+ All Categories
Home > Documents > Hilgert, - Bethlehem · 2019. 1. 18. · agenda for the next meeting South Bethlehem & Mount Airy...

Hilgert, - Bethlehem · 2019. 1. 18. · agenda for the next meeting South Bethlehem & Mount Airy...

Date post: 05-Feb-2021
Category:
Upload: others
View: 1 times
Download: 0 times
Share this document with a friend
21
APPLICATION FOR CERTIFICATE OF APPROPRIATENESS (COA) Building address 25 W 3rd St #300, Bethlehem, PA 18015 Owner of building ArtsQuest; Kassie Hilgert, President & CEO Owner’s email & mailing address Applicant MKSD architects; Todd Applicant’s email & mailing addressi Street and Number Historic & Architectural Review Board Application form, photographs, and drawings (fnecessaiy) must be submitted by 12:00 on the last Wednesday of the month in order to be placed on the agenda for the next meeting South Bethlehem & Mount Airy Historic Conservation Commission - Application form, photographs, and drawings (f necessary) must be submitted by 12:00 noon on the second Monday of the month in order to be placed on the agenda for the next meeting.. 1. PHOTOGRAPHS - Photographs of your building and neighboring buildings must accompany your application. See aftactied packel 2. TYPE OF WORK PROPOSED Check all that apply. Please bring any samples or manufactures specifications for products you will use in this project. Trim and decorative woodwork Skylights Siding and Masonry Metal work Roofing, gutter and downspout Light fixtures Windows, doors, and associated hardware Signs Storm windows and storm doors > Demolition Shutters and associated hardware Other New Construction Paint (Submit color chips HARB only) 3. DRAWINGS OF PROPOSED WORK Required drawings must accompany your application. Please submit ONE ORIGINAL AND TEN (10) COPIES Of DRA WINGS, PHOTOGRAPHS, APPLICATION FORM, AND ANY SPECIFICATIONS Alteration, renovation, restoration (1/4 or l/8”l ‘0” scale drawings required If watts or openings altered.) New addition (1/4” or I /8”= 1 ‘0” scale drawings: elevations, floor plans, site plan) X New building or structure (1/4” or lI$”=l ‘0” scale drawings: elevations, floor plans, site plan) > Demolition, removal of building features or building (1/4” or l/$”l ‘0” scale drawings: elevation of remaining site and site plan) X A scale drawing, with an elevation view, is required for all sign submittals APPLICANT MUSTA TTEND MEETING FOR CASE TO BE HEARD. USE THE CHECKLIST ON THE BACK Of THIS APPLICATION TO ENSURE YOUR SUBMISSION IS COMPLETE. 4. DESCRIBE PROJECT Describe any work checked in #2 and #3 above. Attach additional sheets as needed. See attached packet & narrative. 5. APPLICANT’S SIGNATURE fit(0t1(j(”c... DATE: January 14,2019
Transcript
  • AP

    PL

    ICA

    TIO

    NF

    OR

    CE

    RT

    IFIC

    AT

    EO

    FA

    PP

    RO

    PR

    IAT

    EN

    ES

    S(C

    OA

    )

    Building

    address25

    W3rd

    St #300,B

    ethlehem,

    PA18015

    Ow

    nerof building

    ArtsQ

    uest;K

    assieH

    ilgert,P

    resident&

    CE

    O

    Ow

    ner’sem

    ail&m

    ailingaddress

    Applicant M

    KSD

    architects;T

    odd

    Applicant’s

    email

    &m

    ailingaddressi

    Street and

    Num

    ber

    Histo

    ric&

    Arch

    itecturalR

    eviewB

    oard

    —A

    pplicationform

    , photographs,and

    drawings

    (fnecessaiy)m

    ustbesubm

    ittedby

    12:00

    onthe

    lastW

    ednesdayo

    f them

    onthin

    orderto

    be placedon

    theagenda for

    thenext m

    eeting

    South

    Bethlehem

    &M

    ount A

    iryH

    istoricC

    onservationC

    omm

    ission-A

    pplicationform

    , photographs,and

    drawings

    (fnecessary)

    must be

    submitted

    by12:00

    noonon

    thesecond

    Monday

    of the

    month

    inorder

    tobe

    placedon

    theagenda fo

    rthe

    next

    meeting..

    1.P

    HO

    TO

    GR

    AP

    HS

    -Photographs

    of yourbuilding

    andneighboring

    buildings must

    accompany

    yourapplication.

    See

    aftactiedp

    ackel

    2.T

    YP

    EO

    FW

    OR

    KP

    RO

    PO

    SE

    D—

    Check

    allthat

    apply.Please

    bringany

    samples

    orm

    anufacturesspecifications

    for

    productsyou

    willuse

    inthis

    project.

    Trim

    anddecorative

    woodw

    orkSkylights

    Sidingand

    Masonry

    Metal

    work

    Roofing,

    gutterand

    downspout

    Light

    fixtures

    Window

    s,doors,

    andassociated

    hardware

    Signs

    Stormw

    indows

    andstorm

    doors>

    Dem

    olition

    Shuttersand

    associatedhardw

    areO

    therN

    ewC

    onstruction

    Paint(Subm

    it colorchips

    —H

    AR

    Bonly)

    3.D

    RA

    WIN

    GS

    OF

    PR

    OP

    OS

    ED

    WO

    RK

    —R

    equireddraw

    ingsm

    ustaccom

    panyyour

    application.Please

    submit O

    NE

    OR

    IGIN

    AL

    AN

    DT

    EN

    (10)C

    OP

    IES

    Of

    DR

    AW

    ING

    S, PH

    OT

    OG

    RA

    PH

    S,

    AP

    PL

    ICA

    TIO

    NF

    OR

    M,A

    ND

    AN

    Y

    SPEC

    IFICA

    TIO

    NS

    Alteration, renovation,

    restoration(1/4

    orl/8

    ”l

    ‘0”scale

    drawings

    requiredIf

    watts

    oropenings

    altered.)

    New

    addition(1/4”

    orI/8”=

    1‘0”scale

    drawings:

    elevations,floor

    plans, siteplan)

    XN

    ewbuilding

    orstructure

    (1/4”or

    lI$”=l

    ‘0”scale

    drawings:

    elevations,floor

    plans,site

    plan)

    >D

    emolition, rem

    ovalof building

    featuresor

    building(1/4”

    orl/$

    ”l

    ‘0”scale

    drawings:

    elevationofrem

    ainingsite

    andsite

    plan)

    XA

    scaledraw

    ing,w

    ithan

    elevationview

    ,is

    requiredfor

    allsign

    submittals

    AP

    PL

    ICA

    NT

    MU

    ST

    AT

    TE

    ND

    ME

    ET

    ING

    FO

    RC

    AS

    ET

    OB

    EH

    EA

    RD

    .

    US

    ET

    HE

    CH

    EC

    KL

    IST

    ON

    TH

    EB

    AC

    KO

    fT

    HIS

    AP

    PL

    ICA

    TIO

    NT

    OE

    NS

    UR

    EY

    OU

    RS

    UB

    MIS

    SIO

    NIS

    CO

    MP

    LE

    TE

    .

    4.D

    ES

    CR

    IBE

    PR

    OJE

    CT

    —D

    escribeany

    work

    checkedin

    #2and

    #3above.

    Attach

    additionalsheets

    asneeded.

    See

    attached

    pack

    et&

    narrative.

    5.A

    PP

    LIC

    AN

    T’S

    SIG

    NA

    TU

    RE

    fit(0t1(j(”c...D

    AT

    E:

    January14,2019

  • SOU

    TH

    BETH

    LEHEM

    HIST

    OR

    ICC

    OM

    MISSIO

    N

    25W

    3RD

    SI,

    BETHLEH

    EM,

    PA18015

    PRO

    JEC

    TIN

    FOR

    MA

    TIO

    N:

    This

    document

    isbeing

    submitted

    relativeto

    bothapplications

    citedabove

    asthe

    demolition

    andnew

    constructionare

    allpart

    ofone

    project,a

    newcom

    munity

    culturalarts

    centerin

    theS

    outhSide

    Arts

    District

    ofB

    ethlehem.

    An

    initialapplication

    was

    submitted

    inS

    eptember

    2018,and

    asu

    bseq

    uen

    tapplication

    inD

    ecember

    2018.

    This

    projecthas

    beensubstantially

    revisedin

    the

    courseof

    discussionw

    iththe

    Historic

    Com

    mission:

    1.T

    heT

    heodoredisB

    uildingw

    illbe

    retainedinstead

    ofdem

    olished2.

    The

    buildingaddition

    was

    reducedto

    three

    storiesinstead

    offour

    asinitially

    requested3.

    The

    buildingaddition

    claddingw

    asrevised

    fromm

    etalpanels

    tobrick

    cladprecast

    concrete4.

    The

    window

    patternon

    theaddition

    was

    changedfrom

    aseem

    inglyrandom

    pattern

    toa

    pattern

    that

    emulates

    industrialbuildings

    ofth

    epast

    Additionally:

    1.T

    heproject

    proposesto

    retainth

    eexisting

    Crayola

    Gallery

    Building

    (former

    autoparts

    store)2.

    The

    demolition

    ofth

    ehouse

    isstill

    requiredto

    successfullycom

    pleteth

    eproject

    3.T

    hedoor

    surroundof

    the

    housew

    illbe

    removed

    andreinstalled

    onthe

    newbuilding

    —w

    eproposed

    toinstall

    itin

    the3

    dstreet

    plazaon

    thenew

    exteriorw

    allof

    theC

    rayolaG

    allery

    Followup

    information

    fromth

    eD

    ecember

    meeting

    follows:

    January

    14,2

    01

    9A

    RT

    SQ

    UE

    ST

    MK

    imagine

    thatS

    D

    APPL

    ICA

    TIO

    Nan

    dM

    EE

    TIN

    G#3

    FOR

    :

    CO

    A—

    DE

    MO

    LIT

    ION

    OF

    EXISTIN

    GB

    UILD

    ING

    S(6

    Sep

    arateB

    uildings/Structures)

    CO

    A—

    CO

    NST

    RU

    CT

    ION

    ,A

    RISQ

    UE

    STSO

    UT

    HB

    ET

    HL

    EH

    EM

    CO

    MM

    UN

    ITY

    CU

    LTUR

    AL

    CE

    NT

    ER

  • 1.T

    heT

    heodoridisB

    uildingexterior

    will

    receiveth

    efollow

    ingw

    ork:

    a.M

    asonry(including

    brick,terra

    cotta,stone,

    andcast

    stonedetails)

    will

    becleaned

    with

    appropriatem

    ethodsfor

    thecom

    positionof

    the

    material

    b.M

    asonryw

    illbe

    repointedas

    necessary

    c.W

    indowm

    ullions,doors,

    andfram

    esw

    illbe

    paintedto

    match

    the

    same

    onth

    ebuilding

    addition

    d.T

    heroof

    will

    bereplaced

    with

    aslate-look

    asphaltshingle

    roofing

    2.T

    henew

    gallerybuilding

    additionat

    the

    cornerof

    3rdand

    Northam

    ptonS

    treetshas

    been

    updatedto

    reflectthe

    following:

    a.T

    hefront

    façadehas

    beenm

    ovedforw

    ardtow

    ard3rd

    Street

    asfar

    aspossible

    (the

    cornerradius

    preventsm

    ovingit to

    alignw

    iththe

    frontof

    theneighboring

    gallery

    building.T

    heoffset

    isapproxim

    ately2’-8”

    b.T

    heheight

    ofth

    estructure

    nowm

    atchesth

    atof

    the

    neighboringgallery

    c.B

    rickclad

    precastconcrete

    panelsto

    match

    the

    primary

    buildingaddition

    with

    natural

    finishprecast

    concretew

    atertable

    (÷/-3’-O”

    tall)

    d.T

    hesto

    refront

    heightm

    atchesth

    atof

    theneighboring

    gallerybuilding

    e.A

    canopyw

    asadded

    aboveth

    estorefront

    3.T

    heprim

    arybuilding

    additionhas

    beenrevised

    asfollow

    s:

    a.C

    aststo

    ne

    (naturalfinish

    precastconcrete)

    sillshave

    beenadded

    toem

    ulatethe

    sillson

    the

    Theodoredis

    Building

    b.T

    hesills

    ofth

    ew

    indows

    onth

    efirst

    floorhave

    beenlow

    eredto

    am

    oreregular

    heightof

    abo

    ut

    3’above

    thefloor

    4.A

    rtsQuest

    hascontacted

    theB

    ethlehemFine

    Arts

    Com

    mission

    about

    them

    osaicsth

    atadorn

    the

    buildingsslated

    fordem

    olition(w

    ew

    illprovide

    anupdate

    atth

    eJanuary

    meeting)

    5.W

    ehave

    includeddetailed

    proposeddesigns

    forboth

    the3rd

    and2

    Street

    plazasand

    offerth

    e

    following

    descriptionof

    theprogram

    ming

    forth

    esespaces:

    The

    re-imagined

    Com

    munity

    Cultural

    Center

    includestw

    ooutd

    oor

    Arts

    Plazas.These

    two

    openplazas

    will

    beneatly

    tuckedin

    thefront

    andrear

    ofthe

    Com

    munity

    Cultural

    Center

    tom

    eeta

    varietyof

    programm

    ingand

    comm

    unityneeds.

    We

    envisiona

    welcom

    ingand

    inspiringev

    ent

    spaceth

    atw

    illappeal

    toa

    diverseaudience,

    ranging

    fromcasual

    visitorsand

    localresidents,

    tostudents,

    tourists,artists

    andart

    lovers.T

    he

    spacesw

    illbe

    agreat

    fit forfocused

    learningas

    anoutdoor

    classroomor

    aquiet

    respite

    todevelop

    yournextgreat

    idea.

    These

    user-friendlyspaces

    will

    bedesigned

    forflexibility

    toaccom

    modate

    avariety

    of

    programm

    ingand

    audienceneeds,

    includingan

    outd

    oor

    classroomspace

    forthe

    Arts-

    Based

    Preschool

    Program

    ,afterschool

    artprogram

    s,and

    Sum

    mer

    ArtC

    amp

    Program

    s.It

    will

    alsoserve

    asan

    opportunityfor

    adultart

    classesto

    createoutdoors,

    frompainting

    enplein

    airto

    firingraku

    ceramic

    kilnsfor

    alternativeprocesses.

    The

    spacew

    illserve

    as

    inspirationfor

    interactivepublic

    artinstallations

    ordigital

    projectionsonto

    the

    building

    byregional

    andnational

    artists,as

    well

    asan

    eventspace

    forfestivals,

    rentalsand

    events.T

    heconnection

    between

    the

    two

    plazasat

    the

    frontand

    rearof

    the

    building

    throughthe

    lobbyw

    illhelp

    move

    attend

    eesthroughout

    the

    building,w

    ithlarge

    window

    sand

    viewareas

    tosee

    artistsand

    studen

    tsat

    work

    includinga

    min

    i

    amp

    hith

    eaterto

    sitand

    watch

    theH

    otG

    lassstudio

    artistsat

    work.

    Januarv14,

    2019A

    RT

    SU

    ES

    TM

    Kim

    aginethat

    SD

  • (0 —

    ==

    -I —=1=

    cc

    — —

    ==c.

    I

    U)0

    cD

  • z =

    =

    III

    —I

    ==-n=1

    C

    =Co

    WaC=CD0,-I

    ‘C==

    CD=1

    CD=CDS=

    =

    -I

    CD=

    CD

    >0

    -IU,

    0

  • C-

    I.2

    nd

    __

    I-

    4

    I

    ArtsUuost $outbDetbiebem

    CulturalArtsCenter

    HCOJDemolitionsite

    Plan

    1.B

    uildingA

    :T

    heH

    ouse-

    To

    Be

    Dem

    olished2.

    Building

    B:Infill

    -T

    oB

    eD

    emolished

    3.B

    uildingC

    :T

    heodoredis-

    To

    Be

    Retained

    4.B

    uildingD:

    Banana

    Expansion

    -T

    oB

    eD

    emolishes

    5.B

    uildingE:

    Garage

    -T

    oB

    eD

    emolished

    6.B

    uildingF:

    Auto

    Parts

    Store

    -T

    obe

    Retained

    AR

    TS

    QU

    ES

    Tim

    aginethat

    MK

    SD

    ar

    ch

    It

    eC

    t5

    [j!J

    I,

    .-.

    r.r.-

    11’ .z_

    Li

    --aI

    .

    &

    r

    12

    r3rd_s:b:eet___

    I-

    --

    I-

    1/14/19

  • 2ndS

    treet

    ArtsU

    uest southBethlehem

    CulturalArtsCenter

    HCO2Proposed

    SitePIao

    4-IC)a)I...1-IU,04-IECu.0z

    AR

    TS

    QU

    ES

    Tim

    aginethat

    MK

    SD

    arch

    itects

    3rdS

    treet

    1/14/19

  • =

    4

    ==

    ==—

    -

    cn0

    (0=

    ==

    I-

    -=

  • +1- 35 - 0”

    =CD

    C.,==

    CD-I

    CD

    CD

    =—

    =

    CD=CD

    00

    CD><

    m

    o.‘1032.

    m03Cl)I

    0

    033

    0

    Co-I’

    CDCD

    00

    CD><

    m

    0)

    o.-n0)2.

    Co0

    I

    C)-‘

    Co

    CDCD

    —-CD 00i 3Q)C0 Cl)

    :3- Cl)

    cx

    CCa

    -

    II

    0

    p

    =CD

    I

    =CD

    -I—I

    =C.,

    aC,)

    CDCD

    -

    IIC30

    CDaCl)

    t3

    H0):3

    CD

    C’,00)

    CaCD

    46 - 2

    >0

    -1U)0

    /-

    ¶ -:3-0)30:3

    CDCD

    r’j:3a-

    0)

    CDCD

    CD:3-

    Ca:3-

    -tJ

    0)

    CD1

    0

    +1- 34 - 0”

  • __

    _

    EXR

    f38’

    -8”

    Level

    214’

    -3”

    EX

    Level

    1

    ArtsQ

    uestsouthBethlehem

    Cultural ArtsCenter

    0C051/14/19

    [astElevation

    AR

    TS

    QU

    ES

    Tim

    aginethat

    MK

    SD

    architects

    t

    EX

    Level

    3-

    8”

    9

    Existing

    Structure

    toR

    emain

    -O

    riginalT

    heodoredisB

    uilding

    EX

    1B

    uildingElevation

    FacingE

    ast-N

    orthampton

    Street1116”

    =

    Exterio

    rM

    aterialL

    egen

    d

    1P

    recastC

    oncreteW

    allP

    anelsw

    ithbrickface

    finish6.

    Alum

    inumSkylight

    System

    with

    blackpainted

    finish2.

    Precast

    Concrete

    Wall

    Panels

    with

    naturalfinish

    7.P

    aintedM

    etalP

    anelR

    ooftopU

    nitS

    creen3.

    Alum

    inumC

    urtainwall

    System

    with

    blackpainted

    finish8.

    Painted

    Metal

    Overhead

    Door

    4.A

    luminum

    StorefrontS

    ystemw

    ithblack

    paintedfinish

    9.V

    entilationE

    xhaustS

    tack5.

    Alum

    inumW

    indowS

    ystemw

    ithblack

    paintedfinish

    10.P

    aintedInsulated

    Metal

    Panel

    11.C

    astS

    toneSill

    (naturalprecast

    concrete)

    t

  • ArtsO

    uest southBethlehem

    CulturalArtsCenter

    IICOGW

    estElevationA

    RT

    SQ

    UE

    ST

    imagine

    thatM

    KS

    Darch

    itects

    L84

    L5

    —5

    1B

    uildingElevation

    FacingW

    est1116”

    =1,-U

    Exterio

    rM

    aterialL

    egen

    d

    1.P

    recastC

    oncreteW

    allP

    anelsw

    ithbrickface

    finish6.

    Alum

    inumSkylight

    System

    with

    blackpainted

    finish2.

    Precast

    Concrete

    Wall

    Panels

    with

    naturalfinish

    7.P

    aintedM

    etalP

    anelR

    ooftopU

    nitS

    creen3.

    Alum

    inumC

    urtainwall

    System

    with

    blackpainted

    finish8.

    Painted

    Metal

    Overhead

    Door

    4.A

    luminum

    Storefront

    System

    with

    blackpainted

    finish9.

    Ventilation

    Exhaust

    Stack

    5.A

    luminum

    Window

    System

    with

    blackpainted

    finish10.

    Painted

    InsulatedM

    etalP

    anel11.

    Cast

    Stone

    Sill(natural

    precastconcrete)

    1/14/19

  • Existing

    Building

    toR

    emain

    -O

    riginalT

    heodoredisB

    uilding

    1B

    uildingE

    levationFacing

    North

    -2ndStreet

    1116”=

    ArtsU

    uest southBethlehem

    CulturalArtsCenter

    HCOJ1/14/19

    NortbElevation

    AR

    TS

    QU

    ES

    Tim

    aginethat

    MK

    SD

    arch

    itects

    Exterior

    Material

    Leg

    end

    1.P

    recastC

    oncreteW

    allP

    anelsw

    ithbrickface

    finish6.

    Alum

    inumSkylight

    System

    with

    blackpainted

    finish2.

    Precast

    Concrete

    Wall

    Panels

    with

    naturalfinish

    7.P

    aintedM

    etalP

    anelR

    ooftopU

    nitS

    creen3. A

    luminum

    Curtainw

    allS

    ystemw

    ithblack

    paintedfinish

    8.P

    aintedM

    etalO

    verheadD

    oor4.

    Alum

    inumS

    torefrontS

    ystemw

    ithblack

    paintedfinish

    9.V

    entilationE

    xhaustS

    tack5. A

    luminum

    Window

    System

    with

    blackpainted

    finish10.

    Painted

    InsulatedM

    etalP

    anel11.

    Cast

    Stone’

    Sill(natural

    precastconcrete)

  • -IC.,

    =Cs,

    C.,

    =

    ==—

    -

    =-I

    -

    Ct-•:

    -=Ct

    —I

    -

    4

    Ct

    -I

    LI,0

  • F—CU-c-I—’

    ‘JJ)I.IcW.Io)

    DIC, 1%!)

    =

    I

    =z—=

    I———

    =-C’,I-=

  • Cutu

    rC

    enterL

    obby

    3rdSt.

    Plaza

    Elem

    entsK

    ey1.

    3rdS

    treetcurb

    line(m

    atchesexisting)

    2.S

    treeted

    ge

    trelliselem

    ent3.

    Multi-purpose

    pavedarea

    4.P

    lazaw

    alkway

    tom

    ainen

    trance

    Cast

    inplace

    concrete5.

    Main

    entran

    ce6.

    Art

    Cafe

    -outdoor

    seatingO

    verheaddoor

    integratedinto

    buildingto

    allowindoor-

    outdoorcafe

    seating

    area7.

    Relocated

    ‘historic’door

    surround8.

    Law

    narea

    9.G

    allery/Projection

    areaon

    exteriorw

    allof

    Crayola

    Gallery

    10.R

    aisedarea

    forlarge

    scalesculpture

    installationB

    rickw

    allsto

    match

    buildingw

    ithcast

    stone

    cap,top

    atseatin

    gheight

    11.M

    oveableplanter

    12.B

    ikeR

    ackS

    outhsidestan

    dard

    (orby

    localartist)

    13.P

    lantingbed

    &area

    forourtdoor

    sculpturedisplay

    14.L

    owbrick

    wall

    tom

    atchbuilding

    15.S

    outhB

    ethlehemstreet

    treein

    treegrate

    16.S

    outhB

    ethlehemstreet

    light17.

    Mast

    light

    ArisO

    uest southBethlehem

    Cultural ArtsCenter

    imagine

    thatHC1O

    3tdStreatPIaZaPIaN1/14/19

    3rdS

    :reet

    AR

    TS

    QU

    ES

    TM

    KS

    D

  • I.’

    —I=-==-z==

    -z

    ==-=—IJ

    -I

    =CD

    ==

    CD

    —CD

    CD

    =—

    =-

    CD=CD

    -1U,

    0

  • —I

    I=

    C.,==

    =

    =—

    =—

    I

    ==I=

    U)0

  • Ii_

    I

    [(i.

    I

    /

    ArtsU

    uest southBethlehem

    CulturalArtsCenter

    HCElExteriorPerspective

    -3rd$treet Plaza

    AR

    TS

    QU

    ES

    Tim

    aginethat

    MK

    SD

    arc

    hitecs

    kg

    H

    /‘S

    I:

    j1

    JIjfl

    ii-

    1/14/19

  • 2ndSt.

    Plaza

    Elem

    entsK

    ey

    1.N

    orthampton

    Street

    curbline

    (match

    esexisting)

    2.P

    roposedparking

    lotA

    sphaltpaving

    3.M

    ulti-purposepaved

    areaC

    astin

    placeconcrete

    4.P

    lazaw

    alkway

    tom

    ainen

    trance

    Cast

    inplace

    concrete5.

    Main

    entran

    ce(R

    ear)6.

    Law

    narea

    7.G

    allery/Projection

    areaon

    exteriorw

    allof

    Theodoredis

    Building

    8.R

    ecessedarea

    forglass

    hotshop

    viewingS

    eatingintegrated

    intotiered

    surround,overh

    eaddoor

    op

    ens

    tohot

    shop

    9.B

    ikeR

    ackS

    outhsidestan

    dard

    (orby

    localartist)

    10.P

    lantingbed

    &area

    forourtdoor

    sculpturedisplay

    11.S

    had

    etree12.

    South

    Bethlehem

    streettree

    intree

    grate13.

    South

    Bethlehem

    streetlight

    14.M

    astlight

    ArtsU

    uest southBethlehem

    CulturalArtsCenter

    NC141/14/19

    2ndstreetPlaza PlanA

    RT

    SQ

    UE

    ST

    imagine

    thatM

    KS

    Darch

    itectz

    ‘0

    z

    tr

    ‘—i

    —‘

    —r

    L.U

    rL

    LJ

  • I

    ArtsU

    uest $outbBetbiebem

    CulturalArtsCenter

    NC15

    1/14/19

    ExteriorPerspective-2ndStreetPlaza

    AR

    TS

    QU

    ES

    Tim

    aginethat

    MK

    SD

    arc

    hI

    te

    ct

    s

  • (D —

    —-go

    =

    -:

    -= —

    -I

    I

    U)0

    :


Recommended