Heavy cargo transport
2 3
MERIAURA LTDOPEN DECK CARGO CARRIERS ‘MERI’ AND ‘AURA’
Vessel descriptions MERI AURALength 105,4 m 101,8 mWidth 18,8 m 18,8 mDepth moulded 6,55 m 6,55 mDraft min/max 3,0 – 4,9m 3,0 – 4,9mFreeboard during loadout min/max 1,5 – 3,5m 2,0 – 3,5mGT / NT 3360 / 1008 3259/ 978Port of reg / flag Turku / Finland Turku / FinlandDP possibility DP 1 DP 2Deck space 85,4 x 18,8m 1605m2 82,7 x 18,8m 1554 m2Deck strenght (general and strong points) 8 t/m2 25t/m 50t/m 120/200t 8 t/m2 25t/m 50t/m 120/200tBallast pump capacity 2 x 350 m3/h 2 x 250 m3/hBallast tank capacity 5791 m3 4181 m3Ice classification 1A - DAS™ 1A
MERIAURA LTDLOADING AND DISCHARGING OPERATIONS
Cargo items can be driven onboard by truck and trailer, spmt or other wheel based equipment. Roll-on/off operation can be performed over the stern or over the side, provided that the quay height and water depth is sufficient. Vessels are equipped with ramp elements or link spans for the roll-on loadout over the side or stern. The ramp elements can be placed at any location on ships side. Vessel can be moored stern or side facing the quay, subject to port permits.
Roll-on operation over the stern of mv AURA. Roll-on spmt operation over the side of mv MERI
>ROLL-ON LOADOUT
>The ramp elements can be placed at any location on
ships’ side
1605m2
85,4m
18,8m
105,4m
Maximum cargo diameter 110 x 40m
68,3m
Self propelled crane rolling onboard mv MERI by using ship’s portable ramp elements
4 5
>SKIDDING LOADOUT
Skidding operation can be performed over the stern or over the side, provided that the quay height and water depth is sufficient.
Sometimes it is not possible to bring cargo to the quay side. In this case it was possible to lift the vessel and skid mv MERI to the assembly hall and perform loadout in the hall with overhead cranes.
Project references roll-on loadout
> CLIENT: CARGOTEC
Harbour cranesBaltic Sea / North Sea Sea transport, engineering, sea fastening
Mobile harbour cranes Baltic Sea / North Sea Transshipment & sea transport, engineering, sea fastening
> CLIENT: KONECRANES
Rubber tyred container gantry cranes North EuropeSea transport, engineering, sea fastening
Hydraulic cranes Finland - BelgiumSea transport, engineering, sea fastening
> CLIENT: MANTSINEN
> CLIENT: LIEBHERR
Project references skidding loadout> CLIENT: MEYER TURKU
Ship sections and steel structures Baltic Sea shipyards to Finland Sea transport
> CLIENT: BRING / KVAERNER
> CLIENT: AIBEL
> CLIENT: SEABROKERS / SUBSEA7
Offshore components Norway - NorwaySea transport
Offshore modules Poland- Norway Sea transport & engineering
> CLIENT: REMONTOWA SHIPBUILDING
Engines and aux.Baltic SeaSea transport & engineering
Offshore modules / Johan Sverdrup-project Baltic Sea / North Sea Sea transport
6 7
>SUPPORTING
Vessels are equipped with supporting blocks with 100 tons capacity each. Blocks can be secured to the deck by means of locking system or welded. Supporting height can be selected from 0,9 / 1,1 / 2,0m. Each sup-port is designed MBL/MSL 600/100 tons loads and cer-tified by Bureau Veritas.
>SEA FASTENING
Vessels are equipped with large stock of sea fastening equipment’s. Vessels have a large stock of standard lashing chains but also heavy duty turnbuckles and wires for securing large items. Heavy duty materials are certified by Bureau Veritas.
>ENGINEERING, SITE SURVEY, SUPERCARGO AND MARINE WARRANTY SURVEYOR
Our in-house engineering services are available for any project cargo. Our core services include calculat-ing and preparing stowage plans, as well as stability calculations and survey reports. Transport Manuals are provided to all projects according to the project re-quirements.
Our in-house Supercargoes are attending the loadout and discharging activities as required. Supercargoes can also perform as Marine Warranty Surveyor upon request.
1540
0
1180
0
6000
~400
0B
ALLA
ST6000
DES
IGN
~430
0B
ALLA
ST
Rev. Description Date Sign.
A Comments Acc. to Client 2013-06-17 NL/FS
Drawing number:
Metric
Drawing name:
Client:Scale:
Page: Revision:Project #:
Checked:
Designed:
FS2079 A1
4700 DWT GENERAL CARGO CARRIEROUTLINE GENERAL ARRANGEMENT
B1 (1)D.2079.1000.001
30.4.2013 MA
30.4.2013 NL
1:200
DOUBLE BOTTOM
TANK TOP1000 ab. BL
UPPER DECK7800/8850/9400 ab. BL
8850
9400
FORECASTLE DECK11800 ab. BL
64800
BW BW BWBW
BW
BW
8600
11200
4700 DWT GENERAL CARGO CARRIER
Length, between perpendiculars ........................ 101.2mLength, overall ................................................ 103.0mBreadth, moulded .............. .............................. 13.6 mDraught, design................................................ 6.0 mDepth to freeboard deck ............. ...................... 7.8 mSpeed, service ................................................. 10.5 kn
Cargo hold volume ..................................... abt. 5950 m³
Frame spacing............................................. 800/900 mm
Ø35
00
BW BW BWBW
BW
min. 600
BW
BW BW BW BW
BW
BW BW BW
Deck Store
#15
TWEEN DECK6000 ab. BL
SECTION #15
TOTAL 105 TEU IN HOLD
84 TEU ON DECK
LO
BW
BW
Ven
tila
tion
BW BW BW BW
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'BW
BW
BW
Fwd. Machinery
Deck Store
Steering Gear
CO2 Room
Casing
Casing
Vent
Pipe
s
Stair
Casing
Pipe
s
Stair
Sr. Officer
Mess / Day Room
Casing
Wheelhouse
Battery
BRIDGE DECK17800 ab. BL
2nd CABIN DECK14500 ab. BL
1st CABIN DECK11800 ab. BL
WHEELHOUSE TOP20500 ab. BL
Stair
#15
110 120
ESC
Bow Thruster
9400 ab. BL7800 ab. BL8850 ab. BL 7800 ab. BL
ESC
ESC
ESC
Stair
Rope Store
Crew
CaptainBed room
CaptainDay room
Day room
Sr. OfficerBed room
WC
64800BW
E.R. TWEENDECK3300 ab. BL
E.R. TWEENDECK3300 ab. BL
BW BW BW BW BW
ICECHEST
LBO
20 m³
LBO
20 m³
LBOSettling
10 m³
MGOSettling
10 m³
MGODay
LBODay10 m³ 10 m³
Wash W.
Wash W.
Boiler Room
ESC
Heat Recovery Tank
Black Water Grey Water
LBO
20 m³
LBO
20 m³
LBOSettling
10 m³
MGOSettling
10 m³
MGO
Wash W.
Wash W.
ESC
DayLBODay10 m³ 10 m³
FW
15 m³
ESC
ESC
BW
BW
MGO
20 m³
MGO
20 m³Ven
t
Pipe
s
AC Room
Workshop
Machinery Store
FO Purifiers
Engine Room
Sewage Treatment
Bilge WaterTreatment TK.
Bilge WaterCollection TK.
Bilge Well
Bilge Well
2000 ab. BL Slope1200 ab. BL 1000 ab. BLSlope
2000 ab. BL Slope1200 ab. BL 1000 ab. BLSlope
Switch board room
FW
15 m³
BW
Dry tank
Room
BW BW BW BWBW
ESC
BWBow ThrusterRoom
BW BW BW BWBW
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
Engine Room
LO S
tore
1
LO S
tore
2
MGO
EM DG Room
Paint Store
Officer
Officer
Crew
Provision
Galley
Change Room
Wash Room
Sauna
Gym
Ven
t
Technical
5 m³
Vent
WC
Laundry
Deck Store
ESC
ESC
110 120
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
BW
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8' 20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
3.3m ab. BL
BW
BW
BW
BW
BW
BW
Component room
Component room
LO Purifier
Bilge water treatment
Drying Room
BOXCOOLERS
Ove
rflo
w
Slu
dge
ICECHEST
FW
Water
ICECHEST
ICECHEST
BOXCOOLERS
0 10 20 30 40 50 60 70 80 90 100 110 120
0 10 20 30 40 50 60 70 80 90 100 110 120
0 10 20 30 40 50 60 70 80 90 100 110 120
0 10 20 30 40 50 60 70 80 90 100 110 120
0 10 20 30 40 50 60 70 80 90 100 110 120
0 10 20 30 40 50 60 70 80 90 100 110 120
900 mm 800 mmFrame spacing
3.3m ab. BL
3.3m ab. BL
3.3m ab. BL
0 10
0 10
0 10
0 10
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
20'*8'6''*8'
Ven
t
Ven
t
B Modified cargo hold geometry 2013-07-03 NL/FS
Fire Pump
>LIFTING LOADOUT
In addition to roll-on and skidding operation, the cargo can be loaded by shore cranes or floating cranes. Also offshore operations with DP can be performed.
EB towerNorth SeaSea transport
> CLIENT: IHC MERWEDE
Windmill foundationsHolland / Offshore site, UK East coastSea transport
> CLIENT:DHL / SHERINGHAM SHOAL OFFSHORE WINDFARM
> CLIENT:MHI VESTAS / BURBOBANK EXTENSIONOFFSHORE WINDFARM
Windmill equipment Denmark / UKSea transport & engineering
> CLIENT: BLUE WATER SHIPPING
Gemini monopilesNorth SeaSea transport, engineering
Project references lifting loadout
8
>SEA PASSAGE
>CONTACT OUR PROJECT TEAM
Jessica SaariSales Director
+358 2 2111 628+358 44 068 6860
Transportations can be performed during winter ice season or during summer. Limitations of towage can be neglected as the transportation is performed with a ship, but if your cargo has limitations with allowed motions, these can be controlled by using ships Motion Monitoring System and advanced weather programs. Transit times are shorter and expenses are saved in ports and canals as assisting tug are not obligatory.
Jaani Snellman Supercargo
+358 40 53 65 122
Ville LaurilaSupercargo
+358 41 543 7672
Meriaura Ltd. Linnankatu 88, FIN-20100 Turku
Aug
ust
2020
Mathias MattssonChartering Coordinator
+358 50 495 69 42
>OUR ACTIONS FOR SUSTAINABLE DEVELOPMENT
We operate in a number of renewable energy and energy efficiency-re-lated projects both on land and offshore. We have set tough targets to decrease all waste from ships. We are the first company using biofuel in shipping, and we are constanly looking for new solutions for cutting our emissions. The raw material for our biofuel comes from industry side streams, and therefore is not competing against food production. The waste based bio oil is ethically sustainable and it reduces carbon dioxide emissions up to 96%. VG Marine EcoFuel is produced by VG EcoFuel Ltd that is part of our Group. Our production is audited by DNV GL and has a sustainability system certificate.
Hannu LaivoniemiChartering Manager+358 40 675 2219
Pihla LehtoSupercargo
+358 40 643 1512