Höegh LNG The floating LNG services provider Third Quarter 2013 Presentation of financial results 19 November 2013
Transcript
Page 1: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Höegh LNG – The floating LNG services provider

Third Quarter 2013

Presentation of financial results 19 November 2013

Page 2: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Forward looking statements

2

This presentation contains forward-looking statements which reflects management’s current expectations, estimates and projections about

its operations. All statements, other than statements of historical facts, that address activities and events that will, should, could or may

occur in the future are forward-looking statements. Words such as “may,” “could,” “should,” “would,” “expect,” “plan,” “anticipate,” “intend,”

“forecast,” “believe,” “estimate,” “predict,” “propose,” “potential,” “continue” or the negative of these terms and similar expressions are

intended to identify such forward-looking statements. These statements are not guarantees of future performance and are subject to

certain risks, uncertainties and other factors, some of which are beyond our control and are difficult to predict. Therefore, actual outcomes

and results may differ materially from what is expressed or forecasted in such forward-looking statements. You should not place undue

reliance on these forward-looking statements, which speak only as of the date of this presentation. Unless legally required, Höegh LNG

undertakes no obligation to update publicly any forward-looking statements whether as a result of new information, future events or

otherwise.

Among the important factors that could cause actual results to differ materially from those in the forward-looking statements are: changes

in LNG transportation and regasification market trends; changes in the supply and demand for LNG; changes in trading patterns; changes

in applicable maintenance and regulatory standards; political events affecting production and consumption of LNG and Höegh LNG’s

ability to operate and control its vessels; change in the financial stability of clients of the Company; Höegh LNG’s ability to win upcoming

tenders and securing employment for the FSRUs on order; changes in Höegh LNG’s ability to convert LNG carriers to FSRUs including

the cost and time of completing such conversions; changes in Höegh LNG’s ability to complete and deliver projects awarded; increases in

the Company’s cost base; changes in the availability of vessels to purchase; failure by yards to comply with delivery schedules; changes

to vessels’ useful lives; changes in the ability of Höegh LNG to obtain additional financing, in particular, currently, in connection with the

turmoil in financial markets; the success in achieving commercial success for the projects being developed by the Company; changes in

applicable regulations and laws; and unpredictable or unknown factors herein also could have material adverse effects on forward-looking

statements.

Page 3: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Agenda

3

Highlights

Financials

Operational review

Market outlook

Summary

Page 4: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Highlights

4

Total income USD 45.7 million

EBITDA USD 10.9 million

Loss before tax of USD 2.6 million

Signed USD 310 million limited recourse

facility

Awarded pre-FEED study for jetty-moored

barge FLNG solution for North American

LNG export project

Awarded pre-FEED study for offshore

moored FLNG project in Australia

13 month time-charter extension for LNG

Libra

Norman Lady sold in line with strategy to

focus on FSRU segment

Page 5: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Agenda

5

Highlights

Financials

Operational review

Market outlook

Summary

Page 6: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Income statement

6

USD million 3Q2013 2Q2013 1Q2013 4Q2012 3Q2012 YTD2013 YTD2012

TOTAL INCOME 45,7 51,3 29,5 37,6 38,0 126,5 98,0

Charterhire expenses (5,2) (5,1) (5,1) (5,2) (5,2) (15,4) (15,5)

Operating expenses (8,7) (8,5) (8,4) (10,1) (7,8) (25,6) (23,0)

Construction contract expenses (10,4) (22,5) - - - (32,9) -

Administrative expenses (4,6) (3,8) (3,9) 4,1 (3,5) (12,3) (10,1)

Business development expenses (5,9) (4,1) (4,6) (5,8) (8,2) (14,6) (20,7)

EBITDA 10,9 7,3 7,5 20,5 13,2 25,7 28,8

Gain /(loss) on sale of assets - - - 10,4 0,0 - -

Depreciation and impairment (7,8) (7,6) (7,3) (8,4) (6,2) (22,7) (14,3)

EBIT 3,2 (0,3) 0,1 22,5 7,0 3,0 14,5

Interest expenses (5,9) (5,9) (8,3) (8,5) (6,1) (20,1) (18,3)

Interest income 0,0 0,0 0,1 0,0 0,0 0,1 0,1

Other financial items 0,1 0,2 0,5 (0,4) 0,1 0,8 1,5

PROFIT OR (LOSS) BEFORE TAX (2,6) (6,0) (7,6) 13,6 1,1 (16,2) (2,2)

Taxes (0,2) (0,1) (0,4) 0,0 (0,2) (0,7) (0,2)

NET PROFIT OR (LOSS) (2,8) (6,1) (7,9) 13,6 0,9 (16,9) (2,4)

Page 7: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Financial position

7

USD million 30.09.2013 30.06.2013 31.03.2013 31.12.2012 30.09.2012

Licences, design and other intangibles 74 74 74 74 74

Investments in newbuildings and vessels 813 814 797 713 685

Other assets 64 45 7 13 13

Hedging reserves 12 13 3 - -

Restricted cash 26 26 25 25 28

Current cash and marketable securities 104 112 176 247 133

TOTAL ASSETS 1 092 1 084 1 082 1 072 932

Total equity 381 381 349 344 328

Interest bearing debt 563 561 569 559 430

Hedging reserves 97 96 123 133 137

Other liabilities 51 47 41 36 37

TOTAL EQUITY AND LIABILITIES 1 092 1 084 1 082 1 072 932

Total equity adjusted for hedging reserves 461 463 469 477 465

Equity ratio adjusted for hedging reserves 42 % 43 % 43 % 44 % 50 %

Net interest bearing debt * 433 423 367 288 268

* Gross interest bearing debt less cash, marketable securities and restricted cash

Page 8: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Cash flow statement

8

USD million 3Q2013 2Q2013 1Q2013 4Q2012 3Q2012 YTD2013 YTD2012

Net profit or (loss) before tax (3) (6) (8) 14 1 (16) (2)

Adjustments of non-cash P&L items 12 10 15 (1) 12 38 32

Net changes in working capital, other 3 (5) 1 1 (1) (2) (13)

Net cash flow from operating activities 13 (1) 9 14 12 20 17

Proceeds from sale of marketable securities - 80 - - 81 80 183

Investments in marketable securities - - - (50) - - (155)

Investments in vessels and newbuildings (14) (38) (90) (32) (98) (141) (189)

Investments in intangibles and equipment - - (3) (0) (0) (4) (2)

Proceeds from sale of projects and equipment (0) - - 20 - - -

Net cash flow from/(used in) investing activities (14) 42 (93) (62) (17) (65) (163)

Proceeds from borrowings 5 - 19 130 - 24 -

Repayment of borrowings (3) (3) (3) (3) (3) (10) (10)

Interest paid (8) (8) (8) (6) (6) (25) (18)

Net proceeds from issue of capital - - - - - - 202

Other financing activities (0) (1) (4) (6) (0) (5) (0)

Net cash flow from/(used in) financing activities (7) (13) 2 115 (10) (16) 174

TOTAL CASH FLOW (8) 28 (82) 67 (15) (61) 27

Page 9: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

9

Accounting changes

New segment reporting from the third quarter 2013

Commercial

Technical

FLNG

Other

With effect from 1 January 2014 , joint venture companies will be recognised

according to the equity method in the consolidated accounts of Höegh LNG

Höegh LNG’s share of net profit in joint venture companies will replace the proportionate

consolidation of joint venture profit and loss account items in the consolidated accounts

EBITDA will be reduced while pre-tax profit will remain unchanged

Investment in associated companies will replace the proportionate recognition of joint

venture balance sheet items in the consolidated balance sheet of Höegh LNG

Höegh LNG will continue to present the segment reporting according to the proportionate

consolidation method. This will include a full income statement and selected balance

sheet items

Page 10: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Agenda

10

Highlights

Financials

Operational review

Market outlook

Summary

Page 11: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Main focus: FSRU newbuilding programme

11

Hull Project Construction Delivery

2549 KN, Lithuania 93% February 2014

2548 PGN, Indonesia 82% April 2014

2550 On offer in tenders 69% June 2014

2551 On offer in tenders 0% March 2015

All four FSRU’s under construction at Hyundai Heavy Industries are on time and on budget

Page 12: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

12

Klaipedos Nafta FSRU

FSRU will be delivered ex shipyard end

February 2014

Klaipedos Nafta's jetty and pipeline

scheduled for completion 1 September

2014

Terminal scheduled to commence

operations in second half 2014

Pursuing interim employment of FSRU

before starting operations in Lithuania

Pipeline from jetty under construction

Jetty construction in progress in Klaipeda port

Page 13: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

13

Perusahaan Gas Negara FSRU

FSRU will be delivered ex shipyard in

April 2014 for operations to

commence according to schedule in

June 2014

Construction of FSRU and mooring is

progressing according to schedule

and budget

USD 310 million debt facility signed

Pump tower for cargo tank being installed

Page 14: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

14

Perusahaan Gas Negara Mooring

Mooring construction ahead of

schedule and on budget

Installation contract to be signed in Q4

2013

Mooring to be transferred to PGN upon

acceptance

Weather waning swivel Gas transfer lines

Platform

Transfer pipeline

Mooring jacket structure under construction

Page 15: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

15

Colbún / AES Gener FSRU

Final contract with Colbún and AES

Gener is delayed

Colbún and AES Gener are making

progress on the permitting and

commercial agreements in Chile,

but the timing of final completion is

uncertain

Höegh LNG is pursuing alternative

employment opportunities for FSRU

Hull 2550

Page 16: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

16

Vessels in operation

Existing fleet operated safely and without incidents

On 17 November, GDF Suez Cape Ann arrived in Tianjin to be used as China's first

FSRU for up to five years

On 13 November, Gas Natural extended LNG Libra's time charter by 13 months to

the end of 2014

Norman Lady's time charter ended on 14 September 2013. The vessel has been

sold for green recycling

Page 17: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Höegh FLNG Ltd.

17

Pursuing barge based FLNG projects in Asia, North

America and Africa with liquefaction capacity 0.5 to

2 mtpa

Awarded a pre-FEED study for 2 mtpa jetty-moored

barge FLNG solution for a North American LNG

export project. Potential full FEED in 2014

Awarded pre-FEED study for 2 mtpa FLNG for a gas

field offshore Australia. Potential full FEED in 2014

Executing strategy based on barge FLNG solutions,

which includes the design and ordering of our first

FLNG. This order will form the basis for a separate

listing of the company. Selected Norwegian

investment bank to manage IPO process

Page 18: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Agenda

18

Highlights

Financials

Operational review

Market outlook

Summary

Page 19: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

LNG production forecast to 2030:

19

(Source: Energy Outlook 2030, BP 2013)

LNG contributes an increasing

share of natural gas trade

LNG will account for more than

15% of global gas consumption

by 2030

Australia is set to overtake

Qatar as the largest LNG

supplier by 2018

Depending on export permits,

North America could overtake

Australia as the next leader in

LNG production

600

300

mtpa

Page 20: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Asian LNG imports 2013-2025, a doubling in demand

20

(Source: BG Group)

Page 21: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

FSRU market outlook

21

Around 30 projects in pipeline

16 projects in Asia/Middle East

6 projects in the Americas

9 projects in Europe/Africa

Owner FSRUs (oper+constr)

Customers*

Höegh LNG 2+4 GDF Suez (2),

Perusahaan Gas Negara,

Klaipedos Nafta,

Colbún/AES Gener

Golar LNG 4+3 Petrobras (2), Pertamina,

Dubai Power Authority,

Jordanian Energy Ministry,

Kuwait Oil Corporation

Excelerate 8+1 YPF (2), Petrobras,

PREPA, Israel Electric

Corporation

OLT 1+0 E.ON, IREN (also owners)

MOL 0+1 GDF Suez (conditional)

BW Gas 0+1 N/A

* Projects in operation or awarded

Existing

Under construction / awarded

Potential

Page 22: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

22

Near-term FSRU contract award opportunities

Project Pre-

qualified Bid Selection

Contract

award Start-up

Columbia 2013 2014 2015

Egypt 2013 2013 2014

Lebanon 2014 2014 2016

India 2014 2014 2015

Chile 2014 2017

Port Meridian Exclusive 2014 2016

Page 23: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

3 FLNGs under construction

23

1) Shell's Prelude 5.2 mtpa1 FLNG (2017) 2) Petronas' Kanowit 1.2 mtpa FLNG (2015)

3) Exmar's 0.5 mtpa FLNG barge (2015) 4) Höegh LNG’s 1.0 mtpa inshore barge (FEED)

1 Whereof 3.6 mtpa of LNG

Page 24: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

24

Announced FLNG projects

COUNTRY LOCATION OF FIELD MAIN SPONSORS STATUS

Australia

Prelude In EPC phase

Cash Maple Completed pre-FEED studies

Sunrise Pending resolution with Timor, under review

Bonaparte Expecting EPC award soon

Browse Changed design from onshore plant to 3 FLNG units

Scarborough FEED

Canada

Douglas Channel Approved. Awaiting FID

Kitimat / Prince Rupert Pre-FEED

Colombia Caribbean coast In EPC phase

Indonesia Abadi In FEED phase

Malaysia Sarawak Kanowit In EPC phase

Sarawak Rotan Expecting EPC award soon

Mozambique Pre-FEED

USA Texas FEED completed, no off-take or approvals in place

Page 25: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Global LNG fleet overview

15 FSRUs in fleet

10 FSRU newbuildings on order plus two

options to change from LNGC to FSRU

365 LNG carriers in fleet

106 newbuildings on order (29%)

25

Type Delivered Newbuildings

on order

Under

conversion Total

LNGC 365 106 - 471

FLNG - 3 - 3

FSRU 15* 10** - 25

Total 380 119 - 499

LNG carrier fleet FSRU fleet

• 10 newbuildings and 5 conversions

(Source: Wood Mackenzie, LNG Unlimited, Fearnley LNG)

Page 26: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Agenda

26

Highlights

Financials

Operational review

Market outlook

Summary

Page 27: Höegh LNG The floating LNG services provider · Third Quarter 2013 Presentation of financial results 19 November 2013 . ... Colbún / AES Gener FSRU Final contract with Colbún and

Summary

27

Strong market prospects for newbuilt FSRUs

Newbuilding programme on track and on

budget

LNG Libra on extended time charter

Norman Lady sold

Paid pre-FEED work for two FLNG projects

Pursuing separate listing of Höegh FLNG