Hillhouse Quarry, Dundonald Environmental Impact Assessment Screening and Scoping Report SLR Ref : 413-01917-00002 July 2010 Hillhouse Quarry Group Ltd
Transcript
Page 1: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald

Environmental Impact Assessment Screening and Scoping Report

SLR Ref : 413-01917-00002

July 2010

Hillhouse Quarry Group Ltd

Page 2: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald ii 413-01917-00002 EIA Screening and Scoping Report June 2010

SLR

CONTENTS 1.0  INTRODUCTION ............................................................................................................ 1 

1.1  Background ........................................................................................................ 1 1.2  Development History and the Intended Planning Application ....................... 1 1.3  Fallback Position ................................................................................................ 1 1.4  Purpose of this Report ....................................................................................... 2 1.5  Hillhouse Quarry Group Limited ....................................................................... 2 1.6  SLR Consulting Limited ..................................................................................... 2 1.7  Report Structure ................................................................................................. 2 

2.0  HILLHOUSE QUARRY SITE ......................................................................................... 4 2.1  Location .............................................................................................................. 4 2.2  Quarry Land Uses .............................................................................................. 4 

3.0  DESCRIPTION OF THE OPERATIONS ........................................................................ 5 3.1  Method of Extraction, Processing and Despatch ............................................ 5 3.2  Operating Hours ................................................................................................. 5 3.3  Quarry Development .......................................................................................... 5 3.4  Restoration Concept .......................................................................................... 6 

4.0  SCREENING THE DEVELOPMENT FOR EIA .............................................................. 7 4.1  Introduction ........................................................................................................ 7 4.2  Approach to Screening and Scoping Study .................................................... 7 4.3  Considering Schedule 1 and Schedule 2 of EIA Regulations ........................ 7 

5.0  ENVIRONMENTAL TOPICS CONSIDERED IN THE SCOPING STUDY ..................... 9 5.1  Ecology and Biodiversity................................................................................... 9 5.2  Landscape and Visual Amenity......................................................................... 9 5.3  Hydrology and Hydrogeology ........................................................................... 9 5.4  Noise .................................................................................................................. 10 5.5  Blasting ............................................................................................................. 10 5.6  Traffic and Transportation ............................................................................... 10 5.7  Air Quality (Dust) .............................................................................................. 10 5.8  Public Access ................................................................................................... 11 

6.0  CONCLUSION ............................................................................................................. 12 7.0  INVITATION TO COMMENT ....................................................................................... 13 

APPENDICES Appendix A Screening Checklist

DRAWINGS

Drawing HQ1 Site Location

Drawing HQ2 Site Boundaries

Page 3: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 1 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

1.0 INTRODUCTION

1.1 Background

Hillhouse Quarry Group Limited (Hillhouse) intends to submit an application for planning permission to South Ayrshire Council under Section 42 of the Town and Country Planning (Scotland) Act 1997, as amended, to operate Hillhouse Quarry ‘without complying with conditions subject to which a previous planning permission was granted’.

The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. The site location is shown on Drawing HQ1.

Hillhouse has appointed SLR Consulting Limited (SLR) to undertake a screening/scoping study and prepare this report to accompany a request to South Ayrshire Council to adopt a Screening and/or Scoping Opinion as to the required form and content of the planning application and if appropriate an Environmental Statement (ES).

1.2 Development History and the Intended Planning Application

Hillhouse Quarry has been operational since 1907. The extent of development permitted at the quarry is that contained in planning permission reference 5431, dated 2nd July 1948.

Planning permission reference 5431 was subject to a review under Schedule 9 of the Town and Country Planning (Scotland) Act 1997, which imposed a revised set of conditions on the operations at the quarry. The revised set of conditions is set out in the notice of determination reference CE/5/2 dated 29th January 1999 (The 1999 Decision). The progressive development of Hillhouse Quarry continues to be undertaken in accordance with The 1999 Decision.

The efficient development of the quarry is currently constrained until the 28th January 2014 by Condition 6 of The 1999 Decision that currently requires:

That the limit of excavations for the 15 year period from the date of the conditions being approved shall be restricted to the area outlined in blue and yellow on the submitted plans.

The combined extent of the blue and yellow areas that are referred to in Condition 6 is shown delineated purple on Drawing HQ2.

The intended planning application aims to remove the constraints imposed by condition 6 in order to allow development outwith the restricted area to commence during late 2010 rather than wait until January 2014, as the current condition 6 requires.

The anticipated final extent of development at the quarry shown in dashed green on Drawing HQ2.

1.3 Fallback Position

The intended application is fundamentally different from many other forms of planning application as it wholly relates to a development that is already authorised and being undertaken. The planning application will not contain any proposal for new or extended quarrying operations. The purpose is instead to vary a planning condition and remove a time limited restriction on the lateral extent of workings.

The areas within which it is proposed to work by removing the restriction placed by Condition 6 of The 1999 Decision would be worked on lapse of the time limit i.e. 28th January 2014.

Page 4: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 2 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

The fallback position therefore would see extraction within the constrained area of the quarry commence in 2014 (rather than late 2010) irrespective of the outcome of the intended planning application.

1.4 Purpose of this Report

This report is intended to engage South Ayrshire Council in pre-application consultation in respect of the intended planning application and in this regard the report looks to set out a description of the proposed development and outline the format of the planning application that is intended to be made.

The report is also intended to provide South Ayrshire Council with the necessary information to ‘screen’ the proposal and to issue a Screening Opinion as to the requirement to undertake a formal Environmental Impact Assessment (EIA). Furthermore, should the development be deemed to be EIA development, then the report provides the necessary information to enable the council to adopt a Scoping Opinion under the provisions of the Environmental Impact Assessment (Scotland) Regulations 1999, as amended (‘EIA Regulations’).

1.5 Hillhouse Quarry Group Limited

The Hillhouse Quarry Group Limited is South Ayrshire based and is one of Scotland’s largest privately owned heavy building materials businesses. The company supplies drystone, coated stone and concrete products to markets throughout Central and Southern Scotland, particularly Ayrshire and Glasgow

Hillhouse Quarry has been producing crushed aggregate since 1907 and continues to produce crushed rock aggregates, coated stone and concrete products. The operations at Hillhouse Quarry form the base of a complementary portfolio of operations comprising two hardstone quarries, three asphalt plants, a surfacing division, four ready-mixed concrete plants and a concrete blocks business, all in Ayrshire. The company also operates precast concrete businesses in Beith and in Inverness.

Further information on the company can be found on its corporate web site at www.hillhousegroup.co.uk.

1.6 SLR Consulting Limited

SLR is a multi-disciplinary environmental consultancy with significant experience in preparing planning applications.

SLR is a registered Environmental Impact Assessor and Member of the Institute of Environmental Management and Assessment (IEMA). The company has significant experience in the preparation of mineral review applications, planning applications and undertaking EIA for a wide variety of projects, including minerals, waste, renewable energy and infrastructure developments.

Further information on SLR Consulting Limited can be found on its corporate web site at www.slrconsulting.co.uk.

1.7 Report Structure

Following this introductory section, the remainder of this report comprises the following Sections:

Page 5: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 3 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

Section 2 Hillhouse Quarry Site: describes the location, setting and physical characteristics of the Quarry and describes the baseline features in and around the Site;

Section 3 Description of the Development: provides a summary of the operations that are currently undertaken at the quarry and planned to continue;

Section 4 Screening the Development: provides detail on the approach to screening the development, sets out a Screening Checklist and describes the specialist studies that will be undertaken as a result of the screening exercise irrespective of whether or not a formal ES is required.

Section 5 Environmental Topics Considered in Screening Study: provides the rationale for discounting, or screening out certain environmental topics from further detailed consideration as part of the planning application.

Section 6 Conclusions

Section 7 Invitation to Comment: provides the relevant SLR contact details where any queries or responses to this Screening/Scoping Report should be directed.

Drawings and appendices referred to in the main text are included at the end of Section 7.

Page 6: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 4 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

2.0 HILLHOUSE QUARRY SITE

2.1 Location

Drawing HQ1 illustrates the location of Hillhouse Quarry. The quarry is located on the outskirts of Dundonald in South Ayrshire, approximately 4km north-east of Troon, 9km north of Prestwick and 6km south of Irvine. The quarry is centred on national grid reference NS351340.

The quarry is accessed off the A759 that is located to the north-west. The Glasgow South Western Railway (Stranraer Branch) runs north-east to south-west approximately 200m from the north western boundary of the quarry.

Collenan Reservoir is located approximately 400m south of the Quarry.

The nearest residential properties are isolated dwellings located approximately 800m to the south and west of the quarry. The nearest settlements are Dundonald to the east, and Barassie and Loans to the west.

Core footpath SA7 runs through Dundonald Woodland to the south and west of the quarry.

2.2 Quarry Land Uses

The Quarry can be described in the following key compartments:

• Active quarrying areas comprising areas of extraction by drilling and blasting, and loading of blasted material for transportation to the plant site.

• Plant and stocking area: plant, buildings and stocking areas including coating plants. • Undeveloped area: eastern area of the Quarry into which the working face will

progress following soil stripping and other enabling works. • Periphery lands: undeveloped areas to the south-west and north of the current

operations.

Approximately 6.5ha of the currently undeveloped areas into which it is intended to progress the quarry workings comprises parts of the Dundonald Wood SSSI. Dundonald Wood is a mixed predominantly deciduous woodland extending to 31ha in total. The intended working in the areas of the SSSI would be subject to Mitigation and Management works that are provided for by condition 16 of The 1999 Decision.

The majority of the other undeveloped areas comprise enclosed pasture which is currently utilised for the grazing of livestock (cattle and sheep).

Page 7: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 5 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

3.0 DESCRIPTION OF THE OPERATIONS

3.1 Method of Extraction, Processing and Despatch

The existing methods of extraction, processing and despatch have been established over a number of years and are summarised below for information.

Rock is dislodged from quarry faces by blasting whereby a series of holes are drilled in a development bench, filled with explosives and thereafter blasted to release rock.

The blasted rock is loaded by a face shovel into dump trucks and hauled from the blast location to the plant area for processing. The processing operation involves preparing the blasted rock into saleable products. This is achieved by feeding the blasted rock via a primary feed hopper through a series of crushers and screens that shape and sort the stone into the required range of products.

From the processing plant, the largest portion of the resultant aggregate products is stocked in their respective sizes before being hauled from the plant area to the stockyard for final stocking and subsequent sale. A smaller proportion of the aggregates are fed to the asphalt plant for use in the manufacture of a range of surfacing (coated stone) materials.

The asphalt plant blends the quarried aggregates with sand and a filler (such as stone dust) in the correct proportions and then heats the materials to a temperature suitable for coating with a bitumen binder.

The aggregates and asphalts are ultimately dispatched from the stockyard, or from the asphalt plant, by way of road going lorries that typically carry 20 tonnes per load. Unladen vehicles arriving at the quarry for loading are weighed in at the weighbridge upon arrival, before progressing to the stockyard where they are loaded by a wheel shovel loader before being weighed back out at the weighbridge, passing through a wheel wash and then being sheeted before leaving the quarry.

All vehicles enter and leave the quarry using the established access road running from the A759 road.

3.2 Operating Hours

Extractive operations are regulated by Condition 5 of 1999 Decision that restricts excavation working to between the hours of 6.45am to 6pm Monday to Friday, from 7am to 1pm on Saturdays and from 7am to 3pm on Sundays.

Works outwith the periods regulated by Condition 5 are restricted to servicing and repairs and the operation of the coating, crushing and concrete plants.

3.3 Quarry Development

The final extent of the quarry development envisaged is delineated by a dashed green line on Drawing HQ2.

As the working face progresses into areas of previously undeveloped land, the vegetation would be cleared in advance of soil stripping. The stripped soils would be used in restoring other exhausted areas of the quarry. The existing quarry faces will then progress over time until approaching their final face positions at the limit of the intended operations.

Page 8: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 6 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

3.4 Restoration Concept

Condition 21 of planning permission CE/5/2 makes provision for the submission of a restoration scheme for approval by the local planning authority 12 months prior to completion of extractive operations at the Quarry.

Page 9: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 7 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

4.0 SCREENING THE DEVELOPMENT FOR EIA

4.1 Introduction

A preliminary EIA screening and scoping study has been carried out by SLR, following the practice described in Planning Circular 8/20071 and taking account of best practice guidelines from the Institute of Environmental Management and Assessment2, from the SNH handbook on EIA3 and from PAN 584.

The remainder of this section sets out the screening assessment of the proposed development in order to assist South Ayrshire Council adopt a ‘screening opinion’ and if appropriate a ‘scoping opinion’ as prescribed in the EIA Regulations.

4.2 Approach to Screening and Scoping Study

The existing operations at Hillhouse Quarry are well established and already form an integral part of the environmental baseline for the area. The proposed development would not materially alter the nature of land use currently employed.

This screening and scoping study has initially comprised a desk based appraisal that considered datasets from a variety of sources including the existing operating features of the Quarry, Ordnance Survey mapping and Development Plans.

4.3 Considering Schedule 1 and Schedule 2 of EIA Regulations

In considering the requirement for EIA it is necessary to firstly determine whether the proposed development is listed in either Schedule 1 or Schedule 2 of the EIA Regulations. Figure 1 of Planning Circular 8/2007 outlines a process diagram for applying Schedule 1 and Schedule 2 of the EIA Regulations as a way of establishing whether a development requires EIA.

The already consented operations at Hillhouse Quarry are over an area “where the surface of the site exceeds 25 hectares” as described at paragraph 19 of Schedule 1 to the EIA Regulations. It is therefore considered that the already consented operations at Hillhouse Quarry are of a type listed in Schedule 1 of the EIA Regulations.

Paragraphs 21 of Schedule 1 and Paragraph 13 of column 1 to Schedule 1 of the EIA Regulations provides that changes or extensions to already implemented EIA developments can themselves require EIA, where such a change or extension in itself meets the thresholds, if any, or description of development set out in Schedule 1 or Schedule 2 as appropriate.

It is acknowledged that the intended planning application relates to a quarry development over an area exceeding 25 hectares and in that regard the intended planning application might be considered capable of falling within Schedule 1 of the EIA Regulations. As described above however, the intended planning application relates to quarrying development that is already authorised and being undertaken and will not itself contain any

1 Scottish Planning Circular 8-2007: The Environmental Impact Assessment (Scotland) Regulations 1999 2 Guidelines for Environmental Impact Assessment, Institute of Environmental Management and Assessment, 2004. 3 A Handbook on Environmental Impact Assessment, SNH, revised 2006 4 Planning Advice Note 58, Environmental Impact Assessment, September 1999

Page 10: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 8 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

proposal for new or extended quarrying operations. The physical extent of those consented operations would not alter in any way as a result of the intended planning application. It is not therefore considered that the relevant thresholds of Schedule 1 are necessarily exceeded.

The intended planning application would involve development within the Dundonald Wood SSSI. SSSIs are identified in the EIA Regulations as being ‘sensitive areas’ and the EIA Regulations in turn require that all developments within or adjacent to sensitive areas are Schedule 2 developments, requiring to be screened for the need for EIA.

The following discussion provides relevant information on the intended planning application to inform a systematic assessment as to whether the proposed development is likely to be EIA development. The checklist provided at Annex B to Circular 8/2007 has been completed and applied to the planning application to highlight potential areas of environmental impact arising from the proposed facility. The checklist is reproduced at Appendix A.

The checklist provides the opportunity to consider the characteristics of the proposed development in combination with its proposed location in order to identify the potential for interactions between the development and its environment and to therefore determine whether there are likely to be environmental effects.

Page 11: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 9 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

5.0 ENVIRONMENTAL TOPICS CONSIDERED IN THE SCOPING STUDY

5.1 Ecology and Biodiversity

The currently undeveloped parts of Hillhouse Quarry largely comprise an area of pasture which is currently utilised for the grazing of livestock (cattle and sheep). This area is considered to be of limited ecological value.

The undeveloped part also comprises part of the Dundonald Wood SSSI. At present the Dundonald Wood SSSI has an unfavourable nature conservation status.

Mineral extraction throughout the SSSI is already consented by the extant planning permission at the quarry, albeit not before 2014. However the intended planning application would rationalise the extent of SSSI to be occupied by quarrying and envisage developing within only 6.5ha of the 31ha designated site.

An ecological appraisal including site visit by an experienced ecologist has been carried out in order to inform the preparation of a Mitigation and Management Plan for the Dundonald Wood SSSI. The Mitigation and Management Plan has been funded by Hillhouse and has been developed in consultation with SNH.

The Mitigation and Management Plan is to be submitted to South Ayrshire Council for approval as envisaged by Condition 16 of The 1999 Decision. The implementation of the measures contained within the plan would be funded by Hillhouse and would bring about the positive management of the SSSI and the adjacent woodland so as to significantly improve the conservation of the SSSI in the longer term.

It is considered that potential impacts on the Dundonald Wood SSSI can be effectively regulated and mitigated through the existing planning controls contained in The 1999 Decision.

The only direct effect of the intended planning application on the Dundonald Wood SSSI would be to see parts of it being removed from late 2010 onwards as opposed to those works being put off until early 2014. Those effects are not considered to be significant.

5.2 Landscape and Visual Amenity

Quarrying at Hillhouse and at other localised operations is a long established feature in the local landscape. Hillhouse Quarry is in general terms relatively well screened from the local area by virtue of retained topography and established woodland around the flanks of the quarry.

The intended planning application would not alter the planned lateral extent of quarrying. The intended planning application will propose areas of currently undeveloped land being removed from late 2010 onwards as opposed to those works being put off until early 2014. Those effects are not considered to be significant.

5.3 Hydrology and Hydrogeology

The main interface between Hillhouse Quarry and the water environment currently is the management of collected rain and surface from the quarry.

Page 12: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 10 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

The depth of the extraction is limited to the current floor level by Condition 7. There will therefore be no change in the hydrological and hydrogeological regime at the quarry as a result of the intended planning application.

5.4 Noise

The aspects of development which could potentially give rise to noise impacts are:

• site preparation works, including soil stripping; • mineral extraction operations and transportation within the site; • mineral processing operations; and • transportation of minerals from the site by heavy goods vehicles.

All of the potential sources of noise impact listed above already take place at Hillhouse Quarry and are already accommodated within the environmental baseline for the local area.

In so far as the mineral processing operations and the transportation of minerals by HGV’s are concerned, there is no proposal to alter the characteristics of those existing activities.

The scope for any change to the environmental baseline from those operations is therefore limited and can reasonably be disregarded from further consideration.

Noise limits will continue to be regulated by Condition 9 of the extant planning permission.

5.5 Blasting

Blasting is used at Hillhouse Quarry to break and dislodge rock from quarry faces.

The potential environmental impacts of blasting include ground vibration, air overpressure, noise and dust at adjacent premises. Conditions 10 and 13 of the existing planning permission regulate blast events at the quarry in order to manage any potential impact.

Routine monitoring of quarry blasts demonstrates compliance with the limits set out in Condition 10 of the existing permission. The intended planning application will not present any variation to the nature of blasting undertaken at the quarry.

5.6 Traffic and Transportation

Hillhouse Quarry is accessed via a well laid out and formed junction from the A759. Condition 19 of the extant permission requires that the visibility splays at the junction are suitably maintained.

The intended planning application will not contain any proposal for a new quarry access or any proposal to alter the volume or nature of distribution of traffic that has been established for some considerable period of time.

5.7 Air Quality (Dust)

The primary potential impact on air quality from the continued working of Hillhouse Quarry is the risk of deterioration in local air quality as a result of wind blown dust.

The main sources of dust within the quarry are from the haulage of materials and from the processing and subsequent stocking of aggregates. There is also a limited potential for dust to be generated during the drilling of blast holes and the subsequent detonation of blasts.

Page 13: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 11 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

Each of the dust sources mentioned above are currently in operation at the Quarry and have not caused any significant levels of dust that have given rise to outstanding complaints. Generation and control of dust are regulated by Conditions 2, 3, 4, and 18 which make provisions for reducing dust generated by the movement of vehicles, and Condition 8 which controls dust emissions from plant.

There will be no additional dust sources from the haulage, processing or stocking of aggregates as all of those activities will continue on site in the same manner and employing the same mitigation measures as the existing operations.

5.8 Public Access

Core Path SA7 runs to the south and west of the Quarry boundary within the Dundonald Wood. A number of other footpaths have been created by Hillhouse in partnership with South Ayrshire Council that run through the wooded area.

The Mitigation and Management Plan proposed for Dundonald Wood SSSI will contain measures for the ongoing maintenance of footpaths and access to the woodland. It is not considered that there will be any significant impact to public access as a result of the intended application.

Page 14: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 12 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

6.0 CONCLUSION

Hillhouse Quarry Group intend to progress the extraction of minerals at Hillhouse Quarry without compliance with the time limit envisaged by Condition 6 of planning decision CE/5/2.

The intended planning application would provide for extractive operations to progress into currently undeveloped parts ahead of the current permissible start date of 28th January 2014. The company do not however intend to extend the quarry workings beyond that already permitted at the site

This report describes the nature of the intended planning application and the site setting with a view to establishing whether the proposed development constitutes EIA development. It is acknowledged that the intended planning application would be for a change to an existing Schedule 1 EIA development. It is not considered that the intended planning would necessarily be Schedule 1 EIA development in itself.

The intended planning application would be Schedule 2 development as defined in the EIA Regulations. A screening checklist has considered the potential for significant environmental impacts to occur through the intended planning application. Through that screening, it is not considered that the development requires the undertaking of an EIA.

Potential effects on the Dundonald Wood SSSI would be effectively managed through a Mitigation and Management Plan to be funded by Hillhouse as a requirement of the existing planning permission for the quarrying activities at the site.

Page 15: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 13 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

7.0 INVITATION TO COMMENT

If you wish to discuss matters contained in this report in greater detail prior to responding to the screening/scoping exercise, please contact Colin Hume at:

SLR Consulting Limited 4 Woodside Place Charing Cross Glasgow G3 7QF 0141 353 5037 [email protected]

Page 16: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 14 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

DRAWINGS

Page 17: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

NOTESNW E

S

1. NOTESREPRODUCED BY PERMISSION OF ORDNANCE SURVEY ONBEHALF OF HMSO. CROWN COPYRIGHT AND DATABASE RIGHT

ALL RIGHTS RESERVED. LICENCE NUMBER AI100012293OS DATA LICENCE EXPIRATION: NA - OS OPENDATA

1917_00002_18_HQ1_0 SITE LOCATION

HQ1

4 THE ROUNDALRODDINGLAW BUSINESS

PARK, GOGAREDINBURGH. EH12 9DB

T: 0131 335 6830F: 0131 335 6831

www.slrconsulting.com

JUNE 2010DateScale

1:25,000

HILL HOUSE QUARRYPLANNING APPLICATION

SITE LOCATION

LEGEND

QUARRY LOCATION

Page 18: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

A 7 8

A 78

A 759

A 759

A 759

OLD AUCHANS VIEW

KILNFORD CRESCENT

PARKTHORN VIEW

VERNON PLACE

DRIVEKILNFORD

DRYBRIDGE ROAD

OLD AUCHANS VIEW

WILSON

PLACE

COATS

PLACE

KILNFORD CRESCENT

AUCHANS AVENUE

Wa rd Bd y

Def

P Const &

UA Bdy

P Const &

UA Bdy

Def

Hil lhouse

LaundryCottages

8

West Lodge

Chap el hill Cottages

1

3

2

HillhouseStables

Parkthorn

Parkthorn Cottages

HillhouseLodge

Woodend Cottages

1

2

1

3

Hallyards

Conveyor

Hoppers

Conveyor s

Silos

4 5

14

18

44

32

33

35

4 7

11

3 8

3 2

Highlees

Tank

Dundonald HouseNursing Home

5

1

9

13

23

1

11

17

1

1 1

2

21

2 5

2 0

1 4

12

1

2

10

48

50

2

1

52

65

4 9

1

9

2

4 7

2

1 6

16

2

25

Pav

Garage

20

2

1 2

1

13

7

1 0

2

11 a

5

27

15

11

5 7

6 1

62

9

Shelter

PCs

3

9A

Vi si tor Centre

Kilnford Driv e

29

ETL

Track

ETL

FB

57.0 m

44.2 m

Dovecot Hill

TrackChapel Hill

Tank

Chapel(site of)

BM 45.87m

43.3 m

Mound

31.4 m

Sheepfol d

ETL

ETL

Mast

20.1 m

21.9 m

BM 31.17m

MP 6.25

SP

Shewalton Moss

15.8 m

Track

BM 14.61m

13.4 m

ETL

Kemp Law

Badger Brae

ConveyorConveyor

Path

Dun

Old Bank

Path (um)

Path (

um)

Chapel(site of)

Path

Hallyards Quarry(Whinstone)

Hoppers

18.6 m

Beech Wood

17.4 m

21.0 m

16.5 m

Path

(um)

Path (um)

Path (

um)

Auchans

Old Bank

Track

Old Bank

LBEl Sub Sta

DW

DW

FB

WB

Old Bank

103.3m

98.1 m

80.2 m

57.9 m

Path

Path

Path (um)

Hallyards Quarry(Whinstone)

80.8 m

77.4 m

Path (um)

Path (um)

Path

Path (um)

32.6 m

BM 35.36m

Path

Old Bank

Tennis Courts

Bow li ng Green

Path (um)

DW

Play ing Fi el d

DW

Castle Hill

Dundonald

Dundonald Castl e

El Sub Sta

Path

LB

Vi ewpoint Path

Ci stern

Gailes B u

rn

Drain

Drain

Issues

Issues

Drain

Issues

Drain

Drain

Drain

Drain

Gailes B u

rn

Issues

Merkland Loch

Spring

Well

Well

Springs

Spring

Drain

Pond

Sinks

Issues

Dundonald B urn

Drain

Drain

Spreads

Spreads

Issues

Issues

Issues

Issues

Drain

Dundonald B urn

Drain

0002

6827

9929

1446

2443

2560

4452

2873

4473

5568

00020002

3652

7448

8049

90557755

5360

6861

4072

3960

9168

0001

30704170

6176

7061

0156

0449

24450001

3346

3747

3430

5018

6506

0001

9086

4833

4566

3187

3518

2650

0001

0001

3509

2943

LP

LP

LP LP LP LP

LP

LP

LP

LP

LP

LP

LP

LP

RS

RS

RS

RS

RS

RS

RS

RS

RS

RS

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

TP

MH

EP

EP

EP EP

EP

P

P

PP

P

P

P

P

P

P

Stay

StayStayStayStay

Stay

Cu lvCu lv

Cu lvCu lv

Cu lv

Cu lv

Cu lv

Cu lv

Cu lv

Cu lv

Cu lv

Cu lv

IL

AV

MH

MH

KO

KO

RE

Erod

MO N

WLe v

WLe v

Tap

Tap

JBo x

JBo x

JBo x

1

3

4

5

6

8

2

1112

13

14

15

16

17

18

19

21

20

22

23

24

25

26

27

28

29

3031

32

33

34

35

72.473.4

72.9 73.1 73.072.9

73.1

73.7

73.4

73.2

71.8

70.268.0

65.4

65.1

65.7

66.9

70.7

71.9

73.2

82.1

80.8

79.9

80.7

82.4

80.980.9

83.7

86.5

84.8

82.2

81.4

82.0

82.1

82.7

80.3

77.2

70.4

62.9

62.9

71.0

69.1

76.2

79.6

80.980.9 82.5

83.3

85.5

85.4

83.7

82.0

81.7

82.8

84.4

85.6

84.9

84.7

85.3

83.4

82.3

81.9

82.6

84.3

84.8

81.581.6

84.1

83.1

82.0

82.1

81.8

82.1

83.0

81.6

81.9

81.5

81.4

82.1

80.9

80.8

81.0

80.9

79.9

80.2

80.5

79.5

78.9

79.1

79.3

79.2

78.8

78.175.3

75.9

76.2

76.8

74.6

74.6

73.0

71.7

74.4

72.1

72.7

72.7

70.7

69.0

63.6

63.3

63.2

63.4

63.9

65.1

63.4

63.3

63.5

65.7

67.8

71.0

70.4

69.0

68.0

68.2

67.4

68.2

68.5

68.4

71.2

73.2

73.7

73.4

72.5

73.5

74.8

71.8

72.2

74.5

73.2

73.6

75.1

76.4

79.7

80.1

79.7

79.178.0

78.7

78.9

79.3

77.5

61.9

63.1

61.7

62.2

65.0

66.966.8

67.2

69.5

72.4

73.2

71.1

72.872.1

67.3

68.6

71.8

72.4

71.6

71.8

71.6

72.2

72.973.9 74.0 73.8 73.8

74.6 74.8

74.3

74.2

76.1

76.9

77.176.7

76.076.577.2

78.3

78.377.9

78.7

78.5

77.9

78.8

80.4

80.5

80.280.080.179.6

79.2

81.181.7

81.3

84.6

84.0

82.9

81.782.1

83.0

83.8

82.8

83.3

82.9

82.6

83.0

82.7

82.7

83.3

83.0

81.8

83.0

83.5

82.7

83.6

83.2

82.9

82.2

81.2

80.6

81.8

82.9

81.9

81.8

81.4

80.5

81.5

81.2

83.283.2

84.5

81.6

81.2

81.6

85.6

87.0

84.1

81.7

80.8

84.2

87.9

86.2

82.5

80.6

81.3

80.0

78.7

78.0

79.9

85.4

86.9

87.5

86.9

88.1

84.3

82.1

76.2

73.8

73.4

73.8

70.6

68.6

67.7

68.069.9

74.0

74.7

75.4

72.8

69.2

71.6

75.8

77.0

74.5

72.5

78.7

83.6

81.6

79.2

78.3

82.1

81.4

20.5

21.3

21.6

23.425.0

24.0

24.2

24.2

27.6

27.9

26.8

27.5

27.326.6

26.5

26.1

25.7

26.6

26.1

25.8

24.8

24.2

23.6

23.9

24.5

24.9

24.4

25.4

25.6

25.2

23.8

22.6

22.7

22.4

22.0

22.4

22.4

22.5

24.1

26.5

25.0

23.922.6

23.723.8

22.4

21.7

24.6 25.124.7

24.7

21.5

21.9

22.5

22.0

21.4

21.7

22.1

22.4

22.3

20.4

20.4 21.0

21.220.9

20.6

20.220.2

20.6

20.1

18.819.5

18.9

20.1

20.1

20.1

20.220.2

27.9

34.8

35.9

38.139.4

39.7

39.5

39.7

24.0

24.0

24.4

24.2

24.0

23.8

21.6

36.7

21.0

20.2 20.0

19.1

18.8

17.9

17.819.5

24.8

29.7

35.3

35.6

36.3

36.6

38.2 39.8

40.0 39.9

39.9

39.9

39.9

39.6

40.0

40.1

39.7

39.7

40.0

39.6

39.840.1

39.5

40.8

41.4

42.1

39.4

38.2

38.1

37.0

50.8

55.6

39.8

40.1

56.9

57.1

56.6

56.9

45.2

56.8

31.3

31.1

25.5

24.5

24.3

22.0

21.5

27.5

24.5

24.7

25.4

22.4

56.4

50.1

36.7

32.421.0

21.0

28.426.9

24.7

21.1

19.9

20.0

21.0

21.8

21.221.8

20.8 21.4

21.0

20.4

20.4

20.9

22.6

21.3

22.023.0

22.3

22.6

21.4

21.3

21.3

20.7 19.4

20.0

41.4

48.7

50.0

55.6

50.2

53.2

54.7

54.5

65.5

64.9

62.0

59.2

54.237.3

37.3

37.0

36.2

36.2

36.2

37.3

37.5

37.7

37.5

37.3

37.3

38.0

37.8

37.3

37.2

37.0

36.7

36.6

35.6

35.7

36.1

36.8

38.8

40.4

42.0 48.5

36.9 38.0

37.3

37.2

37.337.3

37.0

36.2

36.6

36.6

36.1

36.2

36.2

36.3

37.3

36.7

36.8

36.537.1

37.2

81.1

89.7

92.4

97.1

98.6

68.3

58.1

58.3

58.056.8

56.9

57.3

56.4

60.9

60.4

60.3

59.8

59.5

59.4

59.5

58.8

58.7

57.9

72.3

68.8

65.7

67.2

69.1

69.2

69.7

71.3

74.3

78.980.6

81.7

83.0

83.4

83.1

81.8

81.6

80.4

82.2

82.4

83.8

80.2

79.278.0

77.0

59.6

59.8

59.3

56.8

57.5

59.7

60.3

61.3

61.7

63.0

64.7

43.9

33.4

32.4

32.6

30.7 30.1

23.2

19.6

18.1

20.1

19.5

19.319.4

19.619.4

19.620.3

20.421.2

19.6

23.0

25.4

27.2

26.8

28.127.1

27.528.8

30.531.0

29.7

27.8

21.7

23.2

23.8

25.526.9

28.2

27.8

30.030.6

32.833.3

34.0

27.2

29.3

31.434.2

33.4

36.6

40.243.6

44.2

39.8

42.842.1

40.9

40.8

32.4

33.6

40.9

41.043.5 40.5

40.7 43.8 42.9

40.3

40.4

43.142.1

43.5

43.0

42.9

42.7

41.1

43.8

43.7

41.4 42.4

42.5

42.0

43.3

43.8

43.6

42.3

42.3

43.4

42.142.4

43.243.3

42.8

43.8

43.9

42.4

39.0 39.0

39.1

40.0

39.6

50.6

47.8

47.7

47.9

47.5

48.6

51.2

52.1

47.5

40.8

38.540.6 41.5

41.8

40.9

40.6

37.5

38.4

38.5

40.7

40.3 41.6

39.7

41.3

41.3

55.4

27.6

26.9

25.6

23.8

25.0

25.4

25.6

25.7

25.8

25.6

25.4

25.6

25.6 25.7

24.8

24.8

24.0

23.8

24.9

79.6

81.7

84.6

87.2

83.5

82.7

86.9

87.0 84.6

78.6

75.8

75.3

81.4

86.1

86.9

84.8 82.7

77.9

88.5

88.3

87.4

85.8

81.4

79.5

71.1

69.8

86.6

85.8

83.2

83.1

81.8

67.5

64.9

67.1

64.6

65.0

87.0

76.5

75.4

74.1

72.8

70.1

70.168.2

67.9

66.4

65.971.4

76.6

76.983.4

83.6

81.8

79.4

76.5

81.6

82.2

78.6

74.3

75.8

66.0

67.2

67.1

65.965.9

67.2

69.9

70.4

71.8

70.5

70.9

72.8

73.570.8

68.8

66.967.4

64.965.1

63.465.3

63.863.8

63.8

63.162.7

64.6

62.9

61.561.362.6

76.5

68.2

59.259.1

59.7

57.7

57.7

57.257.6

54.955.156.3

52.7

53.8 52.9

52.4

57.4

62.2

61.9

65.0

65.6

74.575.6

77.2 75.6 74.173.1

72.9

72.4

73.473.4

71.071.2

71.4

71.4

71.6

72.672.1

71.5

72.4

71.5

72.4

71.471.471.4

71.8

71.3

71.4

71.0

71.1

70.8

71.0

70.8

71.7

53.2

52.7

53.0 52.052.1

47.747.9

49.4

49.350.3

48.248.5

47.647.6

45.7

46.7

46.3

44.541.5

47.0

20.7

20.3

20.7

21.320.7

21.4

22.7

23.7

23.3

22.1

22.8 23.224.3

23.3

24.4

24.6 27.3

27.326.5

26.2

20.6

22.6

22.2

21.0

21.818.0

18.1

17.9

17.9

19.3

18.7

17.9

17.8

17.5

17.7

17.9

19.417.6

17.7

17.3

18.4

17.7

19.5

19.7

21.223.123.3

25.8

25.9

26.5

27.8

28.1

28.7

26.9

26.5

26.2

26.1

26.9

29.7

31.1

34.0

36.2

34.036.2

28.7

34.2

34.334.9

32.8

29.529.7

27.0

25.3

24.6

25.9

22.2

20.5

17.6

19.117.9

18.3

18.1

18.2

17.6

18.0

18.1

18.2

17.4

19.8

18.917.6

18.3

17.5

18.217.6

18.3

17.6

17.6

17.9

17.7

18.0

18.1

17.8

17.8

18.2 18.6

20.7

20.7

21.0

18.4

18.318.6

17.818.318.3

19.1

20.6

20.4

52.6

53.1

53.2

52.4

50.4

49.9

48.9

47.3

46.2

45.6

44.3

41.2

40.0

40.2

41.1

41.1

42.2

42.0

43.243.2

43.3

45.4

45.9

46.5

44.5

43.3

47.3

46.8

46.4

46.0

45.1

48.3

48.6

46.946.8

47.6

47.2

48.7

48.7

50.5

50.7

52.6

52.6 53.2 57.0

46.5

44.1

45.1

45.5

43.4

42.242.2

43.5

45.144.4

46.7

42.4 42.8

42.0

41.3

40.9

41.041.7

43.0 44.3

45.3

37.3

39.0

37.6 38.3

38.8

40.7

39.1 40.9

41.1

42.6

43.444.3

46.745.5

42.8

41.540.9

40.8

39.2

39.1

39.1

38.7

39.1

38.7

38.6

37.8

37.2

37.036.7

36.6

36.5

36.0

35.6

35.4

35.634.6

35.7

35.434.7

35.8

35.7

36.736.9

36.9

34.732.3

30.4

30.3

31.031.0

37.3 35.9

37.0

36.3

36.0

36.7

38.8

38.7

42.8

36.4

36.1

37.0

35.6

35.7

43.2

40.9

40.0

36.9

37.1

37.2

72.7

81.4

82.8

83.5

83.0

82.8

84.5

85.1

87.5

85.8

86.1

86.2

84.7

84.8

83.486.9

82.481.5

80.678.6

73.9

76.079.5

80.377.3

72.273.3

79.182.5

76.7

82.0

81.5

80.4

50.8

52.0

47.0

42.6 43.1

44.2

53.7

54.3

54.3

55.155.1

54.7

54.3

54.5

54.0

53.5

53.5

53.8

53.7

53.6

53.6

52.8

52.8

53.053.3

51.4

51.4

51.6

51.450.3

49.7

49.8

49.9

49.3 49.6

47.6

48.9

48.2

47.4

47.7

46.4

46.0

46.044.6

44.942.7

42.1

39.3

39.2

38.6

37.7

38.0

40.140.6

40.2

40.6

41.7

56.6

56.0

51.9

51.3

70.9

75.875.6

78.4

79.2

81.6

87.0

87.7 86.9

90.7

90.7

93.0

91.8

95.193.6

96.1

99.098.5

101.3100.6

102.4

101.8

101.9102.7

98.6

99.9

99.0

99.0

99.5

98.7

98.898.4

98.297.8

93.695.3

87.0

76.9

77.4

82.8

83.2

83.1

90.9

93.5

87.1 89.7

88.7

88.0

89.2

87.0

87.3

87.6

87.3

87.0

87.3

87.2

86.8

82.7

85.383.4

82.3

83.9

82.8

81.5

81.5

85.3

87.3

77.8

82.8

86.7

86.8

87.7

86.9

82.9

82.1

84.7

83.7

86.3

85.5

83.4

83.8

82.1

85.5

82.9

84.1

86.1

86.6

89.888.3

89.4

86.1

86.386.4

85.283.2

74.7

76.7

75.1

73.6

74.275.0

71.871.2

71.0

69.2

70.5

66.5

65.9

66.8

62.7

62.461.9

59.758.8

56.7

58.4

56.9

57.2

35.0

28.6

19.3

19.2

18.5 17.5

17.218.6

18.117.3

17.718.2

18.6

17.5

18.917.4

18.517.5

17.6

18.7

18.2

19.0

19.3

19.6

19.9

19.2

19.7

21.0

21.4

19.8

22.9

23.022.5

21.8

23.2

22.9

21.7

21.7

23.1

21.622.7

27.1

26.1

25.124.1

22.2

22.5

21.7

19.6

20.2

20.2

20.2

20.6

20.7

21.0

21.0

21.2

21.9

25.5

25.4

26.1

26.8

25.2

25.3

25.2

24.1

24.3

22.4

20.9

21.223.1

24.1

24.0 23.0

23.6

20.3

19.2

23.6

22.5

22.523.4

24.0 23.7

23.3

24.0

23.8

23.7

24.0

22.823.6

24.4

23.924.3

24.4

24.7

25.1

26.8

28.729.1

30.6

30.7

31.6

31.932.0

33.0

33.6

33.935.0

34.235.0

34.2

33.6

33.0

32.5

29.8

28.4

27.4

29.1

44.444.1

45.0

44.6

42.5

45.0

53.0

53.3

58.2

61.0

63.1

58.6

51.4

59.6

60.1

62.062.2

63.5 63.8

67.0

71.2

69.7

70.7

66.1

67.9 68.8

71.3

69.7

70.2

76.573.8

70.7

71.0

67.2

65.2

62.161.7

61.3

60.8

62.0

65.4

64.4

56.8

56.7

57.3

60.1

58.4

54.9

54.1

55.9

55.153.5

56.5

56.0

55.0

51.4

47.6

46.946.8

44.6

38.9

60.2

58.8

55.3

55.7

56.9

55.5

55.8

57.1

55.5

55.7

57.5

59.9

57.8

58.0

57.2

56.1

53.3

52.8

52.0

53.4

53.7

53.7

54.2

55.1

54.654.7

54.7

54.554.8

55.3

55.2

57.6

57.0

53.6

47.2

45.8

57.4

58.2

57.7

57.2

57.7

57.856.6

56.7

54.6

52.1

50.7

45.5

44.6

39.1

38.7

38.1

37.1

42.3

53.6

53.4

50.2 38.9

38.5

40.840.8

46.0

53.9

53.8

53.753.6

55.9

57.1

57.3

56.5

42.3

54.7

54.7

54.9

54.3

54.7

53.8

54.3

55.8

47.845.8

42.039.2

41.1

41.440.2

38.6

38.5

41.9

42.0

42.8

66.1

65.0

63.0

74.1

56.0

55.5

58.8

50.5

45.6

31.6

32.0

32.8

33.3

34.7

33.5

34.9

42.0

43.5

43.3

37.634.0

32.9

14.9

15.8 14.7

16.516.1

14.816.2

16.1 14.6

15.0

16.3

14.8

13.4

13.413.4

13.4

13.4

13.4

13.4

14.623.9

25.6

30.4

30.2

34.9

36.1

35.9

38.234.1

37.738.2

21.1

13.3

13.4

13.4

13.4

16.3 16.1

16.416.0

14.6 15.3

15.515.4

15.9

16.1

15.3

15.1

15.1

14.5

14.4

14.9

15.1

15.1

15.1

16.5

15.2

15.1

15.2

19.1

20.520.7

22.0 21.3

18.9

18.6

18.018.9

18.0

22.2

21.318.9

25.925.7

25.9

24.6

22.3

20.3

20.3

22.4

20.3

19.9

17.1

20.3

15.3

15.316.2

17.3

17.5

25.6

25.5

22.9

21.7

20.0

19.4

19.5

19.1

19.0

19.1

19.8

22.2

23.2

25.2

23.0

22.0

22.4

19.2

19.5

19.7

19.7

19.4

21.1

17.316.1

15.8

14.315.7

18.4

18.218.1

17.8

17.918.6

18.417.6

18.317.5

18.018.7

14.9

14.814.7

14.8

14.8

14.815.3

15.2

17.8

17.817.9

18.1

18.4

21.2

33.1

29.0

28.4

68.4

63.2

61.0

61.2

61.8

62.1

57.8

54.7

53.4

52.7

53.4

23.4 23.3

23.3

23.7

24.0

24.1

24.2

24.2

24.224.2 24.3 24.0

23.9

24.8

24.0

24.1

24.8

24.5

22.5

23.7

23.0

23.4

23.7

24.4

26.6

29.4

31.5

31.7

29.4

32.8

32.232.0

32.2

31.531.2

31.7

32.5

32.5

34.832.6

33.2

33.6

34.0 33.7

34.7

35.5

37.5

38.2

37.3

38.1

37.3 36.6

61.2

62.7

64.4

40.0

39.9

39.9

39.9

40.0

40.1

40.1

40.2

41.2

42.5

44.3

45.6

46.2

47.7

49.0

27.0

23.8

25.8

24.4

24.7

24.3

24.1

20.9

24.2

22.2

22.6

32.3

30.6 30.6

29.7

28.628.6

27.3 27.3

33.4

30.0

32.3

27.8

29.0

30.2

31.3

31.8

36.5

41.5

40.842.4

46.3

46.3

47.9

46.3

34.7

17.9

17.9

17.917.6

17.7

17.6

24.8

23.9

23.122.6

21.4

20.0

19.719.0

19.3

21.020.3

21.5

22.3

21.0

22.721.920.6

22.3

22.822.6

22.8

23.1

23.2

23.7

24.8

25.6

29.4 25.9

26.4

28.1

29.8

30.3

21.5

20.120.0

20.1

21.6

21.5

19.6

19.6

19.6

19.2

18.3

18.5

18.4

18.718.5

18.918.9

19.519.3

19.3

19.2

19.1

26.0

22.3

23.4

25.5

28.2

19.4

19.2

19.6

28.2

28.228.2

24.7

24.1

23.0

20.3

46.4

23.4

23.4

23.4

17.6

17.6

17.6

20.5

26.0

18.3

18.3

34.5

14.914.1

12.9

12.5

12.4

12.511.6

11.411.6

11.711.811.5

11.611.611.812.1

12.312.4

12.7 13.2

12.6

12.5

12.2

12.212.0

11.8

11.812.0

11.8

11.812.012.0

11.911.911.711.8

11.6 11.811.7

12.3

14.4

18.1

17.116.6

21.120.4

19.519.0 21.4

19.6

19.9

19.5

19.6

19.5

20.9

24.2

23.3 26.5

24.725.2

24.4

16.417.7

15.7

16.415.4

15.2

14.5

13.6

13.9

17.6

17.7

18.9

19.0 19.9

19.019.6

19.1

18.0

15.9

15.9

17.4

18.1

18.9

18.7

19.1

19.2

19.2

19.2

19.2

19.1

18.818.9

19.0

18.7

17.7

18.9

19.1

19.2

19.3

18.5

16.7

17.0

16.0

15.7

14.4

13.8

14.8

17.3

21.5 21.9

21.1

21.2

21.6

22.021.8

22.322.3

22.7

22.6

22.7

23.0

23.3

24.0

24.4

24.6

24.2

22.9

22.9

19.6

24.0

25.1

25.6

26.1

27.0

27.3

25.6

25.4

25.018.6

20.620.7

20.5

20.2

20.0

19.8

19.7

20.5

20.5

20.5

20.4

20.1

19.619.512.

7

12.9

12.7

12.8

12.9

13.0

12.9

13.0

13. 1

13.213.0

12.913.013.

0

13.2

13.1

13.5

13.2

13.3

16. 1

16.3

25.225.2

20.9

84.5

86.787.448.2

48.8

45.3

46.3

50.0

51.9

52.7

22.3

23.8

21.4

21.2

24.0

23.1

22.8

22.6

22.4

22.8

24.6

23.7

23.4

26.5 25.1

25.0

24.7

25.3

25.0

24.1

23.3

22.9

22.4

23.5

32.633.233.8

32.3

33.0

31.5

31.4

31.330.9

26.4

21.0

20.5

19.219.2

20.4

20.6

19.7

20.4

20.8

20.6

18.8

18.5

21.8

22.0

21.4

21.7

21.9

25.2

24.9

26.8

21.5

21.2

20.9

21.1

20.9

20.7

19.5

20.2

18.3 21.0

21.1

21.321.1

15.617.0

17.8

22.1

22.2

22.5 23.0

25.0

25.2

22.4

22.8

26.9

27.0

36.4

27.6

27.0

27.3

33.1

26.7

26.3

19.4

31.8

32.0

31.8 31.9

32.7

34.334.2

35.2

33.4

31.8

30.8 32.5

30.6

31.4

18.4

15.5

35.8

43.0

44.0

30.6

23.2

37.9

40.1

40.2

42.3

42.1

41.2

40.9

42.4

40.5

40.8

40.3

43.0

42.4

33.9

34.9

35.6

34.8

36.8

37.2

35.1

35.6

38.3

38.5

18.2

18.3

18.3

18.2

18.3

18.2

18.7

18.3

18.3

18.2

18.1

17.9

17.9

18.2

18.2

19.3

18.9

19.019.0

18.9

18.9

18.5

18.4 18.3

18.3

18.3

18.7

18.9

19.3

19.6

20.8

21.6

21.3

20.2

20.8

21.8

22.0

21.6

19.5

19.6

20.4

18.9

18.4

18.4

18.2

23.3

22.8

23.3

23.623.8

23.5

23.5

57.557.1

56.7

56.7

56.5

57.5

57.457.8

58.2

58.4

57.3

57.8

57.6

57.157.1

56.9

61.6

61.5

61.9

60.8

60.4

60.3

60.1

59.1

62.0

42.6

44.8

51.1

49.6

50.450.1

49.0

49.349.5

49.4

48.4

47.3

47.0

37.5

37.5

38.1

38.2

37.9

37.1

69.3

69.6

69.3

68.8

67.4

67.3

67.1

72.3

70.2

72.2

73.4

74.5

75.0

76.775.1

91.9

95.6

98.6

98.599.0

90.3

41.0

41.2

41.4

41.6

42.3

41.8

43.7

42.5

41.0

41.3

44.8

45.642.6

41.7

41.3

41.043.9

46.7

44.7

45.4

47.9

51.4

51.450.4

55.6

53.2

54.6

51.4

54.2

57.1

53.0

41.8

40.8

40.2

41.4 48.4

47.8

48.5

49.3

37.5

36.935.0

34.3

34.2

35.8

45.5

48.7

35.4

35.6

35.4

35.5

35.6

36.9

18.4

18.3

40.0

45.0

45.0

44.6

60.5

62.1

63.3

64.3

64.7

63.666.4

70.0

71.4

72.6 67.6

67.5

66.2

66.6

66.7

69.1

82.0

82.7

82.1

59.8

58.9

58.5

58.8

58.559.4

57.9

56.7

69.8

71.8

72.2

71.9

71.0

69.0

84.4

87.4

89.1

86.9

85.2

94.4 96.3

99.2

62.2

63.4

61.9

62.0

60.9

59.9

60.6

55.5

53.6

52.3

40.5

39.3

41.8

46.0

48.2

38.1

39.2

42.9

46.3

42.3

43.7

45.2

70.1

70.7

71.6

69.9

68.567.6

70.6

67.2 67.6

71.4

73.4

72.9

75.6

77.6

76.1

79.5

76.5

74.4

86.8 90.2

93.9

90.4

91.589.3

89.9

90.5

89.5

87.8

85.6 87.8

92.2

94.8

100.6

101.2

100.9

100.5

97.6

99.5

98.984.0

82.7

82.3

87.6

34.4

34.9

35.3

35.4

36.2

19.1

66.4

67.5

69.1

70.7

73.0

75.6

77.6

78.5

82.0

84.5

85.6 86.2

83.8

84.3

84.6

83.0

80.7

78.6

81.4

82.9

83.3

81.9

82.3

82.3

80.7

77.9

74.5

73.0

76.3

79.4

81.3

81.9

81.0

81.3

80.8

78.2

74.6

72.6

71.7

75.4

78.3

80.2

81.1

80.8

81.1

81.0

80.8

80.3

78.1

79.0

75.7

75.1

73.5

71.6

71.3

71.072.5 73.4

69.268.8

62.6

57.2

64.7 67.5

70.072.1

75.2

78.0

78.7

79.6

80.0

80.7

80.6

80.1

77.2

73.7

72.4

72.2

75.3

78.079.3

80.1

59.4

58.5

G

Tank s

Offic e

Tank s

Wh eel wa sh

Tank s

Tank

Tank

Tank

Ta rma c

Qu ar ry Fl oo r

Pa stu re

Mars hMars h

Pa stu re

Pa stu re

Pa stu re

Pos t & W ire 1.0m Pos t & W ire 1.0m

Pos t & W ire 1.0m

Post &

Wire

1.0m

Pos t & W ire 1.0m

Pos t & W

ire 1.0m

Pos t & W ire 1.0m

Post &

Wire

1.0m

Post &

Wire

1.0m

Dry S tone Wal l

Dry S tone Wal l

Dry S tone Wal l

Dry S tone Wal l

Dry S to

ne Wal

l

Pos t & W ire 1.0m

Pos t & W ire 1.0mPos

t & Wire

1.0m

Pos t & W ire 1.0m

Post &

Wire

1.0m

Sl urr y

Lag o on

Sl urr y

Sl urr y

Sl urr y

Sl urr y

Sl urr y

Sl urr y

Sl urr y

Sl urr y

G G

G

G

RS

Tank

Tank

Offic e

Weighbridge

Work shop

Lab

Ma st

RS

RS

BT

MH

Pos t & W ire 1.0m

MHMH

Dry S tone Wal l

Pos t & W ire 1.0m

Post &

Wire

1.0m

Post &

W ire 1

.0m

Tre es

Ca nteen

Offic e

Shed

A 759

Ta rma c

Tarma c

GMH

MHMH

MH

MH

MH

MH

MH

MH

MH

MH

Wo rk sho p

Wo rk sho p

Wo rk sho p

Wo rk sho p

Ha u l R oa d

Ha u l R oa d

Ha ul R

oa d

Ha u l R oa d

Hau l

R oa d

Ha u l R oa d

Ha u l R oa d

Ha u l R oa d

Ha ul R

oa d

Ha ul R

oa d

Ha u l R oa d

Ta rma c

Hau l R oa d

Hau l

R oa d

Ha u l R oa d

Ha u l R oa d

Ha u l R oa d

Ha u l R oa d

Ha u l R oa d

Ha u l R oa d

MH

MH

MH

MH

MH

Lag o on

66 .0

68 .0

68 .0

70 .0

70.0

72 .0

72.0

72 .0

74 .0

74.0

74 .0

74 .074 .0

74.0

74.0

74.0

76 .0

76.0

76 .0

76 .076 .0

76.0

76.0

76.0

82 .0

82 .0

82 .0

82.0

78.080 .082 .

0

82.0

62.0

66.0

66.0

66.0

64.0

64.0

80 .0

80 .0

80 .0

80 .0

80 .0

80.0

80.0

78 .0

78.0

78 .0

78 .078 .0

78.0

78.0

78.0

30.0

30 .0

30 .0

30 .0

30 .0

30.0

30.0

72 .072 .072 .0

72.0

72.0

72.0

92 .0

90.0

90.0

88 .0

88.0

86 .0

86.0

86.0

84 .0

84 .0

84.0

80 .082 .0

78 .0

38.0

38 .0

38.0

38.0

38 .0

38 .0

38 .0

38.0

38.0

38.0

38.0

36.0

36.0

36.0

36.0

36.0

36 .0

36 .0

36 .0

36.0

36 .0

36.0

44.0

56 .0

56 .0

56 .0

56.0

56.0

56 .0

56.0

56.0

56.0

56.0

56.0

56 .0

56 .0

54 .0

54 .0

54 .0

54.0

54.0

54.0

54.0

54 .0

54.0

54.0

54 .0

54 .0

54.0

50 .0

50 .0

50 .0

52 .0

52 .0

52 .0

48.0

48 .0

32 .0

32 .0

32 .0

32 .0

32.0

32.0

34 .0

34 .0

34 .0

34 .0

34.0

34.0

40.0

40.0

40.0

40.0

40 .0

40 .0

40 .0

40.0

40 .0

40.0

40.0

40.0

50.0

50.0

50.0

50.0

50.0

50 .0

50.0

44.0

44.0

44.0

44 .0

44.0

44 .0

44 .0

42.0

42.0

42.0

42.0

42.0

42 .0

42.0

42.0

48.0

48.048.0

48.0

48.0

48.0

48.0

48 .0

46.0

46.0

46.0

46.0

46 .0

46.0

46.0

46 .0

52.0

52.0

52.0

52.0

52 .0

52 .0

52.0

32 .030 .0

30 .0

28 .0

28 .0

26 .0

26 .0

24 .0

24 .0

24 .0

20.0

20.0

20.0

20.0

20 .020 .0

20 .0

14.0

14.0

14.0

14.0

12.0

12 .0

16.0

16.0

16.0

16.0

16.0

18.0

18.0

18.0

20.0

20.0

20.0

20.0

22.024.0

22.0

22.0

22.0

22.0

22.0

22.0

22.0

22 .0

22 .0

22 .0

24.0

24.0

24.0

24.0

24.0

24.0

24.0

46.0

44.0

42.0

40.0

40.0

38.0

38 .0

36.0

36.0

34.0

34.0

34 .0

34 .0

32.0

32.0

32.0

32 .0

32.0

32.0

30.0

30.0

30.0

30.0

30.0

28.0

28.0

28.0

28.0

28 .028.0

28.0

28.0

28 .0

28.0

28 .0

28.0

28 .0

28 .0

28 .0

28 .0

28.0

28.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26.0

26 .0

26 .0

26 .0

26.0

26.0

48 .0

86 .0

84 .0

84.0

84 .0

82 .0

82.0

82.0

82.0

46 .0

64.0

64.0

64.0

64.0

64 .0

64.0

64.0

62.0

62.0

62 .0

62 .0

62 .0

62 .0

60.0

60.0

60.0

60.0

60.0

58.0

58.0

58.0

58.0

58.0

58 .0

58.0

58.0

58.0

58 .0

70.0

70.0

70.0

70.0

70.0

70.0

70.0

70.0

68.0

68.0

68.0

68 .0

68.0

68.0

68.0

66.0

66.0

66.0

66.0

72.0

72.0

72.0

72.0

72.0

72.0

74.0

74.0

74.0

74.0

74.0

74.0

76.0

76.0

76.0

76.0

76.0

78.0

78.0

78.0

80 .0

80.0

80.0

56 .0

82 .0

82 .0

82.0

82.0

82.0

84.0

84.0

84.0

84 .0

84 .0

84.0

86.0

86.0

86 .0

86.0

24 .0

24 .0

24 .0

24 .0

24 .0

24 .0

24.0

24.0

24.0

24.0

24.0

24.0 24.0

24 .0

24 .0

22 .0

22 .0

22 .0

22 .0

22.0

22.0

22.0

22.0

22.0

22.0

22.0

22.0

22.0

22.0

22 .0

24.0

20.0

20 .0

20 .0

20 .0

20.0

20.0

20.0

20 .0

20.0

20 .0

20.0

20.0

18.0

26 .0

26 .0

24 .0

24 .0

22 .0

22 .0

30.0

30 .0

32.0

32 .0

34.0

34 .0

20 .0

56.0

42 .0

42 .0

42.0

42.0

42 .0

44 .0

44.0

44 .0

42 .0

42 .0

46 .0

46.0

48 .0

48.0

50.0

52.0

40 .0

18.0

18.0

18 .0

18.0

18 .018 .0

18.0

70 .0

18 .0

18.0

18.0

18 .0

18.0

86 .0

86.0

88.0

86 .0

42.0

26.0

24.0

58 .0

58.0

58.0

56.016 .0

16.0

16.0

16 .0

36 .0

38.0

26.0

26.0

28.0

42.0

38.0

48.0

48 .0

22.0

88.0

88.0

24 .0

22.0

22.0

36.0

10 2 .0

18.0

18.0

18.0

18 .0

44.0

42.0

24.0

18.0

18 .0

18 .0

38.0

38.0

56.0

102.0

56 .0

16.0

16.0

42 .0

68.0

10 0 .0

82.0

NW E

S

REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ONBEHALF OF HMSO. CROWN COPYRIGHT AND DATABASE RIGHT

ALL RIGHTS RESERVED. LICENCE NUMBER AI100012293OS DATA LICENCE EXPIRATION: SUPPLIED BY CLIENT

1917_00002_18_HQ2_0 SITE BOUNDARIES

HQ2

4 THE ROUNDALRODDINGLAW BUSINESS

PARK, GOGAREDINBURGH. EH12 9DB

T: 0131 335 6830F: 0131 335 6831

www.slrconsulting.com

JUNE 2010DateScale

1:10,000

HILLHOUSE QUARRYEIA SCREENING

PLANNING APPLICATION AREAS

LEGEND

ESTATE BOUNDARY

EXTRACTION CURRENTLY CONSTRAINED TO COMBINED EXTENT OF BLUE AND YELLOW AREAS FROM 1999 DECISION (77.6HA)ANTICIPATED FINAL EXTENT OF OPERATIONS (126.4HA)

FURTHER AREAS TO BE DEVELOPED PRIOR TO EXPIRY OF 15 YEAR CONSTRAINT (48.2HA)

Page 19: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 15 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

APPENDIX A

SCREENING CHECKLIST

Page 20: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 16 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

1 CHARACTERISTICS OF THE DEVELOPMENT Yes/no Briefly describe

(a) Size of the development

Will the development be out of scale with the existing environment?

No

The intended removal of Condition 6 of Planning Permission CE/5/2 will not introduce any new development to the existing environment.

Will it lead to further consequential development or works ( e.g. new roads, extraction of aggregate, provision of new water supply, generation or transmission of power, increased housing and sewage disposal)?

No

The Quarry will continue to operate as it does currently and will utilise the access roads and other plant currently in use.

(b) Cumulation with other development

Are there potential cumulative impacts with other existing development or development not yet begun but for which planning permission exists?

No

The existing quarry operations at Hillhouse Quarry already coexists with Hallyards Quarry.

The planning application will not itself result in any new development.

Should the application for this development be regarded as an integral part of a more substantial project? If so, can related developments which are subject to separate applications proceed independently?

Yes

The quarry development is permitted under planning permission CE/5/2 – there are no other related developments proposed.

(c) Use of natural resources

Will construction or operation of the development use natural resources such as land, water, materials or energy, especially any resources which are non-renewable or in short supply?

• land (especially undeveloped or agricultural land)? • water? • minerals? • aggregates? • forests and timber? • energy including electricity and fuels? • any other resources?

No

The proposed removal of Condition 6 will instead make provision for the release (as opposed to consumption) of additional mineral reserves sooner than currently permitted.

Page 21: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 17 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

(d) Production of waste

Will the development produce wastes during construction or operation or decommissioning?

• spoil, overburden or mine wastes? • municipal waste (household and/or commercial)? • hazardous or toxic wastes (including radioactive)? • other industrial process wastes? • surplus product? • sewage sludge or other sludges from effluent treatment? • construction or demolition wastes? • redundant machinery or equipment? • contaminated soils or other material? • agricultural wastes? • any other solid wastes? • liquid or solid wastes in suspension?

Yes

During extraction a quantity of mineral wastes will be generated. However, the operation of the Quarry will continue as currently permitted and the proposed variation to Condition 6 will not increase the quantity of mineral wastes generated.

(e) Pollution and nuisances

Will the development release pollutants or any hazardous, toxic or noxious substances to air?

Emissions from:

• combustion of fossil fuels from stationary or mobile sources? • production processes? • materials handling including storage or transport? • construction activities including plant & equipment? • dust or odours from handling of materials including construction

materials, sewage & waste? • incineration of waste? • burning of waste in open air ( e.g. slash material, construction

debris)? • any other sources

No

Fugitive dust is currently regulated by a range of planning conditions. Dust is controlled by wheel washing (Condition 2), sheeting of loads (Condition 3), the cleaning of mud from the access road (Condition 4), dust collection equipment on plant (Condition 8) and dust suppression measures (Condition 11).

Is there a potential risk from:

• leachates? • Escape of wastes or other products/by-products that may

constitute a contaminant in the environment?

No

Current water management and treatment methods would be maintained. Settlement lagoons are used to ensure water used in the processing operations is cleaned of suspended solids.

Will the development cause noise and vibration or release of light, heat energy or electromagnetic radiation?

• from operation of equipment e.g. engines, ventilation plant, crushers?

• from industrial or similar processes? • from blasting or piling?

Yes

The Quarry will continue to operate as currently permitted.

Blasting, plant and vehicles would

Page 22: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 18 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

• from construction or operational traffic? • from lighting or cooling systems? • from sources of electromagnetic radiation (effects on nearby

sensitive equipment as well as people)? • from any other sources?

give rise to noise and vibration. Noise and vibration are regulated by Conditions 9 and 10, respectively.

(f) Risk of accidents, having regard in particular to substances technologies used

Will there be a risk of accidents during construction or operation of the development which could have effects on people or the environment?

• from explosions, spillages, fires etc from storage, handling, use or production of hazardous or toxic substances?

• from events beyond the limits of normal environmental protection e.g. failure of pollution control systems?

• from any other causes? • could the development be affected by natural disasters causing

environmental damage ( e.g. floods, earthquakes, landslip, etc)?

No

The Quarry would continue to operate as currently permitted. A health & safety management plan is in place.

Will the development involve use, storage, transport, handling or production of substances or materials which could be harmful to people or the environment (flora, fauna, water supplies)?

• use of hazardous or toxic substances ? • potential changes in occurrence of disease or effect on disease

carriers ( e.g. insect or water borne diseases)? • effect on welfare of people ( e.g. change of living conditions) • effects on vulnerable groups ( e.g. the elderly)?

No

(Other characteristics: potential physical changes (topography, land use, changes in waterbodies etc) from construction, operation or decommissioning of the development

• permanent or temporary change in land use, landcover or topography including increases in intensity of land use?

• clearance of existing land, vegetation & buildings? • Peat land disturbance and/ or degredation leading to; carbon

release, damage to habitats, affecting land stability or hydrology? • creation of new land uses? • pre-construction investigations e.g. boreholes, soil testing? • construction or demolition works? • temporary sites or housing for construction workers? • above ground buildings, structures or earthworks including linear

structures, cut & fill or excavations? • underground works including mining or tunnelling? • reclamation works? • dredging? • coastal structures (seawalls, piers)? • offshore structures? • production and manufacturing processes? • facilities for storage of goods or materials? • facilities for treatment or disposal of solid wastes or liquid

effluents?

Yes

As per the existing planning permission for Hillhouse Quarry, the currently undeveloped parts would be changed from its current land use (grazing & woodland) to quarrying. The intended planning application would result in those changes occurring prior to 2014, as currently permitted.

No new transport or quarry infrastructure or plant other than that permitted by planning consent reference CE/5/2 is proposed.

The development of the Site involves removal of a small part of the Dundonald Woodland SSSI. A

Page 23: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 19 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

• facilities for long term housing of operational workers? • new road, rail or sea traffic during construction or operation? • new road, rail, air, waterborne or other transport infrastructure

including new or altered routes and stations, ports, airports etc? • closure or diversion of existing transport routes or infrastructure

leading to changes in traffic movements? • new or diverted transmission lines or pipelines? • impounding, damming, culverting, realignment or other changes to

the hydrology of watercourses or aquifers? • stream crossings • abstraction or transfers of water from ground or surface waters? • changes in waterbodies or the land surface affecting drainage or

run-off? • transport of personnel or materials for construction, operation or

decommissioning? • long term dismantling or decommissioning or restoration works? • ongoing activity during decommissioning which could have an

impact on the environment? • influx of people to an area either temporarily or permanently? • introduction of alien species? • loss of native species or genetic diversity? • any other changes?

Mitigation and Management Plan has been developed and agreed with SNH as envisaged by Condition 16 of the extant consent.

2 LOCATION OF THE DEVELOPMENT

(a) Existing land use

Are there existing land uses on or around the location which could be affected by the development, e.g. homes, gardens, other private property, industry, commerce, recreation, public open space, community facilities, agriculture, forestry, tourism, water catchments, functional floodplains, mining or quarrying?

Yes

Residential properties are located within approximately 800m of the Quarry. The intended application does not constitute a new proposal and therefore the effects of the development on surrounding land uses are small.

Are there any areas on or around the location which are occupied by sensitive land uses e.g. hospitals, schools, places of worship, community facilities, which could be affected? No

Is the development located in a previously undeveloped area where there will be loss of greenfield land?

Yes

The Site has not previously been developed. However the development of this area is already permitted by planning consent CE/5/2. The intended planning application would result in the development of those areas prior to 2014, as is currently permitted.

(b) Relative abundance, quality and regenerative capacity of natural resources in the area

Page 24: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 20 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

Are there any areas on or around the location which contain important, high quality or scarce resources which could be affected by the development?

• groundwater resources • surface waters • forestry • agriculture • fisheries • tourism • minerals

Yes

Approximately 6.5ha of the 31ha Dundonald Wood SSSI would be lost through the proposed quarrying operations in the eastern area of the site.

Planning consent CE/5/2 permits mineral extraction within the whole of the Dundonald Wood SSSI.

A Mitigation and Management Plan has been produced in consultation with SNH and as envisaged by Condition 16 of the extant planning consent reference CE/5/2.

Potential effects on the SSSI can be effectively managed through the Mitigation and Management Plan.

(c) Absorption capacity of the natural environment

Are there any areas on or around the location which are protected under international or national or local legislation for their ecological, landscape, cultural or other value, which could be affected by the development?

Yes

See above re the Dundonald Wood SSSI.

Are there any other areas on or around the location which are important or sensitive for reasons of their ecology

• wetlands, watercourses or other waterbodies • the coastal zone • mountains, forests or woodlands • nature reserves and parks

No

(except with reference to Dundonald Wood SSSI above)

The majority of the currently undeveloped parts is used for grazing cattle and/or sheep and has limited ecological value. There are no anticipated impacts on any ecological resource outwith the site.

Are there any areas on or around the location in which species and habitats of Local Biodiversity Action Plan importance are present?

Yes

The planning application would not result in any new effects on those features and the Mitigation and Management Plan envisaged by Condition 16 of the existing planning permission for the site would effectively mitigate any such effects on the habitats etc. of the Dundonald Wood SSSI and adjacent woodland.

Page 25: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 21 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

Are there any areas on or around the location which are used by protected, important or sensitive species of fauna or flora e.g. for breeding, nesting, foraging, resting, overwintering, migration, which could be affected?

Yes

There are a number of mature trees on the Site which will need to be removed to allow works to proceed. An ongoing assessment of the trees as part of the Mitigation and Management Plan would be carried out prior to any works taking place.

The majority of the site is regularly disturbed by grazing livestock and is considered to have limited scope as suitable habitat for protected species.

Are there any inland, coastal, marine or underground waters on or around the location which could be affected?

No

The intended planning application does not contain any proposal for new or extended workings beyond those already consented.

Are there any groundwater source protection zones or areas that contribute to the recharge of groundwater resources?

No

The intended planning application does not contain any proposal for new or extended workings beyond those already consented.

Are there any areas or features of high landscape or scenic value on or around the location which could be affected?

No

The intended planning application does not contain any proposal for new or extended workings beyond those already consented.

Are there any routes or facilities on or around the location which are used by the public for access to recreation or other facilities, which could be affected?

No

Part of Core Path SA7 and other informal footpaths and trails pass through Dundonald Wood. These will continue to be available throughout the proposed development.

Are there any transport routes on or around the location which are susceptible to congestion or which cause environmental problems, which could be affected?

No

Output from the Quarry and vehicle movements will not alter as a result of the intended application. In addition, the routing and traffic distribution will remain the same.

Is the development in a location where it is likely to be highly visible to many people? No

Page 26: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 22 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

The intended planning application does not contain any proposal for new or extended workings beyond those already consented.

Are there any areas or features of historic or cultural importance on or around the location which could be affected?

No

It is not anticipated that historic or cultural heritage features will be directly affected by the intended planning application.

The intended planning application does not contain any proposal for new or extended workings beyond those already consented.

Are there any areas on or around the location which are already subject to pollution or environmental damage e.g. where existing legal environmental standards are exceeded, which could be affected?

No

There are no known areas of pollution or environmental damage.

The intended planning application does not contain any proposal for new or extended workings beyond those already consented.

Is the location of the development susceptible to earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions e.g. temperature inversions, fogs, severe winds, which could cause the development to present environmental problems?

No

Page 27: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 23 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

CHECKLIST OF CRITERIA FOR EVALUATING THE SIGNIFICANCE OF ENVIRONMENTAL EFFECTS

The checklist below is for use in conjunction with the Screening Checklist in the first part of this Annex. It is based on the third section (Characteristics of the Potential Impact) of the 'Selection Criteria for Screening Schedule 2 Development' in Schedule 3 to the EIA Regulations. It is designed to help in deciding whether EIA is required based on the characteristics of the likely impacts of the development.

The Screening Checklist provided a list of questions to help in identifying where there are potential interactions between a development and its proposed location. The checklist below is designed to helping deciding whether those interactions are likely to be significant.

The following questions can be asked for each 'Yes' answer in the Screening Checklist, and the conclusion and reasons noted against the relevant answer. The questions are designed so that a 'Yes' answer will generally point towards the need for EIA and a 'No' answer towards EIA not being required.

CHARACTERISTICS OF THE POTENTIAL IMPACT

(Disturbance to Dundonald Wood SSSI)

Yes/no Briefly describe

(a) Extent of the impact

Will the effect extend over a large area?

No

The area of potential influence is anticipated to be limited. A Mitigation and Management plan has been developed in consultation with SNH.

Will many people be affected?

No

Informal recreation across the Dundonald Wood SSSI would be maintained as part of the Mitigation and Management Plan Proposed.

(b) Transboundary nature of the impact

Will there be any potential for transboundary impact? (nb. Development which has a significant effect on the environment in another Member State is likely to be very rare. It is for the Scottish Ministers to consider whether there is likely to be such an effect in each case).

No

(c) Magnitude and complexity of the impact

Will there be a large change in environmental conditions? No

The Dundonald Wood SSSI has been assessed as having an unfavourable

Page 28: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 24 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

declining nature conservation status. Although a small proportion of the SSSI will be lost to quarrying operations the overall management of the SSSI will be improved. In the absence of management it is likely that the site would continue to deteriorate.

Will the effect be unusual in the area or particularly complex? No

Will many receptors other than people (fauna and flora, businesses, facilities) be affected?

Yes

The removal of small areas of the SSSI will affect the flora and fauna of the site, however an ecological assessment has concluded that this impact will not be significant.

Will valuable or scarce features or resources be affected? No

Is there a risk that environmental standards will be breached? No

Is there a risk that protected sites, areas, features will be affected?

No

No other protected sites, areas or features other than described above will be affected.

(d) Probability of the impact

Is there a high probability of the effect occurring? Yes

Planning permission has already been granted for quarrying at the site.

Is there a low probability of a potentially highly significant effect?

Yes

The area of the SSSI affected is relatively small and the implementation of a Mitigation and Management plan may well lead to an overall positive affect on the nature conservation status of the designated site.

(e) Duration, frequency and reversibility of the impact

Will the effect continue for a long time? Yes

Page 29: Hillhouse Quarry, Dundonald Environmental Impact ... · The Quarry is located on the outskirts of Dundonald, approximately 4km north-east of Troon. ... primary feed hopper through

Hillhouse Quarry, Dundonald 25 413-01917-00002 EIA Screening and Scoping Report July 2010

SLR

The removal of the small area of the SSSI is permanent.

Will the effect be permanent rather than temporary? Yes

Will the impact be continuous rather than intermittent? Yes

If intermittent, will it be frequent rather than rare? N/A

Will the impact be irreversible? Yes

Will it be difficult to avoid or reduce or repair or compensate for the effect?

No

The effect can be mitigated by improving the management of the remaining SSSI and increasing the nature conservation status.


Recommended