Historically Underutilized Business ( HUB) Subcontracting Plan (HSP) Requirements

Date post: 30-Dec-2015
Category:
Upload: lavinia-augustus
View: 19 times
Download: 0 times
Share this document with a friend
Description:
Historically Underutilized Business ( HUB) Subcontracting Plan (HSP) Requirements. Agenda Topics. RFP Section HUB Participation Requirements HSP Development and Submission Requirements HSP Assistance Post Award HUB Requirements. - PowerPoint PPT Presentation
Popular Tags:
50
Historically Historically Underutilized Business Underutilized Business ( ( HUB) Subcontracting Plan HUB) Subcontracting Plan (HSP) Requirements (HSP) Requirements
Transcript
Page 1: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

Historically Underutilized Historically Underutilized BusinessBusiness ( (HUB) HUB)

Subcontracting Plan (HSP) Subcontracting Plan (HSP) RequirementsRequirements

Page 2: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

22

Agenda TopicsAgenda Topics

• RFP Section HUB Participation RFP Section HUB Participation RequirementsRequirements

• HSP Development and Submission HSP Development and Submission RequirementsRequirements

• HSP AssistanceHSP Assistance

• Post Award HUB RequirementsPost Award HUB Requirements

Page 3: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

33

• Highlights the HSP Development and Highlights the HSP Development and

Submission Submission Requirements Requirements

• Responses that do not include a completed Responses that do not include a completed

HSP HSP shall be rejected pursuant to the Texas shall be rejected pursuant to the Texas

Government Government Code §2161.252(b).Code §2161.252(b).

• HUB Category and Participation GoalHUB Category and Participation Goal

RFP Section Historically Underutilized RFP Section Historically Underutilized

Business Participation RequirementsBusiness Participation Requirements

Page 4: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

44

• Potential Subcontracting Opportunities Potential Subcontracting Opportunities

• Using theUsing the Centralized Master Bidders List and Centralized Master Bidders List and

HUB DirectoryHUB Directory

• Vendor Intends to SubcontractVendor Intends to Subcontract

• Self PerformanceSelf Performance

RFP Section Historically Underutilized RFP Section Historically Underutilized

Business Participation RequirementsBusiness Participation Requirements

Page 5: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

55

HSP Development and HSP Development and SubmissionSubmission Requirements

• HSP Methods;HSP Methods;

• Quick ChecklistQuick Checklist

Page 6: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

66

If HSP is inadequate, response will be rejected

HUB GOALS

Special reminders and

instructions

HSP Information Page

Special reminders and instructions will be included by

the HUB Program Office, if applicable.

Page 7: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

77

HUB Participation Requirements

HSP MethodsHSP Methods

Page 8: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

88

METHOD I

If all (100%) of your subcontracting opportunities will be performed using only HUB vendors, complete the following in the HSP:

• Section 1 – Respondent and Requisition Information (Page 1);

• Section 2 a. – Yes, I will be subcontracting portions of the contract (Page 2);

• Section 2 b. – List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to HUB vendors (Page 2 and the continuation sheet as needed);

• Section 2 c. – Yes, I will be using only Texas certified HUBs to perform all of the subcontracting opportunities listed (Page 2);

• Section 4 – Affirmation that all information and supporting documentation submitted is true and correct (Page 3); and,

• HSP GFE Method A (Attachment A) – Complete this attachment for each subcontracting opportunity (Page 1 of 1).

Page 9: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

99

Respondent and Requisition Information

HSP Information Page

Page 10: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1010

Company Name and Requisition #

SubcontractingIntentions:Complete Section 2-a; Yes, I will be subcontracting portions of the contract.

Page 11: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1111

Complete Section 2-c; Yes if you will be using only HUBs to perform all Subcontracting Opportunities in 2-b.

Complete Section 2-b; List all the portions of work you will subcontract, and indicate the % of the contract you expect to award to all HUBs.

Page 12: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1212

Section 4; Affirmation

Signature Affirms that Information Provided isTrue and Correct.

Page 13: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1313

Complete this attachment (Sections A-1 and A-2) and List Line # and Subcontracting Opportunity.

HSP GFE Method A (Attachment A)

HUB Subcontractor Selection for this Subcontracting Opportunity

Reminders: Notice to subcontractors and HHSC.

Page 14: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1414

METHOD II

If any of your subcontracting opportunities will be performed using HUB protégés, complete the following in the HSP:

• Section 1 – Respondent and Requisition Information (Page 1);

• Section 2 a. – Yes, I will be subcontracting portions of the contract (Page 2);

• Section 2 b. – List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to HUB vendors (Page 2 and the continuation sheet as needed);

• Section 4 – Affirmation that all information and supporting documentation submitted is true and correct (Page 3); and,

• HSP GFE Method B (Attachment B) – Complete Section B-1, Section B-2, and Section B-4 only for each subcontracting opportunity as (Page 1 of 2).

Page 15: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1515

Respondent and Requisition Information

HSP Information Page

Page 16: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1616

Company Name and Requisition #

SubcontractingIntentions:Complete Section 2-a; Yes, I will be subcontracting portions of the contract.

Page 17: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1717

Skip Sections 2-c and 2-d.

Complete Section 2-b; List all the portions of work you will subcontract, and indicate the % of the contract you expect to award to HUB Protégés.

Page 18: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1818

Section 4; Affirmation

Signature Affirms that Information Provided isTrue and Correct.

Page 19: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

1919

HSP GFE Method B (Attachment B)

Complete Sections B-1;

B-2 only for each HUB Protégé subcontracting opportunity.

Page 20: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2020

HSP GFE Method B (Attachment B)

List the HUB Protégé(s)

Page 21: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2121

METHOD III

If you are subcontracting with HUBs and Non-HUBs, and the aggregate percentage of subcontracting with HUBs, holding an existing contract with HUBs for 5 years or less, which meets or exceeds the HUB Goal identified in the solicitation, complete the following in the HSP:

• Section 1 – Respondent and Requisition Information (Page 1);

• Section 2 a. – Yes, I will be subcontracting portions of the contract (Page 2);

• Section 2 b. – List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to HUB vendors (Page 2 and the continuation sheet as needed);

• Section 2 c. – No, I will not be using only Texas certified HUBs to perform all of the subcontracting opportunities listed (Page 2);

Page 22: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2222

METHOD III (cont.)

If you are subcontracting with HUBs and Non-HUBs, and the aggregate percentage of subcontracting with HUBs, holding an existing contract with HUBs for 5 years or less, which meets or exceeds the HUB Goal identified in the solicitation, complete the following in the HSP (cont.):

• Section 2 d. – Yes, the aggregate expected percentage of the contract you will subcontract with Texas certified HUBs, which you have a contract in place for five (5) years or less, meets or exceeds the HUB goal in the solicitation (Page 2)

• Section 4 – Affirmation that all information and supporting documentation submitted is true and correct (Page 3); and,

• HSP GFE Method A (Attachment A) – Complete this attachment for each subcontracting opportunity (Page 1 of 1).

Page 23: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2323

Respondent and Requisition Information

HSP Information Page

Page 24: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2424

Company Name and Requisition #

SubcontractingIntentions:Complete Section 2-a; Yes, I will be subcontracting portions of the contract.

Page 25: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2525

Complete Section 2-c; No to using only HUBs to perform all Subcontracting Opportunities in 2-b.

Complete Section 2-b; List all the portions of work you will subcontract, and indicate the % of the contract you expect to award to HUBs and Non-HUBs.

Page 26: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2626

Complete Section 2-d; Yes, to the Aggregate % of the contract expected to be subcontracted to HUBs to meet or exceed the HUB goal, which you have a contract agreement in place for five (5) years or less.

Page 27: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2727

Section 4; Affirmation

Signature Affirms that Information Provided isTrue and Correct.

Page 28: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2828

Complete this attachment (Sections A-1 and A-2) for each subcontracting opportunity.

HSP GFE Method A (Attachment A)

Subcontractor Selection (HUBs and Non-HUBs)

Reminders: Notice to subcontractors and HHSC.

Page 29: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

2929

METHOD IV

If you are subcontracting with HUBs and Non-HUBs, and the aggregate percentage of subcontracting with HUBs, holding an existing contract with HUBs for 5 years or less, does not meet or exceed the HUB Goal identified in the solicitation, complete the following in the HSP:

• Section 1 – Respondent and Requisition Information (Page 1);

• Section 2 a. – Yes, I will be subcontracting portions of the contract (Page 2);

• Section 2 b. – List all the portions of work you will subcontract, and indicate the percentage of the contract you expect to award to HUB vendors (Page 2 and the continuation sheet as needed);

• Section 2 c. – No, I will not be using only Texas certified HUBs to perform all of the subcontracting opportunities listed (Page 2);

Page 30: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3030

METHOD IV (cont.)

If you are subcontracting with HUBs and Non-HUBs, and the aggregate percentage of subcontracting with HUBs, holding an existing contract with HUBs for 5 years or less, does not meet or exceed the HUB Goal identified in the solicitation, complete the following in the HSP (cont.):

• Section 2 d. – No, the aggregate expected percentage of the contract you will subcontract with Texas certified HUBs, which you have a contract in place for five (5) years or less, does not meet or exceed the HUB goal in the solicitation (Page 2)

• Section 4 – Affirmation that all information and supporting documentation submitted is true and correct (Page 3); and,

• HSP GFE Method B (Attachment B) – Complete this attachment for each subcontracting opportunity (Page 1 of 1).

Page 31: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3131

Respondent and Requisition Information

HSP Information Page

Page 32: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3232

Company Name and Requisition #

SubcontractingIntentions:Complete Section 2-a; Yes, I will be subcontracting portions of the contract.

Page 33: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3333

Complete Section 2-c; No, to using only HUBs to perform all Subcontracting Opportunities in 2-b.

Complete Section 2-b; List all the portions of workyou will subcontract, and indicated the % of the contract you expect to award to HUBs and Non-HUBs.

Page 34: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3434

Complete Section 2-d; No, to the Aggregate % of the contract expected to be subcontracted to HUBs to meet or exceed the HUB goal, which you have a contract agreement in place for five (5) years or less.

Page 35: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3535

Section 4; Affirmation

Signature Affirms that Information Provided isTrue and Correct.

Page 36: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3636

HSP GFE Method B (Attachment B)

Complete Section B-1; and

Section B-2 only for each subcontracting opportunity.

Good Faith Efforts to find Texas Certified HUB Vendors

Page 37: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3737

HSP GFE Method B (Attachment B)

Written Notification Requirements

List 3 HUBs Contacted for this Subcontracting Opportunity

Page 38: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3838

HSP GFE Method B (Attachment B)

Written Notification To Trade Organizations

Page 39: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

3939

HSP GFE Method B (Attachment B)

List Trade Organizations Notified with Dates Sent/Accepted.

Page 40: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4040

Provide written justification why HUB was not selected for this Subcontracting Opportunity

HSP GFE Method B (Attachment B)

Reminders: Notice to subcontractors and HHSC.

Page 41: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4141

METHOD V

If you are not subcontracting any portion of the contract and will be fulfilling the entire contract with your own resources (i.e., equipment, supplies, materials, and/or employees), complete the following in the HSP:

• Section 1 – Respondent and Requisition Information (Page 1); • Section 2 a. – No, I will not be subcontracting any portion of the

contract, and I will be fulfilling the entire contract with my own resources (Page 2);

• Section 3 – Self Performing Justification that explains how your company will fulfill the entire contract with its own resources (Page 3); and,

• Section 4 – Affirmation that all information and supporting

documentation submitted is true and correct (Page 3);

Page 42: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4242

Respondent and Requisition Information

HSP Information Page

Page 43: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4343

Company Name and Requisition #

SubcontractingIntentions:Complete Section 2-a; No, I will not be subcontracting any portion of the contract.

Page 44: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4444

List the specific page(s)/section(s) of your proposal response, OR in the space provided, which explains how your company will perform the entire contract with its own equipment, supplies, materials and/or employees.

Section 3; Self Performing Justification

Page 45: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4545

Section 4; Affirmation

Signature Affirms that Information Provided isTrue and Correct.

Page 46: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4646

HUB Subcontracting Opportunity HUB Subcontracting Opportunity Notification FormNotification Form

http://www.cpa.state.tx.us/procurement/prog/hub/hub-forms/HUBSubcontractingOpportunityNotificationForm.pdf

Page 47: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4747

Sample for Respondent’s Use.

This form is used to notify vendors of potential subcontracting opportunities related to a specific agency solicitation. This is not a required form, just a sample notification form

Page 48: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4848

HSP AssistanceHSP Assistance

HSP Quick Checklist:HSP Quick Checklist:

http://www.hhsc.state.tx.us/about_hhsc/BusOpp/HUB/HSP-Quick-Check-List.pdf

HSP Instructions:HSP Instructions:http://www.hhsc.state.tx.us/about_hhsc/Contracting/rfp_attch/HUB_Info_Inst.html#info

Page 49: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

4949

RFP Section 4.0 Historically Underutilized RFP Section 4.0 Historically Underutilized Business Participation RequirementsBusiness Participation Requirements

● Post Award MeetingsPost Award Meetings

● HSP Prime Contractor Progress Assessment HSP Prime Contractor Progress Assessment ReportReport

● HSP Changes After Contract AwardHSP Changes After Contract Award

● Reporting and Compliance with the HSP Reporting and Compliance with the HSP

Post Award HUB RequirementsPost Award HUB Requirements

Page 50: Historically Underutilized Business  ( HUB) Subcontracting Plan (HSP) Requirements

5050

Administrative Services Administrative Services Development HUB Program Development HUB Program

OfficeOffice Robert L. Hall, C.P.M., CTPM, CCARobert L. Hall, C.P.M., CTPM, CCA

Administrative Services Development DirectorAdministrative Services Development Director

- (512) 424-6596- (512) 424-6596

- - [email protected]@hhsc.state.tx.us

Melvin Alvarez, CTPMMelvin Alvarez, CTPM

ASD HUB Program/Procurement Team LeadASD HUB Program/Procurement Team Lead

- (512) 487-3307- (512) 487-3307

- - [email protected]@hhsc.state.tx.us

Carlos Balderas, CTPMCarlos Balderas, CTPM

HUB AdministratorHUB Administrator

- (512) 424-6896- (512) 424-6896

- - [email protected]@hhsc.state.tx.us

Sherice WilliamsSherice Williams

HUB AdministratorHUB Administrator

- (512) 424-6909- (512) 424-6909

- - [email protected]@hhsc.state.tx.us