HI-600: Analysis and Design of Health Information Systems

Implementation IIMigration and Post-Implementation

Page 2: Hi600 u13_inst_slides

Making the Transition to the New System

Page 3: Hi600 u13_inst_slides

The Migration Plan

Page 4: Hi600 u13_inst_slides

Preparing the Business• Selecting

the Conversion Strategy

• Evaluating the Strategy Choices

• Preparing a Business Contingency Plan

Page 5: Hi600 u13_inst_slides

Preparing the Technology• Install the Hardware• Install the Software• Convert Data

Page 6: Hi600 u13_inst_slides

Preparing People for the New System• Understanding Resistance to Change• Costs and benefits

of change

• Change Management• Revising management policies• Assessing costs and benefits of organization

and potential adopters• Motivating adaption• Enabling adaption through training

Page 7: Hi600 u13_inst_slides

POSTIMPLEMENTATION ACTIVITIES• System Support• System Maintenance• Project Assessment• Project Team Review• System Review

Page 8: Hi600 u13_inst_slides

SUMMARY