Page 1 ISS 2004-03 ATV Johannes Kepler docking ATV-CC – 24 th February 2011 1 ATV Johannes Kepler docking ATV-CC – 24 th February 2011 A. Novelli – Head of ATV Mission Operations
Transcript
Page 1: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 1ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 1ATV Johannes Kepler docking ATV-CC –

24th

February 2011

A. Novelli –

Head of ATV Mission Operations

Page 2: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 2ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 2

84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03

Reagan’s call Gore/Tchernomyrdinagreement

IGA/MOUs

Phase BFreedom

Redesign

Phase1 – MIR/Shuttle

International Space Station - ISS

Scrub 89 Restructuring

1st crew

04

Short Term studies Complementary study

B1 B2

ATV development (C/D) ‏Trilateral Statement

Joint Decision

Exchange Of Letters

Integration Contract signature

Russian Systems Contract signature

Jules Verne Launch

ATVStory

DMS-R/RDS Barter

ISSStory

05 06 07 08

ATV Johannes Kepler docking

Page 3: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 3ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 3

ISS today

ATV Johannes Kepler docking

Page 4: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 4ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 4

The International Space Station

ESA-COLOMBUS

JAPANUSA

CANADA

RUSSIAESA-ATV

ATV Johannes Kepler docking

Page 5: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 5ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 5

CupolaPressurised observation and work area

MELFI- 80°C

Freezer for research specimens. Located in Destiny or Kibo

ATVAutomated

Transfer Vehicle

DMS-RESA's Data

Management System for the Russian

Segment of the ISS. Located in service

module Zvezda.

Node 3Connecting Module

Node 2Connecting Module

MSG Microgravity Science Glovebox

MSL Materials Science Laboratory (in MSRR-1) ‏

EMCS European Modular Cultivation System

PFS Pulmonary Function System (in HRF-2)‏

ERA European

Robotic Arm

Columbus(Biolab, FSL, EPM, EDR with

PCDF, MARES, EuTEF, SOLAR, ACES)‏

ESA Elements on ISS

Page 6: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 6ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 6

Automated Transfer Vehicle (ATV) ‏

ATV Johannes Kepler docking

Page 7: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 7ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 7

Operations

ATV Control-Centre, Toulouse (F) ‏

COL-CC is now in full operations since 2007

ATV-CC has successfully performed the first ATV mission and is now executing the ATV-02 operations

Columbus Control-Centre, Munich (D) ‏

Page 8: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 8ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 8

ATV ground communication network

MCC-H

SSCC

HOSC

POIC & PDSS

N/W Mgt &

ControlNISN

WSGTTDRSS

ATV

ARTEMIS

TDRSSISS

REDU EET

ARTEMIS

Columbus-CC

IGS Central Nodeand NetworkServices

Data, Voice & Video Services

ESA

G/W

ESA

G/W

ESA G/W

MCC-M

TsUP

ESA G

/W

ATV-CC

IGS Node IGS Node

ColumbusATV

ESCs

IGS Node

USOCsA5 GSCKourou

EuropeanAstroautCentre

ESA G

/W

ESA IGS cloud

RussianGS

ESA MSMCommunications

Infrastructure

S-Band

ATV Prox Link

Ku-BandFwd 3Mbps (OCA)Rtn 50Mbps

S-Band

ATV Johannes Kepler docking

Page 9: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 9ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011

Page 10: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 10ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 10

Mission Overview

TsUP/Korolev –

24th

February 2011ATV Johannes Kepler docking

Page 11: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 11ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 11

ATV Mission altitude profile

ATV Johannes Kepler docking

Page 12: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 12ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 12

ATV Rendez-vous

Homing Closing FA

V

R

S2

S 1

S3

S -1/2

AE

KOS

- 250 m- 3500 m

S 0

Station keeping

30 km

Pre - homing

CoM distances

ATV Johannes Kepler docking

Page 13: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 13ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011

- 3.5 km

S3 S2

S1S-1/2

~39 km ~15 km -249 m

Telegoniometers

VideometersGNC RGPS

FCM DPVt

MSU CM

Absolute

GPS Docking

S4

-19 m

S41

-11 m

IF ESCAPE/CAM

Safety is guaranteed by ESCAPE/CAM availability

Safety is guaranteed by ATV if ATV is within S-1/2 box

14:09-14:42

15:22-15:58

16:22-16:35

16:37-16:42

16:46Timeline ATV-02In Centr. European

Time

Page 14: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 14ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 14

Rendez-vous –

Crew monitoring

Crew monitoring:

during closing and final approach

–Independent safety level–Dedicated video camera on aft end of Russian service module

–Dedicated hardware control panel to send discrete commands to ATV

ATV Johannes Kepler docking

Page 15: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 15ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 15

ATV to ISS propulsive support

ATV Johannes Kepler docking

Page 16: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 16ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 16

Automated Transfer Vehicle Johannes Kepler performances

ATV Johannes Kepler docking

ATV2 will deliver to ISS 2534Kg more than its predecessor ATV1 Jules Verne.

45577091Total Cargo Fluid + Dry

11501605Total Dry Cargo

No late load for ATV-1

435Late Load Cargo (Integrated 28-29 Jan 2011)‏

11501170Nominal Load Cargo (Integrated 17 Sep 2010)‏

Dry Cargo Loading

34075486Total Fluid Cargo

860850.6Refuel Propellant

20100Gas (3 tanks: Oxygen) ‏

2670Water

22604535ISS Propulsive Support

35982030Mission Propellant

ATV-1[kg]

ATV-2[kg]Fluid Cargo Loading

Page 17: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 17ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 17

Automated Transfer Vehicle Johannes Kepler Cargoes

ATV Johannes Kepler docking

Cargo TypeUtilization

Mass 204.58

Spares 555.59Supplies (hygiene, batteries, cleaning) ‏ 181.72

Tools 26.52

Clothing 48.09

Food 519.94

PR Items 14.73

Other 54.18Total 1605.35

Geoflow2Columbus Power

Distribution Unit

(PDU) ‏

Page 18: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 18ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 18

ATV de-orbit and re-entry

ATV Johannes Kepler docking

Page 19: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 19ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011

Back –up slides

Page 20: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 20ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 20

First operational flight (Jules Verne): Launch 9 March 2008Docking 3 April 2008De-docking 5 Sept. 2008Re-entry 29 Sept. 2008

Second operational flight (Johannes Kepler) ‏Launch 16 Feb. 2011Docking 24 Feb. 2011De-docking 4 June 2011

Operational flight rate:approximately 1 flight/15 months

Overall length 10.3 m,diameter 4,5 m,

Total launch mass up to 20.7 t,with up to 9 t of gross cargo.

Automated Transfer Vehicle (ATV) :Technical description

Made up of a an unpressurised module for propellant, water and gas, and a pressurised cargo carrier for dry cargo.

First ATV launched by Ariane 5 from Kourou on 9 March. 08. After 25 days of autonomous transfer flight (including demonstration mission), Jules Verne arrived at the International Space Station and docked automatically to rear of Russian Service Module (Zvezda) on the 3rd April 2008.

Generic ATV can carry a total cargo of up to 9 t:• up to 5.5 t of dry cargo

(re-supply goods, scientific payload, etc) ‏• up to 840 kg of water and 100 kg gas• up to 860 kg of propellant for refuelling the Station• up to 4.7 t of propellant for ISS propulsive support (reboost, attitude control, debris avoidance manœuvre).

ATV Johannes Kepler docking

Page 21: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 21ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 21

Additional ESA-provided Elements

Data Management for Zvezda (Roskosmos) On-orbit since July 2000

Super Guppy (NASA) Delivered October 1997

Microgravity Science Glovebox (NASA)‏On-orbit since July 2002

Crew Refrigerator/

Freezer

(NASA) QM delivered September ’05 FM Cancelled

Node 3

(NASA) Delivered early 2007

- 80°

C Freezer (MELFI ) (NASA

and JAXA )‏FM 1 delivered March 2002

to fly on ULF1.1

FM 2 delivered July 2004

Cupola (NASA) Delivered September 2004

Hexapod (NASA) Storage 2005-2008

Node 2 (NASA) Delivered June 2003

European Robotic Arm

(Roskosmos) ‏Delivery to Russia May ’06 Launch with MLM 2009

ATV Johannes Kepler docking

Page 22: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 22ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 22

ATV technical data

Kourou, French GuianaLaunch site

Electrical power will be supplied by non rechargeable batteries.

ATV will be launched with its solar panels folded to the body of the spacecraft.

Ariane 5 (260x260 km, 51.6°

transfer path) ‏

Launch vehicle

Total net cargo upload capacity:7667 kg

ISS re-boost and attitude control propellant: 0-4500 kg

Gas (Nitrogen, Oxygen, air, 2 gasses/flight): 0-100 kg

Water: 0-840 kg

Dry cargo: 1500-5500 kgCargo mass

2 x 0.314 m3 and 2 x 0.414 m3 for each of 8 racks

Payload envelope

Launch Configuration

ATV Johannes Kepler docking

Page 23: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 23ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 23

Vehicle comparison

ATV Johannes Kepler docking

HTV ATV Progress

M1 Apollo CSM

Length 9.2m 10.3 m 7.4 m 11.03 m

Maximum Diameter 4.4 4.51 m 2.70 m 3.90 m

Launch Mass 16500kg 20750 kg 7150 kg 30329 kg

Pressurized Volume 14 m3 (+16 m3 unpressurized)

14 m3 6.6 m3 6.17 m3

Cargo Upload Capacity 6000kg 7667kg 2230-3200kg Lunar mission

Engine Thrust 4x500N = 2000N 4x490 N = 1960N 2942 N 1x97860 N

Page 24: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 24ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 24

Docking system

ATV Johannes Kepler docking

Page 25: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 25ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 25

Optical guidance

Page 26: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 26ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 26

Docking system probe deployment

ATV Johannes Kepler docking

Page 27: Head of ATV Mission Operations February 2011 1blogs.esa.int/orion/files/2011/02/esa_atv-2_docking... · 2011-02-23 · Page 1 ATV Johannes Kepler dockingISS 2004-03 ATV-CC – 24ATV-CC

Page 27ISS 2004-03ATV Johannes Kepler docking ATV-CC – 24th February 2011 27

Cargoes integration and cleaning

ATV Johannes Kepler docking


Recommended