International NATM Seminar, Sao Paulo, Brazil, 16 th May2014 High-precision NATM tunnelling through advanced surveying and monitoring technology Klaus Rabensteiner
Transcript

International NATM Seminar Sao Paulo Brazil 16th May2014

High-precision NATM tunnelling through advanced surveying and monitoring technology Klaus Rabensteiner

2

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Activities

o Surveying

o Monitoring

o Instrumentation

o Software

Customers

Contractors

Government authorities

Engineering companies

Manufacturing Industry

Introduction to Geodata wwwgeodatacom

BUSINESS AREAS

Infrastructure Mining Industry

Subways Quarries amp

Gravel-pits

Traffic Routes amp

Tunnelling

Hydro Power Stations

Utility Facilities

Underground Mining

Industrial Plants

Precision Surveying

Production

Measurement

3

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Network Survey

Inventory Survey

Setting-out

Mobile Mapping Systems

Guidance Systems

Geotechnical Monitoring

SERVICES HARDWARE

Vibration

amp Noise Testing

Checking Instrumentation

Monitoring Systems

S

OF

TW

AR

E

Integrated Tunnel Surveying and Monitoring

4

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

GPS-measurement for a tunnel network

(Pir Panjal India)

Network and control survey

5

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

Sketch of a network

with error ellipses

Network and control survey

portal network

tunnel network

7

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Measurement of azimuths using a

fully automated gyroscope system

Possibility of centric and eccentric

setups assures great flexibility in

adapting to difficult conditions

(inclined shafts etc)

Gyro-measurement in a subway tunnel

(Metro Sofia Bulgaria)

Network and control survey

8

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Free stationing

Heading survey

Check of profile

Heading control of side-wall drifts during construction

(Lainzer Tunnel lot 31 Vienna Austria)

Heading control and construction survey

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

2

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Activities

o Surveying

o Monitoring

o Instrumentation

o Software

Customers

Contractors

Government authorities

Engineering companies

Manufacturing Industry

Introduction to Geodata wwwgeodatacom

BUSINESS AREAS

Infrastructure Mining Industry

Subways Quarries amp

Gravel-pits

Traffic Routes amp

Tunnelling

Hydro Power Stations

Utility Facilities

Underground Mining

Industrial Plants

Precision Surveying

Production

Measurement

3

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Network Survey

Inventory Survey

Setting-out

Mobile Mapping Systems

Guidance Systems

Geotechnical Monitoring

SERVICES HARDWARE

Vibration

amp Noise Testing

Checking Instrumentation

Monitoring Systems

S

OF

TW

AR

E

Integrated Tunnel Surveying and Monitoring

4

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

GPS-measurement for a tunnel network

(Pir Panjal India)

Network and control survey

5

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

Sketch of a network

with error ellipses

Network and control survey

portal network

tunnel network

7

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Measurement of azimuths using a

fully automated gyroscope system

Possibility of centric and eccentric

setups assures great flexibility in

adapting to difficult conditions

(inclined shafts etc)

Gyro-measurement in a subway tunnel

(Metro Sofia Bulgaria)

Network and control survey

8

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Free stationing

Heading survey

Check of profile

Heading control of side-wall drifts during construction

(Lainzer Tunnel lot 31 Vienna Austria)

Heading control and construction survey

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

3

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Network Survey

Inventory Survey

Setting-out

Mobile Mapping Systems

Guidance Systems

Geotechnical Monitoring

SERVICES HARDWARE

Vibration

amp Noise Testing

Checking Instrumentation

Monitoring Systems

S

OF

TW

AR

E

Integrated Tunnel Surveying and Monitoring

4

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

GPS-measurement for a tunnel network

(Pir Panjal India)

Network and control survey

5

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

Sketch of a network

with error ellipses

Network and control survey

portal network

tunnel network

7

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Measurement of azimuths using a

fully automated gyroscope system

Possibility of centric and eccentric

setups assures great flexibility in

adapting to difficult conditions

(inclined shafts etc)

Gyro-measurement in a subway tunnel

(Metro Sofia Bulgaria)

Network and control survey

8

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Free stationing

Heading survey

Check of profile

Heading control of side-wall drifts during construction

(Lainzer Tunnel lot 31 Vienna Austria)

Heading control and construction survey

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

4

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

GPS-measurement for a tunnel network

(Pir Panjal India)

Network and control survey

5

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

Sketch of a network

with error ellipses

Network and control survey

portal network

tunnel network

7

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Measurement of azimuths using a

fully automated gyroscope system

Possibility of centric and eccentric

setups assures great flexibility in

adapting to difficult conditions

(inclined shafts etc)

Gyro-measurement in a subway tunnel

(Metro Sofia Bulgaria)

Network and control survey

8

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Free stationing

Heading survey

Check of profile

Heading control of side-wall drifts during construction

(Lainzer Tunnel lot 31 Vienna Austria)

Heading control and construction survey

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

5

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Many years of experience

required for planning measuring

and analysis of large fundamental

networks for tunnel construction

Sketch of a network

with error ellipses

Network and control survey

portal network

tunnel network

7

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Measurement of azimuths using a

fully automated gyroscope system

Possibility of centric and eccentric

setups assures great flexibility in

adapting to difficult conditions

(inclined shafts etc)

Gyro-measurement in a subway tunnel

(Metro Sofia Bulgaria)

Network and control survey

8

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Free stationing

Heading survey

Check of profile

Heading control of side-wall drifts during construction

(Lainzer Tunnel lot 31 Vienna Austria)

Heading control and construction survey

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

7

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Measurement of azimuths using a

fully automated gyroscope system

Possibility of centric and eccentric

setups assures great flexibility in

adapting to difficult conditions

(inclined shafts etc)

Gyro-measurement in a subway tunnel

(Metro Sofia Bulgaria)

Network and control survey

8

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Free stationing

Heading survey

Check of profile

Heading control of side-wall drifts during construction

(Lainzer Tunnel lot 31 Vienna Austria)

Heading control and construction survey

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

8

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Free stationing

Heading survey

Check of profile

Heading control of side-wall drifts during construction

(Lainzer Tunnel lot 31 Vienna Austria)

Heading control and construction survey

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

9

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Highly accurate provision of

the planned profile

Fast installation and simple

operation No laser setting

out lists required

Instant profile control on site

Remote operation (WLAN

display)

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

10

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

fixed installation of the total

station

Setting out of drill holes by WLAN-Interface

Heading control with motorised laser

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

11

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

3-dimensional digital object

registration (geometry and

image) using a laser scanner

in the 1-200 m measuring

range

Fast simple and complete

survey independent of

lighting or surface

characteristics

High reliability and accuracy

(plusmn 5 hellip10 mm)

Laser scanner on a vehicle in the heading area

(Tunnel Kirchdorf Austria)

Profile check with tunnel laser scanner

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

12

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Profile check with tunnel laser scanner

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

13

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Roadheader guidance system

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

14

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

14

This is the main operator

screen on a Sandvik MT

Series Roadheader

The guidance system takes

the top left part of the screen

For clarity only this area is

shown in the following slides

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

15

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Why is monitoring so important

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

16

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

displacements with high

precision

Flexible measurement setup

avoiding interference with

construction activities

Requires special software for

high-quality measurements and

analysis

3D-displacement measurements with

free stationing during excavation

Optical 3D displacement monitoring

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

17

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

- installation of points in the lining close to the face

- arrangement in measuring cross sections

- typical arrangement of 5 ndash 7 monitoring points per cross section

typical arrangement of points in alpine railway tunnel typical arrangement of points in urban metro tunnel

Optical 3D displacement monitoring

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

18

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Determination of absolute

3D displacements

Flexible measurement setup

3D displacement monitoring

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

19

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Optical 3D displacement monitoring

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

20

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Data Categories

DBMS

User Interfaces

Tunnel information system

Data Analysis Data Acquisition Verification

amp Validation Data Storage Visualization Reporting Alarming

Workflow

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

21

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Alarming service

Check of data quality monitoring network

integrity and the rapid discovery of all

kinds of critical situation

Notification by mail and SMS through the

alarming service

Relevant information is displayed

on-line in overview maps

Alarm and reporting system

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

22

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

bull under construction

since 2007

bull 2 x 95 km of line TBM twin tunnels

and NATM

bull 13 center platform

stations

Metro Thessaloniki

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

23

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Budget 29 Billion Euro

155 km of TBM twin tunnels

partly in the historical center of

Copenhagen

17 underground box stations

62m long

5 shafts 4 crossovers

tunnel track at depth of approx

10-35 m

Client Metroselskabet

Contractor CMT

-Salini

-Technimont

-SELI

Cityringen ndash Copenhagen Denmark

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

24

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

Crossrail ndash Farringdon station England

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology

25

High-precision NATM tunnelling through advanced surveying technology

International NATM Seminar Sao Paulo Brazil 16th May2014

GEODATA Group

Monitoring

Surveying

Information Technology


Recommended