HI-SPEC unit_HON.doc 07/2011 1 of 12 Installation Instructions Honeywell Air Sampling Smoke Detection System Honeywell HI-SPEC 14 11 11 4 3 1 6 2 5 7 10 8 9 12 13 11 1 Operating-indicator light 2 Indicator light for fault 3 Indicator light for alert alarm-detector module I 4 Indicator light for action alarm-detector module I 5 Indicator light for fire alarm-detector module I 6 Smoke level display 1 to 10 for detector module I 7 Indicator light for alert alarm-detector module II 8 Indicator light for action alarm-detector module II 9 Indicator light for fire alarm-detector module II 10 Smoke level display 1 to 10 for detector module II 11 Pre-punched cable entries for connection to the central fire panel or power supply (input/output) 12 Connection pipe system I 13 Connection pipe system II 14 Connection for air return
Transcript
Page 1: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 1 of 12

Installation Instructions Honeywell Air Sampling Smoke Detection System Honeywell HI-SPEC

14

11

114 3

1

6

2

5

7

10

8

9

1213

11

1 Operating-indicator light

2 Indicator light for fault

3 Indicator light for alert alarm-detector module I

4 Indicator light for action alarm-detector module I

5 Indicator light for fire alarm-detector module I

6 Smoke level display 1 to 10 for detector module I

7 Indicator light for alert alarm-detector module II

8 Indicator light for action alarm-detector module II

9 Indicator light for fire alarm-detector module II

10 Smoke level display 1 to 10 for detector module II

11 Pre-punched cable entries for connection to the central fire panel or power supply (input/output)

12 Connection pipe system I

13 Connection pipe system II

14 Connection for air return

Page 2: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 2 of 12

Installation of the Detector Module

Please note: - Only the detector modules of the type ASD-TT-05, ASD-TT-01 and ASD-TT-001 - that have been approved by the VdS-certification authority may be used. - Carry out the following works only if the device is powered down. 1. Open the device by carefully unlocking the housing snap-in closures by means of a screwdriver. Then lift the housing lid a little bit. 2. Carefully pull the connection cable of the display board off (connection “Display”) and remove the housing lid.

Note: Shall the device only be provided with one detector module, please skip to point 5. Shall the device however be provided with two detector modules please follow the following instructions. 3. Recover carefully the ventilator cover for the second air sampling duct (self-adhesive plastic cover).

4. Break carefully the clasp for the connection of the second pipe system (predetermined breaking point, marked by “II“) with a screwdriver from the housing.

Note: The knockout is to be removed completely from the device. 5. Make the required settings by setting the contacts of switch S1 accordingly (see also “Settings of the detector module”).

6. Fix the detector module in the corresponding mounting position.

7. Ensure the detector is fully clipped home

8. Connect the detector module via the ribbon cable with the connection “Head 1” (detector module I) or “Head 2” (detector module II) to the base board. Note the labelling of the base board.

9. Reconnect the display board to the base board (connection “Display”). Note the labelling of the base board.

OFF

S1

7

9

6

5 1

3 4

Page 3: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 3 of 12

Detector Module Settings

In the following tables of the switch positions S1 have 2 positions.

on off

The standard settings have a grey background.

Setting the response sensitivity

detector module

DM-TT-50

DM-TT-10

DM-TT-01

S1.

1

S1.

2

0,8 %/m 0,12 %/m on on

0,4 %/m 0,06 %/m off on

1,0 %/m 0,2 %/m 0,03 %/m on off

0,5 %/m 0,1 %/m 0,015%/m off off

Setting the alarm delay

S1. 3 S1. 4

0 seconds off off

10 seconds on off

30 seconds off on

60 seconds on on

Setting the activating threshold “air flow fault”

S1. 5 S1. 6

small on off

medium off on

large off off

very large on on

Setting the delay “air flow fault”

S1. 7 S1. 8

0.5 minutes off on

2 minutes on off

15 minutes on on

60 minutes off off

Setting the fault signal

S1. 9

non-latched off

latched on

Setting LOGIC⋅ SENS

S1.10

off off

on on

Page 4: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 4 of 12

HEAD 1 DIAG

BR1X8

BR2

BR3

1 2

HEAD 1 HEAD 2DIAG DISPLAY

BR1 X8

BR2

F2

CUTOFF

X1

BR3

SCI ITAG

BR3

BR

1

1 2

X1

1 1223

X2

Br1

Br1

Br1

Br2

Br2

Br2

Choose number of the detector modules

The number of detector modules is chosen with the jumper BR1. The following table shows, whether the jumper must be put or not: X = pin pair bridge O = pin pair open The standard settings have a grey background.

Choose number of the detector modules

Bridge Pin No.

BR1, 1+2

1 detector module X

2 detector module O

Setting the ventilator voltage

Jumper BR3 on the base board and Jumper BR1 on the additional board allows the setup of the ventilator voltage. The following table shows whether the jumpers are set or not: X = pin pair bridge O = pin pair open The standard settings have a grey background.

Setting the ventilator voltage

base- board

additional board

Jumper Pin No.

BR 3 1 + 2

BR 1 1 + 2

BR 2 1 + 2

6,5 V O O X

6,9 V O X O

9 V O O O

Page 5: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 5 of 12

X1

X3

X5

K1

JU1 JU2

K3 K4

JU3 JU4

K5 K6

JU5 JU6

X2

X4

X6

X8 X9 X10 X11 X12

JU8

JU7

JU1-JU6

JU1 JU2

K3 K4

JU3 JU4

K5 K6

JU5 JU6

1 2 3 1 2 3

X1

1 2 3 1 2 3

1 2 3 1 2 3

Setting the function of the collective fault contact

The contact type (break contact or make contact) of the collective fault is set using the jumper JU 7 and JU 8.

collective fault contact detector module I = Jumper JU8

collective fault contact detector module II = Jumper JU7

The following table shows the positioning of the jumpers: X = pin pair bridge O = pin pair open The standard settings have a grey background.

Setting the collective fault contact

Jumper Pin No.

JU7/8 1+2

JU7/8 2+3

break contact O X

make contact X O

Page 6: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 6 of 12

Setting the alarm contacts

The contact type (break contact or make contact) of the alarm contacts is set using the jumper JU 1 to JU 6.

Alarm contact alert alarm detector module I = Jumper JU2

Alarm contact alert alarm detector module II = Jumper JU1

Alarm contact action alarm detector module I= Jumper JU4

Alarm contact action alarm detector module II = Jumper JU3

Alarm contact fire alarm detector module I = Jumper JU6

Alarm contact fire alarm detector module II = Jumper JU5

The following table shows the positioning of the jumpers: X = pin pair bridge O = pin pair open The standard settings have a grey background.

Setting the alarm contacts

Jumper Pin-No.

JU1-6 1+2

JU1-6 2+3

break contact O X

make contact X O

A B

Device Supports

A

B

Support Type MT-1 horizontal installation

Support Type MT-1 vertical installation

Page 7: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 7 of 12

Installation of the device

General information: - When choosing the installation location make sure the displays of the device are clearly visible. - Screw the air sampling smoke detection system either directly to the wall with its bottom casing or mount it by means of a special support (type

MT-1). This support allows to mount the device also to racks for example. - The air outlet of the device must not be blocked. (The distance between the air outlet and adjacent objects (e.g. wall) is to be at least 10 cm.) - The air sampling smoke detection system can be mounted with the air sampling pipe connector(s) pointing upwards or downwards. (If neces-

sary, turn the lid by 180°). If the air sampling pipe connector(s) point downwards make sure no impurities enter the air outlet which then points upwards.

- At switching-on the supply voltage, the device does not start running at once but only after approx. 10 seconds. Procedure: 1. First, clearly mark the fixing points for mounting the device. If necessary, use the provided drilling jig. Fix the device using four screws (max. ∅ of 6

mm for wall mounting and max. ∅ of 4 mm for mounting by means of the device support MT-1) in order to guarantee a safe fixing and to limit vibra-tions which occur.

2. Fix the device by means of four screws in accordance with the mounting type to the wall or the device support. Make sure the device is not fixed under mechanical tension or the screws are not tightened too much. Otherwise the device might be damaged, or unintended secondary noise may arise.

Note: To balance unevenness and/or to avoid vibrations vibration dampers need to be installed. 3. Carefully break out of the housing the required cable entries (max. 5 x M20 und 2 x M25). If required, use a screwdriver. 4. Carefully equip the cable entry(entries) according to requirements with M20 or M25 glands (2x M25, 1x M20 included in the delivery) by inserting

them into the corresponding cable entry/entries. 5. Pass the connection cable(s) (max. 1.5 mm²) required to wire the device through the prepared M20 or M25 glands into the device and cut it to the

required length within the device. 6. Wire the device according to the following connection diagram.

Page 8: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 8 of 12

internal connection connection board

X12

2

1

2

1

_+

_+

X10

connection to central fire panel

4

3

2

1

+24V

X11

24V fürDisplay

DisplayData

_+

24V+24V

0V

0V

X9

4

3

2

1

+24V

_+

Alt.Sens.+24V

0V

0V

X8

4

3

2

1

+24V

_+

Reset+24V

0V

0V

X61

X41

2

X6

X21

2

JU8

RF

I

K8

X2

X63

X43

4

X64

X23

4

JU2

RA

1 I

K2

X2

X65

X45

6

X66

X25

6

JU4

RA

2 I

K4

X2

X67

X47

8

X68

X27

8

JU6

RA

3 I

K6

X2

X51

X31

2

2

X11

2

JU7

RF

II

K7

3

3

4

4

3

4

JU1

RA

1 II

K1

5

5

6

6

5

6

JU3

RA

2 II

K3

7

7

8

8

7

8

JU5

RA

3 II

K5

X5 X1

X5

X3

X1

X5 X1

X5 X1

X5 X1

X5

X3

X1

X5 X1

X3123

123

123

123

123

123

123

123

dete

ctor

mod

ule

I

Ale

rt a

larm

-rel

ay

L1+

L1+

L1-

L1-

L2+

L2+

L2-

L2-

L3+

L3+

L3-

L3-

L4+

L4+

L4-

L4-

L5+

L5+

L5-

L5-

L6+

L6+

L6-

L6-

L7+

L7+

L7-

L7-

L8+

L8+

L8-

L8-

faul

t con

tact

dete

ctor

mod

ule

II

fau

lt co

ntac

t A

ctio

n a

larm

-rel

ayF

ire a

larm

-rel

ayA

lert

ala

rm-r

elay

Act

ion

ala

rm-r

elay

Fire

ala

rm-r

elay

internal connection connection board

2

Parallel-anzeige

Page 9: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 9 of 12

Connections

X1 1+2

Fault resistance for fault contact II (just to connect, if the contact as normally open programmed is, no standard)

X1 3+4

alarm resistance for alarm contact “alert alarm II” (just to connect, if the contact as normally open programmed is, standard)

X1 5+6

alarm resistance for alarm contact “action alarm II” (just to connect, if the contact as normally open programmed is, standard)

X1 7+8

alarm resistance for alarm contact “fire alarm II” (just to connect, if the contact as normally open programmed is, standard)

X2 1+2

Fault resistance for fault contact I (just to connect, if the contact as normally open programmed is, no standard)

X2 3+4

alarm resistance for alarm contact “alert alarm I” (just to connect, if the contact as normally open programmed is, standard)

X2 5+6

alarm resistance for alarm contact “action alarm I” (just to connect, if the contact as normally open programmed is, standard)

X2 7+8

alarm resistance for alarm contact “fire alarm I” (just to connect, if the contact as normally open programmed is, standard)

X3 / 1

X3 / 2

+ output line “Fault II“

- output line “Fault II”

X3 / 3

X3 / 4

+ output line “Alert alarm II“

- output line “Alert alarm II”

X3 / 5

X3 / 6

+ output line “Action alarm II“

- output line “Action alarm II”

X3 / 7

X3 / 8

+ output line “Fire alarm II“

- output line “Fire alarm II”

X4 / 1

X4 / 2

+ output line “Fault I“

- output line “Fault I”

X4 / 3

X4 / 4

+ output line “Alert alarm I“

- output line “Alert alarm I”

X4 / 5

X4 / 6

+ output line “Action alarm I“

- output line “Action alarm I”

X4 / 7

X4 / 8

+ output line “Fire alarm I“

- output line “Fire alarm I”

X5 / 1

X5 / 2

+ input line “Fault II“

- input line “Fault II”

X5 / 3

X5 / 4

+ input line “Alert alarm II“

- input line “Alert alarm II”

Page 10: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 10 of 12

X5 / 5

X5 / 6

+ input line “Action alarm II“

- input line “Action alarm II”

X5 / 7

X5 / 8

+ input line “Fire alarm II“

- input line “Fire alarm II”

X6 / 1

X6 / 2

+ input line “Fault I“

- input line “Fault I”

X6 / 3

X6 / 4

+ input line “Alert alarm I“

- input line “Alert alarm I”

X6 / 5

X6 / 6

+ input line “Action alarm I“

- input line “Action alarm I”

X6 / 7

X6 / 8

+ input line “Fire alarm I“

- input line “Fire alarm I”

X8 / 1

X8 / 2

+ 24 V reset input

0 V reset input

X8 / 3

X8 / 4

+ 24 V reset output

0 V reset output

X9 / 1

X9 / 2

+ 24 V input “Alt. Sens.“ Alternate Sensitivity

0 V input “Alt. Sens.“ Alternate Sensitivity

X9 / 3

X9 / 4

+ 24 V output “Alt. Sens.“ Alternate Sensitivity

0 V output “Alt. Sens.“ Alternate Sensitivity

X10 / 1

X10 / 2

+ 24 V supply voltage

0 V supply voltage

X10 / 3

X10 / 4

+ 24 V supply voltage

0 V supply voltage

X11 / 1

X11 / 2

+ data external Display

- data external Display

X12 / 1

X12 / 2

+ 24 V external Display

0 V external Display

Page 11: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 11 of 12

S2Flow-Init

OF

FS1

Commissioning

1. Switch on the voltage supply (24v) Note: The fan starts running 15 seconds after switching on the voltage supply (24 V).

Commissioning

2. Make sure first that the device has been in operation for at least 30 minutes prior to the air flow initialization in order to reach the operating tem-

perature. 3. In order to initialize the connected pipe system, press the Flow-Init-button S2 (see figure) of the corresponding detector module until the green

operating-indicator light of the device starts flashing. The initialization is terminated after approx. 5 seconds. After a successful initialization the op-erating- indicator light is lit permanently.

4. During and after initialization the pipe system must no longer be changed. Even the ventilator voltage of the device must no longer be modified after initializations. Otherwise the initialization must be carried out again.

Page 12: HI-SPEC UNIT HON - GentExpert

HI-SPEC unit_HON.doc 07/2011 12 of 12

Certificate of Conformity pursuant to EU Construction Products Directive 89/106/EEC

• The conformity of the „air sampling smoke detector for fire detection and fire alarm systems in buildings“ according to DIN EN 54-20 has been established by a test at the VdS laboratory.

• The EC certificate of conformity has been issued by notified product certification body (ID no. 0786, VdS).

• The CE designation according to DIN EN 54-20 has been carried out.

0786

WAGNER Group GmbH Schleswigstrasse 1 - 5 30853 Langenhagen

09

Nr. 0786 – CPD – 20685

EN 54-20: 2006 Air sampling smoke detector for fire detection and fire alarm systems in buildings 0,015 % light obscuration/m Class: A, B and C 0,1 % light obscuration/m Class: A, B and C

0,5 % light obscuration/m Class: A, B and C

Honeywell Life Safety Systems 140 Waterside Road Hamilton Industrial Park

Leicester

LE5 1TN

Tel (+44) 116 246 2000


Recommended