 c0.03 c0.49

v/s Ratio Perm 0.02 c0.06 0.02

v/c Ratio 0.13 0.40 0.15 0.68 0.66 0.03 0.79 0.81

Uniform Delay, d1 19.9 20.7 19.9 26.3 7.7 4.8 25.6 8.2

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.3 1.0 0.3 42.2 1.6 0.0 41.2 4.4

Delay (s) 20.1 21.8 20.2 68.5 9.3 4.8 66.8 12.6

Level of Service C C C E A A E B

Approach Delay (s) 20.1 20.8 10.9 16.1

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 14.9 HCM Level of Service B

HCM Volume to Capacity ratio 0.69

Actuated Cycle Length (s) 54.1 Sum of lost time (s) 8.0

Intersection Capacity Utilization 73.5% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 37: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 326 2 64 0 0 0 0 44 15 39 66 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 347 2 68 0 0 0 0 47 16 41 70 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 177 216 35 242 208 31 70 63

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 177 216 35 242 208 31 70 63

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 54 100 93 100 100 100 100 97

cM capacity (veh/h) 753 662 1030 631 669 1036 1528 1538

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 347 70 31 32 41 35 35

Volume Left 347 0 0 0 41 0 0

Volume Right 0 68 0 16 0 0 0

cSH 753 1013 1700 1700 1538 1700 1700

Volume to Capacity 0.46 0.07 0.02 0.02 0.03 0.02 0.02

Queue Length 95th (ft) 61 6 0 0 2 0 0

Control Delay (s) 13.8 8.8 0.0 0.0 7.4 0.0 0.0

Lane LOS B A A

Approach Delay (s) 13.0 0.0 2.8

Approach LOS B

Intersection Summary

Average Delay 9.7

Intersection Capacity Utilization 34.7% ICU Level of Service A

Analysis Period (min) 15

Page 38: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 37 3 424 20 350 0 0 68 33

Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

Hourly flow rate (vph) 0 0 0 45 4 511 24 422 0 0 82 40

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 854 552 41 511 592 211 122 422

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 854 552 41 511 592 211 122 422

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 90 99 36 98 100

cM capacity (veh/h) 88 433 1021 440 411 795 1463 1134

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 46 513 24 211 211 41 41 40

Volume Left 45 0 24 0 0 0 0 0

Volume Right 0 511 0 0 0 0 0 40

cSH 439 792 1463 1700 1700 1700 1700 1700

Volume to Capacity 0.11 0.65 0.02 0.12 0.12 0.02 0.02 0.02

Queue Length 95th (ft) 9 121 1 0 0 0 0 0

Control Delay (s) 14.2 17.5 7.5 0.0 0.0 0.0 0.0 0.0

Lane LOS B C A

Approach Delay (s) 17.2 0.4 0.0

Approach LOS C

Intersection Summary

Average Delay 8.7

Intersection Capacity Utilization 34.7% ICU Level of Service A

Analysis Period (min) 15

Page 39: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 244 387 48 98 82 60

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 287 455 56 115 96 71

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 173 1145 115

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 173 1145 115

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 80 45 92

cM capacity (veh/h) 1403 175 937

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 287 455 172 167

Volume Left 287 0 0 96

Volume Right 0 0 115 71

cSH 1403 1700 1700 304

Volume to Capacity 0.20 0.27 0.10 0.55

Queue Length 95th (ft) 19 0 0 78

Control Delay (s) 8.2 0.0 0.0 31.6

Lane LOS A D

Approach Delay (s) 3.2 0.0 31.6

Approach LOS D

Intersection Summary

Average Delay 7.1

Intersection Capacity Utilization 36.8% ICU Level of Service A

Analysis Period (min) 15

Page 40: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 283 186 133 129 17 9

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 333 219 156 152 20 11

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 552 907 442

vC1, stage 1 conf vol 442

vC2, stage 2 conf vol 465

vCu, unblocked vol 552 907 442

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 85 93 98

cM capacity (veh/h) 1018 286 615

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 552 156 152 20 11

Volume Left 0 156 0 20 0

Volume Right 219 0 0 0 11

cSH 1700 1018 1700 286 615

Volume to Capacity 0.32 0.15 0.09 0.07 0.02

Queue Length 95th (ft) 0 14 0 6 1

Control Delay (s) 0.0 9.2 0.0 18.5 11.0

Lane LOS A C B

Approach Delay (s) 0.0 4.7 15.9

Approach LOS C

Intersection Summary

Average Delay 2.2

Intersection Capacity Utilization 46.9% ICU Level of Service A

Analysis Period (min) 15

Page 41: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.92

Flt Protected 0.95 1.00 1.00 0.98

Satd. Flow (prot) 1770 1863 1836 1654

Flt Permitted 0.95 1.00 1.00 0.98

Satd. Flow (perm) 1770 1863 1836 1654

Volume (vph) 60 232 227 20 25 35

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87

Adj. Flow (vph) 69 267 261 23 29 40

RTOR Reduction (vph) 0 0 5 0 21 0

Lane Group Flow (vph) 69 267 279 0 48 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 4.3 20.4 11.6 26.9

Effective Green, g (s) 4.8 20.9 12.1 27.4

Actuated g/C Ratio 0.09 0.37 0.21 0.49

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 151 692 395 805

v/s Ratio Prot 0.04 c0.14 c0.15 c0.03

v/s Ratio Perm

v/c Ratio 0.46 0.39 0.71 0.06

Uniform Delay, d1 24.5 13.0 20.4 7.6

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.8 0.1 4.6 0.1

Delay (s) 25.3 13.1 25.1 7.8

Level of Service C B C A

Approach Delay (s) 15.6 25.1 7.8

Approach LOS B C A

Intersection Summary

HCM Average Control Delay 18.7 HCM Level of Service B

HCM Volume to Capacity ratio 0.28

Actuated Cycle Length (s) 56.3 Sum of lost time (s) 12.0

Intersection Capacity Utilization 50.8% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 42: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 3 1 2 461 15 61 1 53 98 0 0 0

Peak Hour Factor 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

Hourly flow rate (vph) 4 1 3 615 20 81 1 71 131 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 101 46 1302 1383 177 1599 1344 61

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 101 46 1302 1383 177 1599 1344 61

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 59 98 14 82 100 100 100

cM capacity (veh/h) 1491 1507 88 82 744 12 86 1005

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 8 615 101 72 131

Volume Left 4 615 0 1 0

Volume Right 3 0 81 0 131

cSH 1491 1507 1700 82 744

Volume to Capacity 0.00 0.41 0.06 0.88 0.18

Queue Length 95th (ft) 0 51 0 115 16

Control Delay (s) 3.7 9.0 0.0 156.2 10.9

Lane LOS A A F B

Approach Delay (s) 3.7 7.7 62.5

Approach LOS F

Intersection Summary

Average Delay 19.7

Intersection Capacity Utilization 52.1% ICU Level of Service A

Analysis Period (min) 15

Page 43: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 50 90 318 250 201 330

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 57 102 361 284 228 375

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 57 102 361 284 228 375

Volume Left (vph) 57 0 0 0 228 0

Volume Right (vph) 0 0 0 284 0 375

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.8 7.3 6.6 5.9 7.1 5.9

Degree Utilization, x 0.12 0.21 0.66 0.46 0.45 0.62

Capacity (veh/h) 435 467 534 594 481 582

Control Delay (s) 10.6 10.9 20.3 12.6 14.7 16.8

Approach Delay (s) 10.8 16.9 16.0

Approach LOS B C C

Intersection Summary

Delay 15.8

HCM Level of Service C

Intersection Capacity Utilization 43.8% ICU Level of Service A

Analysis Period (min) 15

Page 44: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1849 1583 1770 1851 1665 1478 1859 1583

Flt Permitted 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1849 1583 1770 1851 1665 1478 1859 1583

Volume (vph) 2 10 296 117 21 1 581 84 196 3 75 7

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 2 11 325 129 23 1 638 92 215 3 82 8

RTOR Reduction (vph) 0 0 138 0 1 0 0 0 61 0 0 7

Lane Group Flow (vph) 0 13 187 129 23 0 0 730 154 0 85 1

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 1.2 52.2 13.4 13.4 51.0 13.4 8.9 8.9

Effective Green, g (s) 1.2 52.2 13.4 13.4 51.0 13.4 8.9 8.9

Actuated g/C Ratio 0.01 0.58 0.15 0.15 0.56 0.15 0.10 0.10

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 25 983 262 274 938 219 183 156

v/s Ratio Prot 0.01 c0.11 0.07 0.01 c0.44 c0.10 c0.05

v/s Ratio Perm 0.01 0.00

v/c Ratio 0.52 0.19 0.49 0.08 0.78 0.70 0.46 0.01

Uniform Delay, d1 44.4 9.1 35.4 33.3 15.4 36.6 38.5 36.8

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 18.1 0.1 1.5 0.1 4.1 9.7 1.9 0.0

Delay (s) 62.5 9.2 36.9 33.4 19.5 46.4 40.4 36.8

Level of Service E A D C B D D D

Approach Delay (s) 11.3 36.3 25.6 40.1

Approach LOS B D C D

Intersection Summary

HCM Average Control Delay 24.4 HCM Level of Service C

HCM Volume to Capacity ratio 0.69

Actuated Cycle Length (s) 90.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 65.1% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 45: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.98 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1683 1770 1604 1676 1765 1500 1743 1822

Flt Permitted 0.87 0.73 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1487 1360 1604 1676 1765 1500 1743 1822

Volume (vph) 12 3 23 76 12 151 26 698 30 24 442 22

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 13 3 25 84 13 166 29 767 33 26 486 24

RTOR Reduction (vph) 0 21 0 0 139 0 0 0 12 0 2 0

Lane Group Flow (vph) 0 20 0 84 40 0 29 767 21 26 508 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.0 8.0 8.0 0.6 28.5 28.5 0.6 28.5

Effective Green, g (s) 8.0 8.0 8.0 0.6 28.5 28.5 0.6 28.5

Actuated g/C Ratio 0.16 0.16 0.16 0.01 0.58 0.58 0.01 0.58

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 242 222 261 20 1024 871 21 1058

v/s Ratio Prot 0.02 c0.02 c0.43 0.01 0.28

v/s Ratio Perm 0.01 c0.06 0.01

v/c Ratio 0.08 0.38 0.15 1.45 0.75 0.02 1.24 0.48

Uniform Delay, d1 17.4 18.3 17.6 24.2 7.6 4.4 24.2 6.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.1 1.1 0.3 363.9 3.0 0.0 278.6 0.3

Delay (s) 17.6 19.4 17.9 388.1 10.7 4.4 302.8 6.3

Level of Service B B B F B A F A

Approach Delay (s) 17.6 18.4 23.6 20.7

Approach LOS B B C C

Intersection Summary

HCM Average Control Delay 21.7 HCM Level of Service C

HCM Volume to Capacity ratio 0.68

Actuated Cycle Length (s) 49.1 Sum of lost time (s) 12.0

Intersection Capacity Utilization 58.6% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 46: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 71 2 15 0 0 0 0 78 35 270 27 0

Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87

Hourly flow rate (vph) 82 2 17 0 0 0 0 90 40 310 31 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 697 782 16 764 761 65 31 130

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 697 782 16 764 761 65 31 130

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 70 99 98 100 100 100 100 79

cM capacity (veh/h) 274 255 1060 239 262 986 1580 1453

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 82 20 60 70 310 16 16

Volume Left 82 0 0 0 310 0 0

Volume Right 0 17 0 40 0 0 0

cSH 274 773 1700 1700 1453 1700 1700

Volume to Capacity 0.30 0.03 0.04 0.04 0.21 0.01 0.01

Queue Length 95th (ft) 30 2 0 0 20 0 0

Control Delay (s) 23.6 9.8 0.0 0.0 8.1 0.0 0.0

Lane LOS C A A

Approach Delay (s) 20.9 0.0 7.4

Approach LOS C

Intersection Summary

Average Delay 8.1

Intersection Capacity Utilization 33.2% ICU Level of Service A

Analysis Period (min) 15

Page 47: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 8 1 102 62 87 0 0 289 262

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 0 0 0 9 1 116 70 99 0 0 328 298

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 635 568 164 404 866 49 626 99

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 635 568 164 404 866 49 626 99

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 98 100 89 93 100

cM capacity (veh/h) 302 399 851 501 268 1008 951 1492

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 10 116 70 49 49 164 164 298

Volume Left 9 0 70 0 0 0 0 0

Volume Right 0 116 0 0 0 0 0 298

cSH 477 995 951 1700 1700 1700 1700 1700

Volume to Capacity 0.02 0.12 0.07 0.03 0.03 0.10 0.10 0.18

Queue Length 95th (ft) 2 10 6 0 0 0 0 0

Control Delay (s) 12.7 9.1 9.1 0.0 0.0 0.0 0.0 0.0

Lane LOS B A A

Approach Delay (s) 9.4 3.8 0.0

Approach LOS A

Intersection Summary

Average Delay 2.0

Intersection Capacity Utilization 33.2% ICU Level of Service A

Analysis Period (min) 15

Page 48: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 116 105 320 125 129 247

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 136 124 376 147 152 291

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 524 846 450

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 524 846 450

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 87 47 52

cM capacity (veh/h) 1043 289 609

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 136 124 524 442

Volume Left 136 0 0 152

Volume Right 0 0 147 291

cSH 1043 1700 1700 842

Volume to Capacity 0.13 0.07 0.31 0.53

Queue Length 95th (ft) 11 0 0 78

Control Delay (s) 9.0 0.0 0.0 21.1

Lane LOS A C

Approach Delay (s) 4.7 0.0 21.1

Approach LOS C

Intersection Summary

Average Delay 8.6

Intersection Capacity Utilization 48.0% ICU Level of Service A

Analysis Period (min) 15

Page 49: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 207 27 13 292 153 129

Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80

Hourly flow rate (vph) 259 34 16 365 191 161

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked 0.92

vC, conflicting volume 292 673 276

vC1, stage 1 conf vol 276

vC2, stage 2 conf vol 398

vCu, unblocked vol 292 647 276

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 99 49 79

cM capacity (veh/h) 1269 373 763

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 292 16 365 191 161

Volume Left 0 16 0 191 0

Volume Right 34 0 0 0 161

cSH 1700 1269 1700 373 763

Volume to Capacity 0.17 0.01 0.21 0.51 0.21

Queue Length 95th (ft) 0 1 0 70 20

Control Delay (s) 0.0 7.9 0.0 24.3 11.0

Lane LOS A C B

Approach Delay (s) 0.0 0.3 18.2

Approach LOS C

Intersection Summary

Average Delay 6.4

Intersection Capacity Utilization 30.5% ICU Level of Service A

Analysis Period (min) 15

Page 50: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.91

Flt Protected 0.95 1.00 1.00 0.98

Satd. Flow (prot) 1770 1863 1829 1631

Flt Permitted 0.95 1.00 1.00 0.98

Satd. Flow (perm) 1770 1863 1829 1631

Volume (vph) 30 306 215 25 40 90

Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88

Adj. Flow (vph) 34 348 244 28 45 102

RTOR Reduction (vph) 0 0 7 0 51 0

Lane Group Flow (vph) 34 348 265 0 96 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 2.6 18.0 10.9 26.2

Effective Green, g (s) 3.1 18.5 11.4 26.7

Actuated g/C Ratio 0.06 0.35 0.21 0.50

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 103 648 392 819

v/s Ratio Prot 0.02 c0.19 c0.14 c0.06

v/s Ratio Perm

v/c Ratio 0.33 0.54 0.68 0.12

Uniform Delay, d1 24.1 13.9 19.2 7.0

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.7 0.4 3.6 0.3

Delay (s) 24.7 14.3 22.8 7.3

Level of Service C B C A

Approach Delay (s) 15.3 22.8 7.3

Approach LOS B C A

Intersection Summary

HCM Average Control Delay 16.4 HCM Level of Service B

HCM Volume to Capacity ratio 0.32

Actuated Cycle Length (s) 53.2 Sum of lost time (s) 12.0

Intersection Capacity Utilization 50.6% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 51: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 2 3 1 195 1 68 0 63 420 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 2 3 1 203 1 71 0 66 438 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 72 98 509 580 239 1062 545 36

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 72 98 509 580 239 1062 545 36

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 85 100 80 33 100 100 100

cM capacity (veh/h) 1528 1378 365 334 651 42 350 1036

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 6 203 72 66 438

Volume Left 2 203 0 0 0

Volume Right 1 0 71 0 438

cSH 1528 1378 1700 334 651

Volume to Capacity 0.00 0.15 0.04 0.20 0.67

Queue Length 95th (ft) 0 13 0 18 129

Control Delay (s) 2.5 8.1 0.0 18.4 21.1

Lane LOS A A C C

Approach Delay (s) 2.5 6.0 20.8

Approach LOS C

Intersection Summary

Average Delay 15.4

Intersection Capacity Utilization 52.5% ICU Level of Service A

Analysis Period (min) 15

Page 52: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 209 263 165 247 315 109

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 227 286 179 268 342 118

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 227 286 179 268 342 118

Volume Left (vph) 227 0 0 0 342 0

Volume Right (vph) 0 0 0 268 0 118

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.4 6.9 7.0 6.3 7.5 6.3

Degree Utilization, x 0.47 0.55 0.35 0.47 0.72 0.21

Capacity (veh/h) 469 497 489 546 462 541

Control Delay (s) 15.5 16.7 12.6 13.7 26.2 9.8

Approach Delay (s) 16.2 13.2 21.9

Approach LOS C B C

Intersection Summary

Delay 17.1

HCM Level of Service C

Intersection Capacity Utilization 47.7% ICU Level of Service A

Analysis Period (min) 15

Page 53: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.96 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1831 1583 1770 1793 1675 1478 1862 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1831 1583 1770 1793 1675 1478 1862 1583

Volume (vph) 23 42 582 211 29 10 420 134 284 2 160 22

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 23 43 594 215 30 10 429 137 290 2 163 22

RTOR Reduction (vph) 0 0 180 0 8 0 0 0 128 0 0 19

Lane Group Flow (vph) 0 66 414 215 32 0 0 566 162 0 165 3

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Effective Green, g (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Actuated g/C Ratio 0.06 0.48 0.18 0.18 0.41 0.18 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 119 837 323 327 690 270 248 211

v/s Ratio Prot 0.04 c0.20 c0.12 0.02 c0.34 0.11 c0.09

v/s Ratio Perm 0.06 0.00

v/c Ratio 0.55 0.49 0.67 0.10 0.82 0.60 0.67 0.01

Uniform Delay, d1 35.0 13.8 29.4 26.3 20.2 29.0 31.8 29.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 5.5 0.5 5.1 0.1 7.7 3.8 6.6 0.0

Delay (s) 40.5 14.3 34.5 26.4 27.9 32.7 38.4 29.1

Level of Service D B C C C C D C

Approach Delay (s) 16.9 33.2 29.5 37.3

Approach LOS B C C D

Intersection Summary

HCM Average Control Delay 26.5 HCM Level of Service C

HCM Volume to Capacity ratio 0.71

Actuated Cycle Length (s) 77.2 Sum of lost time (s) 12.0

Intersection Capacity Utilization 68.9% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 54: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.91 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1666 1770 1599 1676 1765 1500 1743 1828

Flt Permitted 0.86 0.89 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1458 1658 1599 1676 1765 1500 1743 1828

Volume (vph) 19 1 43 100 10 165 22 654 46 59 871 23

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 20 1 45 104 10 172 23 681 48 61 907 24

RTOR Reduction (vph) 0 38 0 0 147 0 0 0 18 0 1 0

Lane Group Flow (vph) 0 28 0 104 35 0 23 681 30 61 930 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.4 8.4 8.4 1.2 34.6 34.6 2.5 35.9

Effective Green, g (s) 8.4 8.4 8.4 1.2 34.6 34.6 2.5 35.9

Actuated g/C Ratio 0.15 0.15 0.15 0.02 0.60 0.60 0.04 0.62

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 213 242 234 35 1062 903 76 1141

v/s Ratio Prot 0.02 0.01 0.39 c0.03 c0.51

v/s Ratio Perm 0.02 c0.06 0.02

v/c Ratio 0.13 0.43 0.15 0.66 0.64 0.03 0.80 0.81

Uniform Delay, d1 21.4 22.4 21.4 27.9 7.4 4.7 27.3 8.3

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.3 1.2 0.3 36.6 1.3 0.0 43.8 4.6

Delay (s) 21.6 23.6 21.7 64.6 8.8 4.7 71.1 12.8

Level of Service C C C E A A E B

Approach Delay (s) 21.6 22.4 10.2 16.4

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 15.2 HCM Level of Service B

HCM Volume to Capacity ratio 0.70

Actuated Cycle Length (s) 57.5 Sum of lost time (s) 8.0

Intersection Capacity Utilization 73.5% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 55: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 331 2 64 0 0 0 0 44 15 44 66 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 352 2 68 0 0 0 0 47 16 47 70 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 187 227 35 253 219 31 70 63

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 187 227 35 253 219 31 70 63

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 52 100 93 100 100 100 100 97

cM capacity (veh/h) 739 651 1030 619 658 1036 1528 1538

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 352 70 31 32 47 35 35

Volume Left 352 0 0 0 47 0 0

Volume Right 0 68 0 16 0 0 0

cSH 739 1012 1700 1700 1538 1700 1700

Volume to Capacity 0.48 0.07 0.02 0.02 0.03 0.02 0.02

Queue Length 95th (ft) 65 6 0 0 2 0 0

Control Delay (s) 14.2 8.8 0.0 0.0 7.4 0.0 0.0

Lane LOS B A A

Approach Delay (s) 13.3 0.0 3.0

Approach LOS B

Intersection Summary

Average Delay 9.9

Intersection Capacity Utilization 35.0% ICU Level of Service A

Analysis Period (min) 15

Page 56: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 37 3 430 20 355 0 0 73 37

Peak Hour Factor 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83 0.83

Hourly flow rate (vph) 0 0 0 45 4 518 24 428 0 0 88 45

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 870 564 44 520 608 214 133 428

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 870 564 44 520 608 214 133 428

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 90 99 35 98 100

cM capacity (veh/h) 83 426 1017 434 402 791 1450 1128

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 46 520 24 214 214 44 44 45

Volume Left 45 0 24 0 0 0 0 0

Volume Right 0 518 0 0 0 0 0 45

cSH 432 788 1450 1700 1700 1700 1700 1700

Volume to Capacity 0.11 0.66 0.02 0.13 0.13 0.03 0.03 0.03

Queue Length 95th (ft) 9 126 1 0 0 0 0 0

Control Delay (s) 14.3 17.9 7.5 0.0 0.0 0.0 0.0 0.0

Lane LOS B C A

Approach Delay (s) 17.6 0.4 0.0

Approach LOS C

Intersection Summary

Average Delay 8.8

Intersection Capacity Utilization 35.0% ICU Level of Service A

Analysis Period (min) 15

Page 57: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 244 398 57 100 85 60

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 287 468 67 118 100 71

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 186 1169 127

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 186 1169 127

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 79 41 92

cM capacity (veh/h) 1388 169 923

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 287 468 185 171

Volume Left 287 0 0 100

Volume Right 0 0 118 71

cSH 1388 1700 1700 288

Volume to Capacity 0.21 0.28 0.11 0.59

Queue Length 95th (ft) 19 0 0 88

Control Delay (s) 8.3 0.0 0.0 35.0

Lane LOS A D

Approach Delay (s) 3.1 0.0 35.0

Approach LOS D

Intersection Summary

Average Delay 7.5

Intersection Capacity Utilization 37.6% ICU Level of Service A

Analysis Period (min) 15

Page 58: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 297 186 133 140 17 9

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 349 219 156 165 20 11

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 568 936 459

vC1, stage 1 conf vol 459

vC2, stage 2 conf vol 478

vCu, unblocked vol 568 936 459

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 84 93 98

cM capacity (veh/h) 1004 279 602

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 568 156 165 20 11

Volume Left 0 156 0 20 0

Volume Right 219 0 0 0 11

cSH 1700 1004 1700 279 602

Volume to Capacity 0.33 0.16 0.10 0.07 0.02

Queue Length 95th (ft) 0 14 0 6 1

Control Delay (s) 0.0 9.2 0.0 18.9 11.1

Lane LOS A C B

Approach Delay (s) 0.0 4.5 16.2

Approach LOS C

Intersection Summary

Average Delay 2.1

Intersection Capacity Utilization 47.7% ICU Level of Service A

Analysis Period (min) 15

Page 59: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.92

Flt Protected 0.95 1.00 1.00 0.98

Satd. Flow (prot) 1770 1863 1837 1654

Flt Permitted 0.95 1.00 1.00 0.98

Satd. Flow (perm) 1770 1863 1837 1654

Volume (vph) 60 246 238 20 25 35

Peak-hour factor, PHF 0.87 0.87 0.87 0.87 0.87 0.87

Adj. Flow (vph) 69 283 274 23 29 40

RTOR Reduction (vph) 0 0 5 0 21 0

Lane Group Flow (vph) 69 283 292 0 48 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 4.3 20.8 12.0 26.6

Effective Green, g (s) 4.8 21.3 12.5 27.1

Actuated g/C Ratio 0.09 0.38 0.22 0.48

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 151 704 407 795

v/s Ratio Prot 0.04 c0.15 c0.16 c0.03

v/s Ratio Perm

v/c Ratio 0.46 0.40 0.72 0.06

Uniform Delay, d1 24.6 12.9 20.3 7.8

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.8 0.1 4.9 0.1

Delay (s) 25.4 13.0 25.3 8.0

Level of Service C B C A

Approach Delay (s) 15.4 25.3 8.0

Approach LOS B C A

Intersection Summary

HCM Average Control Delay 18.8 HCM Level of Service B

HCM Volume to Capacity ratio 0.30

Actuated Cycle Length (s) 56.4 Sum of lost time (s) 12.0

Intersection Capacity Utilization 51.4% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 60: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 3 1 2 467 15 61 1 53 102 0 0 0

Peak Hour Factor 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75

Hourly flow rate (vph) 4 1 3 623 20 81 1 71 136 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 101 46 1318 1399 177 1620 1360 61

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 101 46 1318 1399 177 1620 1360 61

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 59 98 11 82 100 100 100

cM capacity (veh/h) 1491 1507 85 79 744 10 84 1005

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 8 623 101 72 136

Volume Left 4 623 0 1 0

Volume Right 3 0 81 0 136

cSH 1491 1507 1700 79 744

Volume to Capacity 0.00 0.41 0.06 0.91 0.18

Queue Length 95th (ft) 0 52 0 119 17

Control Delay (s) 3.7 9.1 0.0 166.9 10.9

Lane LOS A A F B

Approach Delay (s) 3.7 7.8 64.9

Approach LOS F

Intersection Summary

Average Delay 20.4

Intersection Capacity Utilization 52.4% ICU Level of Service A

Analysis Period (min) 15

Page 61: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 52 92 321 250 201 333

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 59 105 365 284 228 378

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 59 105 365 284 228 378

Volume Left (vph) 59 0 0 0 228 0

Volume Right (vph) 0 0 0 284 0 378

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.8 7.3 6.6 5.9 7.1 5.9

Degree Utilization, x 0.13 0.21 0.67 0.47 0.45 0.63

Capacity (veh/h) 434 466 533 592 480 579

Control Delay (s) 10.7 11.0 20.7 12.7 14.7 17.1

Approach Delay (s) 10.9 17.2 16.2

Approach LOS B C C

Intersection Summary

Delay 16.1

HCM Level of Service C

Intersection Capacity Utilization 44.2% ICU Level of Service A

Analysis Period (min) 15

Page 62: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1849 1583 1770 1851 1665 1478 1859 1583

Flt Permitted 0.99 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1849 1583 1770 1851 1665 1478 1859 1583

Volume (vph) 2 10 298 117 21 1 584 84 196 3 75 7

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 2 11 327 129 23 1 642 92 215 3 82 8

RTOR Reduction (vph) 0 0 138 0 1 0 0 0 61 0 0 7

Lane Group Flow (vph) 0 13 189 129 23 0 0 734 154 0 85 1

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 1.2 52.2 13.4 13.4 51.0 13.4 8.9 8.9

Effective Green, g (s) 1.2 52.2 13.4 13.4 51.0 13.4 8.9 8.9

Actuated g/C Ratio 0.01 0.58 0.15 0.15 0.56 0.15 0.10 0.10

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 25 983 262 274 938 219 183 156

v/s Ratio Prot 0.01 c0.11 0.07 0.01 c0.44 c0.10 c0.05

v/s Ratio Perm 0.01 0.00

v/c Ratio 0.52 0.19 0.49 0.08 0.78 0.70 0.46 0.01

Uniform Delay, d1 44.4 9.1 35.4 33.3 15.4 36.6 38.5 36.8

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 18.1 0.1 1.5 0.1 4.3 9.7 1.9 0.0

Delay (s) 62.5 9.2 36.9 33.4 19.7 46.4 40.4 36.8

Level of Service E A D C B D D D

Approach Delay (s) 11.2 36.3 25.8 40.1

Approach LOS B D C D

Intersection Summary

HCM Average Control Delay 24.5 HCM Level of Service C

HCM Volume to Capacity ratio 0.69

Actuated Cycle Length (s) 90.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 65.3% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 63: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.98 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1683 1770 1604 1676 1765 1500 1743 1822

Flt Permitted 0.87 0.73 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1487 1360 1604 1676 1765 1500 1743 1822

Volume (vph) 12 3 23 76 12 151 26 701 30 24 444 22

Peak-hour factor, PHF 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91

Adj. Flow (vph) 13 3 25 84 13 166 29 770 33 26 488 24

RTOR Reduction (vph) 0 21 0 0 139 0 0 0 12 0 2 0

Lane Group Flow (vph) 0 20 0 84 40 0 29 770 21 26 510 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.0 8.0 8.0 0.6 28.5 28.5 0.6 28.5

Effective Green, g (s) 8.0 8.0 8.0 0.6 28.5 28.5 0.6 28.5

Actuated g/C Ratio 0.16 0.16 0.16 0.01 0.58 0.58 0.01 0.58

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 242 222 261 20 1024 871 21 1058

v/s Ratio Prot 0.02 c0.02 c0.44 0.01 0.28

v/s Ratio Perm 0.01 c0.06 0.01

v/c Ratio 0.08 0.38 0.15 1.45 0.75 0.02 1.24 0.48

Uniform Delay, d1 17.4 18.3 17.6 24.2 7.7 4.4 24.2 6.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.1 1.1 0.3 363.9 3.2 0.0 278.6 0.3

Delay (s) 17.6 19.4 17.9 388.1 10.8 4.4 302.8 6.3

Level of Service B B B F B A F A

Approach Delay (s) 17.6 18.4 23.7 20.7

Approach LOS B B C C

Intersection Summary

HCM Average Control Delay 21.8 HCM Level of Service C

HCM Volume to Capacity ratio 0.68

Actuated Cycle Length (s) 49.1 Sum of lost time (s) 12.0

Intersection Capacity Utilization 58.8% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 64: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 75 2 15 0 0 0 0 78 35 275 27 0

Peak Hour Factor 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87 0.87

Hourly flow rate (vph) 86 2 17 0 0 0 0 90 40 316 31 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 708 793 16 776 773 65 31 130

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 708 793 16 776 773 65 31 130

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 68 99 98 100 100 100 100 78

cM capacity (veh/h) 268 250 1060 234 257 986 1580 1453

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 86 20 60 70 316 16 16

Volume Left 86 0 0 0 316 0 0

Volume Right 0 17 0 40 0 0 0

cSH 268 767 1700 1700 1453 1700 1700

Volume to Capacity 0.32 0.03 0.04 0.04 0.22 0.01 0.01

Queue Length 95th (ft) 34 2 0 0 21 0 0

Control Delay (s) 24.7 9.8 0.0 0.0 8.2 0.0 0.0

Lane LOS C A A

Approach Delay (s) 21.9 0.0 7.4

Approach LOS C

Intersection Summary

Average Delay 8.4

Intersection Capacity Utilization 33.6% ICU Level of Service A

Analysis Period (min) 15

Page 65: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 8 1 107 62 91 0 0 294 266

Peak Hour Factor 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88

Hourly flow rate (vph) 0 0 0 9 1 122 70 103 0 0 334 302

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 649 578 167 411 881 52 636 103

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 649 578 167 411 881 52 636 103

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 98 100 88 93 100

cM capacity (veh/h) 293 393 848 495 263 1005 943 1486

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 10 122 70 52 52 167 167 302

Volume Left 9 0 70 0 0 0 0 0

Volume Right 0 122 0 0 0 0 0 302

cSH 470 992 943 1700 1700 1700 1700 1700

Volume to Capacity 0.02 0.12 0.07 0.03 0.03 0.10 0.10 0.18

Queue Length 95th (ft) 2 10 6 0 0 0 0 0

Control Delay (s) 12.8 9.1 9.1 0.0 0.0 0.0 0.0 0.0

Lane LOS B A A

Approach Delay (s) 9.4 3.7 0.0

Approach LOS A

Intersection Summary

Average Delay 2.0

Intersection Capacity Utilization 33.6% ICU Level of Service A

Analysis Period (min) 15

Page 66: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 116 114 330 128 132 247

Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85

Hourly flow rate (vph) 136 134 388 151 155 291

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 539 871 464

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 539 871 464

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 87 44 51

cM capacity (veh/h) 1030 279 599

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 136 134 539 446

Volume Left 136 0 0 155

Volume Right 0 0 151 291

cSH 1030 1700 1700 801

Volume to Capacity 0.13 0.08 0.32 0.56

Queue Length 95th (ft) 11 0 0 87

Control Delay (s) 9.0 0.0 0.0 22.3

Lane LOS A C

Approach Delay (s) 4.6 0.0 22.3

Approach LOS C

Intersection Summary

Average Delay 8.9

Intersection Capacity Utilization 48.9% ICU Level of Service A

Analysis Period (min) 15

Page 67: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 219 27 13 305 153 129

Peak Hour Factor 0.80 0.80 0.80 0.80 0.80 0.80

Hourly flow rate (vph) 274 34 16 381 191 161

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked 0.91

vC, conflicting volume 308 704 291

vC1, stage 1 conf vol 291

vC2, stage 2 conf vol 414

vCu, unblocked vol 308 676 291

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 99 47 78

cM capacity (veh/h) 1253 362 749

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 308 16 381 191 161

Volume Left 0 16 0 191 0

Volume Right 34 0 0 0 161

cSH 1700 1253 1700 362 749

Volume to Capacity 0.18 0.01 0.22 0.53 0.22

Queue Length 95th (ft) 0 1 0 74 20

Control Delay (s) 0.0 7.9 0.0 25.6 11.1

Lane LOS A D B

Approach Delay (s) 0.0 0.3 19.0

Approach LOS C

Intersection Summary

Average Delay 6.4

Intersection Capacity Utilization 31.2% ICU Level of Service A

Analysis Period (min) 15

Page 68: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.91

Flt Protected 0.95 1.00 1.00 0.98

Satd. Flow (prot) 1770 1863 1831 1631

Flt Permitted 0.95 1.00 1.00 0.98

Satd. Flow (perm) 1770 1863 1831 1631

Volume (vph) 30 318 228 25 40 90

Peak-hour factor, PHF 0.88 0.88 0.88 0.88 0.88 0.88

Adj. Flow (vph) 34 361 259 28 45 102

RTOR Reduction (vph) 0 0 6 0 51 0

Lane Group Flow (vph) 34 361 281 0 96 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 2.6 18.3 11.2 26.1

Effective Green, g (s) 3.1 18.8 11.7 26.6

Actuated g/C Ratio 0.06 0.35 0.22 0.50

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 103 656 401 812

v/s Ratio Prot 0.02 c0.19 c0.15 c0.06

v/s Ratio Perm

v/c Ratio 0.33 0.55 0.70 0.12

Uniform Delay, d1 24.2 13.9 19.2 7.1

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.7 0.6 4.5 0.3

Delay (s) 24.8 14.5 23.7 7.4

Level of Service C B C A

Approach Delay (s) 15.4 23.7 7.4

Approach LOS B C A

Intersection Summary

HCM Average Control Delay 16.8 HCM Level of Service B

HCM Volume to Capacity ratio 0.33

Actuated Cycle Length (s) 53.4 Sum of lost time (s) 12.0

Intersection Capacity Utilization 51.1% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 69: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 2 3 1 201 1 68 0 63 426 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 2 3 1 209 1 71 0 66 444 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 72 98 522 592 239 1081 558 36

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 72 98 522 592 239 1081 558 36

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 85 100 80 32 100 100 100

cM capacity (veh/h) 1528 1378 357 327 651 39 342 1036

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 6 209 72 66 444

Volume Left 2 209 0 0 0

Volume Right 1 0 71 0 444

cSH 1528 1378 1700 327 651

Volume to Capacity 0.00 0.15 0.04 0.20 0.68

Queue Length 95th (ft) 0 13 0 18 133

Control Delay (s) 2.5 8.1 0.0 18.8 21.5

Lane LOS A A C C

Approach Delay (s) 2.5 6.0 21.2

Approach LOS C

Intersection Summary

Average Delay 15.7

Intersection Capacity Utilization 52.9% ICU Level of Service A

Analysis Period (min) 15

Page 70: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 212 266 168 247 315 112

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 230 289 183 268 342 122

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 230 289 183 268 342 122

Volume Left (vph) 230 0 0 0 342 0

Volume Right (vph) 0 0 0 268 0 122

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.4 6.9 7.1 6.4 7.6 6.4

Degree Utilization, x 0.48 0.56 0.36 0.47 0.72 0.21

Capacity (veh/h) 468 496 488 544 461 539

Control Delay (s) 15.8 17.0 12.8 13.7 26.4 9.9

Approach Delay (s) 16.4 13.4 22.1

Approach LOS C B C

Intersection Summary

Delay 17.3

HCM Level of Service C

Intersection Capacity Utilization 48.0% ICU Level of Service A

Analysis Period (min) 15

Page 71: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.96 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1831 1583 1770 1793 1675 1478 1862 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1831 1583 1770 1793 1675 1478 1862 1583

Volume (vph) 23 42 585 211 29 10 423 134 284 2 160 22

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 23 43 597 215 30 10 432 137 290 2 163 22

RTOR Reduction (vph) 0 0 180 0 8 0 0 0 127 0 0 19

Lane Group Flow (vph) 0 66 417 215 32 0 0 569 163 0 165 3

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Effective Green, g (s) 5.0 36.8 14.1 14.1 31.8 14.1 10.3 10.3

Actuated g/C Ratio 0.06 0.48 0.18 0.18 0.41 0.18 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 119 837 323 327 690 270 248 211

v/s Ratio Prot 0.04 c0.21 c0.12 0.02 c0.34 0.11 c0.09

v/s Ratio Perm 0.06 0.00

v/c Ratio 0.55 0.50 0.67 0.10 0.82 0.60 0.67 0.01

Uniform Delay, d1 35.0 13.9 29.4 26.3 20.2 29.0 31.8 29.0

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 5.5 0.5 5.1 0.1 7.9 3.8 6.6 0.0

Delay (s) 40.5 14.3 34.5 26.4 28.2 32.8 38.4 29.1

Level of Service D B C C C C D C

Approach Delay (s) 16.9 33.2 29.7 37.3

Approach LOS B C C D

Intersection Summary

HCM Average Control Delay 26.6 HCM Level of Service C

HCM Volume to Capacity ratio 0.71

Actuated Cycle Length (s) 77.2 Sum of lost time (s) 12.0

Intersection Capacity Utilization 69.1% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 72: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Existing Plus Hotel & ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/5/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.91 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1666 1770 1599 1676 1765 1500 1743 1828

Flt Permitted 0.86 0.89 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1460 1651 1599 1676 1765 1500 1743 1828

Volume (vph) 19 1 43 100 10 165 22 657 46 59 874 23

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 20 1 45 104 10 172 23 684 48 61 910 24

RTOR Reduction (vph) 0 38 0 0 147 0 0 0 18 0 1 0

Lane Group Flow (vph) 0 28 0 104 35 0 23 684 30 61 933 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.5 8.5 8.5 1.2 35.0 35.0 2.5 36.3

Effective Green, g (s) 8.5 8.5 8.5 1.2 35.0 35.0 2.5 36.3

Actuated g/C Ratio 0.15 0.15 0.15 0.02 0.60 0.60 0.04 0.63

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 214 242 234 35 1065 905 75 1144

v/s Ratio Prot 0.02 0.01 0.39 c0.03 c0.51

v/s Ratio Perm 0.02 c0.06 0.02

v/c Ratio 0.13 0.43 0.15 0.66 0.64 0.03 0.81 0.82

Uniform Delay, d1 21.5 22.5 21.6 28.2 7.4 4.7 27.5 8.3

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.3 1.2 0.3 36.6 1.3 0.0 46.8 4.6

Delay (s) 21.8 23.8 21.9 64.8 8.8 4.7 74.3 12.9

Level of Service C C C E A A E B

Approach Delay (s) 21.8 22.6 10.2 16.7

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 15.3 HCM Level of Service B

HCM Volume to Capacity ratio 0.71

Actuated Cycle Length (s) 58.0 Sum of lost time (s) 8.0

Intersection Capacity Utilization 73.5% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 73: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 460 5 115 0 0 0 0 75 25 210 230 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 489 5 122 0 0 0 0 80 27 223 245 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 731 798 122 787 785 53 245 106

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 731 798 122 787 785 53 245 106

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 98 86 100 100 100 100 85

cM capacity (veh/h) 274 270 906 212 275 1003 1319 1482

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 489 128 53 53 223 122 122

Volume Left 489 0 0 0 223 0 0

Volume Right 0 122 0 27 0 0 0

cSH 274 825 1700 1700 1482 1700 1700

Volume to Capacity 1.79 0.15 0.03 0.03 0.15 0.07 0.07

Queue Length 95th (ft) 815 14 0 0 13 0 0

Control Delay (s) 400.6 10.2 0.0 0.0 7.9 0.0 0.0

Lane LOS F B A

Approach Delay (s) 319.8 0.0 3.8

Approach LOS F

Intersection Summary

Average Delay 167.1

Intersection Capacity Utilization 50.5% ICU Level of Service A

Analysis Period (min) 15

Page 74: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 115 5 610 50 485 0 0 325 55

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 125 5 663 54 527 0 0 353 60

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1391 989 177 812 1049 264 413 527

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1391 989 177 812 1049 264 413 527

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 52 97 10 95 100

cM capacity (veh/h) 9 234 836 260 215 735 1142 1036

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 128 666 54 264 264 177 177 60

Volume Left 125 0 54 0 0 0 0 0

Volume Right 0 663 0 0 0 0 0 60

cSH 259 728 1142 1700 1700 1700 1700 1700

Volume to Capacity 0.49 0.91 0.05 0.16 0.16 0.10 0.10 0.04

Queue Length 95th (ft) 63 310 4 0 0 0 0 0

Control Delay (s) 31.6 39.8 8.3 0.0 0.0 0.0 0.0 0.0

Lane LOS D E A

Approach Delay (s) 38.5 0.8 0.0

Approach LOS E

Intersection Summary

Average Delay 17.3

Intersection Capacity Utilization 50.5% ICU Level of Service A

Analysis Period (min) 15

Page 75: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 325 470 85 160 125 300

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 353 511 92 174 136 326

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 267 1398 180

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 267 1398 180

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 73 0 62

cM capacity (veh/h) 1295 113 862

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 353 511 266 462

Volume Left 353 0 0 136

Volume Right 0 0 174 326

cSH 1295 1700 1700 353

Volume to Capacity 0.27 0.30 0.16 1.31

Queue Length 95th (ft) 28 0 0 541

Control Delay (s) 8.8 0.0 0.0 188.9

Lane LOS A F

Approach Delay (s) 3.6 0.0 188.9

Approach LOS F

Intersection Summary

Average Delay 56.8

Intersection Capacity Utilization 49.3% ICU Level of Service A

Analysis Period (min) 15

Page 76: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 330 265 125 210 35 60

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 359 288 136 228 38 65

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 647 1003 503

vC1, stage 1 conf vol 503

vC2, stage 2 conf vol 500

vCu, unblocked vol 647 1003 503

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 86 86 89

cM capacity (veh/h) 939 268 569

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 647 136 228 38 65

Volume Left 0 136 0 38 0

Volume Right 288 0 0 0 65

cSH 1700 939 1700 268 569

Volume to Capacity 0.38 0.14 0.13 0.14 0.11

Queue Length 95th (ft) 0 13 0 12 10

Control Delay (s) 0.0 9.5 0.0 20.6 12.1

Lane LOS A C B

Approach Delay (s) 0.0 3.5 15.3

Approach LOS C

Intersection Summary

Average Delay 2.6

Intersection Capacity Utilization 53.8% ICU Level of Service A

Analysis Period (min) 15

Page 77: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.98 0.89

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1806 1610

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1806 1610

Volume (vph) 220 170 150 30 50 185

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 239 185 163 33 54 201

RTOR Reduction (vph) 0 0 14 0 104 0

Lane Group Flow (vph) 239 185 182 0 151 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.0 20.7 8.2 27.0

Effective Green, g (s) 8.5 21.2 8.7 27.5

Actuated g/C Ratio 0.15 0.37 0.15 0.49

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 265 697 277 781

v/s Ratio Prot c0.14 0.10 c0.10 c0.09

v/s Ratio Perm

v/c Ratio 0.90 0.27 0.66 0.19

Uniform Delay, d1 23.7 12.3 22.6 8.3

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 30.3 0.1 4.3 0.6

Delay (s) 54.0 12.4 26.9 8.9

Level of Service D B C A

Approach Delay (s) 35.9 26.9 8.9

Approach LOS D C A

Intersection Summary

HCM Average Control Delay 26.0 HCM Level of Service C

HCM Volume to Capacity ratio 0.42

Actuated Cycle Length (s) 56.7 Sum of lost time (s) 12.0

Intersection Capacity Utilization 54.3% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 78: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 590 15 65 5 65 190 0 0 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 5 5 5 641 16 71 5 71 207 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 87 53 1360 1431 182 1727 1398 52

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 87 53 1360 1431 182 1727 1398 52

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 57 93 4 72 100 100 100

cM capacity (veh/h) 1509 1498 78 74 739 5 77 1016

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 641 87 76 207

Volume Left 5 641 0 5 0

Volume Right 5 0 71 0 207

cSH 1509 1498 1700 74 739

Volume to Capacity 0.00 0.43 0.05 1.02 0.28

Queue Length 95th (ft) 0 55 0 136 29

Control Delay (s) 2.5 9.2 0.0 208.6 11.8

Lane LOS A A F B

Approach Delay (s) 2.5 8.1 64.8

Approach LOS F

Intersection Summary

Average Delay 23.6

Intersection Capacity Utilization 59.2% ICU Level of Service B

Analysis Period (min) 15

Page 79: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 90 145 445 255 265 325

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 98 158 484 277 288 353

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 98 158 484 277 288 353

Volume Left (vph) 98 0 0 0 288 0

Volume Right (vph) 0 0 0 277 0 353

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 8.3 7.8 7.0 6.3 7.7 6.5

Degree Utilization, x 0.22 0.34 0.94 0.49 0.62 0.64

Capacity (veh/h) 425 455 502 557 451 533

Control Delay (s) 12.5 13.5 52.4 13.9 21.2 19.1

Approach Delay (s) 13.1 38.4 20.1

Approach LOS B E C

Intersection Summary

Delay 27.4

HCM Level of Service D

Intersection Capacity Utilization 53.1% ICU Level of Service A

Analysis Period (min) 15

Page 80: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1854 1583 1770 1848 1666 1478 1860 1583

Flt Permitted 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1854 1583 1770 1848 1666 1478 1860 1583

Volume (vph) 5 45 405 150 85 5 615 95 210 5 130 10

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 5 49 440 163 92 5 668 103 228 5 141 11

RTOR Reduction (vph) 0 0 158 0 2 0 0 0 61 0 0 10

Lane Group Flow (vph) 0 54 282 163 95 0 0 771 167 0 146 1

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.0 57.3 15.7 15.7 50.3 15.7 13.5 13.5

Effective Green, g (s) 7.0 57.3 15.7 15.7 50.3 15.7 13.5 13.5

Actuated g/C Ratio 0.07 0.56 0.15 0.15 0.49 0.15 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 127 947 271 283 818 226 245 208

v/s Ratio Prot c0.03 0.15 0.09 0.05 c0.46 c0.11 c0.08

v/s Ratio Perm 0.03 0.00

v/c Ratio 0.43 0.30 0.60 0.34 0.94 0.74 0.60 0.01

Uniform Delay, d1 45.8 12.0 40.5 38.8 24.7 41.4 41.9 38.7

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 0.2 3.7 0.7 18.9 11.9 3.9 0.0

Delay (s) 48.1 12.1 44.2 39.5 43.6 53.4 45.8 38.7

Level of Service D B D D D D D D

Approach Delay (s) 16.1 42.4 45.8 45.3

Approach LOS B D D D

Intersection Summary

HCM Average Control Delay 37.6 HCM Level of Service D

HCM Volume to Capacity ratio 0.81

Actuated Cycle Length (s) 102.5 Sum of lost time (s) 16.0

Intersection Capacity Utilization 73.3% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 81: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1684 1770 1599 1676 1765 1500 1743 1824

Flt Permitted 0.72 0.72 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1236 1345 1599 1676 1765 1500 1743 1824

Volume (vph) 15 5 30 95 15 240 30 665 30 25 635 25

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 16 5 33 103 16 261 33 723 33 27 690 27

RTOR Reduction (vph) 0 27 0 0 196 0 0 0 13 0 2 0

Lane Group Flow (vph) 0 27 0 103 81 0 33 723 20 27 715 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.2 8.2 8.2 1.2 26.4 26.4 1.2 26.4

Effective Green, g (s) 8.2 8.2 8.2 1.2 26.4 26.4 1.2 26.4

Actuated g/C Ratio 0.17 0.17 0.17 0.03 0.55 0.55 0.03 0.55

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 212 231 274 42 975 828 44 1007

v/s Ratio Prot 0.05 c0.02 c0.41 0.02 0.39

v/s Ratio Perm 0.02 c0.08 0.01

v/c Ratio 0.13 0.45 0.30 0.79 0.74 0.02 0.61 0.71

Uniform Delay, d1 16.8 17.8 17.3 23.2 8.1 4.9 23.1 7.9

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.3 1.4 0.6 62.3 3.1 0.0 22.8 2.4

Delay (s) 17.0 19.1 17.9 85.4 11.2 4.9 45.8 10.3

Level of Service B B B F B A D B

Approach Delay (s) 17.0 18.2 14.0 11.6

Approach LOS B B B B

Intersection Summary

HCM Average Control Delay 14.0 HCM Level of Service B

HCM Volume to Capacity ratio 0.68

Actuated Cycle Length (s) 47.8 Sum of lost time (s) 12.0

Intersection Capacity Utilization 60.2% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 82: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 160 5 30 0 0 0 0 245 85 500 75 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 174 5 33 0 0 0 0 266 92 543 82 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1302 1527 41 1476 1481 179 82 359

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1302 1527 41 1476 1481 179 82 359

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 91 97 100 100 100 100 55

cM capacity (veh/h) 76 64 1021 52 68 833 1514 1197

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 174 38 178 181 543 41 41

Volume Left 174 0 0 0 543 0 0

Volume Right 0 33 0 92 0 0 0

cSH 76 324 1700 1700 1197 1700 1700

Volume to Capacity 2.28 0.12 0.10 0.11 0.45 0.02 0.02

Queue Length 95th (ft) 406 10 0 0 61 0 0

Control Delay (s) 703.1 17.6 0.0 0.0 10.5 0.0 0.0

Lane LOS F C B

Approach Delay (s) 580.1 0.0 9.1

Approach LOS F

Intersection Summary

Average Delay 107.6

Intersection Capacity Utilization 58.8% ICU Level of Service B

Analysis Period (min) 15

Page 83: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 30 5 220 230 175 0 0 545 450

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 33 5 239 250 190 0 0 592 489

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1429 1283 296 986 1772 95 1082 190

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1429 1283 296 986 1772 95 1082 190

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 77 89 75 61 100

cM capacity (veh/h) 46 100 700 141 50 943 641 1381

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 35 242 250 95 95 296 296 489

Volume Left 33 0 250 0 0 0 0 0

Volume Right 0 239 0 0 0 0 0 489

cSH 123 786 641 1700 1700 1700 1700 1700

Volume to Capacity 0.29 0.31 0.39 0.06 0.06 0.17 0.17 0.29

Queue Length 95th (ft) 27 33 46 0 0 0 0 0

Control Delay (s) 45.5 11.6 14.2 0.0 0.0 0.0 0.0 0.0

Lane LOS E B B

Approach Delay (s) 15.9 8.0 0.0

Approach LOS C

Intersection Summary

Average Delay 4.4

Intersection Capacity Utilization 58.8% ICU Level of Service B

Analysis Period (min) 15

Page 84: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 220 145 430 175 185 460

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 239 158 467 190 201 500

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 658 1198 562

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 658 1198 562

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 74 0 5

cM capacity (veh/h) 930 152 526

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 239 158 658 701

Volume Left 239 0 0 201

Volume Right 0 0 190 500

cSH 930 1700 1700 404

Volume to Capacity 0.26 0.09 0.39 1.74

Queue Length 95th (ft) 26 0 0 1081

Control Delay (s) 10.2 0.0 0.0 364.9

Lane LOS B F

Approach Delay (s) 6.2 0.0 364.9

Approach LOS F

Intersection Summary

Average Delay 147.1

Intersection Capacity Utilization 68.4% ICU Level of Service C

Analysis Period (min) 15

Page 85: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 290 40 70 345 260 110

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 315 43 76 375 283 120

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 359 864 337

vC1, stage 1 conf vol 337

vC2, stage 2 conf vol 527

vCu, unblocked vol 359 864 337

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 94 10 83

cM capacity (veh/h) 1200 313 705

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 359 76 375 283 120

Volume Left 0 76 0 283 0

Volume Right 43 0 0 0 120

cSH 1700 1200 1700 313 705

Volume to Capacity 0.21 0.06 0.22 0.90 0.17

Queue Length 95th (ft) 0 5 0 214 15

Control Delay (s) 0.0 8.2 0.0 66.2 11.1

Lane LOS A F B

Approach Delay (s) 0.0 1.4 49.8

Approach LOS E

Intersection Summary

Average Delay 17.0

Intersection Capacity Utilization 46.0% ICU Level of Service A

Analysis Period (min) 15

Page 86: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.97 0.89

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1787 1607

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1787 1607

Volume (vph) 235 165 165 50 60 250

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 255 179 179 54 65 272

RTOR Reduction (vph) 0 0 19 0 150 0

Lane Group Flow (vph) 255 179 214 0 187 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.0 23.0 10.5 25.1

Effective Green, g (s) 8.5 23.5 11.0 25.6

Actuated g/C Ratio 0.15 0.41 0.19 0.45

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 263 767 344 720

v/s Ratio Prot c0.14 0.10 c0.12 c0.12

v/s Ratio Perm

v/c Ratio 0.97 0.23 0.62 0.26

Uniform Delay, d1 24.2 10.9 21.1 9.8

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 46.2 0.1 2.5 0.9

Delay (s) 70.4 11.0 23.6 10.7

Level of Service E B C B

Approach Delay (s) 45.9 23.6 10.7

Approach LOS D C B

Intersection Summary

HCM Average Control Delay 28.9 HCM Level of Service C

HCM Volume to Capacity ratio 0.48

Actuated Cycle Length (s) 57.1 Sum of lost time (s) 12.0

Intersection Capacity Utilization 56.3% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 87: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 310 5 70 0 155 445 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 5 5 5 323 5 73 0 161 464 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 78 104 763 836 243 1391 802 42

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 78 104 763 836 243 1391 802 42

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 76 100 24 28 100 100 100

cM capacity (veh/h) 1520 1371 228 213 647 9 223 1029

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 323 78 161 464

Volume Left 5 323 0 0 0

Volume Right 5 0 73 0 464

cSH 1520 1371 1700 213 647

Volume to Capacity 0.00 0.24 0.05 0.76 0.72

Queue Length 95th (ft) 0 23 0 130 150

Control Delay (s) 2.5 8.4 0.0 61.0 23.3

Lane LOS A A F C

Approach Delay (s) 2.5 6.8 33.0

Approach LOS D

Intersection Summary

Average Delay 22.5

Intersection Capacity Utilization 54.0% ICU Level of Service A

Analysis Period (min) 15

Page 88: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 260 240 265 295 315 125

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 283 261 288 321 342 136

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 283 261 288 321 342 136

Volume Left (vph) 283 0 0 0 342 0

Volume Right (vph) 0 0 0 321 0 136

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.8 7.3 7.3 6.6 8.0 6.8

Degree Utilization, x 0.61 0.53 0.58 0.59 0.76 0.26

Capacity (veh/h) 449 470 481 525 439 508

Control Delay (s) 21.3 17.1 18.8 17.3 31.0 10.9

Approach Delay (s) 19.3 18.0 25.3

Approach LOS C C D

Intersection Summary

Delay 20.6

HCM Level of Service C

Intersection Capacity Utilization 55.8% ICU Level of Service B

Analysis Period (min) 15

Page 89: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (prot) 1830 1583 1770 1824 1691 1478 1861 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (perm) 1830 1583 1770 1824 1691 1478 1861 1583

Volume (vph) 25 45 545 215 90 15 420 340 360 5 235 110

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 26 46 556 219 92 15 429 347 367 5 240 112

RTOR Reduction (vph) 0 0 150 0 6 0 0 0 114 0 0 65

Lane Group Flow (vph) 0 72 406 219 101 0 0 776 253 0 245 47

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.3 37.5 18.1 18.1 30.2 18.1 15.9 15.9

Effective Green, g (s) 7.3 37.5 18.1 18.1 30.2 18.1 15.9 15.9

Actuated g/C Ratio 0.08 0.43 0.21 0.21 0.35 0.21 0.18 0.18

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 153 751 366 377 584 306 338 288

v/s Ratio Prot 0.04 c0.19 0.12 0.06 c0.46 c0.17 c0.13

v/s Ratio Perm 0.07 0.03

v/c Ratio 0.47 0.54 0.60 0.27 1.33 0.83 0.72 0.16

Uniform Delay, d1 38.3 18.6 31.4 29.1 28.7 33.2 33.7 30.2

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 0.8 2.6 0.4 159.5 16.4 7.5 0.3

Delay (s) 40.5 19.4 34.0 29.5 188.1 49.6 41.3 30.5

Level of Service D B C C F D D C

Approach Delay (s) 21.8 32.6 143.7 37.9

Approach LOS C C F D

Intersection Summary

HCM Average Control Delay 82.3 HCM Level of Service F

HCM Volume to Capacity ratio 0.95

Actuated Cycle Length (s) 87.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 84.6% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 90: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative No Project

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.90 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1666 1770 1605 1676 1765 1500 1743 1827

Flt Permitted 0.65 0.75 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1102 1394 1605 1676 1765 1500 1743 1827

Volume (vph) 20 5 60 100 20 235 25 865 50 65 905 25

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 21 5 62 104 21 245 26 901 52 68 943 26

RTOR Reduction (vph) 0 52 0 0 162 0 0 0 15 0 1 0

Lane Group Flow (vph) 0 36 0 104 104 0 26 901 37 68 968 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 11.3 11.3 11.3 1.4 41.9 41.9 3.8 44.3

Effective Green, g (s) 11.3 11.3 11.3 1.4 41.9 41.9 3.8 44.3

Actuated g/C Ratio 0.16 0.16 0.16 0.02 0.61 0.61 0.06 0.64

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 180 228 263 34 1072 911 96 1173

v/s Ratio Prot 0.06 0.02 0.51 c0.04 c0.53

v/s Ratio Perm 0.03 c0.07 0.02

v/c Ratio 0.20 0.46 0.39 0.76 0.84 0.04 0.71 0.83

Uniform Delay, d1 24.9 26.1 25.8 33.6 10.9 5.5 32.1 9.4

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.6 1.4 1.0 66.1 6.1 0.0 21.2 4.9

Delay (s) 25.5 27.5 26.8 99.7 16.9 5.5 53.2 14.3

Level of Service C C C F B A D B

Approach Delay (s) 25.5 27.0 18.5 16.8

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 19.3 HCM Level of Service B

HCM Volume to Capacity ratio 0.72

Actuated Cycle Length (s) 69.0 Sum of lost time (s) 8.0

Intersection Capacity Utilization 84.0% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 91: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 460 5 115 0 0 0 0 75 25 210 230 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 489 5 122 0 0 0 0 80 27 223 245 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 731 798 122 787 785 53 245 106

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 731 798 122 787 785 53 245 106

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 98 86 100 100 100 100 85

cM capacity (veh/h) 274 270 906 212 275 1003 1319 1482

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 489 128 53 53 223 122 122

Volume Left 489 0 0 0 223 0 0

Volume Right 0 122 0 27 0 0 0

cSH 274 825 1700 1700 1482 1700 1700

Volume to Capacity 1.79 0.15 0.03 0.03 0.15 0.07 0.07

Queue Length 95th (ft) 815 14 0 0 13 0 0

Control Delay (s) 400.6 10.2 0.0 0.0 7.9 0.0 0.0

Lane LOS F B A

Approach Delay (s) 319.8 0.0 3.8

Approach LOS F

Intersection Summary

Average Delay 167.1

Intersection Capacity Utilization 50.5% ICU Level of Service A

Analysis Period (min) 15

Page 92: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 115 5 610 50 485 0 0 325 55

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 125 5 663 54 527 0 0 353 60

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1391 989 177 812 1049 264 413 527

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1391 989 177 812 1049 264 413 527

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 52 97 10 95 100

cM capacity (veh/h) 9 234 836 260 215 735 1142 1036

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 128 666 54 264 264 177 177 60

Volume Left 125 0 54 0 0 0 0 0

Volume Right 0 663 0 0 0 0 0 60

cSH 259 728 1142 1700 1700 1700 1700 1700

Volume to Capacity 0.49 0.91 0.05 0.16 0.16 0.10 0.10 0.04

Queue Length 95th (ft) 63 310 4 0 0 0 0 0

Control Delay (s) 31.6 39.8 8.3 0.0 0.0 0.0 0.0 0.0

Lane LOS D E A

Approach Delay (s) 38.5 0.8 0.0

Approach LOS E

Intersection Summary

Average Delay 17.3

Intersection Capacity Utilization 50.5% ICU Level of Service A

Analysis Period (min) 15

Page 93: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 325 470 85 161 130 300

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 353 511 92 175 141 326

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 268 1398 181

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 268 1398 181

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 73 0 62

cM capacity (veh/h) 1294 113 861

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 353 511 267 467

Volume Left 353 0 0 141

Volume Right 0 0 175 326

cSH 1294 1700 1700 338

Volume to Capacity 0.27 0.30 0.16 1.38

Queue Length 95th (ft) 28 0 0 590

Control Delay (s) 8.8 0.0 0.0 220.3

Lane LOS A F

Approach Delay (s) 3.6 0.0 220.3

Approach LOS F

Intersection Summary

Average Delay 66.3

Intersection Capacity Utilization 49.6% ICU Level of Service A

Analysis Period (min) 15

Page 94: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 335 265 126 211 35 65

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 364 288 137 229 38 71

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 652 1011 508

vC1, stage 1 conf vol 508

vC2, stage 2 conf vol 503

vCu, unblocked vol 652 1011 508

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 85 86 87

cM capacity (veh/h) 934 266 565

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 652 137 229 38 71

Volume Left 0 137 0 38 0

Volume Right 288 0 0 0 71

cSH 1700 934 1700 266 565

Volume to Capacity 0.38 0.15 0.13 0.14 0.13

Queue Length 95th (ft) 0 13 0 12 11

Control Delay (s) 0.0 9.5 0.0 20.8 12.3

Lane LOS A C B

Approach Delay (s) 0.0 3.6 15.3

Approach LOS C

Intersection Summary

Average Delay 2.6

Intersection Capacity Utilization 54.1% ICU Level of Service A

Analysis Period (min) 15

Page 95: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.98 0.89

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1806 1609

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1806 1609

Volume (vph) 230 170 150 30 50 187

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 250 185 163 33 54 203

RTOR Reduction (vph) 0 0 14 0 105 0

Lane Group Flow (vph) 250 185 182 0 152 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.0 20.6 8.1 26.9

Effective Green, g (s) 8.5 21.1 8.6 27.4

Actuated g/C Ratio 0.15 0.37 0.15 0.48

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 266 696 275 780

v/s Ratio Prot c0.14 0.10 c0.10 c0.09

v/s Ratio Perm

v/c Ratio 0.94 0.27 0.66 0.20

Uniform Delay, d1 23.7 12.3 22.6 8.3

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 38.3 0.1 4.6 0.6

Delay (s) 62.0 12.4 27.2 8.8

Level of Service E B C A

Approach Delay (s) 40.9 27.2 8.8

Approach LOS D C A

Intersection Summary

HCM Average Control Delay 28.6 HCM Level of Service C

HCM Volume to Capacity ratio 0.43

Actuated Cycle Length (s) 56.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 54.9% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 96: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 592 15 65 5 65 200 0 0 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 5 5 5 643 16 71 5 71 217 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 87 53 1364 1435 182 1742 1402 52

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 87 53 1364 1435 182 1742 1402 52

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 57 93 4 71 100 100 100

cM capacity (veh/h) 1509 1498 78 73 739 4 77 1016

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 643 87 76 217

Volume Left 5 643 0 5 0

Volume Right 5 0 71 0 217

cSH 1509 1498 1700 74 739

Volume to Capacity 0.00 0.43 0.05 1.03 0.29

Queue Length 95th (ft) 0 55 0 137 31

Control Delay (s) 2.5 9.2 0.0 212.4 11.9

Lane LOS A A F B

Approach Delay (s) 2.5 8.1 63.9

Approach LOS F

Intersection Summary

Average Delay 23.8

Intersection Capacity Utilization 59.3% ICU Level of Service B

Analysis Period (min) 15

Page 97: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 90 155 447 257 278 325

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 98 168 486 279 302 353

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 98 168 486 279 302 353

Volume Left (vph) 98 0 0 0 302 0

Volume Right (vph) 0 0 0 279 0 353

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 8.3 7.8 7.1 6.4 7.8 6.6

Degree Utilization, x 0.23 0.37 0.96 0.50 0.65 0.64

Capacity (veh/h) 423 452 498 552 452 533

Control Delay (s) 12.6 14.1 55.6 14.3 23.0 19.5

Approach Delay (s) 13.5 40.5 21.1

Approach LOS B E C

Intersection Summary

Delay 28.7

HCM Level of Service D

Intersection Capacity Utilization 53.9% ICU Level of Service A

Analysis Period (min) 15

Page 98: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1854 1583 1770 1848 1666 1478 1860 1583

Flt Permitted 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1854 1583 1770 1848 1666 1478 1860 1583

Volume (vph) 5 45 430 161 85 5 619 96 212 5 135 10

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 5 49 467 175 92 5 673 104 230 5 147 11

RTOR Reduction (vph) 0 0 148 0 2 0 0 0 61 0 0 9

Lane Group Flow (vph) 0 54 319 175 95 0 0 777 169 0 152 2

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.0 57.3 15.9 15.9 50.3 15.9 13.7 13.7

Effective Green, g (s) 7.0 57.3 15.9 15.9 50.3 15.9 13.7 13.7

Actuated g/C Ratio 0.07 0.56 0.15 0.15 0.49 0.15 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 126 943 273 286 814 228 248 211

v/s Ratio Prot 0.03 c0.17 0.10 0.05 c0.47 c0.11 c0.08

v/s Ratio Perm 0.04 0.00

v/c Ratio 0.43 0.34 0.64 0.33 0.95 0.74 0.61 0.01

Uniform Delay, d1 46.0 12.4 40.8 38.8 25.2 41.5 42.1 38.7

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 0.2 5.1 0.7 21.1 12.2 4.4 0.0

Delay (s) 48.4 12.7 45.9 39.5 46.3 53.8 46.5 38.7

Level of Service D B D D D D D D

Approach Delay (s) 16.4 43.6 48.0 46.0

Approach LOS B D D D

Intersection Summary

HCM Average Control Delay 38.8 HCM Level of Service D

HCM Volume to Capacity ratio 0.79

Actuated Cycle Length (s) 102.9 Sum of lost time (s) 12.0

Intersection Capacity Utilization 74.5% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 99: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1682 1770 1599 1676 1765 1500 1743 1822

Flt Permitted 0.68 0.72 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1159 1337 1599 1676 1765 1500 1743 1822

Volume (vph) 17 5 34 98 15 240 55 670 31 25 668 33

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 18 5 37 107 16 261 60 728 34 27 726 36

RTOR Reduction (vph) 0 31 0 0 195 0 0 0 13 0 2 0

Lane Group Flow (vph) 0 29 0 107 82 0 60 728 21 27 760 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.5 8.5 8.5 2.0 28.9 28.9 1.3 28.2

Effective Green, g (s) 8.5 8.5 8.5 2.0 28.9 28.9 1.3 28.2

Actuated g/C Ratio 0.17 0.17 0.17 0.04 0.57 0.57 0.03 0.56

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 194 224 268 66 1006 855 45 1013

v/s Ratio Prot 0.05 c0.04 0.41 0.02 c0.42

v/s Ratio Perm 0.03 c0.08 0.01

v/c Ratio 0.15 0.48 0.31 0.91 0.72 0.02 0.60 0.75

Uniform Delay, d1 18.0 19.1 18.5 24.3 8.0 4.8 24.4 8.6

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.4 1.6 0.7 78.5 2.6 0.0 19.7 3.2

Delay (s) 18.4 20.7 19.2 102.8 10.6 4.8 44.1 11.7

Level of Service B C B F B A D B

Approach Delay (s) 18.4 19.6 17.1 12.8

Approach LOS B B B B

Intersection Summary

HCM Average Control Delay 16.0 HCM Level of Service B

HCM Volume to Capacity ratio 0.70

Actuated Cycle Length (s) 50.7 Sum of lost time (s) 12.0

Intersection Capacity Utilization 69.3% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 100: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 160 5 30 0 0 0 0 245 85 500 75 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 174 5 33 0 0 0 0 266 92 543 82 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1302 1527 41 1476 1481 179 82 359

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1302 1527 41 1476 1481 179 82 359

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 91 97 100 100 100 100 55

cM capacity (veh/h) 76 64 1021 52 68 833 1514 1197

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 174 38 178 181 543 41 41

Volume Left 174 0 0 0 543 0 0

Volume Right 0 33 0 92 0 0 0

cSH 76 324 1700 1700 1197 1700 1700

Volume to Capacity 2.28 0.12 0.10 0.11 0.45 0.02 0.02

Queue Length 95th (ft) 406 10 0 0 61 0 0

Control Delay (s) 703.1 17.6 0.0 0.0 10.5 0.0 0.0

Lane LOS F C B

Approach Delay (s) 580.1 0.0 9.1

Approach LOS F

Intersection Summary

Average Delay 107.6

Intersection Capacity Utilization 58.8% ICU Level of Service B

Analysis Period (min) 15

Page 101: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 30 5 220 230 175 0 0 545 450

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 33 5 239 250 190 0 0 592 489

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1429 1283 296 986 1772 95 1082 190

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1429 1283 296 986 1772 95 1082 190

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 77 89 75 61 100

cM capacity (veh/h) 46 100 700 141 50 943 641 1381

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 35 242 250 95 95 296 296 489

Volume Left 33 0 250 0 0 0 0 0

Volume Right 0 239 0 0 0 0 0 489

cSH 123 786 641 1700 1700 1700 1700 1700

Volume to Capacity 0.29 0.31 0.39 0.06 0.06 0.17 0.17 0.29

Queue Length 95th (ft) 27 33 46 0 0 0 0 0

Control Delay (s) 45.5 11.6 14.2 0.0 0.0 0.0 0.0 0.0

Lane LOS E B B

Approach Delay (s) 15.9 8.0 0.0

Approach LOS C

Intersection Summary

Average Delay 4.4

Intersection Capacity Utilization 58.8% ICU Level of Service B

Analysis Period (min) 15

Page 102: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 220 145 430 180 186 460

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 239 158 467 196 202 500

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 663 1201 565

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 663 1201 565

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 74 0 5

cM capacity (veh/h) 926 151 524

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 239 158 663 702

Volume Left 239 0 0 202

Volume Right 0 0 196 500

cSH 926 1700 1700 394

Volume to Capacity 0.26 0.09 0.39 1.78

Queue Length 95th (ft) 26 0 0 1110

Control Delay (s) 10.2 0.0 0.0 384.9

Lane LOS B F

Approach Delay (s) 6.2 0.0 384.9

Approach LOS F

Intersection Summary

Average Delay 154.8

Intersection Capacity Utilization 68.7% ICU Level of Service C

Analysis Period (min) 15

Page 103: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 291 40 75 350 260 111

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 316 43 82 380 283 121

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 360 882 338

vC1, stage 1 conf vol 338

vC2, stage 2 conf vol 543

vCu, unblocked vol 360 882 338

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 93 8 83

cM capacity (veh/h) 1199 307 704

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 360 82 380 283 121

Volume Left 0 82 0 283 0

Volume Right 43 0 0 0 121

cSH 1700 1199 1700 307 704

Volume to Capacity 0.21 0.07 0.22 0.92 0.17

Queue Length 95th (ft) 0 5 0 222 15

Control Delay (s) 0.0 8.2 0.0 70.6 11.2

Lane LOS A F B

Approach Delay (s) 0.0 1.5 52.8

Approach LOS F

Intersection Summary

Average Delay 17.9

Intersection Capacity Utilization 46.3% ICU Level of Service A

Analysis Period (min) 15

Page 104: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.97 0.89

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1787 1606

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1787 1606

Volume (vph) 237 165 165 50 60 260

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 258 179 179 54 65 283

RTOR Reduction (vph) 0 0 19 0 156 0

Lane Group Flow (vph) 258 179 214 0 192 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.0 23.0 10.5 25.1

Effective Green, g (s) 8.5 23.5 11.0 25.6

Actuated g/C Ratio 0.15 0.41 0.19 0.45

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 263 767 344 720

v/s Ratio Prot c0.15 0.10 c0.12 c0.12

v/s Ratio Perm

v/c Ratio 0.98 0.23 0.62 0.27

Uniform Delay, d1 24.2 10.9 21.1 9.9

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 49.9 0.1 2.5 0.9

Delay (s) 74.1 11.0 23.6 10.8

Level of Service E B C B

Approach Delay (s) 48.2 23.6 10.8

Approach LOS D C B

Intersection Summary

HCM Average Control Delay 29.8 HCM Level of Service C

HCM Volume to Capacity ratio 0.49

Actuated Cycle Length (s) 57.1 Sum of lost time (s) 12.0

Intersection Capacity Utilization 56.4% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 105: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 320 5 72 0 155 447 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 5 5 5 333 5 75 0 161 466 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 80 104 784 859 243 1415 824 43

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 80 104 784 859 243 1415 824 43

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 76 100 21 28 100 100 100

cM capacity (veh/h) 1518 1371 219 204 647 8 214 1028

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 333 80 161 466

Volume Left 5 333 0 0 0

Volume Right 5 0 75 0 466

cSH 1518 1371 1700 204 647

Volume to Capacity 0.00 0.24 0.05 0.79 0.72

Queue Length 95th (ft) 0 24 0 139 152

Control Delay (s) 2.5 8.5 0.0 67.6 23.5

Lane LOS A A F C

Approach Delay (s) 2.5 6.8 34.8

Approach LOS D

Intersection Summary

Average Delay 23.4

Intersection Capacity Utilization 54.2% ICU Level of Service A

Analysis Period (min) 15

Page 106: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 260 242 277 306 317 125

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 283 263 301 333 345 136

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 283 263 301 333 345 136

Volume Left (vph) 283 0 0 0 345 0

Volume Right (vph) 0 0 0 333 0 136

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.9 7.4 7.3 6.6 8.1 6.8

Degree Utilization, x 0.62 0.54 0.61 0.61 0.77 0.26

Capacity (veh/h) 445 467 480 524 436 504

Control Delay (s) 21.7 17.5 20.1 18.2 32.2 11.0

Approach Delay (s) 19.7 19.1 26.2

Approach LOS C C D

Intersection Summary

Delay 21.3

HCM Level of Service C

Intersection Capacity Utilization 56.5% ICU Level of Service B

Analysis Period (min) 15

Page 107: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (prot) 1830 1583 1770 1824 1691 1478 1861 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (perm) 1830 1583 1770 1824 1691 1478 1861 1583

Volume (vph) 25 45 549 217 90 15 445 345 371 5 236 110

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 26 46 560 221 92 15 454 352 379 5 241 112

RTOR Reduction (vph) 0 0 150 0 6 0 0 0 113 0 0 65

Lane Group Flow (vph) 0 72 410 221 101 0 0 806 266 0 246 47

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.3 37.4 18.8 18.8 30.1 18.8 16.1 16.1

Effective Green, g (s) 7.3 37.4 18.8 18.8 30.1 18.8 16.1 16.1

Actuated g/C Ratio 0.08 0.42 0.21 0.21 0.34 0.21 0.18 0.18

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 151 742 377 388 576 315 339 289

v/s Ratio Prot 0.04 c0.19 0.12 0.06 c0.48 c0.18 c0.13

v/s Ratio Perm 0.07 0.03

v/c Ratio 0.48 0.55 0.59 0.26 1.40 0.85 0.73 0.16

Uniform Delay, d1 38.7 19.2 31.3 29.0 29.1 33.4 34.0 30.4

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.4 0.9 2.3 0.4 190.0 18.4 7.5 0.3

Delay (s) 41.0 20.1 33.6 29.3 219.1 51.8 41.5 30.7

Level of Service D C C C F D D C

Approach Delay (s) 22.4 32.2 165.6 38.1

Approach LOS C C F D

Intersection Summary

HCM Average Control Delay 93.7 HCM Level of Service F

HCM Volume to Capacity ratio 0.98

Actuated Cycle Length (s) 88.3 Sum of lost time (s) 12.0

Intersection Capacity Utilization 86.5% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 108: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus Davis Hotel

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.90 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1661 1770 1605 1676 1765 1500 1743 1827

Flt Permitted 0.60 0.64 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1003 1193 1605 1676 1765 1500 1743 1827

Volume (vph) 28 5 85 101 20 235 29 898 53 65 910 27

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 29 5 89 105 21 245 30 935 55 68 948 28

RTOR Reduction (vph) 0 74 0 0 154 0 0 0 15 0 1 0

Lane Group Flow (vph) 0 49 0 105 112 0 30 935 40 68 975 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 11.7 11.7 11.7 1.4 43.2 43.2 3.8 45.6

Effective Green, g (s) 11.7 11.7 11.7 1.4 43.2 43.2 3.8 45.6

Actuated g/C Ratio 0.17 0.17 0.17 0.02 0.61 0.61 0.05 0.64

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 166 197 266 33 1078 917 94 1178

v/s Ratio Prot 0.07 0.02 0.53 c0.04 c0.53

v/s Ratio Perm 0.05 c0.09 0.03

v/c Ratio 0.29 0.53 0.42 0.91 0.87 0.04 0.72 0.83

Uniform Delay, d1 25.9 27.0 26.5 34.6 11.4 5.5 32.9 9.6

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 1.0 2.8 1.1 118.0 7.5 0.0 23.9 4.9

Delay (s) 26.9 29.8 27.5 152.6 18.9 5.5 56.8 14.5

Level of Service C C C F B A E B

Approach Delay (s) 26.9 28.2 22.1 17.2

Approach LOS C C C B

Intersection Summary

HCM Average Control Delay 21.2 HCM Level of Service C

HCM Volume to Capacity ratio 0.73

Actuated Cycle Length (s) 70.7 Sum of lost time (s) 8.0

Intersection Capacity Utilization 86.6% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 109: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 466 5 115 0 0 0 0 75 25 215 230 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 496 5 122 0 0 0 0 80 27 229 245 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 742 809 122 798 795 53 245 106

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 742 809 122 798 795 53 245 106

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 98 86 100 100 100 100 85

cM capacity (veh/h) 268 265 906 208 269 1003 1319 1482

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 496 128 53 53 229 122 122

Volume Left 496 0 0 0 229 0 0

Volume Right 0 122 0 27 0 0 0

cSH 268 823 1700 1700 1482 1700 1700

Volume to Capacity 1.85 0.16 0.03 0.03 0.15 0.07 0.07

Queue Length 95th (ft) 849 14 0 0 14 0 0

Control Delay (s) 428.1 10.2 0.0 0.0 7.9 0.0 0.0

Lane LOS F B A

Approach Delay (s) 342.5 0.0 3.8

Approach LOS F

Intersection Summary

Average Delay 179.0

Intersection Capacity Utilization 51.1% ICU Level of Service A

Analysis Period (min) 15

Page 110: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 115 5 617 50 491 0 0 330 59

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 125 5 671 54 534 0 0 359 64

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1408 1001 179 822 1065 267 423 534

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1408 1001 179 822 1065 267 423 534

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 51 97 8 95 100

cM capacity (veh/h) 8 230 833 256 211 731 1133 1030

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 128 673 54 267 267 179 179 64

Volume Left 125 0 54 0 0 0 0 0

Volume Right 0 671 0 0 0 0 0 64

cSH 255 724 1133 1700 1700 1700 1700 1700

Volume to Capacity 0.50 0.93 0.05 0.16 0.16 0.11 0.11 0.04

Queue Length 95th (ft) 65 326 4 0 0 0 0 0

Control Delay (s) 32.4 42.5 8.3 0.0 0.0 0.0 0.0 0.0

Lane LOS D E A

Approach Delay (s) 40.9 0.8 0.0

Approach LOS E

Intersection Summary

Average Delay 18.3

Intersection Capacity Utilization 51.1% ICU Level of Service A

Analysis Period (min) 15

Page 111: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 325 483 94 162 128 300

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 353 525 102 176 139 326

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 279 1423 191

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 279 1423 191

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 72 0 62

cM capacity (veh/h) 1282 108 850

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 353 525 278 465

Volume Left 353 0 0 139

Volume Right 0 0 176 326

cSH 1282 1700 1700 325

Volume to Capacity 0.28 0.31 0.16 1.43

Queue Length 95th (ft) 28 0 0 616

Control Delay (s) 8.9 0.0 0.0 242.4

Lane LOS A F

Approach Delay (s) 3.6 0.0 242.4

Approach LOS F

Intersection Summary

Average Delay 71.5

Intersection Capacity Utilization 50.1% ICU Level of Service A

Analysis Period (min) 15

Page 112: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 346 265 125 221 35 60

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 376 288 136 240 38 65

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 664 1032 520

vC1, stage 1 conf vol 520

vC2, stage 2 conf vol 512

vCu, unblocked vol 664 1032 520

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 85 85 88

cM capacity (veh/h) 925 262 556

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 664 136 240 38 65

Volume Left 0 136 0 38 0

Volume Right 288 0 0 0 65

cSH 1700 925 1700 262 556

Volume to Capacity 0.39 0.15 0.14 0.15 0.12

Queue Length 95th (ft) 0 13 0 13 10

Control Delay (s) 0.0 9.6 0.0 21.1 12.3

Lane LOS A C B

Approach Delay (s) 0.0 3.5 15.6

Approach LOS C

Intersection Summary

Average Delay 2.5

Intersection Capacity Utilization 54.7% ICU Level of Service A

Analysis Period (min) 15

Page 113: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.98 0.90

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1804 1613

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1804 1613

Volume (vph) 220 186 161 34 54 185

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 239 202 175 37 59 201

RTOR Reduction (vph) 0 0 14 0 110 0

Lane Group Flow (vph) 239 202 198 0 150 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.0 22.7 10.2 25.1

Effective Green, g (s) 8.5 23.2 10.7 25.6

Actuated g/C Ratio 0.15 0.41 0.19 0.45

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 265 761 340 727

v/s Ratio Prot c0.14 0.11 c0.11 c0.09

v/s Ratio Perm

v/c Ratio 0.90 0.27 0.58 0.21

Uniform Delay, d1 23.7 11.1 21.0 9.4

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 30.3 0.1 1.6 0.6

Delay (s) 54.1 11.2 22.7 10.1

Level of Service D B C B

Approach Delay (s) 34.4 22.7 10.1

Approach LOS C C B

Intersection Summary

HCM Average Control Delay 24.8 HCM Level of Service C

HCM Volume to Capacity ratio 0.43

Actuated Cycle Length (s) 56.8 Sum of lost time (s) 12.0

Intersection Capacity Utilization 54.8% ICU Level of Service A

Analysis Period (min) 15

c Critical Lane Group

Page 114: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 594 15 65 5 65 194 0 0 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 5 5 5 646 16 71 5 71 211 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 87 53 1369 1439 182 1740 1407 52

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 87 53 1369 1439 182 1740 1407 52

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 57 93 3 71 100 100 100

cM capacity (veh/h) 1509 1498 77 73 739 3 76 1016

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 646 87 76 211

Volume Left 5 646 0 5 0

Volume Right 5 0 71 0 211

cSH 1509 1498 1700 73 739

Volume to Capacity 0.00 0.43 0.05 1.04 0.29

Queue Length 95th (ft) 0 56 0 138 29

Control Delay (s) 2.5 9.2 0.0 216.3 11.8

Lane LOS A A F B

Approach Delay (s) 2.5 8.1 66.0

Approach LOS F

Intersection Summary

Average Delay 24.1

Intersection Capacity Utilization 59.5% ICU Level of Service B

Analysis Period (min) 15

Page 115: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 92 147 447 255 265 327

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 100 160 486 277 288 355

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 100 160 486 277 288 355

Volume Left (vph) 100 0 0 0 288 0

Volume Right (vph) 0 0 0 277 0 355

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 8.3 7.8 7.0 6.3 7.7 6.5

Degree Utilization, x 0.23 0.35 0.95 0.49 0.62 0.65

Capacity (veh/h) 425 454 501 556 450 542

Control Delay (s) 12.5 13.6 53.9 14.0 21.3 19.4

Approach Delay (s) 13.2 39.4 20.3

Approach LOS B E C

Intersection Summary

Delay 27.9

HCM Level of Service D

Intersection Capacity Utilization 53.3% ICU Level of Service A

Analysis Period (min) 15

Page 116: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1854 1583 1770 1848 1666 1478 1860 1583

Flt Permitted 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1854 1583 1770 1848 1666 1478 1860 1583

Volume (vph) 5 45 407 150 85 5 617 95 210 5 130 10

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 5 49 442 163 92 5 671 103 228 5 141 11

RTOR Reduction (vph) 0 0 158 0 2 0 0 0 61 0 0 10

Lane Group Flow (vph) 0 54 284 163 95 0 0 774 167 0 146 1

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.0 57.3 15.7 15.7 50.3 15.7 13.5 13.5

Effective Green, g (s) 7.0 57.3 15.7 15.7 50.3 15.7 13.5 13.5

Actuated g/C Ratio 0.07 0.56 0.15 0.15 0.49 0.15 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 127 947 271 283 818 226 245 208

v/s Ratio Prot c0.03 0.15 0.09 0.05 c0.46 c0.11 c0.08

v/s Ratio Perm 0.03 0.00

v/c Ratio 0.43 0.30 0.60 0.34 0.95 0.74 0.60 0.01

Uniform Delay, d1 45.8 12.0 40.5 38.8 24.8 41.4 41.9 38.7

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 0.2 3.7 0.7 19.4 11.9 3.9 0.0

Delay (s) 48.1 12.2 44.2 39.5 44.2 53.4 45.8 38.7

Level of Service D B D D D D D D

Approach Delay (s) 16.1 42.4 46.3 45.3

Approach LOS B D D D

Intersection Summary

HCM Average Control Delay 37.9 HCM Level of Service D

HCM Volume to Capacity ratio 0.81

Actuated Cycle Length (s) 102.5 Sum of lost time (s) 16.0

Intersection Capacity Utilization 73.4% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 117: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1684 1770 1599 1676 1765 1500 1743 1824

Flt Permitted 0.72 0.72 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1233 1345 1599 1676 1765 1500 1743 1824

Volume (vph) 15 5 30 95 15 240 30 667 30 25 637 25

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 16 5 33 103 16 261 33 725 33 27 692 27

RTOR Reduction (vph) 0 27 0 0 195 0 0 0 13 0 2 0

Lane Group Flow (vph) 0 27 0 103 82 0 33 725 20 27 717 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 8.2 8.2 8.2 1.2 26.5 26.5 1.2 26.5

Effective Green, g (s) 8.2 8.2 8.2 1.2 26.5 26.5 1.2 26.5

Actuated g/C Ratio 0.17 0.17 0.17 0.03 0.55 0.55 0.03 0.55

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 211 230 274 42 976 830 44 1009

v/s Ratio Prot 0.05 c0.02 c0.41 0.02 0.39

v/s Ratio Perm 0.02 c0.08 0.01

v/c Ratio 0.13 0.45 0.30 0.79 0.74 0.02 0.61 0.71

Uniform Delay, d1 16.8 17.8 17.3 23.2 8.1 4.8 23.1 7.9

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.3 1.4 0.6 62.3 3.1 0.0 22.8 2.4

Delay (s) 17.1 19.2 18.0 85.5 11.2 4.9 45.9 10.3

Level of Service B B B F B A D B

Approach Delay (s) 17.1 18.3 14.0 11.6

Approach LOS B B B B

Intersection Summary

HCM Average Control Delay 14.0 HCM Level of Service B

HCM Volume to Capacity ratio 0.68

Actuated Cycle Length (s) 47.9 Sum of lost time (s) 12.0

Intersection Capacity Utilization 60.3% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 118: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 165 5 30 0 0 0 0 245 85 506 75 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 179 5 33 0 0 0 0 266 92 550 82 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1315 1540 41 1489 1494 179 82 359

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1315 1540 41 1489 1494 179 82 359

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 91 97 100 100 100 100 54

cM capacity (veh/h) 74 62 1021 50 66 833 1514 1197

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 179 38 178 181 550 41 41

Volume Left 179 0 0 0 550 0 0

Volume Right 0 33 0 92 0 0 0

cSH 74 317 1700 1700 1197 1700 1700

Volume to Capacity 2.42 0.12 0.10 0.11 0.46 0.02 0.02

Queue Length 95th (ft) 427 10 0 0 62 0 0

Control Delay (s) 767.7 17.9 0.0 0.0 10.5 0.0 0.0

Lane LOS F C B

Approach Delay (s) 636.5 0.0 9.2

Approach LOS F

Intersection Summary

Average Delay 119.4

Intersection Capacity Utilization 59.3% ICU Level of Service B

Analysis Period (min) 15

Page 119: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 30 5 226 230 180 0 0 551 456

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 33 5 246 250 196 0 0 599 496

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1445 1295 299 995 1790 98 1095 196

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1445 1295 299 995 1790 98 1095 196

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 76 89 74 61 100

cM capacity (veh/h) 44 98 697 138 48 939 633 1375

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 35 248 250 98 98 299 299 496

Volume Left 33 0 250 0 0 0 0 0

Volume Right 0 246 0 0 0 0 0 496

cSH 121 782 633 1700 1700 1700 1700 1700

Volume to Capacity 0.29 0.32 0.39 0.06 0.06 0.18 0.18 0.29

Queue Length 95th (ft) 28 34 47 0 0 0 0 0

Control Delay (s) 46.7 11.7 14.3 0.0 0.0 0.0 0.0 0.0

Lane LOS E B B

Approach Delay (s) 16.1 8.0 0.0

Approach LOS C

Intersection Summary

Average Delay 4.5

Intersection Capacity Utilization 59.3% ICU Level of Service B

Analysis Period (min) 15

Page 120: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 220 156 442 178 188 460

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 239 170 480 193 204 500

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 674 1225 577

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 674 1225 577

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 74 0 3

cM capacity (veh/h) 917 146 516

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 239 170 674 704

Volume Left 239 0 0 204

Volume Right 0 0 193 500

cSH 917 1700 1700 370

Volume to Capacity 0.26 0.10 0.40 1.90

Queue Length 95th (ft) 26 0 0 1184

Control Delay (s) 10.3 0.0 0.0 440.8

Lane LOS B F

Approach Delay (s) 6.0 0.0 440.8

Approach LOS F

Intersection Summary

Average Delay 175.1

Intersection Capacity Utilization 69.2% ICU Level of Service C

Analysis Period (min) 15

Page 121: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 304 40 70 360 260 110

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 330 43 76 391 283 120

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 374 896 352

vC1, stage 1 conf vol 352

vC2, stage 2 conf vol 543

vCu, unblocked vol 374 896 352

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 94 7 83

cM capacity (veh/h) 1185 305 691

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 374 76 391 283 120

Volume Left 0 76 0 283 0

Volume Right 43 0 0 0 120

cSH 1700 1185 1700 305 691

Volume to Capacity 0.22 0.06 0.23 0.93 0.17

Queue Length 95th (ft) 0 5 0 224 16

Control Delay (s) 0.0 8.2 0.0 72.0 11.3

Lane LOS A F B

Approach Delay (s) 0.0 1.3 54.0

Approach LOS F

Intersection Summary

Average Delay 18.0

Intersection Capacity Utilization 46.7% ICU Level of Service A

Analysis Period (min) 15

Page 122: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 0.99 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.97 0.89

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1787 1609

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1787 1609

Volume (vph) 235 179 180 54 64 250

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 255 195 196 59 70 272

RTOR Reduction (vph) 0 0 19 0 151 0

Lane Group Flow (vph) 255 195 236 0 191 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 8.0 23.4 10.9 25.1

Effective Green, g (s) 8.5 23.9 11.4 25.6

Actuated g/C Ratio 0.15 0.42 0.20 0.45

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 262 774 354 716

v/s Ratio Prot c0.14 0.10 c0.13 c0.12

v/s Ratio Perm

v/c Ratio 0.97 0.25 0.67 0.27

Uniform Delay, d1 24.4 11.0 21.3 10.0

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 47.7 0.1 3.6 0.9

Delay (s) 72.1 11.0 24.9 11.0

Level of Service E B C B

Approach Delay (s) 45.6 24.9 11.0

Approach LOS D C B

Intersection Summary

HCM Average Control Delay 29.3 HCM Level of Service C

HCM Volume to Capacity ratio 0.50

Actuated Cycle Length (s) 57.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 57.0% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 123: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 314 5 70 0 155 449 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 5 5 5 327 5 73 0 161 468 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 78 104 772 845 243 1404 811 42

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 78 104 772 845 243 1404 811 42

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 76 100 23 28 100 100 100

cM capacity (veh/h) 1520 1371 224 210 647 8 219 1029

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 327 78 161 468

Volume Left 5 327 0 0 0

Volume Right 5 0 73 0 468

cSH 1520 1371 1700 210 647

Volume to Capacity 0.00 0.24 0.05 0.77 0.72

Queue Length 95th (ft) 0 23 0 133 153

Control Delay (s) 2.5 8.4 0.0 63.4 23.7

Lane LOS A A F C

Approach Delay (s) 2.5 6.8 33.8

Approach LOS D

Intersection Summary

Average Delay 22.9

Intersection Capacity Utilization 54.3% ICU Level of Service A

Analysis Period (min) 15

Page 124: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 262 242 267 295 315 127

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 285 263 290 321 342 138

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 285 263 290 321 342 138

Volume Left (vph) 285 0 0 0 342 0

Volume Right (vph) 0 0 0 321 0 138

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.8 7.3 7.3 6.6 8.0 6.8

Degree Utilization, x 0.62 0.54 0.59 0.59 0.76 0.26

Capacity (veh/h) 448 470 480 524 438 507

Control Delay (s) 21.6 17.3 19.1 17.4 31.2 11.0

Approach Delay (s) 19.5 18.2 25.4

Approach LOS C C D

Intersection Summary

Delay 20.7

HCM Level of Service C

Intersection Capacity Utilization 56.0% ICU Level of Service B

Analysis Period (min) 15

Page 125: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (prot) 1830 1583 1770 1824 1691 1478 1861 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (perm) 1830 1583 1770 1824 1691 1478 1861 1583

Volume (vph) 25 45 547 215 90 15 422 340 360 5 235 110

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 26 46 558 219 92 15 431 347 367 5 240 112

RTOR Reduction (vph) 0 0 150 0 6 0 0 0 113 0 0 65

Lane Group Flow (vph) 0 72 408 219 101 0 0 778 254 0 245 47

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.3 37.5 18.1 18.1 30.2 18.1 15.9 15.9

Effective Green, g (s) 7.3 37.5 18.1 18.1 30.2 18.1 15.9 15.9

Actuated g/C Ratio 0.08 0.43 0.21 0.21 0.35 0.21 0.18 0.18

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 153 751 366 377 584 306 338 288

v/s Ratio Prot 0.04 c0.19 0.12 0.06 c0.46 c0.17 c0.13

v/s Ratio Perm 0.07 0.03

v/c Ratio 0.47 0.54 0.60 0.27 1.33 0.83 0.72 0.16

Uniform Delay, d1 38.3 18.6 31.4 29.1 28.7 33.2 33.7 30.2

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 0.8 2.6 0.4 161.0 16.7 7.5 0.3

Delay (s) 40.5 19.4 34.0 29.5 189.6 49.9 41.3 30.5

Level of Service D B C C F D D C

Approach Delay (s) 21.8 32.6 144.8 37.9

Approach LOS C C F D

Intersection Summary

HCM Average Control Delay 82.9 HCM Level of Service F

HCM Volume to Capacity ratio 0.96

Actuated Cycle Length (s) 87.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 84.8% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 126: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus Hyatt Expansion

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.90 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1666 1770 1605 1676 1765 1500 1743 1827

Flt Permitted 0.65 0.75 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1097 1393 1605 1676 1765 1500 1743 1827

Volume (vph) 20 5 60 100 20 235 25 867 50 65 907 25

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 21 5 62 104 21 245 26 903 52 68 945 26

RTOR Reduction (vph) 0 52 0 0 161 0 0 0 14 0 1 0

Lane Group Flow (vph) 0 36 0 104 105 0 26 903 38 68 970 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 11.3 11.3 11.3 1.4 42.1 42.1 3.8 44.5

Effective Green, g (s) 11.3 11.3 11.3 1.4 42.1 42.1 3.8 44.5

Actuated g/C Ratio 0.16 0.16 0.16 0.02 0.61 0.61 0.05 0.64

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 179 227 262 34 1074 913 96 1175

v/s Ratio Prot 0.07 0.02 0.51 c0.04 c0.53

v/s Ratio Perm 0.03 c0.07 0.03

v/c Ratio 0.20 0.46 0.40 0.76 0.84 0.04 0.71 0.83

Uniform Delay, d1 25.0 26.2 25.9 33.7 10.9 5.4 32.2 9.4

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.6 1.5 1.0 66.1 6.1 0.0 21.2 4.9

Delay (s) 25.6 27.6 26.9 99.8 16.9 5.5 53.3 14.3

Level of Service C C C F B A D B

Approach Delay (s) 25.6 27.1 18.5 16.8

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 19.3 HCM Level of Service B

HCM Volume to Capacity ratio 0.72

Actuated Cycle Length (s) 69.2 Sum of lost time (s) 8.0

Intersection Capacity Utilization 84.0% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 127: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 425 5 115 0 0 0 0 75 25 210 230 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 452 5 122 0 0 0 0 80 27 223 245 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 731 798 122 787 785 53 245 106

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 731 798 122 787 785 53 245 106

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 98 86 100 100 100 100 85

cM capacity (veh/h) 274 270 906 212 275 1003 1319 1482

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 452 128 53 53 223 122 122

Volume Left 452 0 0 0 223 0 0

Volume Right 0 122 0 27 0 0 0

cSH 274 825 1700 1700 1482 1700 1700

Volume to Capacity 1.65 0.15 0.03 0.03 0.15 0.07 0.07

Queue Length 95th (ft) 708 14 0 0 13 0 0

Control Delay (s) 341.9 10.2 0.0 0.0 7.9 0.0 0.0

Lane LOS F B A

Approach Delay (s) 268.8 0.0 3.8

Approach LOS F

Intersection Summary

Average Delay 136.6

Intersection Capacity Utilization 48.5% ICU Level of Service A

Analysis Period (min) 15

Page 128: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 115 5 560 50 450 0 0 325 55

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 125 5 609 54 489 0 0 353 60

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1318 951 177 774 1011 245 413 489

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1318 951 177 774 1011 245 413 489

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 55 98 19 95 100

cM capacity (veh/h) 21 246 836 278 227 756 1142 1070

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 128 611 54 245 245 177 177 60

Volume Left 125 0 54 0 0 0 0 0

Volume Right 0 609 0 0 0 0 0 60

cSH 276 748 1142 1700 1700 1700 1700 1700

Volume to Capacity 0.46 0.82 0.05 0.14 0.14 0.10 0.10 0.04

Queue Length 95th (ft) 57 221 4 0 0 0 0 0

Control Delay (s) 28.8 27.5 8.3 0.0 0.0 0.0 0.0 0.0

Lane LOS D D A

Approach Delay (s) 27.7 0.8 0.0

Approach LOS D

Intersection Summary

Average Delay 12.4

Intersection Capacity Utilization 48.5% ICU Level of Service A

Analysis Period (min) 15

Page 129: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 325 385 85 160 125 300

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 353 418 92 174 136 326

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 267 1305 180

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 267 1305 180

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 73 0 62

cM capacity (veh/h) 1295 128 862

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 353 418 266 462

Volume Left 353 0 0 136

Volume Right 0 0 174 326

cSH 1295 1700 1700 420

Volume to Capacity 0.27 0.25 0.16 1.10

Queue Length 95th (ft) 28 0 0 401

Control Delay (s) 8.8 0.0 0.0 105.1

Lane LOS A F

Approach Delay (s) 4.0 0.0 105.1

Approach LOS F

Intersection Summary

Average Delay 34.4

Intersection Capacity Utilization 49.3% ICU Level of Service A

Analysis Period (min) 15

Page 130: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 330 180 210 210 35 60

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 359 196 228 228 38 65

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 554 1141 457

vC1, stage 1 conf vol 457

vC2, stage 2 conf vol 685

vCu, unblocked vol 554 1141 457

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 78 82 89

cM capacity (veh/h) 1016 217 604

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 554 228 228 38 65

Volume Left 0 228 0 38 0

Volume Right 196 0 0 0 65

cSH 1700 1016 1700 217 604

Volume to Capacity 0.33 0.22 0.13 0.18 0.11

Queue Length 95th (ft) 0 22 0 15 9

Control Delay (s) 0.0 9.6 0.0 25.0 11.7

Lane LOS A D B

Approach Delay (s) 0.0 4.8 16.6

Approach LOS C

Intersection Summary

Average Delay 3.5

Intersection Capacity Utilization 53.3% ICU Level of Service A

Analysis Period (min) 15

Page 131: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.92

Flt Protected 0.95 1.00 1.00 0.98

Satd. Flow (prot) 1770 1863 1846 1652

Flt Permitted 0.95 1.00 1.00 0.98

Satd. Flow (perm) 1770 1863 1846 1652

Volume (vph) 80 310 385 20 25 35

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 87 337 418 22 27 38

RTOR Reduction (vph) 0 0 3 0 22 0

Lane Group Flow (vph) 87 337 437 0 43 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 6.0 26.4 15.9 25.8

Effective Green, g (s) 6.5 26.9 16.4 26.3

Actuated g/C Ratio 0.11 0.44 0.27 0.43

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 188 819 495 710

v/s Ratio Prot 0.05 c0.18 c0.24 c0.03

v/s Ratio Perm

v/c Ratio 0.46 0.41 0.88 0.06

Uniform Delay, d1 25.7 11.7 21.5 10.2

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.7 0.1 16.4 0.2

Delay (s) 26.4 11.9 37.9 10.4

Level of Service C B D B

Approach Delay (s) 14.8 37.9 10.4

Approach LOS B D B

Intersection Summary

HCM Average Control Delay 25.4 HCM Level of Service C

HCM Volume to Capacity ratio 0.39

Actuated Cycle Length (s) 61.2 Sum of lost time (s) 12.0

Intersection Capacity Utilization 59.0% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 132: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 675 15 65 5 65 190 0 0 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 5 5 5 734 16 71 5 71 207 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 87 53 1545 1615 182 1912 1583 52

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 87 53 1545 1615 182 1912 1583 52

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 51 90 0 72 0 100 100

cM capacity (veh/h) 1509 1498 54 51 739 0 53 1016

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 734 87 76 207

Volume Left 5 734 0 5 0

Volume Right 5 0 71 0 207

cSH 1509 1498 1700 51 739

Volume to Capacity 0.00 0.49 0.05 1.49 0.28

Queue Length 95th (ft) 0 70 0 178 29

Control Delay (s) 2.5 9.7 0.0 428.8 11.8

Lane LOS A A F B

Approach Delay (s) 2.5 8.7 124.0

Approach LOS F

Intersection Summary

Average Delay 37.7

Intersection Capacity Utilization 63.9% ICU Level of Service B

Analysis Period (min) 15

Page 133: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 90 145 487 255 265 368

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 98 158 529 277 288 400

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 98 158 529 277 288 400

Volume Left (vph) 98 0 0 0 288 0

Volume Right (vph) 0 0 0 277 0 400

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 8.3 7.8 7.2 6.4 7.7 6.6

Degree Utilization, x 0.23 0.34 1.05 0.50 0.62 0.73

Capacity (veh/h) 420 449 497 550 453 538

Control Delay (s) 12.5 13.6 79.8 14.4 21.3 24.0

Approach Delay (s) 13.2 57.3 22.9

Approach LOS B F C

Intersection Summary

Delay 37.3

HCM Level of Service E

Intersection Capacity Utilization 55.3% ICU Level of Service B

Analysis Period (min) 15

Page 134: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1854 1583 1770 1848 1665 1478 1860 1583

Flt Permitted 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1854 1583 1770 1848 1665 1478 1860 1583

Volume (vph) 5 45 405 150 85 5 657 95 210 5 130 10

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 5 49 440 163 92 5 714 103 228 5 141 11

RTOR Reduction (vph) 0 0 158 0 2 0 0 0 57 0 0 10

Lane Group Flow (vph) 0 54 282 163 95 0 0 817 171 0 146 1

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.0 57.3 15.9 15.9 50.3 15.9 13.5 13.5

Effective Green, g (s) 7.0 57.3 15.9 15.9 50.3 15.9 13.5 13.5

Actuated g/C Ratio 0.07 0.56 0.15 0.15 0.49 0.15 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 126 945 274 286 815 229 244 208

v/s Ratio Prot c0.03 0.15 0.09 0.05 c0.49 c0.12 c0.08

v/s Ratio Perm 0.03 0.00

v/c Ratio 0.43 0.30 0.59 0.33 1.00 0.74 0.60 0.01

Uniform Delay, d1 45.9 12.0 40.4 38.7 26.2 41.5 42.0 38.8

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 0.2 3.4 0.7 32.1 12.3 3.9 0.0

Delay (s) 48.3 12.2 43.8 39.4 58.3 53.8 46.0 38.8

Level of Service D B D D E D D D

Approach Delay (s) 16.2 42.2 57.3 45.5

Approach LOS B D E D

Intersection Summary

HCM Average Control Delay 44.0 HCM Level of Service D

HCM Volume to Capacity ratio 0.85

Actuated Cycle Length (s) 102.7 Sum of lost time (s) 16.0

Intersection Capacity Utilization 75.8% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 135: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1684 1770 1599 1676 1765 1500 1743 1824

Flt Permitted 0.85 0.72 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1447 1345 1599 1676 1765 1500 1743 1824

Volume (vph) 15 5 30 95 15 240 30 707 30 25 635 25

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 16 5 33 103 16 261 33 768 33 27 690 27

RTOR Reduction (vph) 0 26 0 0 178 0 0 0 13 0 2 0

Lane Group Flow (vph) 0 28 0 103 99 0 33 768 20 27 715 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 10.2 10.2 10.2 1.3 27.9 27.9 1.3 27.9

Effective Green, g (s) 10.2 10.2 10.2 1.3 27.9 27.9 1.3 27.9

Actuated g/C Ratio 0.20 0.20 0.20 0.03 0.54 0.54 0.03 0.54

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 287 267 317 42 958 814 44 990

v/s Ratio Prot 0.06 c0.02 c0.44 0.02 0.39

v/s Ratio Perm 0.02 c0.08 0.01

v/c Ratio 0.10 0.39 0.31 0.79 0.80 0.02 0.61 0.72

Uniform Delay, d1 16.8 17.9 17.6 24.9 9.5 5.4 24.8 8.8

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.1 0.9 0.6 62.3 4.9 0.0 22.8 2.6

Delay (s) 17.0 18.8 18.2 87.2 14.4 5.5 47.6 11.5

Level of Service B B B F B A D B

Approach Delay (s) 17.0 18.3 16.9 12.8

Approach LOS B B B B

Intersection Summary

HCM Average Control Delay 15.7 HCM Level of Service B

HCM Volume to Capacity ratio 0.69

Actuated Cycle Length (s) 51.4 Sum of lost time (s) 12.0

Intersection Capacity Utilization 62.5% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 136: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 160 5 30 0 0 0 0 245 85 450 75 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 174 5 33 0 0 0 0 266 92 489 82 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1193 1418 41 1367 1372 179 82 359

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1193 1418 41 1367 1372 179 82 359

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 93 97 100 100 100 100 59

cM capacity (veh/h) 97 80 1021 66 86 833 1514 1197

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 174 38 178 181 489 41 41

Volume Left 174 0 0 0 489 0 0

Volume Right 0 33 0 92 0 0 0

cSH 97 382 1700 1700 1197 1700 1700

Volume to Capacity 1.79 0.10 0.10 0.11 0.41 0.02 0.02

Queue Length 95th (ft) 355 8 0 0 51 0 0

Control Delay (s) 469.1 15.5 0.0 0.0 10.1 0.0 0.0

Lane LOS F C B

Approach Delay (s) 387.7 0.0 8.6

Approach LOS F

Intersection Summary

Average Delay 76.3

Intersection Capacity Utilization 56.0% ICU Level of Service B

Analysis Period (min) 15

Page 137: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 30 5 220 230 175 0 0 495 405

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 33 5 239 250 190 0 0 538 440

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1375 1228 269 959 1668 95 978 190

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1375 1228 269 959 1668 95 978 190

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 79 91 75 64 100

cM capacity (veh/h) 53 114 729 153 61 943 701 1381

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 35 242 250 95 95 269 269 440

Volume Left 33 0 250 0 0 0 0 0

Volume Right 0 239 0 0 0 0 0 440

cSH 137 812 701 1700 1700 1700 1700 1700

Volume to Capacity 0.26 0.30 0.36 0.06 0.06 0.16 0.16 0.26

Queue Length 95th (ft) 24 31 40 0 0 0 0 0

Control Delay (s) 40.1 11.3 13.0 0.0 0.0 0.0 0.0 0.0

Lane LOS E B B

Approach Delay (s) 15.0 7.4 0.0

Approach LOS B

Intersection Summary

Average Delay 4.4

Intersection Capacity Utilization 56.0% ICU Level of Service B

Analysis Period (min) 15

Page 138: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 220 145 335 175 185 460

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 239 158 364 190 201 500

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 554 1095 459

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 554 1095 459

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 76 0 17

cM capacity (veh/h) 1016 181 602

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 239 158 554 701

Volume Left 239 0 0 201

Volume Right 0 0 190 500

cSH 1016 1700 1700 523

Volume to Capacity 0.24 0.09 0.33 1.34

Queue Length 95th (ft) 23 0 0 771

Control Delay (s) 9.6 0.0 0.0 189.2

Lane LOS A F

Approach Delay (s) 5.8 0.0 189.2

Approach LOS F

Intersection Summary

Average Delay 81.7

Intersection Capacity Utilization 63.4% ICU Level of Service B

Analysis Period (min) 15

Page 139: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 290 40 70 345 165 205

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 315 43 76 375 179 223

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked 0.88

vC, conflicting volume 359 864 337

vC1, stage 1 conf vol 337

vC2, stage 2 conf vol 527

vCu, unblocked vol 359 846 337

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 94 39 68

cM capacity (veh/h) 1200 295 705

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 359 76 375 179 223

Volume Left 0 76 0 179 0

Volume Right 43 0 0 0 223

cSH 1700 1200 1700 295 705

Volume to Capacity 0.21 0.06 0.22 0.61 0.32

Queue Length 95th (ft) 0 5 0 92 34

Control Delay (s) 0.0 8.2 0.0 34.4 12.4

Lane LOS A D B

Approach Delay (s) 0.0 1.4 22.2

Approach LOS C

Intersection Summary

Average Delay 7.9

Intersection Capacity Utilization 40.7% ICU Level of Service A

Analysis Period (min) 15

Page 140: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.90

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1839 1626

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1839 1626

Volume (vph) 50 445 315 25 40 100

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 54 484 342 27 43 109

RTOR Reduction (vph) 0 0 5 0 59 0

Lane Group Flow (vph) 54 484 364 0 93 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 4.2 22.2 13.5 26.0

Effective Green, g (s) 4.7 22.7 14.0 26.5

Actuated g/C Ratio 0.08 0.40 0.24 0.46

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 145 739 450 753

v/s Ratio Prot 0.03 c0.26 c0.20 c0.06

v/s Ratio Perm

v/c Ratio 0.37 0.65 0.81 0.12

Uniform Delay, d1 24.9 14.1 20.3 8.7

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.6 1.6 9.8 0.3

Delay (s) 25.4 15.7 30.1 9.1

Level of Service C B C A

Approach Delay (s) 16.6 30.1 9.1

Approach LOS B C A

Intersection Summary

HCM Average Control Delay 20.3 HCM Level of Service C

HCM Volume to Capacity ratio 0.41

Actuated Cycle Length (s) 57.2 Sum of lost time (s) 12.0

Intersection Capacity Utilization 55.7% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 141: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 310 5 70 0 155 540 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 5 5 5 323 5 73 0 161 562 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 78 104 763 836 243 1490 802 42

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 78 104 763 836 243 1490 802 42

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 76 100 24 13 100 100 100

cM capacity (veh/h) 1520 1371 228 213 647 4 223 1029

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 323 78 161 562

Volume Left 5 323 0 0 0

Volume Right 5 0 73 0 562

cSH 1520 1371 1700 213 647

Volume to Capacity 0.00 0.24 0.05 0.76 0.87

Queue Length 95th (ft) 0 23 0 130 254

Control Delay (s) 2.5 8.4 0.0 61.0 36.2

Lane LOS A A F E

Approach Delay (s) 2.5 6.8 41.8

Approach LOS E

Intersection Summary

Average Delay 28.9

Intersection Capacity Utilization 59.9% ICU Level of Service B

Analysis Period (min) 15

Page 142: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 308 287 265 295 315 125

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 335 312 288 321 342 136

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 335 312 288 321 342 136

Volume Left (vph) 335 0 0 0 342 0

Volume Right (vph) 0 0 0 321 0 136

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 7.9 7.4 7.5 6.8 8.2 7.0

Degree Utilization, x 0.74 0.64 0.60 0.61 0.78 0.26

Capacity (veh/h) 448 471 459 509 427 491

Control Delay (s) 28.6 21.4 20.0 18.5 33.9 11.3

Approach Delay (s) 25.2 19.2 27.4

Approach LOS D C D

Intersection Summary

Delay 23.7

HCM Level of Service C

Intersection Capacity Utilization 58.5% ICU Level of Service B

Analysis Period (min) 15

Page 143: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (prot) 1830 1583 1770 1824 1691 1478 1861 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (perm) 1830 1583 1770 1824 1691 1478 1861 1583

Volume (vph) 25 45 592 215 90 15 420 340 360 5 235 110

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 26 46 604 219 92 15 429 347 367 5 240 112

RTOR Reduction (vph) 0 0 150 0 6 0 0 0 114 0 0 65

Lane Group Flow (vph) 0 72 454 219 101 0 0 776 253 0 245 47

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.3 37.5 18.1 18.1 30.2 18.1 15.9 15.9

Effective Green, g (s) 7.3 37.5 18.1 18.1 30.2 18.1 15.9 15.9

Actuated g/C Ratio 0.08 0.43 0.21 0.21 0.35 0.21 0.18 0.18

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 153 751 366 377 584 306 338 288

v/s Ratio Prot 0.04 c0.21 0.12 0.06 c0.46 c0.17 c0.13

v/s Ratio Perm 0.08 0.03

v/c Ratio 0.47 0.60 0.60 0.27 1.33 0.83 0.72 0.16

Uniform Delay, d1 38.3 19.3 31.4 29.1 28.7 33.2 33.7 30.2

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 1.4 2.6 0.4 159.5 16.4 7.5 0.3

Delay (s) 40.5 20.7 34.0 29.5 188.1 49.6 41.3 30.5

Level of Service D C C C F D D C

Approach Delay (s) 22.8 32.6 143.7 37.9

Approach LOS C C F D

Intersection Summary

HCM Average Control Delay 81.4 HCM Level of Service F

HCM Volume to Capacity ratio 0.96

Actuated Cycle Length (s) 87.5 Sum of lost time (s) 12.0

Intersection Capacity Utilization 84.6% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 144: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus ODR Extension

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.90 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1666 1770 1605 1676 1765 1500 1743 1828

Flt Permitted 0.64 0.74 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1072 1381 1605 1676 1765 1500 1743 1828

Volume (vph) 20 5 60 100 20 235 25 865 50 65 952 25

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 21 5 62 104 21 245 26 901 52 68 992 26

RTOR Reduction (vph) 0 52 0 0 163 0 0 0 14 0 1 0

Lane Group Flow (vph) 0 36 0 104 103 0 26 901 38 68 1017 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 11.4 11.4 11.4 1.5 43.5 43.5 3.8 45.8

Effective Green, g (s) 11.4 11.4 11.4 1.5 43.5 43.5 3.8 45.8

Actuated g/C Ratio 0.16 0.16 0.16 0.02 0.62 0.62 0.05 0.65

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 173 223 259 36 1086 923 94 1184

v/s Ratio Prot 0.06 0.02 0.51 c0.04 c0.56

v/s Ratio Perm 0.03 c0.08 0.03

v/c Ratio 0.21 0.47 0.40 0.72 0.83 0.04 0.72 0.86

Uniform Delay, d1 25.7 26.9 26.6 34.4 10.7 5.4 32.9 9.9

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.6 1.5 1.0 52.1 5.4 0.0 23.9 6.4

Delay (s) 26.3 28.4 27.6 86.5 16.1 5.4 56.8 16.3

Level of Service C C C F B A E B

Approach Delay (s) 26.3 27.8 17.4 18.8

Approach LOS C C B B

Intersection Summary

HCM Average Control Delay 19.8 HCM Level of Service B

HCM Volume to Capacity ratio 0.75

Actuated Cycle Length (s) 70.7 Sum of lost time (s) 8.0

Intersection Capacity Utilization 84.0% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 145: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 430 5 115 0 0 0 0 75 25 215 230 0

Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94

Hourly flow rate (vph) 457 5 122 0 0 0 0 80 27 229 245 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 742 809 122 798 795 53 245 106

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 742 809 122 798 795 53 245 106

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 98 86 100 100 100 100 85

cM capacity (veh/h) 268 265 906 208 269 1003 1319 1482

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 457 128 53 53 229 122 122

Volume Left 457 0 0 0 229 0 0

Volume Right 0 122 0 27 0 0 0

cSH 268 823 1700 1700 1482 1700 1700

Volume to Capacity 1.71 0.16 0.03 0.03 0.15 0.07 0.07

Queue Length 95th (ft) 737 14 0 0 14 0 0

Control Delay (s) 366.2 10.2 0.0 0.0 7.9 0.0 0.0

Lane LOS F B A

Approach Delay (s) 288.5 0.0 3.8

Approach LOS F

Intersection Summary

Average Delay 146.5

Intersection Capacity Utilization 49.1% ICU Level of Service A

Analysis Period (min) 15

Page 146: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 115 5 566 50 455 0 0 330 59

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 125 5 615 54 495 0 0 359 64

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1333 962 179 783 1026 247 423 495

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1333 962 179 783 1026 247 423 495

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 54 98 18 95 100

cM capacity (veh/h) 19 242 833 274 222 753 1133 1065

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 128 618 54 247 247 179 179 64

Volume Left 125 0 54 0 0 0 0 0

Volume Right 0 615 0 0 0 0 0 64

cSH 272 745 1133 1700 1700 1700 1700 1700

Volume to Capacity 0.47 0.83 0.05 0.15 0.15 0.11 0.11 0.04

Queue Length 95th (ft) 59 231 4 0 0 0 0 0

Control Delay (s) 29.4 28.7 8.3 0.0 0.0 0.0 0.0 0.0

Lane LOS D D A

Approach Delay (s) 28.8 0.8 0.0

Approach LOS D

Intersection Summary

Average Delay 12.8

Intersection Capacity Utilization 49.1% ICU Level of Service A

Analysis Period (min) 15

Page 147: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 325 396 94 163 133 300

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 353 430 102 177 145 326

Pedestrians 1

Lane Width (ft) 12.0

Walking Speed (ft/s) 4.0

Percent Blockage 0

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked

vC, conflicting volume 280 1329 192

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 280 1329 192

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 72 0 62

cM capacity (veh/h) 1281 124 849

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 353 430 279 471

Volume Left 353 0 0 145

Volume Right 0 0 177 326

cSH 1281 1700 1700 369

Volume to Capacity 0.28 0.25 0.16 1.27

Queue Length 95th (ft) 28 0 0 526

Control Delay (s) 8.9 0.0 0.0 173.2

Lane LOS A F

Approach Delay (s) 4.0 0.0 173.2

Approach LOS F

Intersection Summary

Average Delay 55.2

Intersection Capacity Utilization 50.4% ICU Level of Service A

Analysis Period (min) 15

Page 148: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 349 180 211 222 35 65

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 379 196 229 241 38 71

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked

vC, conflicting volume 575 1177 477

vC1, stage 1 conf vol 477

vC2, stage 2 conf vol 700

vCu, unblocked vol 575 1177 477

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 77 82 88

cM capacity (veh/h) 998 211 588

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 575 229 241 38 71

Volume Left 0 229 0 38 0

Volume Right 196 0 0 0 71

cSH 1700 998 1700 211 588

Volume to Capacity 0.34 0.23 0.14 0.18 0.12

Queue Length 95th (ft) 0 22 0 16 10

Control Delay (s) 0.0 9.7 0.0 25.8 12.0

Lane LOS A D B

Approach Delay (s) 0.0 4.7 16.8

Approach LOS C

Intersection Summary

Average Delay 3.5

Intersection Capacity Utilization 54.4% ICU Level of Service A

Analysis Period (min) 15

Page 149: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.92

Flt Protected 0.95 1.00 1.00 0.98

Satd. Flow (prot) 1770 1863 1846 1649

Flt Permitted 0.95 1.00 1.00 0.98

Satd. Flow (perm) 1770 1863 1846 1649

Volume (vph) 90 324 396 20 25 37

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 98 352 430 22 27 40

RTOR Reduction (vph) 0 0 3 0 23 0

Lane Group Flow (vph) 98 352 449 0 44 0

Confl. Peds. (#/hr) 15 8

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 5.9 26.6 16.2 25.8

Effective Green, g (s) 6.4 27.1 16.7 26.3

Actuated g/C Ratio 0.10 0.44 0.27 0.43

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 184 822 502 706

v/s Ratio Prot c0.06 0.19 c0.24 c0.03

v/s Ratio Perm

v/c Ratio 0.53 0.43 0.89 0.06

Uniform Delay, d1 26.1 11.8 21.5 10.3

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 1.5 0.1 17.8 0.2

Delay (s) 27.6 11.9 39.3 10.5

Level of Service C B D B

Approach Delay (s) 15.3 39.3 10.5

Approach LOS B D B

Intersection Summary

HCM Average Control Delay 26.2 HCM Level of Service C

HCM Volume to Capacity ratio 0.40

Actuated Cycle Length (s) 61.4 Sum of lost time (s) 12.0

Intersection Capacity Utilization 59.6% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 150: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 683 15 65 5 65 204 0 0 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 5 5 5 742 16 71 5 71 222 0 0 0

Pedestrians 132 42

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 11 4

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 87 53 1562 1633 182 1944 1600 52

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 87 53 1562 1633 182 1944 1600 52

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 50 90 0 70 0 100 100

cM capacity (veh/h) 1509 1498 52 49 739 0 51 1016

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 742 87 76 222

Volume Left 5 742 0 5 0

Volume Right 5 0 71 0 222

cSH 1509 1498 1700 49 739

Volume to Capacity 0.00 0.50 0.05 1.54 0.30

Queue Length 95th (ft) 0 71 0 182 32

Control Delay (s) 2.5 9.7 0.0 456.4 11.9

Lane LOS A A F B

Approach Delay (s) 2.5 8.7 125.5

Approach LOS F

Intersection Summary

Average Delay 39.0

Intersection Capacity Utilization 64.4% ICU Level of Service C

Analysis Period (min) 15

Page 151: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis AM Peak Hour

7: 1st St. & B St. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 92 157 492 257 278 371

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 100 171 535 279 302 403

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 100 171 535 279 302 403

Volume Left (vph) 100 0 0 0 302 0

Volume Right (vph) 0 0 0 279 0 403

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 8.3 7.8 7.2 6.5 7.8 6.6

Degree Utilization, x 0.23 0.37 1.07 0.50 0.65 0.74

Capacity (veh/h) 418 447 493 542 452 535

Control Delay (s) 12.6 14.2 86.3 14.7 23.0 24.7

Approach Delay (s) 13.6 61.8 24.0

Approach LOS B F C

Intersection Summary

Delay 39.6

HCM Level of Service E

Intersection Capacity Utilization 56.4% ICU Level of Service B

Analysis Period (min) 15

Page 152: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

8: 1st St. & E St. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.99 1.00 0.85 1.00 0.85

Flt Protected 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (prot) 1854 1583 1770 1848 1665 1478 1860 1583

Flt Permitted 1.00 1.00 0.95 1.00 0.96 1.00 1.00 1.00

Satd. Flow (perm) 1854 1583 1770 1848 1665 1478 1860 1583

Volume (vph) 5 45 432 161 85 5 664 96 212 5 135 10

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 5 49 470 175 92 5 722 104 230 5 147 11

RTOR Reduction (vph) 0 0 149 0 2 0 0 0 57 0 0 9

Lane Group Flow (vph) 0 54 321 175 95 0 0 826 173 0 152 2

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.0 57.3 16.1 16.1 50.3 16.1 13.7 13.7

Effective Green, g (s) 7.0 57.3 16.1 16.1 50.3 16.1 13.7 13.7

Actuated g/C Ratio 0.07 0.56 0.16 0.16 0.49 0.16 0.13 0.13

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 126 941 276 289 812 231 247 210

v/s Ratio Prot 0.03 c0.17 0.10 0.05 c0.50 c0.12 c0.08

v/s Ratio Perm 0.04 0.00

v/c Ratio 0.43 0.34 0.63 0.33 1.02 0.75 0.62 0.01

Uniform Delay, d1 46.1 12.6 40.7 38.7 26.4 41.6 42.2 38.8

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.3 0.2 4.7 0.7 36.0 12.4 4.5 0.0

Delay (s) 48.5 12.8 45.4 39.4 62.4 53.9 46.7 38.8

Level of Service D B D D E D D D

Approach Delay (s) 16.5 43.3 60.5 46.2

Approach LOS B D E D

Intersection Summary

HCM Average Control Delay 45.6 HCM Level of Service D

HCM Volume to Capacity ratio 0.82

Actuated Cycle Length (s) 103.1 Sum of lost time (s) 12.0

Intersection Capacity Utilization 77.1% ICU Level of Service D

Analysis Period (min) 15

c Critical Lane Group

Page 153: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus ODR, Davis Hotell, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.92 1.00 0.86 1.00 1.00 0.85 1.00 0.99

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1682 1770 1599 1676 1765 1500 1743 1822

Flt Permitted 0.82 0.72 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 1397 1337 1599 1676 1765 1500 1743 1822

Volume (vph) 17 5 34 98 15 240 55 715 31 25 670 33

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 18 5 37 107 16 261 60 777 34 27 728 36

RTOR Reduction (vph) 0 30 0 0 177 0 0 0 13 0 2 0

Lane Group Flow (vph) 0 30 0 107 100 0 60 777 21 27 762 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 10.5 10.5 10.5 2.2 29.4 29.4 1.4 28.6

Effective Green, g (s) 10.5 10.5 10.5 2.2 29.4 29.4 1.4 28.6

Actuated g/C Ratio 0.20 0.20 0.20 0.04 0.55 0.55 0.03 0.54

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 275 263 315 69 974 827 46 978

v/s Ratio Prot 0.06 c0.04 c0.44 0.02 0.42

v/s Ratio Perm 0.02 c0.08 0.01

v/c Ratio 0.11 0.41 0.32 0.87 0.80 0.03 0.59 0.78

Uniform Delay, d1 17.6 18.7 18.3 25.4 9.6 5.4 25.7 9.8

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.2 1.0 0.6 64.4 4.6 0.0 17.7 4.0

Delay (s) 17.7 19.7 18.9 89.8 14.2 5.4 43.3 13.8

Level of Service B B B F B A D B

Approach Delay (s) 17.7 19.1 19.1 14.8

Approach LOS B B B B

Intersection Summary

HCM Average Control Delay 17.4 HCM Level of Service B

HCM Volume to Capacity ratio 0.65

Actuated Cycle Length (s) 53.3 Sum of lost time (s) 8.0

Intersection Capacity Utilization 71.8% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 154: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

1: I-80 EB & Old Davis Rd. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 164 5 30 0 0 0 0 245 85 455 75 0

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 178 5 33 0 0 0 0 266 92 495 82 0

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1204 1429 41 1378 1383 179 82 359

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1204 1429 41 1378 1383 179 82 359

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 0 93 97 100 100 100 100 59

cM capacity (veh/h) 95 78 1021 65 84 833 1514 1197

Direction, Lane # EB 1 EB 2 NB 1 NB 2 SB 1 SB 2 SB 3

Volume Total 178 38 178 181 495 41 41

Volume Left 178 0 0 0 495 0 0

Volume Right 0 33 0 92 0 0 0

cSH 95 376 1700 1700 1197 1700 1700

Volume to Capacity 1.88 0.10 0.10 0.11 0.41 0.02 0.02

Queue Length 95th (ft) 373 8 0 0 52 0 0

Control Delay (s) 509.1 15.7 0.0 0.0 10.1 0.0 0.0

Lane LOS F C B

Approach Delay (s) 422.3 0.0 8.7

Approach LOS F

Intersection Summary

Average Delay 83.7

Intersection Capacity Utilization 56.4% ICU Level of Service B

Analysis Period (min) 15

Page 155: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

2: I-80 WB & Old Davis Rd. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Stop Stop Free Free

Grade 0% 0% 0% 0%

Volume (veh/h) 0 0 0 30 5 225 230 179 0 0 500 410

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 0 0 0 33 5 245 250 195 0 0 543 446

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 1388 1238 272 966 1684 97 989 195

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 1388 1238 272 966 1684 97 989 195

tC, single (s) 7.5 6.5 6.9 7.5 6.5 6.9 4.1 4.1

tC, 2 stage (s)

tF (s) 3.5 4.0 3.3 3.5 4.0 3.3 2.2 2.2

p0 queue free % 100 100 100 78 91 74 64 100

cM capacity (veh/h) 51 112 726 150 60 940 695 1376

Direction, Lane # WB 1 WB 2 NB 1 NB 2 NB 3 SB 1 SB 2 SB 3

Volume Total 35 247 250 97 97 272 272 446

Volume Left 33 0 250 0 0 0 0 0

Volume Right 0 245 0 0 0 0 0 446

cSH 135 809 695 1700 1700 1700 1700 1700

Volume to Capacity 0.26 0.31 0.36 0.06 0.06 0.16 0.16 0.26

Queue Length 95th (ft) 25 32 41 0 0 0 0 0

Control Delay (s) 41.0 11.4 13.1 0.0 0.0 0.0 0.0 0.0

Lane LOS E B B

Approach Delay (s) 15.1 7.3 0.0

Approach LOS C

Intersection Summary

Average Delay 4.4

Intersection Capacity Utilization 56.4% ICU Level of Service B

Analysis Period (min) 15

Page 156: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

3: Old Davis Rd. & California Ave. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 220 154 345 183 189 460

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 239 167 375 199 205 500

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh) 6

Median type None

Median storage veh)

Upstream signal (ft) 1047

pX, platoon unblocked 0.99 0.99 0.99

vC, conflicting volume 574 1120 474

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 568 1122 467

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s)

tF (s) 2.2 3.5 3.3

p0 queue free % 76 0 15

cM capacity (veh/h) 991 171 588

Direction, Lane # EB 1 EB 2 WB 1 SB 1

Volume Total 239 167 574 705

Volume Left 239 0 0 205

Volume Right 0 0 199 500

cSH 991 1700 1700 465

Volume to Capacity 0.24 0.10 0.34 1.52

Queue Length 95th (ft) 24 0 0 930

Control Delay (s) 9.8 0.0 0.0 266.9

Lane LOS A F

Approach Delay (s) 5.8 0.0 266.9

Approach LOS F

Intersection Summary

Average Delay 113.1

Intersection Capacity Utilization 64.5% ICU Level of Service C

Analysis Period (min) 15

Page 157: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

4: Old Davis Rd. & Hilgard Ln. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBT EBR WBL WBT NBL NBR

Lane Configurations

Sign Control Free Free Stop

Grade 0% 0% 0%

Volume (veh/h) 303 40 75 363 165 206

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 329 43 82 395 179 224

Pedestrians

Lane Width (ft)

Walking Speed (ft/s)

Percent Blockage

Right turn flare (veh)

Median type TWLTL

Median storage veh) 0

Upstream signal (ft) 627

pX, platoon unblocked 0.87

vC, conflicting volume 373 909 351

vC1, stage 1 conf vol 351

vC2, stage 2 conf vol 558

vCu, unblocked vol 373 895 351

tC, single (s) 4.1 6.4 6.2

tC, 2 stage (s) 5.4

tF (s) 2.2 3.5 3.3

p0 queue free % 93 36 68

cM capacity (veh/h) 1186 281 692

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 373 82 395 179 224

Volume Left 0 82 0 179 0

Volume Right 43 0 0 0 224

cSH 1700 1186 1700 281 692

Volume to Capacity 0.22 0.07 0.23 0.64 0.32

Queue Length 95th (ft) 0 6 0 101 35

Control Delay (s) 0.0 8.3 0.0 38.0 12.7

Lane LOS A E B

Approach Delay (s) 0.0 1.4 23.9

Approach LOS C

Intersection Summary

Average Delay 8.3

Intersection Capacity Utilization 41.7% ICU Level of Service A

Analysis Period (min) 15

Page 158: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

5: Old Davis Rd. & Mrak Hall Dr. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00

Frpb, ped/bikes 1.00 1.00 1.00 0.98

Flpb, ped/bikes 1.00 1.00 1.00 1.00

Frt 1.00 1.00 0.99 0.90

Flt Protected 0.95 1.00 1.00 0.99

Satd. Flow (prot) 1770 1863 1840 1622

Flt Permitted 0.95 1.00 1.00 0.99

Satd. Flow (perm) 1770 1863 1840 1622

Volume (vph) 52 457 328 25 40 110

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 57 497 357 27 43 120

RTOR Reduction (vph) 0 0 5 0 65 0

Lane Group Flow (vph) 57 497 379 0 98 0

Confl. Peds. (#/hr) 12 7

Turn Type Prot

Protected Phases 7 4 8 6

Permitted Phases

Actuated Green, G (s) 4.2 22.6 13.9 26.1

Effective Green, g (s) 4.7 23.1 14.4 26.6

Actuated g/C Ratio 0.08 0.40 0.25 0.46

Clearance Time (s) 4.5 4.5 4.5 4.5

Vehicle Extension (s) 0.2 0.2 0.2 0.2

Lane Grp Cap (vph) 144 746 459 748

v/s Ratio Prot 0.03 c0.27 c0.21 c0.06

v/s Ratio Perm

v/c Ratio 0.40 0.67 0.83 0.13

Uniform Delay, d1 25.2 14.1 20.5 8.9

Progression Factor 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.7 1.8 11.1 0.4

Delay (s) 25.8 15.9 31.6 9.3

Level of Service C B C A

Approach Delay (s) 16.9 31.6 9.3

Approach LOS B C A

Intersection Summary

HCM Average Control Delay 20.9 HCM Level of Service C

HCM Volume to Capacity ratio 0.43

Actuated Cycle Length (s) 57.7 Sum of lost time (s) 12.0

Intersection Capacity Utilization 56.4% ICU Level of Service B

Analysis Period (min) 15

c Critical Lane Group

Page 159: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Sign Control Free Free Stop Stop

Grade 0% 0% 0% 0%

Volume (veh/h) 5 5 5 326 5 72 0 155 548 0 0 0

Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Hourly flow rate (vph) 5 5 5 340 5 75 0 161 571 0 0 0

Pedestrians 141 94

Lane Width (ft) 12.0 12.0

Walking Speed (ft/s) 4.0 4.0

Percent Blockage 12 8

Right turn flare (veh)

Median type None None

Median storage veh)

Upstream signal (ft)

pX, platoon unblocked

vC, conflicting volume 80 104 797 872 243 1533 837 43

vC1, stage 1 conf vol

vC2, stage 2 conf vol

vCu, unblocked vol 80 104 797 872 243 1533 837 43

tC, single (s) 4.1 4.1 7.1 6.5 6.2 7.1 6.5 6.2

tC, 2 stage (s)

tF (s) 2.2 2.2 3.5 4.0 3.3 3.5 4.0 3.3

p0 queue free % 100 75 100 19 12 100 100 100

cM capacity (veh/h) 1518 1371 214 200 647 3 209 1028

Direction, Lane # EB 1 WB 1 WB 2 NB 1 NB 2

Volume Total 16 340 80 161 571

Volume Left 5 340 0 0 0

Volume Right 5 0 75 0 571

cSH 1518 1371 1700 200 647

Volume to Capacity 0.00 0.25 0.05 0.81 0.88

Queue Length 95th (ft) 0 25 0 144 265

Control Delay (s) 2.5 8.5 0.0 71.7 37.9

Lane LOS A A F E

Approach Delay (s) 2.5 6.9 45.4

Approach LOS E

Intersection Summary

Average Delay 30.9

Intersection Capacity Utilization 60.4% ICU Level of Service B

Analysis Period (min) 15

Page 160: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Unsignalized Intersection Capacity Analysis PM Peak Hour

7: 1st St. & B St. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT WBT WBR SBL SBR

Lane Configurations

Sign Control Stop Stop Stop

Volume (vph) 311 292 280 306 317 128

Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92

Hourly flow rate (vph) 338 317 304 333 345 139

Direction, Lane # EB 1 EB 2 WB 1 WB 2 SB 1 SB 2

Volume Total (vph) 338 317 304 333 345 139

Volume Left (vph) 338 0 0 0 345 0

Volume Right (vph) 0 0 0 333 0 139

Hadj (s) 0.53 0.03 0.03 -0.67 0.53 -0.67

Departure Headway (s) 8.0 7.5 7.6 6.9 8.3 7.1

Degree Utilization, x 0.75 0.66 0.64 0.63 0.80 0.27

Capacity (veh/h) 434 467 458 507 424 485

Control Delay (s) 30.1 22.6 21.9 19.7 35.5 11.6

Approach Delay (s) 26.4 20.8 28.6

Approach LOS D C D

Intersection Summary

Delay 25.0

HCM Level of Service C

Intersection Capacity Utilization 59.5% ICU Level of Service B

Analysis Period (min) 15

Page 161: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

8: 1st St. & E St. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 3% 0%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 1.00 0.85 1.00 0.98 1.00 0.85 1.00 0.85

Flt Protected 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (prot) 1830 1583 1770 1824 1690 1478 1861 1583

Flt Permitted 0.98 1.00 0.95 1.00 0.97 1.00 1.00 1.00

Satd. Flow (perm) 1830 1583 1770 1824 1690 1478 1861 1583

Volume (vph) 25 45 599 217 90 15 448 345 371 5 236 110

Peak-hour factor, PHF 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98

Adj. Flow (vph) 26 46 611 221 92 15 457 352 379 5 241 112

RTOR Reduction (vph) 0 0 150 0 6 0 0 0 112 0 0 65

Lane Group Flow (vph) 0 72 461 221 101 0 0 809 267 0 246 47

Turn Type Split pm+ov Split Split custom Split Perm

Protected Phases 2 2 8 6 6 8 8 6 4 4

Permitted Phases 2 6 4

Actuated Green, G (s) 7.3 37.4 18.9 18.9 30.1 18.9 16.0 16.0

Effective Green, g (s) 7.3 37.4 18.9 18.9 30.1 18.9 16.0 16.0

Actuated g/C Ratio 0.08 0.42 0.21 0.21 0.34 0.21 0.18 0.18

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 151 742 379 390 576 316 337 287

v/s Ratio Prot 0.04 c0.21 0.12 0.06 c0.48 c0.18 c0.13

v/s Ratio Perm 0.08 0.03

v/c Ratio 0.48 0.62 0.58 0.26 1.40 0.85 0.73 0.16

Uniform Delay, d1 38.7 19.9 31.2 28.9 29.1 33.3 34.1 30.5

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 2.4 1.6 2.3 0.4 192.3 18.4 7.7 0.3

Delay (s) 41.0 21.5 33.4 29.2 221.4 51.7 41.8 30.8

Level of Service D C C C F D D C

Approach Delay (s) 23.6 32.1 167.3 38.4

Approach LOS C C F D

Intersection Summary

HCM Average Control Delay 93.5 HCM Level of Service F

HCM Volume to Capacity ratio 1.00

Actuated Cycle Length (s) 88.3 Sum of lost time (s) 12.0

Intersection Capacity Utilization 86.7% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 162: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

9: Olive Dr. & Richards Blvd. Cumulative Plus ODR, Davis Hotel, & Hyatt

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1800 1800 1800 1900 1900 1900

Grade (%) 0% 0% 0% 3%

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Frt 0.90 1.00 0.86 1.00 1.00 0.85 1.00 1.00

Flt Protected 0.99 0.95 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (prot) 1661 1770 1605 1676 1765 1500 1743 1827

Flt Permitted 0.59 0.64 1.00 0.95 1.00 1.00 0.95 1.00

Satd. Flow (perm) 996 1190 1605 1676 1765 1500 1743 1827

Volume (vph) 28 5 85 101 20 235 29 901 53 65 960 27

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 29 5 89 105 21 245 30 939 55 68 1000 28

RTOR Reduction (vph) 0 74 0 0 155 0 0 0 15 0 1 0

Lane Group Flow (vph) 0 49 0 105 111 0 30 939 40 68 1027 0

Turn Type Perm Perm Prot Perm Prot

Protected Phases 4 8 5 2 1 6

Permitted Phases 4 8 2

Actuated Green, G (s) 11.7 11.7 11.7 1.5 43.5 43.5 3.8 45.8

Effective Green, g (s) 11.7 11.7 11.7 1.5 43.5 43.5 3.8 45.8

Actuated g/C Ratio 0.16 0.16 0.16 0.02 0.61 0.61 0.05 0.65

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 164 196 264 35 1081 919 93 1179

v/s Ratio Prot 0.07 0.02 0.53 c0.04 c0.56

v/s Ratio Perm 0.05 c0.09 0.03

v/c Ratio 0.30 0.54 0.42 0.86 0.87 0.04 0.73 0.87

Uniform Delay, d1 26.0 27.2 26.6 34.6 11.4 5.5 33.1 10.2

Progression Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 1.0 2.8 1.1 94.8 7.6 0.0 25.3 7.3

Delay (s) 27.1 30.0 27.7 129.4 19.0 5.5 58.4 17.5

Level of Service C C C F B A E B

Approach Delay (s) 27.1 28.3 21.5 20.0

Approach LOS C C C C

Intersection Summary

HCM Average Control Delay 22.1 HCM Level of Service C

HCM Volume to Capacity ratio 0.77

Actuated Cycle Length (s) 71.0 Sum of lost time (s) 8.0

Intersection Capacity Utilization 86.6% ICU Level of Service E

Analysis Period (min) 15

c Critical Lane Group

Page 163: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis AM Peak Hour

6: 1st St. & A St. Cumulative Mitigated

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00

Frpb, ped/bikes 0.98 1.00 1.00 1.00 0.85

Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00

Frt 0.95 1.00 0.88 1.00 0.85

Flt Protected 0.98 0.95 1.00 1.00 1.00

Satd. Flow (prot) 1715 1770 1635 1857 1343

Flt Permitted 1.00 0.95 1.00 1.00 1.00

Satd. Flow (perm) 1743 1770 1635 1857 1343

Volume (vph) 5 5 5 683 15 65 5 65 204 0 0 0

Peak-hour factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92

Adj. Flow (vph) 5 5 5 742 16 71 5 71 222 0 0 0

RTOR Reduction (vph) 0 5 0 0 29 0 0 0 175 0 0 0

Lane Group Flow (vph) 0 10 0 742 58 0 0 76 47 0 0 0

Confl. Peds. (#/hr) 42 42 132

Turn Type Perm Prot Perm Perm

Protected Phases 4 3 8 2

Permitted Phases 4 2 2

Actuated Green, G (s) 2.3 17.8 24.1 8.6 8.6

Effective Green, g (s) 2.3 17.8 24.1 8.6 8.6

Actuated g/C Ratio 0.06 0.44 0.59 0.21 0.21

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 98 774 968 392 284

v/s Ratio Prot c0.42 c0.04

v/s Ratio Perm 0.01 0.04 0.03

v/c Ratio 0.10 0.96 0.06 0.19 0.17

Uniform Delay, d1 18.2 11.1 3.5 13.2 13.1

Progression Factor 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.5 22.5 0.0 0.2 0.3

Delay (s) 18.7 33.6 3.5 13.4 13.4

Level of Service B C A B B

Approach Delay (s) 18.7 30.4 13.4 0.0

Approach LOS B C B A

Intersection Summary

HCM Average Control Delay 25.8 HCM Level of Service C

HCM Volume to Capacity ratio 0.58

Actuated Cycle Length (s) 40.7 Sum of lost time (s) 8.0

Intersection Capacity Utilization 67.7% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 164: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

HCM Signalized Intersection Capacity Analysis PM Peak Hour

6: 1st St. & A St. Cumulative Mitigated

Hyatt Expansion TIS Synchro 6 Report

Fehr & Peers Associates, Inc. 5/27/2011

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR

Lane Configurations

Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900

Total Lost time (s) 4.0 4.0 4.0 4.0 4.0

Lane Util. Factor 1.00 1.00 1.00 1.00 1.00

Frpb, ped/bikes 0.96 1.00 1.00 1.00 0.84

Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00

Frt 0.95 1.00 0.86 1.00 0.85

Flt Protected 0.98 0.95 1.00 1.00 1.00

Satd. Flow (prot) 1685 1770 1601 1863 1323

Flt Permitted 1.00 0.95 1.00 1.00 1.00

Satd. Flow (perm) 1713 1770 1601 1863 1323

Volume (vph) 5 5 5 326 5 72 0 155 548 0 0 0

Peak-hour factor, PHF 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96

Adj. Flow (vph) 5 5 5 340 5 75 0 161 571 0 0 0

RTOR Reduction (vph) 0 5 0 0 40 0 0 0 378 0 0 0

Lane Group Flow (vph) 0 10 0 340 40 0 0 161 193 0 0 0

Confl. Peds. (#/hr) 94 94 141

Turn Type Perm Prot Perm Perm

Protected Phases 4 3 8 2

Permitted Phases 4 2 2

Actuated Green, G (s) 2.4 13.3 19.7 14.1 14.1

Effective Green, g (s) 2.4 13.3 19.7 14.1 14.1

Actuated g/C Ratio 0.06 0.32 0.47 0.34 0.34

Clearance Time (s) 4.0 4.0 4.0 4.0 4.0

Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0

Lane Grp Cap (vph) 98 563 755 628 446

v/s Ratio Prot c0.19 c0.03 0.09

v/s Ratio Perm 0.01 c0.15

v/c Ratio 0.10 0.60 0.05 0.26 0.43

Uniform Delay, d1 18.7 12.0 6.0 10.0 10.7

Progression Factor 1.00 1.00 1.00 1.00 1.00

Incremental Delay, d2 0.5 1.8 0.0 0.2 0.7

Delay (s) 19.2 13.9 6.0 10.3 11.4

Level of Service B B A B B

Approach Delay (s) 19.2 12.4 11.2 0.0

Approach LOS B B B A

Intersection Summary

HCM Average Control Delay 11.7 HCM Level of Service B

HCM Volume to Capacity ratio 0.43

Actuated Cycle Length (s) 41.8 Sum of lost time (s) 8.0

Intersection Capacity Utilization 64.4% ICU Level of Service C

Analysis Period (min) 15

c Critical Lane Group

Page 165: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

30

6

0

12

8

0 163

87

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative No Project

AM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph) 25

0

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

434

Direction Lanes Lane Flow LanesN 39

3 495 0

0 1

128 87 0

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph) 25

0

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Old Davis RoadBypass? 1

NoOld Davis Road

North

81

1

Old Davis Road

Total 50% 0

939 332

1 All 434 0 1 1130 0.42 5.9 A 52 332 0

607

North

South

81

1

Ca

lifo

rnia

Ave

nu

e

Bypass? 1 479

No 0 0 0 0 0

Total 434 50% 5.9 A

1 All 811 0 1 1130 0.78 14.2 B 210Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 811 50% 14.2 BTotal (vph) 0 0 0 0 0 125 0 300 0 325 470 0 0 0 85 160

1 All 250 0 1 1130 0.24 4.4 A 24

Northbound Southbound Eastbound WestboundEast

South

81

1

0

Ca

lifo

rnia

Ave

nu

e

1 All 250 0 1 1130 0.24 4.4 A 24Trucks 0 0 0 0 0 3 0 6 0 7 9 0 0 0 2 3

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 122 0 294 0 318 461 0 0 0 83 157

Total 250 50% 4.4 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,495 10.2 BTotal (pcph) 0 0 0 0 0 128 0 306 0 332 479 0 0 0 87 163

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

Northbound Southbound Eastbound Westbound

West

Fehr & Peers 5/27/2011

Page 166: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

46

9

0

18

9

0 179

439

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative No Project

PM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph) 61

8

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

658

Direction Lanes Lane Flow LanesN 90

8 403 0

0 1

189 439 0

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph) 61

8

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Old Davis RoadBypass? 1

NoOld Davis Road

North

37

2

Old Davis Road

Total 50% 0

561 224

1 All 658 0 1 1130 0.63 9.1 A 118 224 0

337

North

South

37

2

Ca

lifo

rnia

Ave

nu

e

Bypass? 1 148

No 0 0 0 0 0

Total 658 50% 9.1 A

1 All 372 0 1 1130 0.36 5.3 A 41Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 372 50% 5.3 ATotal (vph) 0 0 0 0 0 185 0 460 0 220 145 0 0 0 430 175

1 All 618 0 1 1130 0.59 8.3 A 103

Northbound Southbound Eastbound WestboundEast

South

37

2

0

Ca

lifo

rnia

Ave

nu

e

1 All 618 0 1 1130 0.59 8.3 A 103Trucks 0 0 0 0 0 4 0 9 0 4 3 0 0 0 9 4

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 181 0 451 0 216 142 0 0 0 421 171

Total 618 50% 8.3 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,648 8.0 ATotal (pcph) 0 0 0 0 0 189 0 469 0 224 148 0 0 0 439 179

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

Northbound Southbound Eastbound Westbound

West

Fehr & Peers 5/27/2011

Page 167: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

30

6

0

13

3

0 164

87

439

25

1

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus Davis Hotel

AM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph)Direction Lanes Lane Flow Lanes

N 393 496 0

0 1

133 87 0

Old Davis Road

25

1

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph)

Bypass? 1

No

81

1

Old Davis Road

Old Davis Road

North

Total 50% 0

944 332

1 All 439 0 1 1130 0.42 5.9 A 53 332 0

612

81

1

Ca

lifo

rnia

Ave

nu

e

North

SouthBypass? 1 479

No 0 0 0 0 0

Total 439 50% 5.9 A

1 All 811 0 1 1130 0.78 14.2 B 210Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 811 50% 14.2 BTotal (vph) 0 0 0 0 0 130 0 300 0 325 470 0 0 0 85 161

1 All 251 0 1 1130 0.24 4.4 A 24

81

1

0

Ca

lifo

rnia

Ave

nu

e

East

South

Northbound Southbound Eastbound Westbound

1 All 251 0 1 1130 0.24 4.4 A 24Trucks 0 0 0 0 0 3 0 6 0 7 9 0 0 0 2 3

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 127 0 294 0 318 461 0 0 0 83 158

Total 251 50% 4.4 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,501 10.1 BTotal (pcph) 0 0 0 0 0 133 0 306 0 332 479 0 0 0 87 164

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

West

Northbound Southbound Eastbound Westbound

Fehr & Peers 5/27/2011

Page 168: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

46

9

0

19

0

0 184

439

659

62

3

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus Davis Hotel

PM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph)Direction Lanes Lane Flow Lanes

N 908 408 0

0 1

190 439 0

Old Davis Road

62

3

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph)

Bypass? 1

No

37

2

Old Davis Road

Old Davis Road

North

Total 50% 0

562 224

1 All 659 0 1 1130 0.63 9.2 A 119 224 0

338

37

2

Ca

lifo

rnia

Ave

nu

e

North

SouthBypass? 1 148

No 0 0 0 0 0

Total 659 50% 9.2 A

1 All 372 0 1 1130 0.36 5.3 A 41Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 372 50% 5.3 ATotal (vph) 0 0 0 0 0 186 0 460 0 220 145 0 0 0 430 180

1 All 623 0 1 1130 0.60 8.4 A 104

37

2

0

Ca

lifo

rnia

Ave

nu

e

East

South

Northbound Southbound Eastbound Westbound

1 All 623 0 1 1130 0.60 8.4 A 104Trucks 0 0 0 0 0 4 0 9 0 4 3 0 0 0 9 4

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 182 0 451 0 216 142 0 0 0 421 176

Total 623 50% 8.4 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,654 8.0 ATotal (pcph) 0 0 0 0 0 190 0 469 0 224 148 0 0 0 439 184

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

West

Northbound Southbound Eastbound Westbound

Fehr & Peers 5/27/2011

Page 169: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

30

6

0

13

1

0 165

96

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus Hyatt

AM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph) 26

1

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

437

Direction Lanes Lane Flow LanesN 40

2 497 0

0 1

131 96 0

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph) 26

1

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Old Davis RoadBypass? 1

NoOld Davis Road

North

82

5

Old Davis Road

Total 50% 0

956 332

1 All 437 0 1 1130 0.42 5.9 A 53 332 0

624

North

South

82

5

Ca

lifo

rnia

Ave

nu

e

Bypass? 1 493

No 0 0 0 0 0

Total 437 50% 5.9 A

1 All 825 0 1 1130 0.79 14.9 B 221Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 825 50% 14.9 BTotal (vph) 0 0 0 0 0 128 0 300 0 325 483 0 0 0 94 162

1 All 261 0 1 1130 0.25 4.5 A 25

Northbound Southbound Eastbound WestboundEast

South

82

5

0

Ca

lifo

rnia

Ave

nu

e

1 All 261 0 1 1130 0.25 4.5 A 25Trucks 0 0 0 0 0 3 0 6 0 7 10 0 0 0 2 3

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 125 0 294 0 318 473 0 0 0 92 159

Total 261 50% 4.5 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,523 10.6 BTotal (pcph) 0 0 0 0 0 131 0 306 0 332 493 0 0 0 96 165

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

Northbound Southbound Eastbound Westbound

West

Fehr & Peers 5/27/2011

Page 170: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

46

9

0

19

2

0 182

451

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus Hyatt

PM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph) 63

3

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

661

Direction Lanes Lane Flow LanesN 92

0 406 0

0 1

192 451 0

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph) 63

3

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Old Davis RoadBypass? 1

NoOld Davis Road

North

38

3

Old Davis Road

Total 50% 0

575 224

1 All 661 0 1 1130 0.64 9.2 A 120 224 0

351

North

South

38

3

Ca

lifo

rnia

Ave

nu

e

Bypass? 1 159

No 0 0 0 0 0

Total 661 50% 9.2 A

1 All 383 0 1 1130 0.37 5.4 A 43Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 383 50% 5.4 ATotal (vph) 0 0 0 0 0 188 0 460 0 220 156 0 0 0 442 178

1 All 633 0 1 1130 0.61 8.6 A 108

Northbound Southbound Eastbound WestboundEast

South

38

3

0

Ca

lifo

rnia

Ave

nu

e

1 All 633 0 1 1130 0.61 8.6 A 108Trucks 0 0 0 0 0 4 0 9 0 4 3 0 0 0 9 4

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 184 0 451 0 216 153 0 0 0 433 174

Total 633 50% 8.6 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,677 8.1 ATotal (pcph) 0 0 0 0 0 192 0 469 0 224 159 0 0 0 451 182

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

Northbound Southbound Eastbound Westbound

West

Fehr & Peers 5/27/2011

Page 171: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

30

6

0

12

8

0 163

87

434

25

0

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus Old Davis Road

AM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph)Direction Lanes Lane Flow Lanes

N 393 495 0

0 1

128 87 0

Old Davis Road

25

0

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph)

Bypass? 1

No

72

5

Old Davis Road

Old Davis Road

North

Total 50% 0

853 332

1 All 434 0 1 1130 0.42 5.9 A 52 332 0

521

72

5

Ca

lifo

rnia

Ave

nu

e

North

SouthBypass? 1 393

No 0 0 0 0 0

Total 434 50% 5.9 A

1 All 725 0 1 1130 0.70 10.9 B 151Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 725 50% 10.9 BTotal (vph) 0 0 0 0 0 125 0 300 0 325 385 0 0 0 85 160

1 All 250 0 1 1130 0.24 4.4 A 24

72

5

0

Ca

lifo

rnia

Ave

nu

e

East

South

Northbound Southbound Eastbound Westbound

1 All 250 0 1 1130 0.24 4.4 A 24Trucks 0 0 0 0 0 3 0 6 0 7 8 0 0 0 2 3

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 122 0 294 0 318 377 0 0 0 83 157

Total 250 50% 4.4 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,409 8.2 ATotal (pcph) 0 0 0 0 0 128 0 306 0 332 393 0 0 0 87 163

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

West

Northbound Southbound Eastbound Westbound

Fehr & Peers 5/27/2011

Page 172: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

46

9

0

18

9

0 179

342

658

52

1

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus Old Davis Road

PM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph)Direction Lanes Lane Flow Lanes

N 811 403 0

0 1

189 342 0

Old Davis Road

52

1

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph)

Bypass? 1

No

37

2

Old Davis Road

Old Davis Road

North

Total 50% 0

561 224

1 All 658 0 1 1130 0.63 9.1 A 118 224 0

337

37

2

Ca

lifo

rnia

Ave

nu

e

North

SouthBypass? 1 148

No 0 0 0 0 0

Total 658 50% 9.1 A

1 All 372 0 1 1130 0.36 5.3 A 41Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 372 50% 5.3 ATotal (vph) 0 0 0 0 0 185 0 460 0 220 145 0 0 0 335 175

1 All 521 0 1 1130 0.50 6.8 A 72

37

2

0

Ca

lifo

rnia

Ave

nu

e

East

South

Northbound Southbound Eastbound Westbound

1 All 521 0 1 1130 0.50 6.8 A 72Trucks 0 0 0 0 0 4 0 9 0 4 3 0 0 0 7 4

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 181 0 451 0 216 142 0 0 0 328 171

Total 521 50% 6.8 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,551 7.4 ATotal (pcph) 0 0 0 0 0 189 0 469 0 224 148 0 0 0 342 179

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

West

Northbound Southbound Eastbound Westbound

Fehr & Peers 5/27/2011

Page 173: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

30

6

0

13

6

0 166

96

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus ODR, Davis

Hotel, & Hyatt

AM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph) 26

2

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

442

Direction Lanes Lane Flow LanesN 40

2 498 0

0 1

136 96 0

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph) 26

2

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Old Davis RoadBypass? 1

NoOld Davis Road

North

73

6

Old Davis Road

Total 50% 0

872 332

1 All 442 0 1 1130 0.43 5.9 A 54 332 0

540

North

South

73

6

Ca

lifo

rnia

Ave

nu

e

Bypass? 1 404

No 0 0 0 0 0

Total 442 50% 5.9 A

1 All 736 0 1 1130 0.71 11.2 B 158Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 736 50% 11.2 BTotal (vph) 0 0 0 0 0 133 0 300 0 325 396 0 0 0 94 163

1 All 262 0 1 1130 0.25 4.5 A 25

Northbound Southbound Eastbound WestboundEast

South

73

6

0

Ca

lifo

rnia

Ave

nu

e

1 All 262 0 1 1130 0.25 4.5 A 25Trucks 0 0 0 0 0 3 0 6 0 7 8 0 0 0 2 3

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 130 0 294 0 318 388 0 0 0 92 160

Total 262 50% 4.5 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,440 8.4 ATotal (pcph) 0 0 0 0 0 136 0 306 0 332 404 0 0 0 96 166

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

Northbound Southbound Eastbound Westbound

West

Fehr & Peers 5/27/2011

Page 174: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time

46

9

0

19

3

0 187

352

Old Davis Road

California Avenue

Control

Delay

(sec)

Cumulative Plus ODR, Davis

Hotel, & Hyatt

PM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph) 53

9

Ca

lifo

rnia

Ave

nu

e

LOS*

95th

Queue**

(ft)

Approach Conflicting

662

Direction Lanes Lane Flow LanesN 82

1 411 0

0 1

193 352 0

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph) 53

9

Ca

lifo

rnia

Ave

nu

e

North

LOS*

95th

Queue**

(ft)

Old Davis RoadBypass? 1

NoOld Davis Road

North

38

1

Old Davis Road

Total 50% 0

574 224

1 All 662 0 1 1130 0.64 9.2 A 120 224 0

350

North

South

38

1

Ca

lifo

rnia

Ave

nu

e

Bypass? 1 157

No 0 0 0 0 0

Total 662 50% 9.2 A

1 All 381 0 1 1130 0.37 5.4 A 43Volumes

Bypass? 1

NoU L T R U L T R U L T R U L T R

Total 381 50% 5.4 ATotal (vph) 0 0 0 0 0 189 0 460 0 220 154 0 0 0 345 183

1 All 539 0 1 1130 0.52 7.1 A 77

Northbound Southbound Eastbound WestboundEast

South

38

1

0

Ca

lifo

rnia

Ave

nu

e

1 All 539 0 1 1130 0.52 7.1 A 77Trucks 0 0 0 0 0 4 0 9 0 4 3 0 0 0 7 4

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NoCars 0 0 0 0 0 185 0 451 0 216 151 0 0 0 338 179

Total 539 50% 7.1 A fHV 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98 1.00 0.98 0.98 1.00 1.00 1.00 0.98 0.98

All 1,582 7.6 ATotal (pcph) 0 0 0 0 0 193 0 469 0 224 157 0 0 0 352 187

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Truck % 0 2 2 2 0 2 2 2 0 2 2 2 0 2 2 2

Trucks (vph)

Northbound Southbound Eastbound Westbound

West

Fehr & Peers 5/27/2011

Page 175: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.92 Time 0 0 0 0 66

15

1st Street

A Street

Control

Delay

(sec)

Cumulative Mitigated

AM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph) 77

8

A S

tre

et

LOS*

95th

Queue**

(ft)

Approach Conflicting

0

Direction Lanes Lane Flow LanesN 20

137 697

1 All 279 10 1 1119 0.27 4.7 A 28

697 717 0

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph) 77

8

A S

tre

et

North

LOS*

95th

Queue**

(ft)

1st StreetBypass? 1

No 11st Street

North

15

1st Street

Total 279 50% 4.7 A 0 10 76

0 1 5

702 213

North

South

15

A S

tre

et

Bypass? 1 5

No 1 5 0 5 66

20

8

Total 50%

1 All 15 204 1 921 0.02 4.0 A 1Volumes

Bypass? 1

No 1U L T R U L T R U L T R U L T R

Total 15 50% 4.0 ATotal (vph) 0 5 65 204 0 0 0 0 0 5 5 5 0 683 15 65

1 All 778 200 1 925 0.91 29.9 D 338

Northbound Southbound Eastbound WestboundEast

South

15

279

A S

tre

et

1 All 778 200 1 925 0.91 29.9 D 338Trucks 0 0 1 4 0 0 0 0 0 0 0 0 0 14 0 1

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

No 1Cars 0 5 64 200 0 0 0 0 0 5 5 5 0 669 15 64

Total 778 50% 29.9 D fHV 1.00 1.00 0.98 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.98

All 1,072 23.0 CTotal (pcph) 0 5 66 208 0 0 0 0 0 5 5 5 0 697 15 66

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

Northbound Southbound Eastbound Westbound

West

Fehr & Peers 6/9/2011

Page 176: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

ROUNDABOUT CAPACITY ANALYSIS - HCM 2010

Diagram

Period (hr) 0.25 Scenario

PHF 0.96 Time 0 0 0 0 73

5

0

41

1

A S

tre

et

LOS*

95th

Queue**

(ft)

Approach Conflicting

1st Street

A Street

Control

Delay

(sec)

Cumulative Mitigated

PM Peak Hour

E-W Street

N-S Street

Flow

(pcph)v/c

Capacity

(pcph)Direction Lanes Lane Flow Lanes

N 5

236 333

1 All 717 10 1 1119 0.67 10.1 B 135

333 338 0

1st Street

41

1

A S

tre

et

North

LOS*

95th

Queue**

(ft)

Control

Delay

(sec)

Flow

(pcph)v/c

Capacity

(pcph)

Bypass? 1

No 1

15

1st Street

1st Street

North

Total 717 50% 10.1 B 0 10

163

0 1 5

338 564

15

A S

tre

et

North

SouthBypass? 1 5

No 1 5 0 0

15

8

55

9

Total 50%

1 All 15 548 1 653 0.02 5.7 A 2Volumes

Bypass? 1

No 1U L T R U L T R U L T R U L T R

Total 15 50% 5.7 ATotal (vph) 0 0 155 548 0 0 0 0 0 5 5 5 0 326 5 72

1 All 411 537 1 660 0.65 15.6 C 119

15

717

A S

tre

et

East

South

Northbound Southbound Eastbound Westbound

1 All 411 537 1 660 0.65 15.6 C 119Trucks 0 0 3 11 0 0 0 0 0 0 0 0 0 7 0 1

Bypass? 1Bicycles 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

No 1Cars 0 0 152 537 0 0 0 0 0 5 5 5 0 319 5 71

Total 411 50% 15.6 C fHV 1.00 1.00 0.98 0.98 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.98 1.00 0.99

All 1,143 12.0 BTotal (pcph) 0 0 158 559 0 0 0 0 0 5 5 5 0 333 5 73

Source: NCHRP Report 672 - Roundabouts: An Informational Guide, Second Edition (TRB, 2010)

* Does not include the effect of conflicting pedestrians

** Assumes a queued vehicle length of 25 feet

U L T R U L T R U L T R U L T R

West

Northbound Southbound Eastbound Westbound

Fehr & Peers 6/9/2011

Page 177: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street 1st St. Scenario Existing Conditions

Minor Street A St. Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 1 3 393 North/South

Through 53 1 15 x East/West

Right 98 2 61

Total 152 0 6 469

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

1 1NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 475 152

Major Street Minor StreetWarrant Met

1st St. A St.

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 178: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street 1st St. Scenario Existing + ODR

Minor Street A St. Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 1 3 461 North/South

Through 53 1 15 x East/West

Right 98 2 61

Total 152 0 6 537

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

Major Street Minor StreetWarrant Met

1st St. A St.

1 1NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 543 152

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 179: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street 1st St. Scenario Existing + Hyatt + ODR

Minor Street A St. Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 1 3 467 North/South

Through 53 1 15 x East/West

Right 102 2 61

Total 156 0 6 543

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

1 1NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 549 156

Major Street Minor StreetWarrant Met

1st St. A St.

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 180: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street 1st St. Scenario Cumulative No Project

Minor Street A St. Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 5 5 590 North/South

Through 65 5 15 x East/West

Right 190 5 65

Total 260 0 15 670

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

1 1NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 685 260

Major Street Minor StreetWarrant Met

1st St. A St.

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 181: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street 1st St. Scenario Cumulative No Project

Minor Street A St. Peak Hour PM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 0 5 310 North/South

Through 155 5 5 x East/West

Right 445 5 70

Total 600 0 15 385

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

Major Street Minor StreetWarrant Met

1st St. A St.

1 1YES

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 400 600

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 182: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street 1st St. Scenario Cumulative Plus Davis Hotel

Minor Street A St. Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 5 5 592 North/South

Through 65 5 15 x East/West

Right 200 5 65

Total 270 0 15 672

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

1 1NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 687 270

Major Street Minor StreetWarrant Met

1st St. A St.

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 183: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street 1st St. Scenario Cumulative Plus Davis Hotel

Minor Street A St. Peak Hour PM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 0 5 320 North/South

Through 155 5 5 x East/West

Right 447 5 72

Total 602 0 15 397

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

Major Street Minor StreetWarrant Met

1st St. A St.

1 1YES

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 412 602

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 184: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street Old Davis Road Scenario Existing + Hyatt + ODR

Minor Street Hilgard Lane Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 17 0 133 North/South

Through 0 297 140 x East/West

Right 9 186 0

Total 26 0 483 273

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

Major Street Minor StreetWarrant Met

Old Davis Road Hilgard Lane

1 1NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 756 26

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 185: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street Old Davis Road Scenario Existing + Hyatt + ODR

Minor Street Hilgard Lane Peak Hour PM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 153 0 13 North/South

Through 0 219 305 x East/West

Right 129 27 0

Total 282 0 246 318

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

Major Street Minor StreetWarrant Met

Old Davis Road Hilgard Lane

1 1NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 564 282

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 186: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street Old Davis Road Scenario 2015 + Davis Hotel + Hyatt + ODR

Minor Street I-80 Westbound Ramps Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 50 0 0 115 x North/South

Through 455 330 0 5 East/West

Right 0 59 0 566

Total 505 389 0 686

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

2 2YES

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 894 686

Major Street Minor StreetWarrant Met

Old Davis Road I-80 Westbound Ramps

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 187: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street Old Davis Road Scenario 2015 + Davis Hotel + Hyatt + ODR

Minor Street I-80 Westbound Ramps Peak Hour PM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 230 0 0 30 x North/South

Through 179 500 0 5 East/West

Right 0 410 0 225

Total 409 910 0 260

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

2 2YES

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 1,319 260

Major Street Minor StreetWarrant Met

Old Davis Road I-80 Westbound Ramps

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 188: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street Old Davis Road Scenario 2015 + Davis Hotel + Hyatt + ODR

Minor Street I-80 Eastbound Ramps Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 0 215 430 0 x North/South

Through 75 230 5 0 East/West

Right 25 0 115 0

Total 100 445 550 0

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

Major Street Minor StreetWarrant Met

Old Davis Road I-80 Eastbound Ramps

2 2NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 545 550

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane

Page 189: HCM Unsignalized Intersection Capacity Analysis AM Peak Hour 1: I-80 EB … · 2018-10-18 · vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 173 1225 115 tC, single

Sheet No 1 of

Project Hyatt Expansion / Old Davis Road

Major Street Old Davis Road Scenario 2015 + Davis Hotel + Hyatt + ODR

Minor Street I-80 Eastbound Ramps Peak Hour AM

Turn Movement Volumes Major Street Direction

NB SB EB WB

Left 0 455 164 0 x North/South

Through 245 75 5 0 East/West

Right 85 0 30 0

Total 330 530 199 0

0

100

200

300

400

500

600

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

-V

PH

Figure 4C-3Warrant 3, Peak Hour

(Urban Areas)

*150

*100

2 or More Lanes & 2 or More Lanes

1 Lane & 1 Lane

2 or More Lanes & 1 Lane

2 2NO

Number of Approach Lanes

* Note: Traffic Volume for Major Street is Total Volume of Both Approches.

Traffic Volume for Minor Street is the Volume of High Volume Approach.

Traffic Volume (VPH) * 860 199

Major Street Minor StreetWarrant Met

Old Davis Road I-80 Eastbound Ramps

0

100

400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800

Min

or

Str

eet

Hig

her

Vo

lum

e A

pp

roach

Major Street - Total of Both Approaches - Vehicle Per Hour (VPH)

*100

* Note: 150 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACH WITH TWO OR MORE LANES AND 100 VPH APPLIES AS THE LOWER THRESHOLD VOLUME FOR A MINOR STREET APPROACHING WITH ONE LANE.

Source: California Manual on Uniform Traffic Control Devices, Caltrans, 2006

1 Lane & 1 Lane


Recommended