+ All Categories
Home > Documents > HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

Date post: 18-Jan-2018
Category:
Upload: chad-walton
View: 217 times
Download: 0 times
Share this document with a friend
Description:
5 MILLION YEARS – CURRENT RAIN
17
HIGHWAY RECYCLE FACILITY August 12, 2015
Transcript
Page 1: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

HIGHWAY RECYCLE FACILITY

August 12, 2015

Page 2: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

5 MILLION YEARS – CURRENT SUN

Page 3: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

5 MILLION YEARS – CURRENT RAIN

Page 4: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

KELLOGG AVE

SANTA BARBARA CHANNEL COASTLINE

Page 5: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

VICINITY MAPAIRPORT

UCSBGATE

INDUST’L

SANITARY DIST.

GASCO.

TRAILERPARK

217

GASCO.

GASCO.

INDUST’L

Page 6: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

KELLOGG AVE

EROSION AND SEDIMENT CONTROL PLAN

Page 7: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

KELLOGG AVE

EXISTING BUILDINGS

COASTAL BUFFER

EXISTING STORMWATER DRAINAGE

STORMWATER POLLUTION PREVENTION PLAN

Page 8: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

EXISTING BUILDINGS

COASTAL BUFFER

EXISTING STORMWATER DRAINAGE

STORMWATER POLLUTION PREVENTION PLAN

CURB & GUTTER

KELLOGG AVE

Page 9: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

EXISTING BUILDINGS

COASTAL BUFFER

EXISTING STORMWATER DRAINAGE

STORMWATER POLLUTION PREVENTION PLAN

CURB & GUTTER

STOCKPILE

BIOSWALE

KELLOGG AVE

Page 10: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

PONDING

Page 11: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

HIGHWAY RECYCLE OPERATION

COASTAL BUFFER

CURB & GUTTER

STOCKPILE

BIOSWALE

LARGE TRUCK ACCESS & TURNAROUND

TRUCK SCALETRUCK SCALE

KELLOGG AVE

Page 12: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

HIGHWAY RECYCLE OPERATION

COASTAL BUFFER

CURB & GUTTER

STOCKPILE

BIOSWALE

LARGE TRUCK ACCESS & TURNAROUND

TRUCK SCALE

KELLOGG AVE

ELECTRIC CRUSHER

Page 13: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

ELECTRIC CRUSHER

Page 14: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

HIGHWAY RECYCLE OPERATIONPROCESS FLOW DIAGRAM

WATER SPRAY

TRUCK LOADER

UCSB

ELECTRIC CRUSHER ELECTRIC SCREENER ELECTRIC STACKER

LOADER TRUCK

OUT

INFEED PILE

STOCK PILE

Page 15: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

AERIAL – 8/2/73

Page 16: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

VICINITY MAPAIRPORT

UCSBGATE

INDUST’L

SANITARY DIST.

GASCO.

TRAILERPARK

217

GASCO.

GASCO.

INDUST’L

Page 17: HIGHWAY RECYCLE FACILITY August 12, 2015. 5 MILLION YEARS – CURRENT SUN.

Thank you.


Recommended