Herndon Metro Station: Cost Estimates for Town Requests. August 6, 2014. Herndon Metro Station. TOWN OF HERNDON. RESTON. Town requested at the Metro Town-Side Pavilion:. 1 . Imprinted concrete along retaining wall (approx. 400’) – VDOT special standard. 5. More durable sidewalk standard. - PowerPoint PPT Presentation
Popular Tags:
10
Herndon Metro Station: Cost Estimates for Town Requests August 6, 2014
Transcript
Page 1: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Metro Station: Cost Estimates for Town Requests

August 6, 2014

Page 2: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion2 August 6, 2014

Herndon Metro Station

TOWN OF HERNDON

RESTON

Page 3: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion3

Town requested at the Metro Town-Side Pavilion:

August 6, 2014

3. Decorative black handrail/fence both sides of sidewalk (approx. 1000’) – VDOT special standard

1. Imprinted concrete along retaining wall (approx. 400’) – VDOT special standard

2. Metro Sign at Herndon Parkway

4. Canopy for 30 bike racks

5. More durable sidewalk standard

Page 4: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion4 August 6, 2014

For Today’s Consideration

Review MWAA Cost Estimates

Consider Town Options

Direct Staff

Page 5: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion5 August 6, 2014

Land to be acquired

Permanent Easement to be acquired

Temporary Easement

Land to sold after construction

Town-side entry pavilion

Land Transactions for Town-Side Entry Pavilion

Page 6: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion6

Town Easements to be Affected: trail, water and sewer

August 6, 2014

Approx. location existing trail and utility easement

Town water and sewer lines &

easements to be relocated

Page 7: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion7 August 6, 2014

Town Actions Associated with Town-Side Metro Facilities

Planning participation since 2010

Letter Agreement Town-Fairfax County-MWAA 2013

Authorization of Relocated water-sewer-trail easements

Consideration of Special Exception

Page 8: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion

Explanation of Cost Estimates

August 6, 2014

Page 9: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion9 August 6, 2014

Page 10: Herndon Metro Station:  Cost Estimates for Town Requests

Herndon Station North Side Pavilion10 August 6, 2014