HEIS INSTALLATION PROCESS 1
Transcript

HEIS INSTALLATION PROCESS

1

DEMARCATION IN FIELD

2

POND CONSTRUCTION

3

CONSTRUCTION OF PLATE FORM

4

ERECTION OF HEAD UNIT

5

HEAD UNIT

6

HEAD UNIT

7

SHADE OVER HEAD UNIT

8

INSTALLATION OF FERTIGATION PUMP

9

PIPE LAYING

10

PIPES JOINING

11

PIPE LAID IN TRENCH

12

INSTALLATION OF VALVES

13

DRILLING FOR GROMETS

14

HOLES MADE WITH DRILL

15

PLACING GROMETS

16

COVERING HOLES

17

PUTTING TAKEOFF

18

LATERAL JOINING WITH TAKEOFF

19

LATERAL LAYING

20

END STOP

21

LATERALS LAID IN FIELD

22

PUNCHING OF LATERAL

23

INSTALLATION OF ONLINE DRIPPERS

24

INSTALLED DRIPPER

25

PRESSURE CHECK

26

FARMER TRAINING

27

FARMER TRAINING

28