+ All Categories
Home > Documents > Health and Safety Induction For Works Involving UoR Water Systems University of Reading

Health and Safety Induction For Works Involving UoR Water Systems University of Reading

Date post: 24-Feb-2016
Category:
Upload: kirima
View: 31 times
Download: 0 times
Share this document with a friend
Description:
Health and Safety Induction For Works Involving UoR Water Systems University of Reading. Contact Details. Health and Safety Services Tel. 0118 378 8888 Security Services Emergency Number: 0118 378 6300 General Number: 0118 378 7799 FMD Reception 0118 3788958 - PowerPoint PPT Presentation
Popular Tags:
9
© University of Reading 2006 www.reading.ac. uk Dec 2009 Health and Safety Induction For Works Involving UoR Water Systems University of Reading
Transcript
Page 1: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

Dec 2009

Health and Safety InductionFor Works Involving UoR Water SystemsUniversity of Reading

Page 2: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

Contact Details

• Health and Safety Services– Tel. 0118 378 8888

• Security Services– Emergency Number: 0118 378 6300– General Number: 0118 378 7799

• FMD – Reception 0118 3788958– You must also know the contact details of your UoR

Project Manager– Each of the buildings at UoR has a building manager,

you should obtain the details from your UoR contact.

Page 3: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

Works – General Rules• For all works on UoR you must be

competent • All work must be covered by a risk

assessment• All chlorination and legionella testing

to be done by UoR approved MTC contractor

• All works must be considered to be near live utilities unless you have specific information that it is otherwise

• All accidents and incidents must be reported to your line manager and the UoR project or maintenance manager

Page 4: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

Permits• There is no permit for working on the

water system. There is however, permits for excavations, hot work, roof access as well as restricted access areas.

• Permits are required if you are carrying out works involving any of the above as part of the work.

Page 5: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

Non Water Workplace Hazards• Other construction tasks in the area• Students and UoR visitors a large

transient population • Some students and visitors may not

have English as a first language and may not have as sound an understanding of H&S

• Pests• Fragile flooring and roof surfaces

Page 6: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

UoR Standards• UoR issues every contracting

company with a UoR Rules and Guidance document

• We also issue individual contractors a guide for working on UoR. Therefore, there can be no excuse for not following the rules.

Page 7: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

Around campus

Shared traffic routesPark safely in designated areasParking permits are requiredBeware – cyclists!

20

Page 8: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

Summary on your workplace….• Identify your escape route in the event of

an emergency• Find out about fire and first aid

arrangements• Find out how to report accidents and

hazards• Check that your work place is safe to work

in• If not report it to your supervisor

Page 9: Health and Safety Induction For Works Involving  UoR Water Systems University of Reading

© University of Reading 2006 www.reading.ac.uk

October 2009

Any questions?Remember to sign to say you have had the induction and collect your tradesman’s guide to H&S at UoR


Recommended