Page 1: Hercules Nasby Extension Instructions

10ft X 8ft Extension Assembly Instructions

Example 10’ X 12’

Page 2: Hercules Nasby Extension Instructions

Example Section No.

Page No.

Thank you for purchasing your new Hercules greenhouse. We recommend you familiarise yourself with the instructions and read all safety information before you commence assembly. This instruction manual is also available online at www.greenhousepeople.co.uk in our technical help section should you need to reprint it. Should you require any addi-tional advice you can always call us on 01782 388811.

IMPORTANT: PLEASE BE AWARE THAT THE YOUR GLAZING BARS (e.g. 916) / CORNER GLAZING BARS (e.g. 915) ALL NEED TO HAVE RUBBER INSERTED INTO THEM BEFORE FRAME CONSTRUCTION CAN COMMENCE.

Safety Warning

Glass and aluminium can potentially cause injury. Please ensure you wear protective goggles, gloves, headgear and suitable footwear when assembling and glazing the building.

Please remember that glass is fragile and should be handled with extreme care. Always clear up and dispose of any breakages immediately.

Do not assemble the greenhouse in high winds.

For safety reasons and ease of assembly, we recommend that this greenhouse is assembled by a minimum of two people.

Please clear all lying snow from the greenhouse roof as it can cause the roof to buckle or collapse. Site Preparation

When selecting a site for your greenhouse, it is vital that you choose as flat and level an area as possible.

A concrete or slabbed base will provide the most solid foundation for your greenhouse.

Avoid placing your greenhouse under trees or in other vulnerable locations.

To minimise the risk of wind damage, try to select as sheltered a site as possible, e.g. beside a hedgerow or garden fence. Additional Considerations

Please bear in mind that assembling your greenhouse can be time consuming. You may need to spread the construction over two or more days. We recommend that you avoid leaving the building partially glazed. If you ever have to leave your greenhouse half assembled and not anchored down, weigh it down with slabs or bags of sand to stop the wind moving it.

You will find it helpful to prepare a large, clean and clear area in which to work in. A garage floor or flat lawn area is ideal.

If you have arranged for someone to install your greenhouse for you, please check that all components are included. Most parts are numbered and can be identified by a stamp or removable label. Alternatively, the components can be identified by lengths detailed in the packing list (see diagram below).

Once installed your greenhouse requires little maintenance, but to maintain the smooth running of your door(s) WD40 or similar can be applied to the door wheels and lower door guides.

Guarantee

Your new Hercules greenhouse is guaranteed for 10 years against faulty manufacture of the framework. This does not include glass, moving parts, accidental damage or wind damage.

Look out for part numbers

KEY

View Orientation

Potential Hazard

Wear safety goggles

Wear gloves

Think/Decision

e.g. Refer to section 4

Keep away from water while fitting

Cut/Trim

447

Page 3: Hercules Nasby Extension Instructions

B A

SOIL

100mm 5 : 1

3’ X 2’ Slab (910mm X 610mm) 2” thickness (50mm)

Recommended

OPTION 1 - Slab Base

OPTION 2 - Brick Plinth

B A

Base Preperation

For buildings larger than 12 foot long just add 620mm for every 2 foot increase in size.

For buildings larger than 12 foot long just add 620mm for every 2 foot increase in size.

Page 4: Hercules Nasby Extension Instructions

Section Part

Profile Size

8 x 10 Extension No. (mm)

300 Base

bracket -

2

303 Diagonal Bracing

1,742

2

355 Cill 8' Extension

1,888

2

447 Side Glazing Bar

1,670

6

465 Gutter 8' Extension

3,748

2

490 Cill Extension Bracket

50

2

493 Gutter Extension Bracket

50

2

491 Ridge

Extension Plate

-

1

492 Eaves Extension

Plate

-

2

693 A-Frame Brace

1,179

3

694 Side Bar Brace

1,628

2

698 Roof Bar Brace 10'W

1,826

2

P800

Page 5: Hercules Nasby Extension Instructions

IMPORTANT Make sure you insert all the bolts needed into the glazing bars. Aslo remember to insert the glazing rubber. These can not be fitted later.

447

Section Part

Profile Size

8 x 10 Extension No. (mm)

445 Roof

Glazing Bar

1,872

6

484 Ridge 8' Extension

2,480

1

494 Ridge Extension Bracket

50

1

602 Ridge Cantilever 3

915

3

601 Eaves Cantilever

460

691 Hanging Basket Rail 8'

Extension

2,508

2

6 P702

Page 6: Hercules Nasby Extension Instructions

8'

Part Number

Size (mm)

Quantity

303 1742 2

355 2508 1

447 1670 3

465 2508 1

576 (M6) 9

579 (M6) 11

588 (M6) 2

10

16

Side Assembly P800

Left hand side

Right hand side

Partition If you have a partition consider its location at this stage. It would be easier to insert the side bars (423) now.

576 2

588 1

576 2

588 1 576 2

588 1

Page 7: Hercules Nasby Extension Instructions

Add extra bolts for your louvre

IMPORTANT Make sure you insert all the bolts needed into the glazing bars. Aslo remember to insert the glazing rubber. These can not be fitted later.

447

303

465 465

447

303

447

355

300

447

576

Page 8: Hercules Nasby Extension Instructions

465

303 447

355

303 447

447

300

576

Page 9: Hercules Nasby Extension Instructions

430

411

430

335

300

Frame Assembly

IMPORTANT Do not fix the greenhouse to the base untill the greenhouse is fully glazed.

303

Main building side

Main building front

Page 10: Hercules Nasby Extension Instructions

IMPORTANT Do not fix the greenhouse to the base untill the greenhouse is fully glazed.

588 4 576 1

576 1

588 4 576 1

576 1

576 6

Page 11: Hercules Nasby Extension Instructions

IMPORTANT Make sure you insert all the bolts needed into the glazing bars. Aslo remember to insert the glazing rubber. These can not be fitted later.

445

Internal View

445 445

Internal View

445

447

Page 12: Hercules Nasby Extension Instructions

A-Frame Assembly Front View

Rear View

Page 13: Hercules Nasby Extension Instructions

693

693 693

698 698

694 694

Front View

Rear View

Page 14: Hercules Nasby Extension Instructions

698

445

445

491

494

445 698

693

445

693

698

Page 15: Hercules Nasby Extension Instructions

698

445

447

694

694

490

303

447

493 492

693

447

694

Page 16: Hercules Nasby Extension Instructions

490

694

355

447

303

303

698

465

445

Rear View

Page 17: Hercules Nasby Extension Instructions

Main building rear

Rear View

Rear View

Page 18: Hercules Nasby Extension Instructions

430

417

430

335

300

355

465

319

Front View

Internal View

Page 19: Hercules Nasby Extension Instructions

491

445

698

445

698

494 485

Roof Assembly P702

Front View

Internal View

Page 20: Hercules Nasby Extension Instructions

IMPORTANT Make sure you insert all the bolts needed into the glazing bars. Aslo remember to insert the glazing rubber. These can not be fitted later.

445

Vent Location You need to decide at this point

where you want you’re roof vent. Insert an extra bolt (576) into the

glazing bar (445) either side of the vents location.

Front View

Front View

Page 21: Hercules Nasby Extension Instructions

601

602

445

445

447 Internal View

Internal View

Page 22: Hercules Nasby Extension Instructions

445

Internal View

Front View

Page 23: Hercules Nasby Extension Instructions

If you are fitting hanging basket bars to a building with an extension you will need to

do the following. The main building’s hanging basket bar will need to be cut down

with a hacksaw to attach to the glazing bar in front of the A-frame. The extensions

hanging basket bar is already notched out so that it can be clamped between the roof

bar brace of the A-frame and the roof glazing bar. See the image bellow.

Now return to your main instruction bocklet.

Internal View

Page 24: Hercules Nasby Extension Instructions

The Greenhouse People Unit 19, Blythe Park

Cresswell Stoke-on-Trent Staffordshire ST11 9RD

01782 388811


Recommended