Presentation to the Town of Haverhill. October 23, 2008
Popular Tags:
93
Haverhill Cooperative School District Special School District Meeting October 23, 2008 6 pm Dr. John A. Bagonzi Woodsville Community Building
Transcript
Page 1: Hcms Sdm

Haverhill Cooperative School District Special School District Meeting

October 23, 20086 pm

Dr. John A. Bagonzi Woodsville Community Building

Page 2: Hcms Sdm
Page 3: Hcms Sdm
Page 4: Hcms Sdm
Page 5: Hcms Sdm
Page 6: Hcms Sdm
Page 7: Hcms Sdm
Page 8: Hcms Sdm
Page 9: Hcms Sdm
Page 10: Hcms Sdm
Page 11: Hcms Sdm
Page 12: Hcms Sdm
Page 13: Hcms Sdm
Page 14: Hcms Sdm
Page 15: Hcms Sdm
Page 16: Hcms Sdm
Page 17: Hcms Sdm
Page 18: Hcms Sdm
Page 19: Hcms Sdm
Page 20: Hcms Sdm
Page 21: Hcms Sdm
Page 22: Hcms Sdm
Page 23: Hcms Sdm
Page 24: Hcms Sdm
Page 25: Hcms Sdm
Page 26: Hcms Sdm
Page 27: Hcms Sdm
Page 28: Hcms Sdm
Page 29: Hcms Sdm
Page 30: Hcms Sdm
Page 31: Hcms Sdm
Page 32: Hcms Sdm
Page 33: Hcms Sdm
Page 34: Hcms Sdm
Page 35: Hcms Sdm
Page 36: Hcms Sdm
Page 37: Hcms Sdm
Page 38: Hcms Sdm
Page 39: Hcms Sdm
Page 40: Hcms Sdm
Page 41: Hcms Sdm
Page 42: Hcms Sdm
Page 43: Hcms Sdm
Page 44: Hcms Sdm
Page 45: Hcms Sdm
Page 46: Hcms Sdm
Page 47: Hcms Sdm
Page 48: Hcms Sdm
Page 49: Hcms Sdm
Page 50: Hcms Sdm
Page 51: Hcms Sdm

HCMS Roof Project:Armory Photos

October 16, 2008

Page 52: Hcms Sdm

View from Roof – No Students

Page 53: Hcms Sdm

View from Roof – Grade 5 Classroom

Page 54: Hcms Sdm

View from Roof – Grade 6 Classroom

Page 55: Hcms Sdm

View from Roof – Grade Four Classroom

Page 56: Hcms Sdm

View from Roof – Grade 4 Classroom

Page 57: Hcms Sdm

View from Roof – Grade 4 Classroom

Page 58: Hcms Sdm

View from Roof – Grade 4 Classroom

Page 59: Hcms Sdm

View from Roof – Grade 5 Classroom

Page 60: Hcms Sdm

View from Roof – Grade 7 Classroom

Page 61: Hcms Sdm

View from Roof – Grade 7 Classroom

Page 62: Hcms Sdm

View from Roof – Grade 7 Classroom

Page 63: Hcms Sdm

Grade 7 Life Skills Class

Page 64: Hcms Sdm

Grade 7 Art Class

Page 65: Hcms Sdm

Art Supply Cart

Page 66: Hcms Sdm

East Hallway

Page 67: Hcms Sdm

West Hallway

Page 68: Hcms Sdm

Indoor Eating Area and South Hallway

Page 69: Hcms Sdm

Outdoor Eating Area

Page 70: Hcms Sdm

Staff Room with Band Room Next Door

Page 71: Hcms Sdm

Staff Room

Page 72: Hcms Sdm

Band Room

Page 73: Hcms Sdm

Title 1 Room

Page 74: Hcms Sdm

Physical Education Class – Under Cover due to Rain

Page 75: Hcms Sdm

Physical Education Class – Under Cover due to Rain

Page 76: Hcms Sdm

Only Girls Bathroom – One Toilet and One Sink

Page 77: Hcms Sdm

Only Girls Bathroom – One Toilet and One Sink

Page 78: Hcms Sdm

Main Entrance Hallway, Cafeteria POS Computer, Staff Photocopier

Page 79: Hcms Sdm

Janitor’s Closet and Computer Network Closet

Page 80: Hcms Sdm

RSA 508: 4-b – Damages from Construction

I Except as otherwise provided in this section, all actions to recover damages for injury to property, injury to the person, wrongful death or economic loss arising out of any deficiency in the creation of an improvement to real property, including without limitation the design, labor, materials, engineering, planning, surveying, construction, observation, supervision or inspection of that improvement, shall be brought within 8 years from the date of substantial completion of the improvement, and not thereafter.

II The term "substantial completion'' means that construction is sufficiently complete

so that an improvement may be utilized by its owner or lawful possessor for the purposes intended. In the case of a phased project with more than one substantial completion date, the 8-year period of limitations for actions involving systems designed to serve the entire project shall not begin until all phases of the project are substantially complete.

III If an improvement to real property is expressly warranted or guaranteed in writing

for a period longer than 8 years, the period of limitation set out in paragraph I shall extend to equal the longer period of warranty or guarantee.

Page 81: Hcms Sdm

RSA 508: 4-b – Damages from Construction

IV In all actions for negligence in design or construction described in paragraph I, the standard of care used to determine negligence shall be the standard of care applicable to the activity giving rise to the cause of action at the time the activity was performed, rather than a standard applicable to a later time.

V (a) The limitation set out in paragraph I shall not apply to actions involving fraudulent misrepresentations, or to actions involving the fraudulent concealment of material facts upon which a claim might be based. Such actions shall be brought within 8 years after the date on which all relevant facts are, or with due care ought to be, discovered by the person bringing the action.

(b) The 8-year limitation period in paragraph I shall not apply to actions arising out of any deficiency in the design, labor, materials, planning, engineering, surveying, observation, supervision, inspection or construction of improvements which are for nuclear power generation, nuclear waste storage, or the long-term storage of hazardous materials.

VI Nothing in this section shall affect the liabilities of a person having actual possession or control of an improvement to real property as owner or lawful possessor thereof, and nothing contained in this section shall alter or amend the time within which an action in tort may be brought for damages arising out of negligence in the repair, maintenance or upkeep of an improvement to real property.

Page 82: Hcms Sdm

Winnisquam Regional School District versus Daniel J. Levine

and Winnisquam Regional School District versus

Butler Manufacturing Company

• http://www.courts.state.nh.us/supreme/opinions/2005/winni096.htm

Page 83: Hcms Sdm

Project Scope• Adding Roof Trusses• Upgrade Electrical to Current Code• Ventilate Entire Roof • Removing mold under expert supervision• Bringing Insulation from R-38 to R-50• Replacing Sheetrock Ceilings• Upgrading the existing sprinkler system• Upgrading Fire Alarm Panel

Page 84: Hcms Sdm

Project Partners

• Architect – Mac Rood• Structural Engineer – Bruce Stewart• Contractor – Fenn-Way Builders• District Clerk of the Works – George Bagocius• School District Attorney – Gordon Graham• Fire Engineer – Nick Cricenti Jr. (SFC)• Electrical Engineer – Lee Carroll

Page 85: Hcms Sdm

Project Cost(as of 10/23/2008)

Total Project Estimate $2,471,394

Funds Already Budgeted - $239,532

Building Trust Fund Used - $80,392

Loan Required – amount to be raised

$2,151,470

Page 86: Hcms Sdm

How are we going to Fund the Project

Loan Required $2,151,470

Quality Zone Academy Bonds $1,498,000

Loan for Balance $ 653,470

Page 87: Hcms Sdm

QZAB BondsQZAB Bonds Available $1,498,000

About 1% Interest Earned over 15 years

- $104,860

Building Aid to be received over 15 years

- $898,800

QZAB Net Cost to Tax Payers $494,340

Page 88: Hcms Sdm

Loan for Balance of FundsPrincipal & fees $653,720

Plus Interest (5%) estimate $179,863

Less Building Aid to be received over 10 years

- $392,232

Loan Net Cost to Tax Payers $441,351

Page 89: Hcms Sdm

Net Cost to the TaxpayerQZAB Net Cost to Tax Payers $494,340

Loan Net Cost to Tax Payers $441,351

Building Aid to be Received on Funds already Budgeted

- $167,012

Net Project Cost to the Taxpayer over 15 years

$768,679

Page 90: Hcms Sdm

Impact on Our Taxes• No tax impact this school year (08-09)

• 2009 - 2010 Estimated Tax Rate Impact for this Project is $.12 per $1,000.00. The result is $12.00 for a $100,000 property

• Total debt payments for district will decline every year thereafter because the current bonds for 1991 District Building Project are paid off at the end of 2011

Page 91: Hcms Sdm

A “YES” vote means:

• Building repairs begin tomorrow

• Building will be structurally sound and compliant with current codes

• Students will be back in the building in January

Page 92: Hcms Sdm

A “NO” Vote means:

• Students stay in the Armory and other locations until at least the end of the school year

• All work on the building will end immediately

• Cannot petition the court for another special school district meeting on this issue this school year

Page 93: Hcms Sdm

“NO” Vote• Building repairs begin

tomorrow

• Building will be structurally sound and compliant with current codes

• Students will be back in the building in January

• Students stay in the Armory and other locations until at least the end of the school year

• All work on the building will end immediately

• Cannot petition the court for another special school district meeting on this issue this school year

“YES” Vote


Recommended