+ All Categories
Home > Documents > Headquarters MAX STREICHER GmbH & Co. KG aA, … · Headquarters MAX STREICHER GmbH & Co. KG aA,...

Headquarters MAX STREICHER GmbH & Co. KG aA, … · Headquarters MAX STREICHER GmbH & Co. KG aA,...

Date post: 24-Jun-2018
Category:
Upload: lycong
View: 220 times
Download: 0 times
Share this document with a friend
2
Headquarters MAX STREICHER GmbH & Co. KG aA, Deggendorf www.streicher-perspektiven.de PIPELINES & PLANTS MECHANICAL ENGINEERING CIVIL & STRUCTURAL ENGINEERING RAW & CONSTRUCTION MATERIAL Concretor (m/f) Recognised vocational training in accordance with the German Vocatio- nal Training Act (BBiG) Vocational training within the company, the vocatio- nal school and training centers STREICHER Group With a history of more than 100 years, the STREICHER Group under- stands how to combine quality and specialised knowledge with many years of experience in the competence fields pipeline and plant con- struction, mechanical engineering, civil and structural engineering as well as raw and construction material. The parent company MAX STREICHER GmbH & Co. KG aA with its headquarters in Deggendorf, employs more than 3,500 people worldwide. Innovation and investments in future oriented technologies ensure a constant development of the business activities and guarantee a long-term performance of the STREICHER Group.
Transcript
Page 1: Headquarters MAX STREICHER GmbH & Co. KG aA, … · Headquarters MAX STREICHER GmbH & Co. KG aA, ... stall or fabricate formworks and scaffoldings, ... concrete is brought into the

Headquarters MAX STREICHER GmbH & Co. KG aA, Deggendorf

www.streicher-perspektiven.de

PIPELINES & PLANTS MECHANICAL ENGINEERING CIVIL & STRUCTURAL ENGINEERING RAW & CONSTRUCTION MATERIAL

Concretor (m/f)

Recognised vocational training in accordance with the German Vocatio- nal Training Act (BBiG)

Vocational training within the company, the vocatio- nal school and training centers

STREICHER Group

With a history of more than 100 years, the STREICHER Group under-stands how to combine quality and specialised knowledge with many years of experience in the competence fi elds pipeline and plant con-struction, mechanical engineering, civil and structural engineering as well as raw and construction material. The parent company MAX STREICHER GmbH & Co. KG aA with its headquarters in Deggendorf, employs more than 3,500 people worldwide.

Innovation and investments in future oriented technologies ensure a constant development of the business activities and guarantee a long-term performance of the STREICHER Group.

Page 2: Headquarters MAX STREICHER GmbH & Co. KG aA, … · Headquarters MAX STREICHER GmbH & Co. KG aA, ... stall or fabricate formworks and scaffoldings, ... concrete is brought into the

The vocational training at a glance Locations

TasksConcretors build concrete and reinforced concrete constructions, e.g. for bridge constructions or hall and skyscraper constructions. They in- stall or fabricate formworks and scaffoldings, bend steel reinforce-ments and integrate those reinforcements into the formworks. They prepare concrete mixes or process ready-mixed concrete. The liquid concrete is brought into the formworks and compacted by tamping and vibrating. When the concrete is hardened, the concretors remove the formworks and if necessary, they work on the concrete surface. They assemble concrete components, seal concrete structures and insulate them. Furthermore, they repair concrete component damages.

SkillsThe calculation of demand for building materials, the calculation of sur-faces and the drawing up of the required measurements require good mathematical skills. Experience in the fields of crafts and technology make working with tools, machinery and devices easier. Beyond that, technical drawing skills are helpful when reading plans and drafts. Phy-sical knowledge is necessary in order to be able to calculate the charac-teristics of the material and to estimate the impact of forces properly.

Training Period The training period is 3 years and takes place in the company, the vo-cational school and in training centers.

QualificationCSE is required.

The vocational training as concretor takes place at our locations in Deggendorf and Jena.

Please send your application to:

MAX STREICHER GmbH & Co. KG aASchwaigerbreite 1794469 Deggendorf, GermanyPhone: +49(0)991 330-173Fax: +49(0)991 330-268E-Mail: [email protected]

STREICHER Tief- und Ingenieurbau Jena GmbH & Co. KGIn den Teichen 207751 Jena-Maua, GermanyPhone: +49(0)3641 610-300Fax: +49(0)3641 610-310E-Mail: [email protected]


Recommended