Egypt HEPP Final ReportHigher Education Partnership Program (HEPP)
in Egypt Final Report (July 30, 2015–June 30, 2016)
Submitted September 30, 2016 This publication was produced for
review by the United States Agency for International Development.
It was prepared by RTI International.
Higher Education Partnership Program (HEPP) in Egypt Final Report
(July 30, 2015–June 30, 2016)
Cooperative Agreement AID-263-A-15-00024
Submitted to: Arturo Acosta Agreement Officer’s Representative
USAID/Egypt 1A Nady El Etisalat Street New Maadi, Cairo, Egypt
Postal Code - M 11435
Submitted by: Ami Thakkar HEPP Program Manager RTI International
3040 Cornwallis Road Post Office Box 12194 Research Triangle Park,
NC 27709-2194 E-mail:
[email protected] Telephone:
202-728-1973
RTI International is one of the world's leading research
institutes, dedicated to improving the human condition by turning
knowledge into practice. Our staff of more than 3,700 provides
research and technical services to governments and businesses in
more than 75 countries in the areas of health and pharmaceuticals,
education and training, surveys and statistics, advanced
technology, international development, economic and social policy,
energy and the environment, and laboratory testing and chemical
analysis.
RTI International is a registered trademark and a trade name of
Research Triangle Institute.
The author’s views expressed in this publication do not necessarily
reflect the views of the United States Agency for International
Development or the United States Government.
Table of Contents Page List of Figures
.................................................................................................................
iv
Abbreviations
...................................................................................................................
v
Executive Summary
.........................................................................................................
1
Closeout Activities
...............................................................................................
1 Summary of Technical Activities
........................................................................
1 Project Administration
.........................................................................................
2
Introduction: Background on HEPP
................................................................................
2
Closeout Activities
...........................................................................................................
4
Project Launch
.................................................................................................................
6
Technical Activities
.........................................................................................................
8
Priority Industry Sectors Selection and Industry Engagement
............................ 8 Development of the Call for
Proposals for Objective 1 Grants ......................... 14 Other
Technical Work
........................................................................................
15 Technical Work during the Project Pause Period
.............................................. 15
Modification of the Grants Process
........................................................ 16
Industry Engagement
.............................................................................
16 Development of Working Papers
...........................................................
17
Development of SOWs for Anticipated Procurements
...................................... 18
Coordination with the GOE, USAID, and Stakeholders
................................................ 18
Coordination with the GOE
...............................................................................
18 Coordination with USAID
.................................................................................
19
Performance Monitoring
................................................................................................
19
Project Learning
.............................................................................................................
19
Project Administration
...................................................................................................
20
Staffing
...............................................................................................................
20 Operations
..........................................................................................................
21
Annex 1. Actual Results Compared to the Original Work Plan
.................................... 22
Annex 2. Final Draft RFA for Objective 1 Grant
Proposals.......................................... 32
Annex 3. Initial Draft RFA for Objective 2 Grant Proposals
........................................ 32
Annex 4. Documentation of the Applications Evaluation Process
................................ 32
Annex 5. Agenda for Objective 1 Info Sessions Workshop
.......................................... 32
Annex 6. Engineering Industries Survey Analysis through Egyptian
Chamber of Engineering Industries/CEI
................................................................................
32
Annex 7. The 10 Bridges Model
....................................................................................
32
Annex 8. Mapping MOHESR Vision 2030 to HEPP Objectives and 10
Industry Priority Sectors
................................................................................................................
32
Higher Education Partnership Program (HEPP)—Final Report, iv July
30, 2015–June 30, 2016
Annex 9. Steps Toward World Class Higher Education: Reference
Document ............ 32
Annex 10. Policy Reform: Identification of Specific Laws and
Regulations that should be Modified to Strengthen Higher Education
.................................................... 33
Annex 11. Discussion draft on Expansion of the LIN Concept to
Better Support the Objective 2 RDI Centers
....................................................................................
33
Annex 12. SOW for Communications Firm
..................................................................
33
Annex 13. SOW for Gender Analysis
............................................................................
33
Annex 14. Specifications for Management Information for Innovation
and Evaluation (MIILE) System Requirements
..........................................................................
33
Annex 15. Specifications for Contact Management Software
....................................... 33
List of Figures Figure 1: Closeout plan activity status
....................................................................
4
Figure 2: Criteria used to select high-priority sectors of the
Egyptian economy .. 10
Figure 3: Selection process for priority industries
................................................ 11
Figure 4: Example of a sector summary from Annex B of the EOI
...................... 13
Figure 5: Details of the 10 Bridges workforce assessment tool
............................ 17
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 v
Abbreviations AOR Agreement Officer’s Representative CAD
computer-aided design CAM computer-aided manufacturing COA
cooperative agreement COP Chief of Party DCOP Deputy Chief of Party
DEC Development Experience Clearinghouse EOI Expression of Interest
EPEMA Egyptian Plastic Exporters’ and Manufacturers’ Association
FEI Federation of Egyptian Industries FY fiscal year GOE Government
of Egypt HEI higher education institution HEPP Higher Education
Partnership Program HQ headquarters HR human resources ICT
information communication technology IR intermediate result IT
information technology JAA J.E. Austin LIN Learning and Innovation
Network LMA labor market assessment M&E monitoring and
evaluation MIILE Management Information for Innovation, Learning
and Evaluation MOE Ministry of Education MOHESR Ministry of Higher
Education and Scientific Research MOU memorandum of understanding
PIRS Performance Indicator Reference Sheets PPP Public-Private
sector Partnership Q quarter R&D research and development RDI
research, development, and innovation RFP Request for Proposal SCU
Supreme Council of Universities SOW scope of work STTA short-term
technical assistance TEC Technical Evaluation Committee TVET
Technical and Vocational Education and Training UNESCO United
Nations Educational, Scientific and Cultural Organization US United
States USAID US Agency for International Development USG US
Government
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 1
Executive Summary RTI International presents the United States
Agency for International Development’s (USAID’s) Egypt Higher
Education Partnership Program (HEPP) Final Report, covering July
30, 2015 to June 30, 2016. HEPP was a $57-million, five-year
project to facilitate partnerships between Egyptian and US higher
education institutions (HEIs) to enhance higher education in Egypt,
and align research with industry needs among HEIs and Egyptian and
US businesses in order to contribute to Egypt’s human capital and
economic growth goals. HEPP was an important part of the larger
US-Egypt Higher Education Initiative. Regrettably, despite RTI’s
good work in Egypt for more than a decade, it became clear that the
Egyptian government was not willing to permit RTI to continue
operating in country. After eight months of implementation, RTI and
USAID decided in April 2016 to mutually terminate HEPP. On April
19, RTI submitted to USAID a closeout plan and proceeded to
conclude all activities by June 30, 2016.
Closeout Activities
Following the decision to closeout the HEPP project in early April
2016, RTI took swift steps to implement its approved closeout plan.
Despite having to officially terminate HEPP’s full- time staff in
April, RTI worked closely with a closeout consultant, the RTI
Nairobi regional office, and former staff who volunteered their own
time to support RTI in completing key tasks between April and
September 2016. All major tasks were successfully completed,
including closing the office, transferring inventory, closing bank
accounts, making final vendor payments, repatriating the Deputy
Chief of Party (DCOP), and closing staff tax and social insurance
accounts.
Summary of Technical Activities
Because of HEPP’s premature closeout, which occurred within eight
months of the award, the project had a limited period of technical
implementation. Nevertheless, a number of technical achievements
were realized, namely: (1) the identification of priority sectors
and early engagement with industry; (2) the development of the
first key stages of the grants process, including draft calls for
proposals for both Objectives 1 and 2 and the grants evaluation
process; (3) launch of the project in December 2015 with key
stakeholders; (4) customization of the 10 Bridges private sector
engagement model; and (5) the drafting of various working papers to
inform the technical approach for curriculum development, research,
Learning and Innovation Network (LIN) formation, and policy reform.
Finally, the project team also prepared various scopes of work
(SOWs) for anticipated procurements, including the gender analysis,
communications services, and the development of the grants
management and monitoring system and a contact management system.
Each of these work products is described in further detail in this
report.
Higher Education Partnership Program (HEPP)—Final Report, 2 July
30, 2015–June 30, 2016
Project Administration
RTI’s key personnel were fully on board within two months of the
project start date. Recruitment for remaining positions was in full
swing but put on hold to accommodate the project’s pause period,
which began at the end of December. Additionally, in January 2016,
in consultation with USAID, RTI relocated its DCOP to Nairobi,
where RTI’s regional office is located. Through this remote work
arrangement, the DCOP continued to support the HEPP team in
pursuing the technical and operational objectives of the project.
Following the decision to terminate the project, HEPP staff were
let go on April 9, 2016.
Introduction: Background on HEPP Egypt Higher Education Partnership
Program (HEPP) was a $57-million, five-year project to facilitate
partnerships between Egyptian and United States (US) higher
education institutions (HEIs) and, among these HEIs and Egyptian
and US businesses, enhance higher education and align research with
industry needs to contribute to Egypt’s human capital and economic
growth goals. HEPP was an important part of the larger US-Egypt
Higher Education Initiative, and as such, all activities were to be
closely coordinated to ensure the optimal leveraging of resources
and branding of key messages.
Within the context of the Higher Education Initiative, HEPP was
designed to address the shortcomings of Egyptian HEIs in qualified
human capital, relevance and quality of curricula and research,
institutional capacity, and structural misalignment of incentives
while simultaneously building sustainable institutional linkages to
further this work after the end of HEPP.
The purpose of HEPP was to achieve the following: •
Institutionalize effective collaboration between US and Egyptian
HEIs and the private
sector; • Transform faculties within Egyptian HEIs to reflect both
the knowledge and skills
required in a modern economy; • Build a critical mass of
individuals and institutions able to address strategic
challenges vital to Egypt’s sustainable development and economic
prosperity; and • Strengthen the global competitiveness of the
Egyptian private sector through
partnerships linking the private sector with universities and
technical colleges.
The intermediate results (IRs) of HEPP were as follows: • IR1:
Improve the quality and relevance of tertiary education; • IR2:
Promote research, development, and innovation (RDI) in national
priority
development areas; and • IR3: Improve institutional governance and
management of the Egyptian higher
education system through targeted activities.
Our vision for HEPP at the end of its five-year implementation was
to have helped develop a high-functioning system in which HEIs work
more closely with industry partners and employers and in which
faculty members are rewarded for accumulating advanced
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 3
pedagogical skills and industry-relevant expertise. Students would
learn the skills needed to succeed in the Egyptian labor market;
curricula would be more closely tied to the needs of Egyptian
employers; and universities would have the knowledge, expertise,
and motivation to conduct more industry-linked, applied research in
university RDI centers to solve industry problems—all contributing
to relaxing a key constraint on Egypt’s competitiveness and leading
to broad-based economic growth.
To foster university and technical college partnerships, our
primary delivery mechanism would have been the provision of grants
to Egyptian and US HEIs with the active engagement of private
sector partners. More than $42 million of the project’s $57 million
budget was set aside to fund grants in support of the anticipated
partnerships (up to 21 in total; e.g., 15 partnerships for
Objective 1 and six partnerships for Objective 2). Objective 1
grants would have targeted universities and technical colleges
(approximately one third of the partnerships were to be reserved
for technical education), whereas Objective 2 grants would have
been reserved only for universities with research capabilities.
While each partnership would have an overarching agreement laying
out the joint proposal to work together, for legal and
administrative purposes, grants were to be awarded in two distinct
agreements: one to an Egyptian HEI and a second to a US HEI. Per
the terms of the HEPP cooperative agreement (COA), our funding mix
was intended to maximize the funds awarded to Egyptian universities
and technical colleges.
These partnership grants would have been structured to enable
Egyptian HEIs—particularly public universities and technical
colleges—to adapt global best practices from US universities and
community colleges and create, test, and disseminate models of
market- responsive education and research. This was meant to create
a cycle of impact; build widespread consensus for greater public
and private investment in higher education; and lead to a
self-reinforcing cycle of academic, institutional, and commercial
impacts and policy support depicted in Annex 1 of our original
proposal.
Importantly, the university-university and Egyptian-US vocational
education partnerships were to be bolstered by dynamic Learning and
Innovation Networks (LINs) that would bring cohesion to HEPP (as
opposed to a grouping of disparate partnerships and disconnected
technical assistance). The LINs, unlike a traditional partnership
model, would broaden the exposure to and adoption of university
best practices. Resources were also reserved for technical
assistance under Objective 3 to support policy enhancements and
strengthen the institutional capabilities of HEI senior
administrators and Government of Egypt (GOE) officials.
Ultimately, through these three objectives and a dynamic learning
network, we aimed to drive a bottom-up (e.g.,
institution-to-institution grants), top-down (e.g., policy and
institutional leadership support), and middle-out (e.g., learning
networks to broaden best practice exposure) approach to increase
the likelihood partnerships that were both effective and
sustainable. Underscoring our approach was a demand-driven focus on
partnerships (through intense industry engagement) and the
purposeful linking of existing systems (e.g., government and local
actors) to create the necessary pathways to ensure the deep impact
and sustainability of HEPP goals.
Higher Education Partnership Program (HEPP)—Final Report, 4 July
30, 2015–June 30, 2016
Closeout Activities Following the decision to close the HEPP
project in early April 2016, RTI took swift steps to implement its
approved closeout plan. Despite having to officially terminate
HEPP’s full- time staff on April 9, RTI worked closely with a
closeout consultant, the RTI Nairobi regional office, and former
staff who volunteered their own time to support RTI in completing
key tasks between April and September 2016. All major tasks were
successfully completed, including closing the office, transferring
inventory, closing bank accounts, making final vendor payments,
repatriating our Deputy Chief of Party (DCOP), and closing staff
tax and social insurance accounts.
Only four tasks remain, all of which will be prioritized for
completion in October 2016:
1. Submission of the final SF-425;
2. Submission of the Quarter (Q)1 and Q2 fiscal year (FY)2016
quarterly reports, the monitoring and evaluation (M&E) Plan,
and this final report to the Development Experience Clearinghouse
(DEC);
3. Clearing the former DCOP’s laptop from Egyptian customs. RTI is
working closely with DHL in both Kenya and Egypt to update the
shipment forms to reflect the updated instructions received by the
US Agency for International Development (USAID) to finally clear
the item from customs. Once this is achieved, the laptop will be
transferred to the American University in Cairo, the approved
recipient of this last remaining inventory item to be officially
disposed of as per the approved plan; and
4. Obtaining reimbursement of the security deposit and unused rent
from the previous landlord. The landlord is making it difficult for
RTI to recover the security deposit and unused rent by demanding
that many steps be followed that have not been easy to comply with.
RTI is doing all that it can given the circumstances to have these
funds returned to the project and will ask for assistance from
USAID as needed.
Figure 1 provides an updated closeout timeline presented in a
manner similar to the original closeout plan.
Figure 1: Closeout plan activity status Closeout Tasks Completion
Date Status
Deliverables/Reports and Activities Submit two final SF-425
Financial Reports to USAID for the final two quarters spanning
April–September 2016
July 31, 2016 October 31, 2016
First report was submitted on time. Second report is to be
submitted as stated.
Submit two final Accruals Reports for the final two quarters
spanning April–September 2016
June 15, 2016 September 15, 2016
DONE. Both reports were submitted to USAID on time.
Submit the final Technical Program Report to USAID September 30,
2016 DONE. Completed with the submission of this final
report.
Submit all of the required reports to USAID’s DEC October 31, 2016
Will submit all required documents once the final project report is
approved by the client.
Administrative and Office Closeout Issue Notices of Termination to
staff April 9, 2016 DONE Notify landlord of DCOP house and office
lease termination By April 30, 2016 DONE
Notify vendors of the termination of office utility services (e.g.,
cell phones, internet, electricity, water, and etc.)
April 14, 2016 DONE
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 5
Closeout Tasks Completion Date Status
Close the project office By June 30, 2016 DONE. Notification given
on May 19, office cleared July 28, and keys handed to landlord on
August 14.
Repatriate the DCOP By May 15, 2016 DONE. DCOP left Kenya on June
25. Schedule work completion for consultant(s) and arrange final
payments September 30, 2016 DONE. Consultant work to halt as
of
September 30, 2016 Closeout sub-award with J.E. Austin (JAA) April
30, 2016 DONE. Completed on time.
Equipment and Materials Conduct physical inventory and create an
inventory list April 2016 DONE
Request USAID disposition instructions April 19, 2016 (part of
closeout plan) DONE
Carry out disposition instructions By June 30, 2016 DONE. Inventory
transferred in July 2016. Submit disposition receipts to/from RTI
and USAID By June 30, 2016 DONE. August 15, 2016.
Return the DCOP’s former laptop to Cairo from Nairobi By October
15, 2016
Pending. Laptop arrived in Cairo in early August but will remain
held there until paperwork is updated to reflect USAID’s request.
RTI is working actively with DHL in Kenya and Cairo to resolve this
issue.
Finance and Accounting Make final salary and liquidation payments
to staff April 15, 2016 DONE Make final reports to government
agencies for taxes withheld April 17, 2016 DONE
Make all final vendor payments (some minor invoices for utilities
may be delayed past June 30) By June 30, 2016 DONE
Prepare final bank account reconciliation May 10, 2016 DONE Wire
remaining funds back to the US and close bank accounts May 31, 2016
DONE. Completed early August 2016.
Closeout individual accounts for social insurance September 30,
2016 DONE. Completed in August 2016.
Return security deposit and unused rent to USAID By October 31,
2016
Pending. RTI has done everything possible to date to recover the
unused rent and security deposit. The landlord made it difficult to
obtain this money, and we have very little to no leverage on the
ground to recover the funds. RTI will do everything possible to
have these funds returned.
Records Collection and Disposition Wipe clean laptops after
creating hard drives for files needing to be saved By June 15, 2016
DONE
Sort technical and financial documents and files for disposal or
record keeping By May 31, 2016 DONE
Organize and pack files for record keeping By June 20, 2016 DONE
Ship recordkeeping files to RTI Headquarters (HQ)- North Carolina
(technical files) or to RTI Regional Office-Nairobi (financial
files)
By June 30, 2016 DONE
Deliverables The project’s key deliverables, namely the Year 1 Work
Plan, Grants Manual, and M&E Plan were submitted and approved
by USAID in Q1 FY2016. RTI also submitted the M&E Performance
Indicator Reference Sheets (PIRS) and the Branding and Marking
plan, but approval for these deliverables was not received because
the project was discontinued.
Higher Education Partnership Program (HEPP)—Final Report, 6 July
30, 2015–June 30, 2016
Project Launch
In close coordination with the USAID mission, HEPP was successfully
launched on December 15, 2015, in a formal ceremony at the Conrad
Hotel in Cairo. The event was attended by approximately 150 people,
including senior representatives of the US Embassy; USAID; the GOE,
including the Ministry of Higher Education and Scientific Research
(MOHESR), Supreme
Council of Universities (SCU), and the Ministry of Education (MOE);
RTI HQ team members; HEIs, private sector organizations; the
Presidential Leadership Program; the Tahya Misr Fund; and
nongovernmental organizations. The launch invitation is attached as
Annex 2.
Initially, the launch was planned to be held during the December 14
Research and Development (R&D) Incentives Conference that was
organized by the MOHESR and the United Nations Educational,
Scientific, and Cultural Organization (UNESCO) with an expected
audience of over 1,000 attendees from academia and industry.
Although this would have been a unique platform to announce the
launch of HEPP, we were limited in terms of the number of
participants we could invite and our time allocation on the agenda.
Therefore, the decision was made to launch HEPP on the following
day (December 15) to coincide with the celebration of the 65th
anniversary of the Fulbright Program, one of the partner
organizations under the Higher Education Initiative.
HEPP launch participants. Photo credit: HEPP project
Photo of the USAID Mission Director’s presentation at the HEPP
launch event.
Photo credit: HEPP project
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 7
The launch event speakers were as follows:
• Ms. Sherry Carlin, USAID Mission Director;
• Dr. Mohsen Elmahdy Said, HEPP Chief of Party (COP);
• Eng. Mohamed El- Sewedy, Chairman, Federation of Egyptian
Industries (FEI);
• General Mohamed El Halawany, Deputy of Technical and Vocational
Education and Training (TVET), MOE;
• Dr. Ashraf Hatem, Chairman, SCU; • Mr. Kevin Murphy, President,
JAA; • HEPP, Private Sector Engagement Manager; and • Mr. Mohamed
Taher, Egyptian Plastic Exporters’ and Manufacturers’
Association
(EPEMA).
The launch event concluded with the signing of a memorandum of
understanding (MOU) between HEPP and the FEI. This was followed by
a Fulbright seminar to discuss a recent labor market survey and
celebrate the 65th anniversary of the Fulbright Commission in
Egypt.
Despite the last-minute cancellation of the Minister of Higher
Education and Scientific Research, feedback
from USAID and other stakeholders indicated that the launch was
successful, well attended and raised interest in HEPP. The event
was covered by television, radio, and print media, and all speakers
expressed significant support for the project.
HEPP launch ceremony. Photo Credit: HEPP project
HEPP launch with the Agreement Officer’s Representative (AOR)
and DCOP. Photo credit: HEPP project
Higher Education Partnership Program (HEPP)—Final Report, 8 July
30, 2015–June 30, 2016
Technical Activities The HEPP team made important strides in
advancing the preliminary technical work, namely (1) identifying
priority sectors and engagement with the industry and (2)
developing the first stage of the grants process—the call for
proposals and the proposal evaluation process. Additionally, a
number of preparatory work activities were conducted during the
months of JanuaryMarch 2016, when the project was in a holding
pattern. These efforts are explained in further detail below. The
approved Work Plan with a detailed update of the activities can be
found in Annex 1.
Priority Industry Sectors Selection and Industry Engagement
Vital to the success of HEPP as conceived by USAID was active
private sector participation which would ensure that grants would
be designed for those curriculum and research efforts that are
truly responsive to practical industry needs as determined by the
private sector. Therefore, selecting competitive industries with
prospects for growth and engaging these industries to play
leadership roles was an extremely important precedent for the
grant- developing process. The determination of the priority
sectors benefitted from both those already identified by the GOE as
economic drivers and the labor market assessment (LMA) commissioned
by USAID. The industry willingness to play a leadership role was
also key to industry selection. Accordingly, and per the HEPP Work
Plan, the HEPP team, with leadership from sub, JAA, initiated the
process of industry engagement and determination of the priority
sectors immediately at the onset of Q1 2016. This process was an
important prerequisite for establishing the necessary parameters
for demand-driven university partnerships.
HEPP got off to a very fast start with its industry engagement
efforts. HEPP short-term technical assistance (STTA) experts in
industry-education partnerships were able to engage industry
representatives with knowledge of the competitiveness-related
challenges faced by Egyptian industries and shared examples of
successful partnerships in their industries in other countries that
could be brought to Egypt. The result was very high acceptance by
Egyptian industries to participate and sign MOUs. This effort also
enriched the specific inputs to the EOIs being developed for
universities and technical and research institutes. Finally, it
cemented in the demand-driven nature of this project structurally
through the MOU process, which would have contributed to the high
probability of successful grants being produced under this
partnership. The team was able to discover some exciting existing
industry- university partnerships, which were included in the “10
Bridges” product that was adapted for the Egyptian context.
More than 100 meetings were conducted between October and December
2015 with over 50 industry leaders representing over 30 companies,
chambers, and associations to introduce them to the objectives of
HEPP and to solicit their input on the skills and research needs of
businesses in their respective sectors. The sensitive nature of
these discussions meant that multiple meetings were required to
elicit interest and work out the terms of cooperation.
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 9
This intensive activity resulted in the signing of 10 MOUs, with
another 18 which were in progress. This achievement represented a
significant milestone for HEPP. Indeed, HEPP was able to solicit
valuable information from these MOUs to produce a strong EOI
documenting the concrete employee skills and specific research
needs of employers in the project’s target sectors to ensure that
future grants would be demand driven.
Details on the industry engagement activities undertaken are
summarized as follows: • Supplementation of the USAID LMA with
additional data collection and analysis of
macroeconomic data and employment projections. HEPP used the LMA
study and its 11 recommended sectors1 as a starting point and
reviewed other studies on the Egyptian economy and workforce to
validate those industries, reach a consensus with GOE stakeholders,
and obtain USAID approval of these sectors. JAA gathered and
reviewed 21 key studies, creating a virtual library for the project
and summarizing the results that either validated or modified the
industry long list. Moreover, because the LMA study did not focus
on industry subsectors, this analysis helped further pinpoint
specific industry segments where broad industry categories need
further refinement. For example, a focus on the food industry is
too broad because the needs of the meat industry are quite
different from those of horticulture. Similarly, the construction
industry includes a sub-sector focus on construction materials with
different needs. Additionally, the tourism sector contains the
sub-sector industry of hospitality, which has specific employment
and skills category needs. A Directory of Reports and Resources
containing the 21 studies reflecting the economic growth rates,
issues and endeavors of the Egyptian education system, and
employment rates was developed by JAA and is available upon
request.
• Rapid vetting of LMA-identified and GOE priority sectors. The
team conducted a rapid vetting of the LMA with private sector and
public entities related to each proposed sector, as deemed
necessary. Some sectors are semi or fully controlled by the
government, including the transportation, education, and health
sectors. Sector selection was also shaped to leverage and align
with GOE priority industries as defined in Egypt’s Vision 2030.
USAID’s investments in Egyptian sectors, such as agriculture,
renewable energy, the food industry, and health services, were also
taken into account. The long list of industries was eventually
defined, and a consensus was reached by late October 2015. Figure 2
shows the criteria used to select high-priority sectors. It should
be noted that most of the private sector and public entities the
team met with were receptive regarding future collaboration with
HEPP grantees and showed interest in financially supporting the
project, if needed, with the condition that universities respond to
their actual needs and requests. Therefore, the prospects were good
for grants to achieve a highly leveraged impact through the
demonstration effect.
1 Recommended sectors include the following: (1) agriculture,
irrigation, and fishing; (2) oil and gas production (mining); (3)
building materials (manufacturing); (4) engineered products
(manufacturing); (5) food processing (manufacturing); (6) textiles
and apparel (manufacturing); (7) electricity; (8) construction and
building; (9) transportation and storage; (10) communications
(telephone and information communication technology [ICT]); and
(11) tourism.
Higher Education Partnership Program (HEPP)—Final Report, 10 July
30, 2015–June 30, 2016
Figure 2: Criteria used to select high-priority sectors of the
Egyptian economy
1. Existing employment and projected employment growth: The
estimated future demand for jobs in this industry relative to the
expected rate of employment growth and expected industry growth
rate are needed, as is a clear understanding of the relevant career
profiles. This criterion includes the potential scalability of
training and research projects and would favor employment-intensive
industries, such as agriculture, light manufacturing, and
tourism.
2. Projected industry growth, productivity, and competitiveness,
including crosscutting impacts on other industries: This may or may
not be the same as employment growth because some growth drivers
may be less employment intensive but still key for future
productivity growth. This criterion tends to favor high-technology,
energy, and financial sectors that have crosscutting impacts or may
drive future growth in productivity.
3. Skill gaps constraining growth or competitiveness: This
criterion reflects the extent to which skill gaps exist in selected
employment areas and the assessment of industry leaders that these
skill gaps constrain growth and/or competitiveness. This criterion
tends to lead us away from training areas that can be adequately
addressed without project assistance and favors areas that require
the nascence of a new initiative.
4. Government input or prioritization: Within the context of
government-to-government overarching agreements, the project will
be sensitive to guidance from the GOE and its relevant agencies,
councils, and ministries (e.g., MOHESR and SCU) and those training
and research areas perceived as meriting special attention and
priority. Government guidance may include population groups,
industries or regions, and special technological focus areas for
economic or social reasons. This criterion might favor industries,
such as health, where nursing skills are important for social
objectives.
5. Feasibility, ease, and practicality of achieving impact in the
project’s time frame: In addition to the above criteria, the
project will also assess the feasibility, ease of implementation,
and practicality of implementation within the allotted time frame.
To respond, the participating institutions must have this
capability or potential to develop it.
• Outreach and consultations with industry on priority sectors
(subsectors and skills gaps) and the securing of initial
commitments (detailed in the MOUs). These activities were based on
their potential to positively impact the responsiveness of
education, training, and research to support the practical needs of
the private sector. The responsiveness of the industries and their
willingness to assume leadership were also critical. JAA STTA was
front loaded to ensure intensive engagement with relevant industry
associations. The team was able to engage multiple associations and
private sector partners in parallel and over a very short time
frame. It was expected that most of the MOUs with industry
leadership groups would have been signed prior to the issuance of
the call for EOIs. Out of necessity, much of the industry
engagement was front loaded as a condition for the awarding of
grants. Figure 3 provides the specific steps involved in the
priority selection process.
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 11
Figure 3: Selection process for priority industries
As mentioned above, more than 100 meetings with potential partners
were conducted (see Annex 6 for details about these meetings). Some
meetings revealed quickly the lack of competitiveness in some
industries and the lack of interest in others. Some skepticism was
also encountered regarding the responsiveness and capabilities of
public educational institutions based on prior experience. Yet we
also found examples of great enthusiasm and even existing
industry-education partnerships that could serve as models for
success. Some industries have bypassed the public educational
system to meet their own training needs; examples include the
construction and tourism industries, which have both created their
own sponsored training institutes. However, even these industries
were genuinely excited to participate in efforts to team up with
public universities and training institutes to improve their
relevant curricula.
The majority of the meetings garnered a substantial interest from
the private sector. A number of representatives expressed their
appreciation for engaging the private sector from the onset, as
they reported often being seen as an afterthought in education
projects.
HEPP needed to acknowledge and directly address the skepticism that
exists regarding the capacity of Egyptian HEIs to respond to their
needs for qualified employees or research that would be useful to
them. Our early engagement with these industries should help to
ensure that partnership activities are truly demand driven.
In total, HEPP signed MOUs with 10 associations and companies and
had another 18 in progress (Annex 7). The following associations
and companies signed MOUs:
1. FEI;
3. Egyptian Chamber of Hotels;
4. Egyptian Chamber of Food Processing;
5. Egyptian Chamber of Apparel and Home Textile Industries;
6. EPEMA;
7. E-finance Company;
8. Emend Company (executive training arm of the Building Materials
Chamber);
9. Juhayna Company; and
10. Sima Food Industries Company.
Higher Education Partnership Program (HEPP)—Final Report, 12 July
30, 2015–June 30, 2016
MOU signing between HEPP and the FEI at the HEPP
launch on December 15, 2015. Photo credit: HEPP project
MOU signing between HEPP and the EPEMA on December 29, 2015. Photo
credit: HEPP project
Presentation of priority sectors list to USAID and GOE bodies: HEPP
presented its priority sectors and how they were derived very
transparently and publicly to GOE and USAID officials and to
leaders from the academic sector present at the HEPP launch event
on December 15, 2015. Representatives from the private sector were
present to endorse the project, including one particularly moving
testimonial of support from the plastics industry.
Following the intensive industry engagement process, HEPP’s Private
Sector Partnership Manager drafted “sector summaries” for the
priority sectors identified below, which are included as Annex B in
the draft call for proposals. The summary sheets provided examples
of the strategic priorities of several subsectors, growth areas,
and entry-level skills needs with specific requests from industry
at the university and technical college level. An example of the
sector summaries included in the draft call can be found in Figure
4.
• Housing and construction • Utilities (e.g., electricity, water,
and sanitation) • Manufacturing • Agriculture, agribusiness, and
fishing • Transportation and logistics • Retailing and internal
trade • Petroleum, power, and minerals • ICT and
communication
Presentation of the priority sectors list at the HEPP launch
event on December 15, 2015. Photo credit: HEPP project
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 13
• Tourism • Health-related services
Figure 4: Example of a sector summary from Annex B of the EOI
Sector Summary for the EOI Annex: Manufacturing (Example)
What is included in this sector? • Textiles and apparel •
Automobile manufacturing • Suppliers of textile, apparel, and
light/complex manufacturing firms • Food processing, especially
dairy and juice • Electronic components and assembly • Engineered
products • Plastics • Many other manufactured items
Examples of sector growth and competitiveness drivers • Increasing
population leads to increased demands for food and clothing •
Increasing a population’s wealth leads to increasing amounts of
expendable income • Improved logistics increases growth among rural
populations • Suez Canal logistics and a manufacturing hub
initiative could spur growth in light
manufacturing, if well implemented Examples of skills needs
• Food safety, food technology, and food processing • Food
processing (particularly interested in sponsoring internships) •
Cutting and sewing operators • Mid-level and shop floor managers •
Machinery maintenance and repair • Human resource managers •
Operations managers and information technology (IT)-related skills
and integration
(e.g., computer-aided design/manufacturing [CAD/CAM]) Identified
curricula/degrees based on industry demand
For universities: • A new specialty—fashion design—should be added
to relevant faculties,
such as applied arts. For technical colleges:
• Undergraduate curricula on time and motion studies to increase
productivity in factories;
• Undergraduate curricula on advanced textile technologies; and • A
diploma in mechatronics to provide qualified technicians for
factories.
Geographical distribution: Most textile factories are based in the
Delta area. Industry contacts
• Egyptian Automobile Manufacturers’ Association • Egyptian Plastic
Exporters’ and Manufacturers’ Association • Egyptian Chamber of
Apparel and Home Textile Industries
Higher Education Partnership Program (HEPP)—Final Report, 14 July
30, 2015–June 30, 2016
Development of the Call for Proposals for Objective 1 Grants
In parallel to the industry engagement efforts, the HEPP team
developed the call (initially an EOI) for proposals targeting
universities and technical colleges. A working group was identified
that included key staff (e.g., technical specialists and grants
specialists) from the project team and RTI HQ to work
collaboratively for the development of the call. As this was the
first USAID-university partnership project in Egypt, we were keen
to develop a document that was clear and self-explanatory to all
HEIs in both Egypt and the US. Therefore, the draft EOI provided
information about the eligibility criteria, the guidelines for
applying, the evaluation process, a sample concept paper format,
and responses to frequently asked questions.
Key decisions were made from the onset that helped focus the EOI.
First, it was determined that issuing one EOI to both US and
Egyptian HEIs rather than issuing separate EOIs—one to US HEIs and
another to Egyptian HEIs—would be preferable to reinforce the
message of partnership and ensure that both Egyptian and US HEIs
received the same information about the project and grant
opportunities.
The team also decided to stagger the EOIs by Objective because the
activities under Objectives 1 and 2 differed significantly from one
another.2 Further, in consultation with USAID and the SCU, the HEPP
team determined that the eligibility of Egyptian HEIs would be
limited to public universities.
Finally, extensive information about the priority sectors’
strategic priorities and skills needs was prepared and included in
Annex B of the EOI. We believe that this level of information
should provide great value-added for HEIs, especially those who
have had limited contact with industry, for understanding their
priorities and skills needs.
During the project’s pause period, the team decided that to make up
for lost time, the project would bypass the EOI phase and release
an RFA for both Objective 1 and 2. The RFAs can be found in Annexes
2 and 3.
Outreach to US HEIs
Leading up to the original expected release of the EOI (December
2015), RTI conducted significant outreach with US higher education
associations and institutions to raise awareness about HEPP and the
upcoming partnership opportunities. In October 2015, RTI HQ drafted
and finalized a HEPP brochure that included a “coming soon” text
box on the EOI and shared it via e-mail with 13 higher education
associations, including the Association of Public and Land Grant
Universities, American Association of Community Colleges, National
Association of Independent Colleges and Universities, and more than
70 universities and 14 technical colleges/community colleges (Annex
4). The outreach garnered good interest in the project.
2 The decision to stagger the EOIs may be revisited to compensate
for any delays that might ensue as a result of the pause in
releasing the Objective 1 EOI.
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 15
Outreach to Egyptian HEIs
Outreach to Egyptian HEIs occurred through the SCU. The HEPP COP
presented the project and provided information about the
anticipated EOI to the SCU Board in November 2015. Copies of the
HEPP presentation and the English and Arabic versions of the HEPP
brochure were distributed to seek the Board’s assistance to appoint
contact persons to liaise with HEPP. The HEPP brochure was also
sent to respond to individual universities that showed interest in
participating in HEPP. Because of the delay in the release of the
EOI, we decided to pause releasing further information about the
EOI to institutions.
Other Technical Work
In addition to the two major efforts outlined above, the team also
began to think about the development of the LINs and possibly
extending the LIN concept to provide services to further ensure the
successful operation of the Objective 2 RDI centers. In this
regard, the HEPP COP and DCOP were introduced to the RTI
Philippines Science, Technology, Research, and Innovation for
Development program, which has a similar academia-industry
collaboration model and R&D-specific goals. The HEPP COP and
DCOP also met with Innovety, an Egyptian service company
specializing in developing platforms for communication networking
that can support the LIN model we hope to create under the RDI
centers to support Objective 2 partnerships.
The COP made some initial inroads in developing a scope of work
(SOW) for the HEPP Advisory Board. The SOW was shared with the AOR
for review and feedback and to start the process of selecting the
final list of board members. The SOW included proposed board
members who are high-level officials representing the main HEPP
partners from the GOE (e.g., MOHESR, SCU, and the Academy of
Scientific Research and Technology); industry leaders (e.g., the
Chairman of FEI, Renewable Energy Authority, and the Information
Technology Industry Development Agency); and other prominent
potential partners, such as the Chairman of the Presidential
Advisory Committees, who also happens to be the Chairman of the
Presidential Advisory Committee for Education.
Technical Work during the Project Pause Period
During the pause phase (JanuaryMarch 2016), priority was given to
the development of (1) RFAs for both Objectives 1 and 2, (2) the
grants evaluation process, (3) the grants information session
workshop agenda, (4) customization of the 10 Bridges private sector
engagement model, and (5) various working papers to inform the
future project approach and activities for curriculum development,
research, LIN formation, and policy reform. The HEPP team also
prepared various SOWs for anticipated procurements, such as the
gender analysis, communications services, and the development of
the grants management and monitoring system and a contact
management system. These activities are described in further detail
below.
Higher Education Partnership Program (HEPP)—Final Report, 16 July
30, 2015–June 30, 2016
Modification of the Grants Process
HEPP finalized the EOI for Objective 1 during Q1 FY2016 and was
awaiting USAID approval for its release. Because of the unexpected
delay, the team drafted a comparison note to assess the pros and
cons of eliminating the concept paper step and moving directly to
requesting proposals (RFAs) for Objective 1 grants. HEPP agreed on
a strategy to issue one full and comprehensive RFA for Objective 1
that would explain the whole process from concept paper to proposal
and, finally, to the issuing of grants. This decision was made to
accelerate the process and make up for the time lost. The full RFA
was drafted in Q2 FY2016 and is attached to this report (Annex
2).
For Objective 2 grants, the HEPP team had already decided that
there was no need for concept papers as the project was looking for
partnership grants ready to start collaborative work immediately.
Therefore, to take advantage of the pause period in this quarter,
the team drafted an initial RFA (Annex 3) to encourage research
centers to partner with other US centers and submit one partnership
proposal for creating RDI centers or upgrading existing ones.
To plan properly and be ready to start work immediately in
anticipation of project ramp-up, HEPP also drafted a document
titled “Documentation of the Applications Evaluation Process”
(Annex 4). This document describes (1) the selection and
composition of the Technical Evaluation Committee (TEC) members,
(2) roles of the TEC members, (3) application procedures, and (4)
the evaluation of applications. The document is meant to provide
guidance to project personnel, evaluators, and applicants. It also
included a time frame for the Objective 1 grants process.
Finally, the team also put together a draft agenda for the
Information Session Workshops for Objective 1 grants (Annex
5).
Industry Engagement
In early January 2016, HEPP continued to conduct discreet work with
associations and companies with whom MOUs had already been signed.
The nature of this engagement related to the collection of survey
data from various chambers to verify the sub-industry sectors
included in the LMA. Surveys were collected and analyzed for the
Engineering Industries chamber (Annex 6). Surveys were also sent to
the Chamber of Hotels, and data submission is pending.
In addition, on January 14, 2016, the HEPP DCOP, Private Sector
Engagement Manager, and Research Consultant attended the
EGYPLAST–PLASTEX 2016 conference. HEPP was invited by the EPEMA, a
HEPP industry partner. At this conference, the team met with many
companies in this sector. All companies shared their need for
support in the form of curricula relevant to their area of the
plastics industry. They highlighted the fact that no vocational
schools in Egypt focus on the plastics industry, except for EPEMA’s
own school, which is fully funded by industry leaders.
The companies the HEPP team met with during the conference included
Sidi Kerir Petrochemicals Company, Shouman Company, the Egyptian
Company for Training and Industry (DeltaPlast), and others. These
companies have shown great interest in collaborating with the
project and supporting its objectives. For example, Shouman Company
was very
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 17
interested in the RDI Centers envisaged to support Objective 2 of
the HEPP project because they created an R&D Department to
solve its product problems through research. In fact, this R&D
Department is already cooperating with Mansoura University. Shouman
Company is unique because it builds its own machinery to produce
its products.
An initial directory containing all HEPP industry partners and
potential partners was created, including businesses, federations,
chambers, and associations. This directory was intended to be part
of the HEPP website and present information on each partner
disaggregated by economic sector. Its purpose was to provide
contact information to connect academia with private sector
organizations willing to support the HEPP objectives. The directory
includes the names of organizations, sectors and subsectors,
organization descriptions, and MOU status. It also contains contact
information, but the HEPP team did not have the opportunity to
verify that the telephone numbers, addresses, and e-mails are
up-to-date.
JAA completed the customization of its 10 Bridges model (Figure 5)
to suit the context of Egyptian academia. The 10 Bridges PowerPoint
was updated (Annex 7), along with two additional documents
explaining the 10 Bridges tool and its components, which include
the following:
• A summary of the tool planned for use during the information
sessions; and
• A more detailed version to be attached to the RFA.
Finally, the team conducted two private sector-related pieces of
research. The first was to understand the policy bottlenecks that
inhibit private sector collaboration in higher education (Annex
10). Research was conducted to collect data on the nature of
current partnerships in Egypt between the private sector and the
HEIs and between the private sector and the R&D domain. The
objective of this research was to determine the primary challenges
hindering private sector engagement with HEIs and
government-supported R&D centers in general and with respect to
the strategic plan of the MOHESR (20152030).
The second research activity was a mapping of the MOHESR strategic
plan (20152030) to HEPP objectives and the high-growth economic
sectors selected by the HEPP team (Annex 8). The mapping of the
strategic plan outlined the potential projects classified by
economic sectors to highlight the possible collaborations that
could arise between the project and MOHESR.
Development of Working Papers
The HEPP team took the opportunity in Q2 FY2016 to develop four
working papers to inform the project’s strategy and approach toward
supporting demand-driven curricula and research. This work included
the following:
Figure 5: Details of the 10 Bridges workforce assessment tool
Higher Education Partnership Program (HEPP)—Final Report, 18 July
30, 2015–June 30, 2016
• Research on world-class university status. This paper, which
would have been used to inform future partnership and grant
activities, provided a comprehensive overview on what constitutes a
“world-class university”. It gives examples of how such a
university is defined, why universities are interested in being
world class, current rankings of world-class universities, ranking
methodologies, and strategies that could be used to become a
world-class university (Annex 9).
• Mapping MOHESR Vision 2030 to HEPP Objectives and 10 Industry
Priority Sectors. As described above, this mapping included a
summary of the MOHESR’s proposed activities and how they align with
the HEPP Objectives and Industry Priority Sectors (Annex 8).
• Policy reform initial assessment. As described above, the team
conducted an assessment of the specific laws, regulations, and
other barriers/gaps related to the private sector that should be
changed/added to achieve HEPP objectives (Annex 10).
• Discussion draft of the expansion of the LIN concept to support
the development of RDI centers (Annex 11). This paper elaborated on
the LIN concept and how it can be used to support the development
of RDI centers in Egypt.
Development of SOWs for Anticipated Procurements
The HEPP team prepared four SOWs for anticipated procurements as
follows:
1) Communications: To procure communications services to support
the marketing, communication, and publication goals of HEPP (Annex
12);
2) Gender Analysis: To procure a consultant to conduct the Gender
Analysis (Annex 13);
3) M&E and Grants Management System: To develop an M&E and
grants management system to effectively monitor and track project
performance (Annex 14); and
4) Contact Management System: To develop an internal database to
effectively manage HEPP stakeholder contacts (Annex 15).
Coordination with the GOE, USAID, and Stakeholders
Coordination with the GOE
In the early months of its start-up, the HEPP project enjoyed
frequent communication and coordination with the GOE, especially
with the SCU. As part of the Year 1 work planning, the project
organized a listening session with the SCU and coordinated closely
with key government officials on the December launch event.
However, following the decision to put project activities on hold,
no new communication or coordination with government officials was
initiated by the HEPP COP or HEPP team.
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 19
Coordination with USAID
Coordination and communication between USAID and the RTI home
office was frequent, especially around the period of uncertainty
relating to the project’s pending implementation status and
contingency planning. The COP and AOR also remained in regular
contact, mostly by e-mail and phone and, occasionally, via
face-to-face meetings.
Performance Monitoring The M&E Plan was approved in Q1 FY2016.
The PIRS were submitted to USAID on January 18, 2016, but were
never approved because of the project’s circumstances.
The HEPP team developed the specifications for the M&E database
system, which was outlined in the M&E Plan and known as
Management Information for Innovation, Learning and Evaluation
(MIILE). The objective of the MIILE system was to help HEPP M&E
and Grants Management functions collect, analyze, and report
performance data. This would have allowed the HEPP team to make
evidence-based decisions, streamline their business process, and
improve organizational efficiency. A SOW for the development of the
MIILE is attached in Annex 14.
Project Learning The project generated a number of lessons learned
during its short implementation phase. Below are the key
lessons:
• The private sector in Egypt has shown substantial support for the
HEPP objectives. Indeed, many business leaders have expressed
support to continue working toward these objectives. Because the
project activities were placed on hold, many MOUs that were in the
process of being completed were suspended. However, the
demand-driven approach adopted by HEPP was a success. If the
project should ever resume, this area should be emphasized to
ensure that this approach can be utilized to once again create
sustainable agreements for collaboration between the private sector
and academia. For example, USAID should consider providing support
for creating industry-higher education clusters to ensure the
sustainability of partnerships by generating more focused and
decentralized working relationships between academia and the
private sector according to priority economic sectors. This
approach was used by RTI in El Salvador under the USAID-funded
Higher Education for Economic Growth activity and shows promise for
creating a sustainable platform for dialogue and action.
• The mismatch between the supply of graduates and the needs of the
labor market is at the core of Egypt’s challenge, not just for
university education but also for all forms of higher and secondary
education, including TVET spanning both the secondary and tertiary
sectors. Surveys of students and graduates of Egypt’s higher
education and vocational education sub-sectors indicate common
concerns, including the following: − Insufficient variety of fields
of study that are relevant to career goals; − Highly restricted
opportunities for students to change fields of study;
Higher Education Partnership Program (HEPP)—Final Report, 20 July
30, 2015–June 30, 2016
− Inadequate preparation for employment resulting from curriculum
irrelevancies; − Lack of training in practical skills; − An
over-concentration on memorizing content and passive pedagogies;
and − A lack of learning materials, library books, facilities, and
equipment.
The government, in consultation with national and regional
employers, should consider developing a business advisory board
with each public higher education institution that can help clarify
the institution’s distinctive mission, the scope and focus of its
educational programs, the expectations of its performance, the
resources needed to build its capacity, and the extent of its
substantive and procedural autonomy. In this process, it would be
important to clarify the sectors of the labor market for which each
institution prepares graduates. Such mechanisms would significantly
narrow the gap between the supply of graduates and the needs of the
labor market.
• Accurate and timely information about the labor market is
critical for universities to be more responsive industry needs.
Thus, the government should consider establishing a professional
labor market information service that can provide prospective
students, career guidance counselors, and HEIs with information
about trends in labor supply and demand and the labor market
outcomes of graduates in various fields.
Project Administration
Staffing
The project’s five key personnel were in place at the start of the
project, and recruitment to fill both technical and operational
positions was in full swing during Q1 2016. However, following the
decision at the end of December 2015 to place project activities on
hold, staff recruitment also paused.
Three main changes affected staffing during the pause period
between January and March 2016. First, RTI, in consultation with
USAID, decided to temporarily relocate the DCOP to Nairobi, where
the RTI Regional Office is located. This relocation took place on
January 17, 2016. The DCOP was able to work remotely and continued
to support the HEPP team on the work products and activities
described in the technical section.
The second staffing change occurred when the Human Resources (HR)
Manager announced her resignation on February 7. This resignation
came prior to the conclusion of her probationary period. Given the
project’s uncertain status at the time, RTI did not recruit a
replacement.
Third, in March, amid growing concern to minimize project
expenditures during the extended pause period, RTI was asked by
USAID to dramatically reduce HEPP staffing. An Expense Reduction
Plan was submitted on March 9, which proposed three options for a
modified staffing plan. On March 17, USAID asked RTI to reduce
staffing to two positions: the COP and the Finance Officer. At the
end of March, RTI home office staff travelled to Cairo to
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 21
meet with the team and personally discuss the staff reduction,
which would have become effective April 30. HEPP’s AOR participated
in that meeting.
As a result of the decision to close the project in early April,
all staff were let go effective April 9, 2016.
Operations
RTI moved swiftly to start-up the HEPP project. In its first two
months, RTI established the HEPP project office in Maadi, on
boarded its key staff, and set up the necessary financial, IT, and
administrative systems. Following the decision to pause activities
at the end of Q1 FY2016, the HEPP team minimized expenses as much
as possible to conserve resources for when the project could
eventually ramp up activities. To that end, no new procurements—for
example, to hire a local consultant to conduct the Gender
Analysis—were initiated. The only exception was to hire a
consultant to help with the day-to-day essential IT support
services needed to run the project office following the conclusion
of a trial period of services with an IT firm.
The project also developed a draft SOW (Annex 15) to procure a
contact management system with the intent to create an easily
accessible repository of all contacts made by the HEPP team with
individuals working in organizations that collaborate with HEPP
(e.g., HEIs and Egyptian employers and government agencies).
Higher Education Partnership Program (HEPP)—Final Report, 22 July
30, 2015–June 30, 2016
Annex 1. Actual Results Compared to the Original Work Plan
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Se p
O ct
N ov
D ec
Ja n
Fe b
M ar
A pr
M ay
Ju n
Ju l
A ug
Se p
Mobilization (Administrative)
Secure letter of support from Ministry of Higher Education and
Scientific Research (MOHESR)
Completed Letter Secured 8/30/2015
Completed, but Monitoring and
effective 12/17/2015
KP start dates: COP 9/6/2015; DCOP 10/9/2015; M&E Advisor,
9/13/2015; Finance and Administration Manager, 9/27/2015
US Agency for International Development (USAID) kickoff
meeting
Completed Held 9/16/2015
Staff retreat
Postponed pending
Team protocols, communication, etc.
Identify, lease, and move into program office Completed Office move
in on 10/9/2015
Finalize sub-award with JE Austin Associates (JAA) Completed
Sub-award finalized 9/24/2015
Establish administration systems Completed Bank account, office
equipment,
payroll, etc.
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 23
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Work began, but has been
temporarily suspended
Program launch Completed 12/15/2015
To be continued
(TBC) In Process RTI is awaiting feedback on a BIP
Submit Year 1 Work Plan to USAID Completed 10/7/2015
Submit Performance Monitoring Plan to USAID Completed
10/30/2015
Submit Quarterly Report to USAID Completed First report sent on
10/30/2015
Initial Technical Activities
Establish collaboration protocols with concerned Government of
Egypt (GOE) bodies (e.g., MOHESR, Supreme Council of Universities
[SCU], Supreme Council of Technical Colleges [SCTC], Supreme
Council of Private Universities [SCPU], and Ministry of Education
[MOE]/Ministry of Technical Education and Training [MoTET])
On hold
New cabinet changes and new ministers announced on 9/20/2015.
Collaboration protocols to be discussed first with USAID.
Gender in higher education institution (HEI) Leadership
analysis
SOW drafted Local short-term technical assistance (STTA) to
conduct
Higher Education Partnership Program (HEPP)—Final Report, 24 July
30, 2015–June 30, 2016
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Coordination meetings with key higher education (HE) donors (e.g.,
British Council)
Initial coordination
Contract local communications firm SOW drafted
Industry sector partner semi- annual progress reviews Not scheduled
for
this time period
Priority Industry Selection and Ongoing Engagement
Review and discuss labor market assessment (LMA) with USAID
Completed Concluded on 9/29/2015
Supplement LMA with additional data and analysis on macroeconomic
data, employment projections
Completed The results of this work are included in the draft
Expression of Interest (EOI).
Rapid vetting of LMA with MOHESR and SCU. Finalize long list of
industry sectors.
Completed Led by JAA. Intense outreach to private-sector
associations and companies to secure HEPP buy-in
Outreach and consultations with industry on priority sectors
(subsectors and skills gaps) and secure initial commitments
(detailed in memorandum of understanding [MOU])
6-10 MOUs from private
Completed 10 MOUs signed and 18 are in process
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 25
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Se p
O ct
N ov
D ec
Ja n
Fe b
M ar
A pr
M ay
Ju n
Ju l
A ug
Se p
Present priority list of sectors to USAID and GOE bodies Completed
The results of this work are included
in the draft EOI.
Grants Selection Process Develop Grants Manual 12/15/2015 Completed
USAID approval received in 12/2015 Issue EOI to Egyptian and US
HEIs and conduct appropriate outreach (possible event)
12/20/2015 On hold The USAID approved EOI document was ready for
publication on 12/18/2015
HEIs submit EOI Concept Notes 1/31/15 On hold
Evaluation of EOI to determine short list On hold
Issue Request for Applications (RFA) to shortlisted Egyptian
HEIs
On hold
Organize partnership development workshop, including 10 Bridges
training
On hold Planning is complete, but the actual events have been
delayed
Facilitate matchmaking for Objective 1 and, as needed, Objective 2
partnerships
On hold To occur in person or virtually (e.g., by Skype, email,
and/or phone)
US and Egypt universities develop joint proposals On hold
US university faculty encouraged to visit Egypt with their own
resources to develop joint proposal/work plan
Final recommendation/ negotiation/pre-award assessment of
grants
On hold
Higher Education Partnership Program (HEPP)—Final Report, 26 July
30, 2015–June 30, 2016
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
On hold
To be conducted in parallel to pre- award assessment. Will inform
separate USAID construction procurement
Development of grants management system Specifications
drafted
Work has begun on the end user specifications for this system with
the objective of issuing an Request for Information (RFI)/RFA for
system implementation by March 31
Award grants and disbursal of phase I grant funds
18 grants awarded
(9 partner- ships)
On hold
Review of Phase I (intensive supervision of initial grant
implementation by HEPP grants managers to ensure meeting six month
milestones)
Not scheduled for this time period
Review and remediation planning for non-performance included in
this step
Disbursal of Phase 2 grant funds
To be determined
(TBD)
Not scheduled for this time period At about month eight of
grant
Review of Phase 2 (coach and monitor milestone progress at 18
months)
Not scheduled for this time period
Disbursal of Phase 3 grant funds TBD Not scheduled for
this time period At about month 18 of grant
Phase 3 implementation Not scheduled for this time period
Grant implementation continues to the middle of Year 4
Grants officer semiannual review with Egyptian HEIs Not scheduled
for
this time period Ongoing activity, every 6 months
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 27
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Private-sector cost-share fundraising push On hold Majority of
cost-share will be built into
the grant awards
Activities Related To Objective 1 (in addition to activities stated
above)
Consultations with Technical Committee of SCU Completed
Agreement with MOE/MoTET on special conditions for technical
college grants
On hold
Outreach to secure EOIs and commitment parameters from US
universities for sector- specific pre-qualification list
On hold
On hold
Not scheduled for this time period
Activity will be broken down in Year 2 work plan by specific grant
activities, once grants have been awarded
Ongoing technical assistance (TA) to assist grantees in networking
with the private sector to create demand- driven curricula and
improved instructional techniques
Not scheduled for this time period Led by JAA
Analysis of military-to- university transition to work Not
scheduled for
this time period Activity is TBD
Higher Education Partnership Program (HEPP)—Final Report, 28 July
30, 2015–June 30, 2016
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Se p
O ct
N ov
D ec
Ja n
Fe b
M ar
A pr
M ay
Ju n
Ju l
A ug
Se p
Activities Related To Objective 2 (in addition to activities stated
above)
Identify sectors from long list that are most aligned/have
opportunities for research, development, and innovation (RDI)
Partially identified by the efforts
made by JAA to identify industry
needs
Visit existing RDI centers at Egyptian universities to assess
targets of opportunities
On hold
Experts from RTI's Discovery, Science, and Technology Unit to lead
(timing TBD, before EOI or after short list of HEIs)
Facilitate four-party university-private sector agreements for
Objective 2 grants (after short-list of Egyptian and US HEIs
identified)
Not scheduled for this time period
Launch Objective 2 innovation grants (3 out of 6) 3 Not scheduled
for
this time period
Workshops for selected university and private sector groups to
promote industry- academia linkages
Not scheduled for this time period Led by JAA
Implementation of Objective 2 grants
6 grants awarded
(3 partner- ships)
Not scheduled for this time period
Activity will be broken down in Year 2 work plan by specific grant
activities, once grants have been awarded
HEPP Research Conference for initial research grant
applicants
Not scheduled for this time period
Could be combined with annual HEPP conference, TBD
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 29
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Commercialization revenue- sharing arrangements in place in
Objective 2 grantees
On hold To be clarified in Objective 2 grant awards
Develop financial sustainability models to support RDI
centers
Not scheduled for this time period
Round 2 RDI grant selection process (from existing
partnerships)
Not scheduled for this time period
Document best practices/benchmarks from outside Egypt related to
commercialization of research
Not scheduled for this time period
As requested by universities and within the context of learning and
innovation networks (LIN), led by JAA
Award remaining three RDI Grants (Round 2) Not scheduled for
this time period
this time period
Initial consultations with GOE on policy priorities for HE
reform
Three policy priorities identified
On hold With international short-term technical assistance (STTA)
support
Needs assessment of HEI leadership and GOE officials for technical
assistance
On hold With international STTA support
Determine Learning and Innovation Network (LIN) focus areas based
on grants awarded
Not scheduled for this time period
To be determined, once grants are awarded
LINs organizational meeting Not scheduled for this time period To
take place in month 2, Year 2
Higher Education Partnership Program (HEPP)—Final Report, 30 July
30, 2015–June 30, 2016
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Ongoing activity; HEIs present grant milestones to peers in
LINs
Annual HEPP Conference Not scheduled for this time period
Anticipated for October 2016. Grantees present their grants to
peers.
US-Egyptian University Presidents' Network Not scheduled for
this time period
Women’s HEI leadership mentoring Not scheduled for
this time period
Informed by gender analysis and capacity building assessment of HEI
leadership
Provide TA on approach to involve private sector in sustainable
policy reform
Not scheduled for this time period Led by JAA
University Presidents’ Policy Forum Not scheduled for
this time period
This may be combined with annual HEPP conference or coordinated
with existing SCU events
M&E Produce draft performance monitoring plan (PMP), including
results framework
10/30/2015 Completed Approved by USAID in 11/2015
Revise and submit final HEPP PMP
Completed M&E Plan Approved, Performance Indicator Reference
Sheets (PIRS) submitted to USAID on Jan 18, 2016
3 0
M&E systems consultations with MOHESR and SCU (Assessment of
SCU Data Center)
On hold
Baseline M&E data collection (in phases depending program
activities)
Not scheduled for this time period
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 31
HEPP Year 1 Work Plan Timeline July 29, 2015–September 30, 2016 (14
Months)
STATUS AS OF JUNE 30, 2016
Year 1 2015 2016
ug
Plan and develop Management Information for Innovation and
Evaluation (MIILE) system (database and dashboard)
Specifications drafted
Work has begun on the end user specifications for this system with
the objective of issuing an RFI/RFA for system implementation by
March 31
Test MIILE system (database and dashboard) Not scheduled for
this time period
Launch MIILE system at first grantee HEPP conference Not scheduled
for
this time period
Training on MIILE application (for both data center and HEIs'
identified personnel as model for the analytics unit)
Not scheduled for this time period
Grantees report deliverables through MIILE System Not scheduled
for
this time period
Midterm evaluation including gender, process, and in- depth case
studies
Not scheduled for this time period
Quarterly M&E HEPP activities reporting Initiated/ongoing
Initiated/ongoing End of program evaluation/report Not scheduled
for
this time period
Higher Education Partnership Program (HEPP)—Final Report, 32 July
30, 2015–June 30, 2016
Annex 2. Final Draft RFA for Objective 1 Grant Proposals
[Redacted]
Annex 3. Initial Draft RFA for Objective 2 Grant Proposals
[Redacted]
Annex 4. Documentation of the Applications Evaluation Process
[Redacted]
Annex 5. Agenda for Objective 1 Info Sessions Workshop
[Redacted]
Annex 6. Engineering Industries Survey Analysis through Egyptian
Chamber of Engineering Industries/CEI [Redacted]
Annex 7. The 10 Bridges Model [Redacted]
Annex 8. Mapping MOHESR Vision 2030 to HEPP Objectives and 10
Industry Priority Sectors [Redacted]
Annex 9. Steps Toward World Class Higher Education: Reference
Document [Redacted]
Higher Education Partnership Program (HEPP)—Final Report, July 30,
2015–June 30, 2016 33
Annex 10. Policy Reform: Identification of Specific Laws and
Regulations that should be Modified to Strengthen Higher Education
[Redacted]
Annex 11. Discussion draft on Expansion of the LIN Concept to
Better Support the Objective 2 RDI Centers [Redacted]
Annex 12. SOW for Communications Firm [Redacted]
Annex 13. SOW for Gender Analysis [Redacted]
Annex 14. Specifications for Management Information for Innovation
and Evaluation (MIILE) System Requirements [Redacted]
Annex 15. Specifications for Contact Management Software
[Redacted]
Closeout Activities
Development of the Call for Proposals for Objective 1 Grants
Outreach to US HEIs
Outreach to Egyptian HEIs
Modification of the Grants Process
Industry Engagement
Coordination with the GOE, USAID, and Stakeholders
Coordination with the GOE
Annex 1. Actual Results Compared to the Original Work Plan
Annex 2. Final Draft RFA for Objective 1 Grant Proposals
Annex 3. Initial Draft RFA for Objective 2 Grant Proposals
Annex 4. Documentation of the Applications Evaluation Process
Annex 5. Agenda for Objective 1 Info Sessions Workshop
Annex 6. Engineering Industries Survey Analysis through Egyptian
Chamber of Engineering Industries/CEI
Annex 7. The 10 Bridges Model
Annex 8. Mapping MOHESR Vision 2030 to HEPP Objectives and 10
Industry Priority Sectors
Annex 9. Steps Toward World Class Higher Education: Reference
Document
Annex 10. Policy Reform: Identification of Specific Laws and
Regulations that should be Modified to Strengthen Higher
Education
Annex 11. Discussion draft on Expansion of the LIN Concept to
Better Support the Objective 2 RDI Centers
Annex 12. SOW for Communications Firm
Annex 13. SOW for Gender Analysis
Annex 14. Specifications for Management Information for Innovation
and Evaluation (MIILE) System Requirements
Annex 15. Specifications for Contact Management Software