HM CORROSION CORPORATION. COMPANY PRESENTATION
Transcript
Page 1: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

HM CORROSION CORPORATION.COMPANY PRESENTATION

Page 2: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

COMPANY PROFILE:

Established in 2000 and has still been working over prevention of corrosion

by Cathodic Protection applications, as a qualified company in its own

field.

Active both in Turkey and abroad with its experienced engineers and

technical teams.

Serves such as Surveys, Project Preparation, Engineering, Production and

Installation etc. to prevent corrosion of underground pipelines, marine

structures, concrete and chemical structures also.

www.hmkorozyon.com

2

Page 3: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

CERTIFICATES

www.hmkorozyon.com

3

Page 4: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

ACTIVITY FIELDS

HM

CO

RR

OSIO

N

PIPELINES

MARINE STRUCTURES

UNDERGROUND & ABOVEGROUND

TANKS

CONCRETE STRUCTURES

www.hmkorozyon.com

4

Page 5: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

PIPELINES

PIP

ELI

NES OIL PIPELINES

NATURAL GAS PIPELINES

FREHS WATER PIPELINES

GEOTHERMAL PIPELINES

www.hmkorozyon.com

5

Page 6: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

MARINE STRUCTURES

MA

RIN

E S

TRU

CTU

RES

PORTS & PIERS

SHIPS & YACHTS

PLATFORMS

UNDERWATER PIPELINES

www.hmkorozyon.com

6

Page 7: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

UNDERGROUND AND ABOVEGROUND TANKS

UN

DER

GR

OU

ND

AN

D

AB

OV

EG

RO

UN

D T

AN

KS

RAW WATER

FUEL OIL

DİESEL OIL

DEMIN WATER

CONDENSER

www.hmkorozyon.com

7

Page 8: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

CONCRETE STRUCTURES

CO

NC

RETE

STR

UC

TUR

ES

METRO & TUNNELS

VİADUCTS

BUILDINGS

BRIDGES

www.hmkorozyon.com

8

Page 9: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

SERVICES

HM

CO

RR

OSIO

N ENGINEERING

SURVEY

PROJETS

MATERIALS

INSTALLATION

www.hmkorozyon.com

9

Page 10: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

ENGINEERING

EN

GIN

EER

ING

CORROSION

CATHODIC PROTECTION

PLANNING

ORGANİZATION

MANUFACTURING

www.hmkorozyon.com

10

Page 11: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

SURVEY

SU

RV

EY

GROUND RESISTIVITY

pHMEASUREMENTS

DCVG SURVEY

ACVG SURVEY

CIPS SURVEY

www.hmkorozyon.com

11

Page 12: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

PROJECT

PR

OJEC

T

PROJECT REPORTS

PROCEDURES

CALCULATIONS

DRAWINGS

MATERIALS

www.hmkorozyon.com

12

Page 13: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

MATERIAL

MA

TER

IAL

DESIGN

MANUFACTURE

QUALITY CONTROL

TEST

TRANSPORTATION

www.hmkorozyon.com

13

Page 14: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

INSTALLATION

INSTA

LLA

TIO

N ORGANİZATION

EXCAVATION

SECURITY PRECAUTIONS

THERMOWELDING APPLICATIONS

TEST

www.hmkorozyon.com

14

Page 15: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

PARTNERS

PA

RTN

ER

CO

MP

AN

IES

BOTAŞ

TPAO

DSİ

İLLER BANKASI

ŞEHİR İÇİ DOĞALGAZ HATLARI

BTC

(LİMAK-PUNJ LLOYD

GAMA

EREN ENERJİ

www.hmkorozyon.com

15

Page 16: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

PROJECTS IN PROGRESS

WO

RK

S IN

PR

OG

RESS

BOTAŞ

MUŞ HATTI 20 INCH- 155 KM

BİNGÖL-BİTLİSHATTI 16-20 INCH 175 KM

MARDİN HATTI 20-40INCH 75 KM

CITY NATURAL GAS LINES

AKMERCANGAZ 6 INCH 90 KM.

ZORLU GAZİANTEP OSB 30 KM

GAMA

ERBİL/IRAK ENERJİ SANTRALİ YERÜSTÜ TANKLARI 8 ADET

KIRIKKALE ENERJİ SNATRALİ YERÜSTÜ TANKLARI 6 ADET

EREN ENERJİ

ZONGULDAK ENERJİ SANTRALİ 4 METRE ÇAPLI DENİZ VE KARA

BORU HATTI KATODİK KORUMA İŞLERİwww.hmkorozyon.com

16

Page 17: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture

SOME OF COMPLETED PROJECTS

CO

MP

LETE

D W

OR

KS

BOTAŞ

DİYARBAKIR-BATMAN-SİİRT HATTI 180 KM

TRABZON FAZ II HATTI 97 KM

RİZE FAZ III HATTI 117km

TEKİRDAĞ 31 KM

EDİRNE 47 KM

KÜTAHYA 52 KM

ZONGULDAK ÇAYCUMA BARTIN 170 KM

TPAO

SİLİVRİ -19 KM

LÜLEBURGAZ 12 KM

İLLER BANKASI ÇORM-KIRIKKALE-TRABZON-ZONGULDAK-ORDU-KARAMAN-HEREK V.S 450 KM

ŞEHİR İÇİ DOĞALGAZ

HATLARI

ZORLU TRAKYA –GAZİANTEP HATLARI 400 KM

GAZNET – KONYA-NİĞDE-NEVŞEHİR-ANTALYA-AYDIN-AKSARAY-KARAMAN 700 KM

AKMERCAN GAZ –BATIKAR-DELTA-GEPA-MUĞLA-ADIYAMAN 600 KM

KARGAZ- KASTAMONU-HAVZA-LADİK 90 KM

ÇİNİGAZ – KÜTAHYA – EMET – TAVŞANLI 370 KM

www.hmkorozyon.com

17

Page 18: HM CORROSION CORPORATION. · 2019. 6. 28. · acvg survey cips survey 11. project project project reports procedures calculations drawings materials 12. material al design manufacture